Iraq Bill
Iraq Bill
Houses
in zone A-23 - Mosul, Ninevah Governorate, Iraq
Notes:
1 This is the summary/total BoQ of Seventeen houses (H14-01, H14-02 , H14-03 , H14-04 , H14-05 , H14-06 , H14-07 ,H14
H14-10 , H14-11 , H14-12 , H14-13 , H14-14 , H14-15 , H14-16 , H14-17), the detailed BoQ for each house is attached an
will be implemented accordingly.
2 Work items to be implemented as per the conditions and specifications of the tender and in
accordance with the UN-Habitat supervision engineer's instructions.
3 Prices should include all necessary materials, equipment's, to complete the items.
4 The Contractor has the responsibility to do all necessary tests. Random checks will be conducted by
UN-Habitat Engineer during the construction.
5 The contractor must provide all samples. The samples must be approved by the UN-Habitat
Engineer.
6 The contractor must provide detailed time schedule, detailing all activities in logical sequence to
complete the works within the project duration.
7 All quoted prices include removing the existing damaged items (fire or war damaged), which also
include washing (and if needed scrapping) ceiling and walls from ash and to be sure to deliver the
clean unit to the beneficiaries.
# Item Description Unit Quantity
3 Electrical works
Note: MCCB, MDBs, DBs wiring must be re-arranged in suitable & safe way whenever need. The works inlcude provision of materials, w
requirements and necessities to implement the items described below. All types of wiring, trenching, etc. and all that is required to make the jo
the instruction of UN-Habitat supervisor engineer is included in the unit rates. The sample of all items must be approved by the UN-Habitat en
delivery at site.
The price includes removing the old and repairing of any damages that may occur to the wall or finishing due to the replacement process or fin
according to instructions of the supervisor engineer.