Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
32 views
2005 Design Guide Construction Specs
Billllll
Uploaded by
Arianne Buenaobra
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 2005-design-guide-construction-specs For Later
Download
Save
Save 2005-design-guide-construction-specs For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
32 views
2005 Design Guide Construction Specs
Billllll
Uploaded by
Arianne Buenaobra
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 2005-design-guide-construction-specs For Later
Carousel Previous
Carousel Next
Save
Save 2005-design-guide-construction-specs For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 24
Search
Fullscreen
October 2005 Construction Specifications CHAPTER 16 CONSTRUCTION SPECIFICATIONS, 16.0 INTRODUCTION This chapter defines Standard Specifications and Special Provisions. It provides details on the format and guidelines for writing Special Provisions, and describes the approval process for both Standard and Project Special Provisions. 16.1 SPECIFICATIONS - GENERAL 16.1.1 Definition \pecifications” is a general term applying to all directions, provisions, and requirements pertaining to the performance of the work and payment for the work. 16.1.2 Importance and Characteristics of Well-Written Specifications Well-written specifications are essential to the efficient construction of a successful project. Well-written specifications inform the Contractor of the work to be performed, the conditions and restrictions on performance of the work, the expected quality of the work, and the manner in which the work will be measured for payment. With the increased complexity and specialization in modern construction and the need for the Project Engineer to focus on legal requirements and administration, use of the phrase “as directed by the Engineer” should be minimized. Work requirements must be clearly stated in the specifications Well-written specifications: + are clear, concise, and technically correct. + donot use ambiguous words that could lead to misinterpretation, + are written using simple words in short, easy to understand sentences. + use technically correct terms, not slang or “field” words. + avoid conflicting requirements. + do not repeat requirements stated elsewhere in the Contract. 16-1Construction Specifications October 2005 + donot explain or provide reasons for a requirement, + state construction requirements sequentially. + avoid the use of awkward phrases such as “and/or” and “him/her.” Rewriting the sentence can eliminate such phrases. Furthermore, the phrases “approved by the Engineer” or “accepted by the Engineer” should be avoided. These should be used only when the Engineer will actually accept or approve the work. In such phrases, “approved” and “accepted” are synonymous; there is no difference in the responsibility taken by the Engineer. 16.1.3 Basic Specification Policy Some of CDOT’s established policies for the development and use of construction specifications are described below. These pol and State laws and regulations, CDOT. Policy and Procedural Directives, directions from the Chief Engineer, and established CDOT practice. are based on Federa 16.1.3.1 Standards and Specifications Unit ‘The Standards and Specifications Unit in the CDOT Project Development Branch is charged with overseeing the development and implementation of construction specifications. This unit writes and revises the CDOT Standard Specifications for Road and Bridge Construction (1) (commonly called the Standard Specifications) and CDOT Supplemental Specifications, Standard Special Provisions, and prepares or reviews Project Special Provisions. issues CDOT Procedural Directive 513.1 - Construction Project Specifications (2), states that the Standards and Specifications Unit is to review and approve all new Project Special Provisions and newly revised Project Special Provisions that contain significant changes, and initiate a formal review process when necessary. The Standards and Specifications Unit should be given at least two weeks to review proposed Project Special Provisions before they are incorporated into the construction project documents for advertisement. ‘The Specification Committee [described in Procedural Directive 513.1 (2)] assists the Standards and Specifications Unit with the review and development of formal specification changes that may be controversial or have a significant impact on the highway construction indust 16-2October 2005 Construction Specifications 