Document 2
Document 2
Table Of Contents
1 Revision History
2.1 Objective
The purpose of this Installation and Operational Commissioning (IOC) protocol is to verify and document the proper installation and operation of the 9000-P /
Process Waste System .
2.2 Scope
The scope of this IOC protocol is the system 9000-P / Process Waste System .
This system is composed of the associated equipment, instrumentation, mechanical x-items, and piping, as defined on the P&IDs listed below
Process waste from lift stations will be sent to the overhead piping using the transfer pump(s) and will gravity drain into the Process waste collection tank
located inside the sump. The Waste from the Process waste collection tank will be pumped to the existing Waste Neutralisation Tank downstream where all
other waste is neutralised before routing to public waste systems.
9000-P / Potable Water System Installation and Operational Qualification Protocol
Process and Biowaste lift stations are an identical design and a like for like installation. All lift stations are controlled by the same Equipment Module (EM).
Therefore, one lift station will be representative of all lift stations during commissioning.
IC and OC may run concurrently once the section pre-requisites are achieved. Any specific pre-requisites that are required are detailed in the pre-requisite
section at the beginning of each test script.
4.1 IC Pre-requisites
Prior to commencing IC testing, confirm that the following pre-requisites have been met:
If Pre-requisite cannot be met, provide justification in comment section if IC testing can proceed.
If there are any open punch items, Open punches have no impact
document an assessment for impact to IOC. to execution of this IOC
4 Confirm all Change Controls (FPIDCN & All Change Controls (FPIDCN & ACP's) have All FPIDCNs have been closed Yes Aoibheann Minogue (minoguao)
ACP's) have been closed and recorded been closed and recorded in project Electronic and recorded in project Row Sign. 09-May-2023 15:41:32
in project Electronic Data Management Data Management System (EDMS). Electronic Data Management (UTC)
System (EDMS). System (EDMS).
If there are any open Change Controls, an
If there are any open Change Controls, assessment for impact to this IOC has been ACP-105 is open and recorded
complete & attach an assessment for impact completed & attached. in project Electronic Data
to this IOC. Management System (EDMS).
THis ACP does not impact
execution of this protocol.
5 Confirm that the Vendor Turn Over Pack The Vendor Turn Over Pack (VTOP) is The Vendor Turn Over Pack Yes Aoibheann Minogue (minoguao)
(VTOP) is approved and recorded in project approved and recorded in project Electronic (VTOP) for the Process Waste Row Sign. 28-Apr-2023 07:55:18
Electronic Data Management System Data Management System (EDMS). Collection Tanks and Lift (UTC)
(EDMS). Stations are approved and
recorded in project Electronic
Data Management System
(EDMS).
6 Confirm that the Construction Turn Over The Construction Turn Over Pack (CTOP) is The Construction Turn Over Yes Aoibheann Minogue (minoguao)
Pack (CTOP) is approved and recorded approved and recorded in project Electronic Pack (CTOP) is approved and Row Sign. 28-Apr-2023 07:57:50
in project Electronic Data Management Data Management System (EDMS). recorded in project Electronic (UTC)
System (EDMS). Data Management System
(EDMS).
7 Confirm that the Equipment Pre-Dynamic The Equipment Pre-Dynamic Testing Review The Equipment Pre-Dynamic Yes Aoibheann Minogue (minoguao)
Testing Review has been completed has been completed successfully and recorded Testing Review has been Row Sign. 03-May-2023 07:51:26
successfully and recorded in the project in the project Electronic Data Management completed successfully for (UTC)
Electronic Data Management System System (EDMS). Process Waste Tank & Lift
(EDMS). Stations and recorded in the
9000-P / Potable Water System Installation and Operational Qualification Protocol
Comments Performed By
N/A Aoibheann Minogue (minoguao)
Row Sign. 03-May-2023 08:13:38
(UTC)
CCRs are the means for documenting that the completed construction has been checked and adheres to predetermined expectations. The CCRs serve as a
basis for MSD’s acceptance of the construction scope, and subsequent turnover to the operating site.
The system CCR’s have been identified and are checked and approved as part of the turnover phase. The check below is confirming that the CTOP and
VTOP for the system are reviewed and approved during the turnover phase.
Note: Alternative construction records, which are agreed for the project, may be used in place of the MSD CCR's.
9000-P / Potable Water System Installation and Operational Qualification Protocol
CCR Checks
CCRs Pass / Fail / N/A Performed By
Confirm that the CCR’s in the VTOP are reviewed and approved for the system and recorded in the project N/A Aoibheann Minogue (minoguao)
Electronic Data Management System (EDMS). Row Sign. 03-May-2023 08:29:46
(UTC)
Confirm that the CCR’s in the CTOP are reviewed and approved for the system and recorded in the project Pass Aoibheann Minogue (minoguao)
Electronic Data Management System (EDMS). Row Sign. 03-May-2023 08:29:37
(UTC)
Comments Performed By
N/A Aoibheann Minogue (minoguao)
Row Sign. 03-May-2023 08:29:58
(UTC)
Test Title Objective Pre-Requisite Tests Test Conditions Section Requirement Reference Performed By
Reference
acceptable) have been field Row Sign. 09-May-2023
checked (Highlight as 08:36:14 (UTC)
per GES Practice 2.5.8
“Construction Completion
Turnover”) as meeting the
design intent and
specifications of the system.
