2) Piping Installation Check List

The document is a mechanical check sheet for a piping installation project. It lists inspection criteria for a domestic liquids module project to check that piping is installed correctly according to drawings and specifications. The checklist ensures piping supports, valves, labeling and cleaning are properly installed.

Uploaded by

vengat.jdwaters
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
800 views2 pages

2) Piping Installation Check List

The document is a mechanical check sheet for a piping installation project. It lists inspection criteria for a domestic liquids module project to check that piping is installed correctly according to drawings and specifications. The checklist ensures piping supports, valves, labeling and cleaning are properly installed.

Uploaded by

vengat.jdwaters
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MECHANICAL CHECK SHEET – PIPING INSTALLATION

Date: 29/04/2024
Contract Title: TWRP C3C - Domestic Liquids Modules - Civil and Building Services Works
Contractor: Sino Hydro Corporation Limited
RFIW Ref No.: 131233-WSW33-RN-K-5632

Facility/Area: WDL 11 DN 150 FPW PIPE

Approved shop drawings / P&ID drawings attached ☐ Yes ☐ No ☐ N.A


NDE reports attached ☐ Yes ☐ No ☐ N.A
CWI Inspection report attached ☐ Yes ☐ No ☐ N.A

Inspection Checklist Yes No N.A Remarks

Line no.: ☐ ☐ ☐
Check Isometric / shop drawings against
P&ID’s are of latest revisions
☐ ☐ ☐
Check all items installed as per shop drawings
/ P&ID
☐ ☐ ☐
Check that the correct bolts / nuts / washers
and gaskets are installed at all mechanical ☐ ☐ ☐
joints
Check valves installed flow direction is correct ☐ ☐ ☐
Check all pipe supports/saddle support/valve
supports/U bolts /thrust blocks are completely
installed as per drawings and pipe support Std ☐ ☐ ☐
/ Spec. etc. schedule-additional supports may
be required – refer to standard drawings
Bolts for flanged or other mechanical joints
shall show two threads clear off the nut after ☐ ☐ ☐
tightening
Nuts tightened to the torque recommended by
joint manufacturer
☐ ☐ ☐
Acid cleaning on stainless steel weldment ☐ ☐ ☐
completed (Site Joints)
Pipe and pipe support contact between
dissimilar metals isolation done
☐ ☐ ☐
Pipes properly rest on the supports (No gap
between pipe and support) ☐ ☐ ☐
Flexible joints/Mechanical couplings Tie bolts
installed
☐ ☐ ☐
No welding joints and socket weld connections ☐ ☐ ☐
are on beam support
Tag plates on pipe spools are removed ☐ ☐ ☐
(Identification from shop)
All temporary supports removed ☐ ☐ ☐
Facility provided for draining the pipe system
and releasing air
☐ ☐ ☐

1
Flow meter, PIT, PRV. AVRV, Analyzers & etc. ☐ ☐ ☐
Installed as per drgs (or) tapping provided for
installation
Check all chain wheels for specified valves
have been installed
☐ ☐ ☐
Check the valves are fully operation,
accessible and the extended spindles are not ☐ ☐ ☐
damaged
Check the pipework Elevation / slope is
adequate and as indicated on the P&ID ☐ ☐ ☐
Check pressure gauge calibration is correct
and calibration certificate is current (Permeant ☐ ☐ ☐
if applicable)
Pipeline tie in requirement/location as per
drawings
☐ ☐ ☐
Check that all pipes/Valves are labelled and/or
painted colour code correctly/ Flow direction ☐ ☐ ☐
marked

Remarks:

Checked by: ___________________________________ Date: ____________________


Name & Signature of Contractor

Inspected by: ____________________________________ Date: ____________________


Name & Signature of RE/RTO