16.1.3.2 Liquidated Damages, Penalties, and Incentives Do not use specifications that assess penalties to the Contractor. The only deductions that ean be made from monies due the Contractor are: + Liquidated damages based on additional engineering costs to the Department. «= Incentives/disincentives based on either the quality of the work or incurred road user costs. + Price adjustments based on the quality of the work. In each case, the deduction amount included in the specification must be accurately calculated and documented in the project file. Remediation specified for non-specification work should not be harsh or punitive, but should accurately represent the actual loss of value to the Department or to the road user. 16.1.3.3 Uniformity CDOT strives to achieve statewide uniformity in the use and application of specifications. Frequent changes to specifications and differences in specifications from project to project and Region to Region lead to misinterpretation, inconsistent enforcement, higher bid prices, and Contractor claims. As much as possible, the Standard Specifications(1), Standard Special Provisions and formally issued sample Project Special Provisions and Special Provision Work Sheets should not be changed. 16.1.3.4 Warranties and Guaranties ‘Warranty provisions for specific construction products or features are allowed contingent upon the FHWA Division Administrator's advance approval [23 CFR Part 635.413 (3)]. CDOT has experimented with short-term warranties on pavements and continues to work toward development of warranty specifications, Unless approved by the FHWA Division Administrator, federal funds cannot be used for ‘warranties that extend beyond standard manufacturers’ warranties. When an extended warranty is used without FHWA approval, a non-federal aid pay item should be created for the cost of the warranty. 16-3Construction Specifications October 2005 16. Proprietary Items Federal regulations prohibit specifying a proprietary (brand name) product unless justified through a Finding in the Public Interest (FIP) 23 CFR Part 635.411 (3). A FIPI must be lable that will fulfil the Contract requirements. Brand-name products approved in a FIPI can be specified with or without the obtained if there are fewer than three products a phrase “or approved equal.” Project and corridor specific FIPIs must be approved by the Resident Engineer on CDOT oversight projects and by the FHWA Operations Engineer on FHWA oversight projects (i.e. projects on the Interstate Highway System), Regionwide and statewide FI 1s must be approved by the FHWA Division Administrator, The FIPI shall be retained in the project file A FIPI is not required if at least three brand-name products and the phrase “or approved equal” are be listed. For additional information see Design Bulletin 2004-2 (4), 16.1.3.6 Materials-Methods Vs. End-Result Specifications Materials-methods and end-result are the two basic types of construction specifications. Materials-methods specifications describe in detail the materials, workmanship, and processes the Contractor is to use during construction. Materials-methods specifications restrain contractor innovation and obligate the owner to accept the work if the specified materials and process used. End-result specifications describe the desired result or quality of the final product to be achieved. End-result specifications encourage contractor innovation and allow the owner to accept or reject the final product. Current CDOT specifications include both types and, in some cases, a combination thereof. End-result specifications are preferred. Quality Control/Quality Assurance (QC/QA) is a type of end-result specification. QC/QA specifications require the Contractor to perform all testing necessary for control of production while the owner (CDOT) performs the testing necessary to determine acceptance, rejection, or price adjustment of the product. Acceptance/rejection/price adjustment is usually based on a statistical analysis of the test results. CDOT currently uses QC/QA specifications for pavements, 16-4October 2005 Construction Specifications 16.1.3.7 Pay Items ‘The specifications establish the pay items under which the Department will pay the Contractor for work completed. Readily identifiable and measurable items of work should not be made subsidiary to other items, but should be paid for under separate pay items. Use of lump sum pay items should be minimized. Pay items with subsidiary items and lump sum pay items are difficult for contractors to bid and difficult for the Project Engineer to administer during construction, especially in cases of changed conditions or changed quantities. Payment for work by force account should be minimized. Force account work involves additional paperwork and often has a higher cost than if the work had been paid for under a bid item. 16. 