P&ID walkdown verification To verify the as-built P&IDs N/A 7.1 IE312903-42-SP-8900 UR- Grainne Byrne
(red-lined P&IDs are 1.8 (BYRNEGRA)
acceptable) have been field Row Sign. 12-Jun-2023
checked (Highlight as 13:04:29 (UTC)
per GES Practice 2.5.8 Reason for re-sign: Re-
“Construction Completion signing due to update
Turnover”) as meeting the
design intent and
specifications of the system.
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
IE0312903-41-DR-9000 0 28 Oct 2021 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Fail Aoibheann
has been walked down and the system has 9000.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 01-Jun-
2023 10:34:36
(UTC)
IE0312903-41-DR-9000 0 28 Oct 2021 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Fail N/A
has been walked down and the system has 9000.pdf [ 1 ]
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-9000 0 28 Oct 2021 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass [ 2 ] N/A
has been walked down and the system has 9000.pdf
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-9000 0 28 Oct 2021 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 9000.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 02-Jun-
2023 08:38:52
(UTC)
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
Reason for re-sign:
Attachment
Updated
[1] Aoibheann Minogue (minoguao) Executor, 02-Jun-2023 08:38:10 (UTC) Reason: Attachment Updated
[2] Aoibheann Minogue (minoguao) Executor, 02-Jun-2023 08:38:44 (UTC) Reason: Result Updated
IE0312903-41-DR-9001 0 26 May 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 9001.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 14:01:17
(UTC)
IE0312903-41-DR-9004 0 24 Jan 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 9004.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 14:06:53
(UTC)
IE0312903-41-DR-9005 1 20 Jan 2023 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Fail Aoibheann
has been walked down and the system has 9005.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 01-Jun-
2023 10:36:01
(UTC)
IE0312903-41-DR-9005 1 20 Jan 2023 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Fail N/A
has been walked down and the system has 9005.pdf [ 1 ]
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-9005 1 20 Jan 2023 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass [ 2 ] N/A
has been walked down and the system has 9005.pdf
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-9005 1 20 Jan 2023 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 9005.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 02-Jun-
2023 08:40:21
(UTC)
Reason for re-sign:
Attachment
Updated
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
[1] Aoibheann Minogue (minoguao) Executor, 02-Jun-2023 08:39:53 (UTC) Reason: Attachmnet Updated
[2] Aoibheann Minogue (minoguao) Executor, 02-Jun-2023 08:40:13 (UTC) Reason: Result Updated
IE0312903-41-DR-9007 0 26 May 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 9007.pdf IE0312903- Minogue
been visually verified in the field and reflects 41-DR-9007_2.pdf (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 13:58:16
(UTC)
IE0312903-41-DR-9008 0 26 May 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 9008.pdf IE0312903- Minogue
been visually verified in the field and reflects 41-DR-9008_2.pdf (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 14:04:28
(UTC)
IE0312903-41-DR-7000 0 01 Apr 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7000.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 12:23:57
(UTC)
IE0312903-41-DR-7010 0 01 Apr 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7010.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 12:25:33
(UTC)
IE0312903-41-DR-7050 0 31 Mar 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7050.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 12:27:11
(UTC)
IE0312903-41-DR-7060 0 31 Mar 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7060.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 13:53:06
(UTC)
IE0312903-41-DR-7110 0 01 Apr 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7110.pdf Minogue
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 12:28:43
(UTC)
IE0312903-41-DR-7125 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-7120 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-7127 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-7130 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-7131 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-7132 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-7134 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-5040 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-5060 0 05 Apr 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 5060.pdf Minogue
been visually verified in the field and reflects (minoguao)
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
the as-built conditions. Row Sign. 30-May-
2023 12:19:04
(UTC)
IE0312903-41-DR-5080 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-41-DR-4500 1 21 Nov 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 4500.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 01-Jun-
2023 10:38:27
(UTC)
IE0312903-41-DR-4600 1 21 Nov 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 4600.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 01-Jun-
2023 10:39:51
(UTC)
IE0312903-41-DR-7128 0 01 Apr 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7128.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 09-May-
2023 08:38:58
(UTC)
IE0312903-41-DR-7129 0 01 Apr 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7129.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 09-May-
2023 12:44:47
(UTC)
IE0312903-41-DR-7133 0 01 Apr 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-41-DR- Pass Aoibheann
has been walked down and the system has 7133.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 09-May-
2023 12:46:21
(UTC)
IE0312903-46-DR-8110 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
the as-built conditions.
