10 Daily Log Book

The document is a daily log book for a construction project. It provides information on site conditions, resources, equipment, materials, inspections, observations, and reviews.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views

10 Daily Log Book

The document is a daily log book for a construction project. It provides information on site conditions, resources, equipment, materials, inspections, observations, and reviews.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

ID–XXXXX-XXX

DAILY LOG BOOK12


Project Title/ Work Title Please write here

Contract No. Please write here

Employer Please write here

Contractor Please write here

Reported by Please write here Date Please write here Daily Log no. Please write here

Site Data/ Information

Temperature Please write here

Precipitation (mm) Please write here

Other (e.g. wind, fog, snow) Please write here

Working Hours Please write here

Work item/s in progress site leveling, backfill,Concrete

1.1.1.1 Key Resources on Site

Labour

Name Gender Title Work Location

Maria F Surveyor Site Levelling

Casual Labour 20F and 17M Concrete

1 This template can be tailored to suit project specific requirement


2 This daily site diary shall be completed by each construction supervision personnel appropriate to their respective
work area.

DAILY LOG BOOK 1 of 3 IPMG 2019


ID–XXXXX-XXX

1.1.1.2 Major Plant/ Equipment on Site

Equipment Brand/ Capacity Quantity Status (BD/Idle/working)

Concrete Mixer 0.5M3/SONA 1 BD -Breakdown

1.1.1.3 Key Materials in use

Material Quality Status Quantity Remarks

Concrete Mixer 0.5M3/SONA 1 BD -Breakdown

1.1.1.4 Inspection/ Testing/ Measurement carried out and/or in progress

Inspection/Testing/Measurement Location/ chain age Remark

Concrete Slump Test Tie beam

Backfill compaction test

1.1.1.5 Site Observations/ Issues/ Special Events/ Photos

Quality Management

Write here

HSSE

Write here

Progress

Write here

Contemporary Records: Instructions/Discussions/Meetings

Write here

DAILY LOG BOOK 2 of 3 IPMG 2019


ID–XXXXX-XXX

Delays/Disruptions

Write here

Visitors, comments, complaints

Write here

Any other

Write here

General Comment/ Proposed Actions

Write here

Reviewed by (QA Team Lead)

Approved by (PM)

DAILY LOG BOOK 3 of 3 IPMG 2019