8 Reference Specifications AASHTO (American Association of State Highway and Transportation Officials) is the preferred reference for citings. Other national standard references such as ASTM (American Society for Testing and Materials) may be used when there is no AASHTO specification available. 16.1.3.9 Laws, Statutes, and Regulations Subsection 107.01 of the Standard Specifications (1) requires the Contractor to be fully informed of, and comply with, all applicable laws and regulations. Generally, specifications that apply, interpret, or enforce laws and regulations should not be used. 16.1.3.10 Specifications for Innovative Contracting Practices CDOT has experimented with innovative contracting practices such as design-build projects and warranties (see section 16.1.3.4). Other innovative contracting practices that have gained acceptance on appropriate CDOT projects are cost-plus time bidding and lane rental specifications, which are designed to encourage the Contractor to minimize road-user impacts during construction. Samples of these specifications are available on the CDOT Design and Construction Project Support website and should be used only upon approval of the Innovative Contracting Unit. 16-5Construction Specifications October 2005 FHWA Headquarters’ Special Experimental Projects (SEP-14) approval is necessary for any non-traditional construction contracting technique that deviates from the competitive bidding provisions in 23 USC 112 (8). Any contract that utilizes a method of award other than the lowest, responsive bid [or force account as defined in 23 CFR 635.104(b) (3)] should be evaluated under SEP-14. For additional information see the CDOT Innovative Program Delivery Manual (6) and CDOT's sample special provisions on innovative contracting (7). 16.2. STANDARD SPECIFICATIONS. Work on CDOT construction projects is controlled by the Standard Specifications (1). The 1999 Standard Specifications contained both metric (SI) and English units of measure. Except where necessary when citing reference specifications (see section 16.1.3.8), the 2005 Standard Specifications contain only English units of measure. See section 16.6. 16.2.1 Organization and Format The Standard Specifications (1) are organized into numbered Sections. Sections 101 through 109 contain General Provisions dealing with contracting procedures, general and legal responsibilities of the Contractor, prosecution of the work, control of work and materials, and ‘measurement and payment for the work. Sections 201 through 630 contain construction details, and Sections 701 through 717 contain materials details. 16.2.1.1 Five-Part Format Each Section of the construction details, Sections 201 through 630, is organized into the following five parts, in the following order: DESCRIPTION ‘This part consists of short, succinct statements summarizing the work covered by this Section of the Standard Specifications (1). The Description should not contain details, materials or construction requirements, or explanations of measurement and payment. 16-6October 2005 Construction Specifications MATERIALS This part either specifies the materials requirements the work of this section must meet or refers to subsections in the Materials Details Sections (701 through 717) that contain those requirements, CONSTRUCTION REQUIREMENTS This part consists of the required construction procedures or end results of the work to be performed under this Section of the Standard Specifications (1). S specified in this part. ic construction details are METHOD OF MEASUREMENT This part describes the methods and the units by which the work under this Section of the Standard Specifications (1) will be measured for payment to the Contractor. BASIS OF PAYMENT This part establishes the pay items for work accomplished under this Section of the Standard Specifications (1) and, when necessary, explains what is included in the payment for those pay items. 