IE0312903-46-DR-8120 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8210 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8410 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8510 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8610 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8611 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8620 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8621 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8630 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8631 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8710 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8910 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8920 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-8930 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-9016 0 02 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9016.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 31-May-
2023 13:04:40
(UTC)
IE0312903-46-DR-9020 0 02 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9020.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 15:11:32
(UTC)
IE0312903-46-DR-9600 0 02 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9600.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 11:02:33
(UTC)
IE0312903-46-DR-9601 0 29 Aug 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9601.pdf Minogue
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 12:22:22
(UTC)
IE0312903-46-DR-9602 0 29 Aug 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9602.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 10:52:40
(UTC)
IE0312903-46-DR-9603 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-9604 0 02 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9604.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 10:57:28
(UTC)
IE0312903-46-DR-9606 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-9605 0 02 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9605.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 11:06:05
(UTC)
IE0312903-46-DR-9010 N/A N/A The P&ID (red-lined P&IDs are acceptable) N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-9011 0 05 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9011.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 11:04:22
(UTC)
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
IE0312903-46-DR-9012 0 09 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9012.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 10:54:27
(UTC)
IE0312903-46-DR-9310 0 11 Jan 2023 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9310.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 12:12:47
(UTC)
IE0312903-46-DR-9320 0 02 Sep 2022 Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass Aoibheann
has been walked down and the system has 9020.pdf Minogue
been visually verified in the field and reflects (minoguao)
the as-built conditions. Row Sign. 30-May-
2023 13:54:49
(UTC)
IE0312903-46-DR-9320 0 [1]
Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass N/A
has been walked down and the system has 9020.pdf
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-9320 [2]
Full Walkdown The P&ID (red-lined P&IDs are acceptable) IE0312903-46-DR- Pass N/A
has been walked down and the system has 9020.pdf
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-9320 Full Walkdown The P&ID (red-lined P&IDs are acceptable) N/A [ 3 ] Pass N/A
has been walked down and the system has
been visually verified in the field and reflects
the as-built conditions.
IE0312903-46-DR-9320 Full Walkdown The P&ID (red-lined P&IDs are acceptable) N/A Pass Grainne Byrne
has been walked down and the system has (BYRNEGRA)
been visually verified in the field and reflects Row Sign. 12-Jun-
the as-built conditions. 2023 12:57:38
(UTC)
Reason for re-sign:
Re-signing as this
was executed in
error and P&ID
walkdown is not
required per test
9000-P / Potable Water System Installation and Operational Qualification Protocol
P&ID Number P&ID P&ID Date Full / Partial Walkdown Expected Result Attach Walked Down Pass / Fail Performed By
Revision P&ID
Number
exception below
[1] Grainne Byrne (BYRNEGRA) Executor, 12-Jun-2023 12:55:56 (UTC) Reason: updated as P&ID boundary moved no walkdown required
[2] Grainne Byrne (BYRNEGRA) Executor, 12-Jun-2023 12:56:22 (UTC) Reason: updated as P&ID boundary moved no walkdown required
[3] Grainne Byrne (BYRNEGRA) Executor, 12-Jun-2023 12:56:47 (UTC) Reason: updated as P&ID boundary moved no walkdown required
Comments Performed By
Refer to Exception: EIOC - 9000-P-EQ-C-001-ISS-02 Aoibheann Minogue
(minoguao)
Row Sign. 02-Jun-2023
08:40:41 (UTC)
Refer to Exception: EIOC - 9000-P-EQ-C-001-ISS-02 N/A
The above P&IDs that have not been walked down as part of this EIOC no longer include scope for the process waste system due to system boundaries
being updated. Refer to the above exception for details. [ 1 ]
Refer to Exception: EIOC - 9000-P-EQ-C-001-ISS-02 Grainne Byrne (BYRNEGRA)
Row Sign. 09-Jun-2023
The above P&IDs that have not been walked down as part of this EIOC no longer include scope for the process waste system due to system boundaries 11:25:11 (UTC)
being updated. Refer to the above exception for details. Reason for re-sign: Updated to
added further details
[1] Grainne Byrne (BYRNEGRA) Executor, 09-Jun-2023 11:24:55 (UTC) Reason: updated
TC - DBY-500-WAS-GCSV-Q-003 (1.0
Test) 3.3.1.3.1 Discrete Input [ 1 ]
2 Record loop check Loop check document reference(s) are TC - DBY-500-WAS-GCSV-Q-003 (1.0 Pass Aoibheann Minogue
document recorded. Test) 3.3.1.5.1 Variable Speed Motor (minoguao)
reference(s) Row Sign. 30-May-2023
TC - DBY-500-WAS-GCSV-Q-003 (1.0 07:39:39 (UTC)
Test) 3.3.1.2.1 Analogue Input Reason for re-sign: Links
9000-P / Potable Water System Installation and Operational Qualification Protocol
Comments Performed By
Aoibheann Minogue
(minoguao)
Row Sign. 30-May-2023
07:39:45 (UTC)
Table 1
Comments Performed By
N/A Aoibheann Minogue
(minoguao)
Row Sign. 03-May-2023
12:35:42 (UTC)