16-7Construction Specifications October 2005 16.2.1.2. Subsections xxx.01 Text xxx.02 Text @ Text » Text 1 Text 2. Text A Text B. Text a Text 2 Text Figure 16-1 Subsection Organization The text of the Standard Specifications (1) is organized into decimal subsections running consecutively through each Section (the parts are listed in 16.2.1.1). The first subsection is xxx.01, the second xxx.02, etc., where xxx is the Section number. Subsections are broken into smaller parts ordered by consecutive numerical or alphabetical characters and indented as shown in Figure 16-1 Numbers in parentheses are also used to identify items in a list, regardless of the placement of the list within the subsection. 16-8October 2005 Construction Specifications 16.3, SUPPLEMENTAL SPECIFICATIONS ‘Supplemental Specifications are additions and revisions to the Standard Specifications (1) that are formally adopted subsequent to the issuance of the printed book. Supplemental Specifications apply to all CDOT construction projects in the same manner as the Standard Specifications. The Contract will clearly identify when Supplemental Specifications are in effect. 16.4 SPECIAL PROVISIONS Special provisions are additions and revisions to the Standard and Supplemental Specifications covering conditions unique to an individual project or group of projects. Special provisions apply to a particular construction project only when included in the Contract for that project. Special provisions fall into one of two categories: Standard Special Provisions or Project Special Provisions. Special provisions are developed and implemented according to Procedural Directive 513.1 2) 16.4.1 Organization of Text ‘The revised or added specification text should be organized under each heading according to the conventions used in the Standard Specifications (1). 164.2. Margins ‘The margins used in Special Provisions are 0.75 inch for left and right and 0.5 inch for top and bottom. 16.4.3 Text Bold and italicized characters should not be used in the body of the text to emphasize or draw attention to a particular requirement. Underlining is not used in the Standard Specifications (1) and should not be used in Special Provisions. Titles preceded by (a), (b), ete. hould be italicized (see Figure 16-1). Text should be bold where it would be in the Standard Specifications (1). Such locations include section headings, subsection numbers, subsection titles, and table headings. 16-9Construction Specifications October 2005 16.4.4 Standard Special Provisions ‘Standard Special Provisions are additions and revisions to the Standard and Supplemental Specifications, which are unique to a selected group of projects or are intended for temporary use. Standard Special Provisions are dated and formally issued by the CDOT Project Development Branch with specific instructions for their use. They are to be used without modification, The Standards and Specifications Unit of the Project Development Branch should be contacted if a project has special circumstances that may require modification of a Standard Special Provision. 16.4.4.1 Fonts ‘The font used for Standard Special Provisions is 10-point Arial. 16.4.5 Project Special Provisions Project Special Provisions are additions and revisions to the Standard Specifications (A) and ‘Supplemental Specifications unique to a particular project. The writing style used for Project Special Provisions should be consistent and uniform. 16.4.5.1 Criteria + Write a Project Special Provision only if the subject has not been adequately covered in the plans, Standard Specifications (1), or Standard Special Provisions. + Write clear, enforceable requirements that will be interpreted the same way by both the Engineer and the Contractor. + State the correct pay items, The name of the pay item must be consistent throughout the plans, specifications and estimate. If the bid item is not listed in the current CDOT Item Book, the Project Manager should contact the Engineering Estimates and Market Analysis Unit and the Standards and Specific: ions Unit. + Make sure that Project Special Provisions do not conflict with other parts of the plans and specifications. 16-10October 2005 Construction Specifications + Use end-result rather than materials-methods requirements where possible. + Specify a requirement; don’t make a suggestion or give an explanation, + Use the verb “will” when stating actions that will be taken by CDOT and “shall” when the action is to be taken by the Contractor. For example, see the following statements in subsection 108.03 of the Standard Specifications (1) regarding the project schedul schedule shall show all work completed within the contract time." [Contractor's responsibility] (ii) "The Engineer's review of the schedule will not exceed two working days." [Engineer's responsibility] OR in subsection 601.05: (i) "Except for class BZ. concrete, the maximum slump of the delivered concrete shall be the slump of the approved "Acceptance will be based i) "The concrete mix plus 1 % inch.” [Contractor solely on the test results of concrete placed on the project." [Engineer's responsibility] + Use the appropriate Standard Special Provisions as written; don’t write a Project Special Provision that covers the same issue without consulting the Standards and Specifications Unit. + Don’t use Project Special Provisions with guaranty or warranty clauses unless they fall within the guidelines described in 23 CFR Part 635.413 (3) . Check with the Standards and Specifications Unit to ascertain if policies and procedures have been implemented pertaining to the use of the warranty provision. + Don’t use proprietary items except as outlined in section 16.1.3.5. 16.4.5.2 Format and Style Project Special Provisions should conform to the conventions used in the Standard Specifications (J). See the examples at the end of this chapter. 16.4.5.3 Fonts The font used for Project Special Provisions is 11-point Times New Roman. 16-11Construction Specific: October 2005 16.4.5.4 Titles ‘The title, capitalized and centered at the top of the page, should identify the section of the Standard Specifications (1) being revised and the subject of the revision. On multiple page special provisions the page number pertaining to the special provision should be centered on the first line of the title, on every page. Following is an example: 1 REVISION OF SECTION 105 CONTROL OF WORK 16.4.5.5 Headings Use the following headings, or a va (xxx represents the section number). ion thereof, for the appropriate type of special provision + Type 1 - Revision of Various Subsections. Begin a special provision that revises one or more subsections with the following heading: Section xxx of the Standard Specifications is hereby revised for this project as follows: Follow that statement with the appropriate one or more of the following headings, or vai thereof: Delete subsection xxx.01 and replace with the following: In subsection xxx.01, th paragraph, delete the th sentence and replace with the following: In subsection xxx.01 delete the _th paragraph. In subsection xxx.01, _th paragraph, delete the _th sentence Subsection xxx.01 shall include the following: ‘Subsection xxx.01, _th paragraph shall include the following: ‘Subsection xxx.001 shall include the following paragraph between the _th and _th paragraphs: 16-12October 2005 Construction Specifications In subsection xxx.00 revise the term from "to" When appropriate, follow each heading with the added or revised text. Include related changes to separate Sections in a single special provision; e.g., when revising CONSTRUCTION REQUIREMENTS and the related MATERIALS section. + Type 2 - Deletion and Replacement of an Entire Section. Begin a special provision that deletes and replaces an entire Section with the following: Section xxx of the Standard Specifications is hereby deleted for this project and replaced with the following: Follow this statement with the revised text of the Section, Organize the text into the five main parts: DESCRIPTION, MATERIALS, CONSTRUCTION REQUIREMENTS, METHOD OF MEASUREMENT, and BASIS OF PAYMENT. + Type 3 - Addition of a New Section, Begin a special provision that adds a new specification Section with the following: Section xxx is hereby added to the Standard Specifications for this project as follows: Follow this statement with the text of the new Section. Organize the text into the five main parts: DESCRIPTION, MATERIALS, CONSTRUCTION REQUIREMENTS, METHOD OF MEASUREMENT, and BASIS OF PAYMENT. «Type 4 - Addition of Changes Not Tied to Specific Subsections. Begin a special provision that adds text throughout the Section and that does not tie in well to the existing subsections (such as requirements for a new item or type of construction) with the following: Section xxx is hereby revised for this project to include the following: 16-13Construction Specifications October 2005 Follow this statement with the new text organized into the five main parts: DESCRIPTION, MATERIALS, CONSTRUCTION REQUIREMENTS, METHOD OF MEASUREMENT, and. BASIS OF PAYMENT Special provision Type 1 is the preferred and most commonly used type of special provision. ‘Samples of each type of special provision appear in subsection 16.8. 16.4.5.6 Revised or Added Specification Text Special provisions revising any of the Sections 201 through 630 should be written so that the revised or added specification text is incorporated into the appropriate subsections under one or more of the five main parts. New main parts should not be established except in the rare instance of adding an item for design to be performed by the Contractor. The organization used for the Standard Specifications (1) should be followed for the added or revised text of Project Special Provisions. The part of the subsection being revised should be identified and the new or revised text should be made to fit that part. The text or breakdown character should start at the left margin and not be indented. 16.4.6 Use of New or Revised Project Special Provisions New and newly revised Project Special Provisions that contain significant changes must be reviewed by the Standards and Specifications Unit in the Project Development Branch. These should be submitted electronically in the format described above and with sufficient review time (nonmally two weeks). The Project Manager should be prepared to explain the engineering or project management considerations that justify the use of the Project Special Provision. ‘The Standards and Specifications Uni conformance to CDOT policy and FHWA regulations, potential controversy, clarity, grammar, punctuation, and format. The Standards and Specifications Unit will respond with approval, suggested changes, or a statement that the special provision should not be used. When the Standards and Specifications Unit determines that a proposed special provision is controversial or addresses an issue with broad impact, it may initiate a more formal review process to be completed before the proposed special provision can be used on CDOT construction projects. II review the proposed special provision for If the proposed Project Special Provision covers an issue that could have statewide implications, the Branch Manager or Region Transportation Director should request review by the appropriate 16-14October 2005 Construction Specifications CDOT Technical Committee or submit a Form 1215 - Submittal of New Specification or Specification Change (8) to the Standards and Specifications Unit. 16.4.7 Special Provision Package ‘The Contract documents for each CDOT construction project include a set of special provisions accompanying the plan sheets. This set of special provisions consists of an index of the Project Special Provisions and an index of the applicable Standard Special Provisions followed by the Project and Standard Special Provisions. The project manager inserts the Project Special Prov by the Printing and Visual Communication Center before printing, ions listed on the index. ‘The Standard Special Provisions listed on the index will be added ‘When preparing the special provision package for a project, the project number and code should be listed on the left and the date on the right at the top of each Project Special Provision page. ‘The page number should be centered at the bottom of each page. The Index and Project Special Provision pages should be numbered consecutively, beginning with Page 1. 16.5 CONSTRUCTION SPECIFICATIONS WEBSITE ‘The Standards and Specifications Unit maintains Special Provisions on the CDOT website. 16.5.1 Accessing the Website ‘The CDOT website address is https/www.dot state.co.us/ DesignSuppory Construction 1999index htm, 16.5.2 Contents of the Website The website contains: + Standard Specifications Text + Current Standard Special Provisions + Project Special Provision Work Sheets + Sample Project Special Provisions + Materials Specifications Check List + Design/Build Special Provisions + Fuel Cost Adjustment 16-15Construction Specifications October 2005 + Past Davis-Bacon Minimum Wage Decisions. + Innovative Contract Provisions + Phased Funding Special Provisions + Warranted HBP Special Provi: + Significant Changes found in the 2005 Standard Specifications (1) jions ‘The following information is also availabl + Creating a Special Provision Package for a CDOT Project + Guidelines for Writing Construction Specifications (this document) + Specification Changes Under Consideration 16.5.2.1 Project Special Provision Work Sheets Work sheets available on the website include those for frequently used Project Special Provisions and instructions for index pages, Notice to Bidders, Commencement and Completion of Work, and Traffic Control Plan - General. 16.5.3 Updates The Standards and Specifications Unit notifies users of updates to the website by e-mail. 16.6 USE OF METRIC AND ENGLISH UNITS The 1999 Standard Specifications and Standard Special Provisions used with it contain both English and metric units. Project Special Provisions used with the 1999 book should contain either English or metric unit should indicate whether the project appropriate to the project. The index of special provisions metric or English. The 2005 Standard Specifications (1) and Standard Special Provisions used with it contain only English units. Project Special Provisions used with the 2005 book should contain only English units, except where metric units are required to conform to reference specifications. 16.7 WRITING STYLE Traditionally, specifications are written in the indicative mood, either active or passive voice. 16-16October 2005 Construction Specifications + Active voice: The Contractor shall place the aggregate to a depth of 6 inches and compact it to a density of 95 percent + Passive voice: ‘The aggregate shall be placed to a depth of 6 inches and compacted to a density of 95 percent Several states have rewritten their standard specifications in the imperative mood, active voice. This style of writing replaces the lengthy “the Contractor shall” sentences with short sentences giving direct instructions. + Imperative mood, active voice: Place the aggregate to a depth of 6 inches and compact it to a density of 95 percent. However, CDOT has not adopted the imperative mood style in the Standard Specifications (1). ‘The 2005 book is written in the indicative mood, either active voice (where possible) or pi voice (where necessary). Special provisions should match the style of the Standard Specifications (1). In special provisions, use short simple sentences in the active voice wherever possible. Use the imperative ‘mood only if it is preceded by an introductory statement clarifying that the text makes a requirement on the Contractor. An example that appears in subsection 209.05 of the Standard Specifications (1) is the following: Magnesium Chloride dust palliative shall be applied as follows: Scarify the top 2 inches of the existing road surface and wet with water to approximately 4 percent moisture content, or as directed, Apply the magnesium chloride dust palliative in wo applications of 0.25 gallon per square yard in each application. Allow to soak for 30 minutes after each application. Roll the ied in the Contract. Do not permit traffic on the surface with a pneumatic tire roller, as speci treated surface until approved. Other protocols for grammar, syntax, and format that have been applied in the Standard Specifications and that should be applied to special provisions appear in Table 16-1 16-17Construction Specific: October 2005 IN TABLES TUSTS TEM DUTEXT (and tabular lists) (consisting of text) Forcouns trom I tol0 use Box counts from. Lti10 pe; ‘words: three hours, four posts; words: ie ous, fou posts ort: he hous, fue pos Counts over 10 use digits: 24 eee a ‘ hours, 14 posts; where one of hours, 14 posts; where one of ‘Numbers weEN Ervelleel ave die koe Use digits ‘each is related, use digits for chistes ges both 6012 hours beth to 2h, For dimensions f msasremens mension menses se Fordmenons 8 meni digits: 6 inches, 7 cubic yards. Bae * Onina Numbers | Use works fist ith, vents | TEMPTS T ys yon is ith sweet Do notes ia Do norriteateinPareneses | DOBLE Do oot tain Paeneses: Large umbers © | 0/500 at $80,000 egy | PaFemere: $80.00 | 009 oe Su aOD eighty wmney at 380,00 (eighty thousand dla)
You might also like
CTMM Standard Specification (Third Edition) 2005 Print
PDF
No ratings yet
CTMM Standard Specification (Third Edition) 2005 Print
322 pages
DEVELOPMENT AND REVIEW OF SPECIFICATIONS
PDF
No ratings yet
DEVELOPMENT AND REVIEW OF SPECIFICATIONS
70 pages
IADOT Standard Specifications Highway Bridge Construction Series 2012
PDF
No ratings yet
IADOT Standard Specifications Highway Bridge Construction Series 2012
1,284 pages
2022 Standard Specifications For Road and Bridge Construction
PDF
No ratings yet
2022 Standard Specifications For Road and Bridge Construction
1,217 pages
Standard Specifications For Road and Bridge Construction 2016
PDF
No ratings yet
Standard Specifications For Road and Bridge Construction 2016
1,225 pages
Standard Specification
PDF
No ratings yet
Standard Specification
985 pages
WSDOT Standard Spec2012
PDF
No ratings yet
WSDOT Standard Spec2012
974 pages
US Bridge Constraction Standart
PDF
No ratings yet
US Bridge Constraction Standart
1,303 pages
Contract, Specification Note
PDF
No ratings yet
Contract, Specification Note
55 pages
Eac Akanksha123
PDF
No ratings yet
Eac Akanksha123
23 pages
Standard Specifications: For Road, Bridge, and Municipal Construction
PDF
No ratings yet
Standard Specifications: For Road, Bridge, and Municipal Construction
980 pages
06 Specifications Special Provisions
PDF
No ratings yet
06 Specifications Special Provisions
16 pages
Standard Specifications For Road Bridge and Municipal Construction
PDF
No ratings yet
Standard Specifications For Road Bridge and Municipal Construction
974 pages
Ce 413 Contracts and Specification
PDF
No ratings yet
Ce 413 Contracts and Specification
30 pages
01.unit 1 - Specification & Specification Writing
PDF
No ratings yet
01.unit 1 - Specification & Specification Writing
26 pages
IDK Lec 7
PDF
No ratings yet
IDK Lec 7
29 pages
CTMM Civil Specification 2005
PDF
No ratings yet
CTMM Civil Specification 2005
322 pages
DoW Specification For Road and Bridge Works-1995
PDF
100% (1)
DoW Specification For Road and Bridge Works-1995
311 pages
Standard Specifications For Road and Bridge Construction
PDF
No ratings yet
Standard Specifications For Road and Bridge Construction
788 pages
Construction Basics Training
PDF
100% (1)
Construction Basics Training
12 pages
2019--full-spec-web-version
PDF
No ratings yet
2019--full-spec-web-version
935 pages
Spec& Qty 2010
PDF
100% (1)
Spec& Qty 2010
54 pages
Project Title: Upgrading of 2 KM Road LOCATION: Brgy. Taboc, San Juan, La Union
PDF
No ratings yet
Project Title: Upgrading of 2 KM Road LOCATION: Brgy. Taboc, San Juan, La Union
35 pages
AR6901 SE Unit 1 Notes
PDF
No ratings yet
AR6901 SE Unit 1 Notes
2 pages
2012 Standard Specifications Manual With ASTM
PDF
100% (1)
2012 Standard Specifications Manual With ASTM
815 pages
CEng 4231 chapter 2
PDF
No ratings yet
CEng 4231 chapter 2
12 pages
ebdm15
PDF
No ratings yet
ebdm15
10 pages
Specification Writing
PDF
No ratings yet
Specification Writing
6 pages
Course Code: Arl 308 Specifications, Estimation and Costing: Ar. Aditi Sharma
PDF
100% (1)
Course Code: Arl 308 Specifications, Estimation and Costing: Ar. Aditi Sharma
27 pages
Specifications
PDF
No ratings yet
Specifications
46 pages
01 General Provisons
PDF
No ratings yet
01 General Provisons
117 pages
Division I General Requirements and Covenants: Section 1 Definitions and Terms
PDF
No ratings yet
Division I General Requirements and Covenants: Section 1 Definitions and Terms
8 pages
Specification
PDF
No ratings yet
Specification
18 pages
AGREEMENT AND SPECIFICATION
PDF
No ratings yet
AGREEMENT AND SPECIFICATION
35 pages
Scope Annex 03 - Area 12 M& R Specification Issue 7 Rev 2
PDF
No ratings yet
Scope Annex 03 - Area 12 M& R Specification Issue 7 Rev 2
128 pages
Spec Civil
PDF
No ratings yet
Spec Civil
171 pages
Spec& Qty
PDF
No ratings yet
Spec& Qty
53 pages
### Construction Specifications 9-30-13
PDF
No ratings yet
### Construction Specifications 9-30-13
181 pages
Spec Civil Works
PDF
No ratings yet
Spec Civil Works
174 pages
Specifications
PDF
No ratings yet
Specifications
24 pages
Chapter 3-Three Specification1
PDF
No ratings yet
Chapter 3-Three Specification1
20 pages
Specification and Estimation
PDF
100% (1)
Specification and Estimation
8 pages
SPECIFICATION WORD DOC
PDF
No ratings yet
SPECIFICATION WORD DOC
4 pages
general-conditions
PDF
No ratings yet
general-conditions
45 pages
Technical Specifications: Road Works
PDF
No ratings yet
Technical Specifications: Road Works
36 pages
LECTURE 7 - 4.1 - Contract Administration
PDF
No ratings yet
LECTURE 7 - 4.1 - Contract Administration
7 pages
Ord461 Package
PDF
No ratings yet
Ord461 Package
200 pages
Specification Estimation and Valuation
PDF
No ratings yet
Specification Estimation and Valuation
16 pages
General Contract Specification Procedures
PDF
No ratings yet
General Contract Specification Procedures
14 pages
Lecture 2 - TBD 4106
PDF
No ratings yet
Lecture 2 - TBD 4106
39 pages
Ce 413 Contracts and Specification
PDF
No ratings yet
Ce 413 Contracts and Specification
28 pages
Construction Administration 3
PDF
No ratings yet
Construction Administration 3
9 pages
Chapter 2. Part-A S.W.
PDF
No ratings yet
Chapter 2. Part-A S.W.
5 pages
PartB27
PDF
No ratings yet
PartB27
62 pages
Form 818 July 2021
PDF
No ratings yet
Form 818 July 2021
738 pages
Chapter Three
PDF
No ratings yet
Chapter Three
43 pages
8 Specifications of Various Items in Construction
PDF
No ratings yet
8 Specifications of Various Items in Construction
19 pages
P1
PDF
No ratings yet
P1
31 pages