0% found this document useful (0 votes)
13 views8 pages

COEP Reconciliation

Uploaded by

Mayuri Amgaonkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views8 pages

COEP Reconciliation

Uploaded by

Mayuri Amgaonkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

VASCON ENGINEERS LTD

MATERIAL RECONCILIATION REPORT AS ON 30th Sep 2023

PROJECT NAME COEP, Shivaji Nagar

DIFFERENCE Permissible
SR.NO MATERIAL UNIT THEOROTICAL ACTUAL DIFFERENCE REMARK
% limit
1 RMC: M 15 Cum 25.81 26.00 (0.19) -0.73% 1.00%
2 RMC: M 30 Cum 146.77 147.00 (0.23) -0.16% 1.00%
3 RMC: M 35 Cum 4.94 5.00 (0.06) -1.21% 1.00%
4 Reinforcement Steel M.T 17.39 17.7 (0.31) -1.79% 2.00%
COEP

Sr No Description Receipt At Site Consumed WIP Stock At Site Balance

1 R Steel 20.13 17.39 1.8 0.94

2 RMC: M15 26 25.81

3 RMC: M30 147 146.77

4 RMC: M35 5 4.94


pcc m15 4
m35 42 50% 2.5

42 42
Footing

BAR BENDING SCHEDULE

FOOTINGS: COEP

Size of Footing Short Span Long Span Wt. in Kg

S.no. Ft. Mark Coln. Nos. Footing No. of Bar Total Wt. Remark
Type Footings Position Cutting Cutting (Short+Long)
L B D Length Length
Dia. Spac. Nos. Unit wt. Total wt. Dia. Spac. Nos. Unit wt. Total wt. 8 mm 10mm 12mm 16mm 20mm 25mm 28mm
Short Long (Short span) (Long span)
Span Span Depth L1 L2

-
1 F1 F1 1 10 3.50 2.00 0.90 Bottom 20 0.150 27 3.70 2.47 2,466.67 12.00 0.100 70.00 2.20 0.89 1,368.89 3,835.56 - - 1,368.89 - 2,466.67 - -
Top 10 0.125 33 3.70 0.62 753.70 10.00 0.125 57.00 2.20 0.62 774.07 1,527.78 - 1,527.78 - - - - -

2 F2 F2 2 2 8.39 2.00 0.80 Bottom 20 0.150 27 9.59 2.47 1,278.67 12.00 0.100 168.00 2.20 0.89 657.07 1,935.73 - - 657.07 - 1,278.67 - -
Top 12 0.100 40 9.59 0.89 681.96 12.00 0.100 168.00 2.20 0.89 657.07 1,339.02 - - 1,339.02 - - - -

2 F3 F3 2 2 9.72 2.00 0.80 Bottom 25 0.100 40 4.95 3.86 1,527.78 12.00 0.100 195.00 2.20 0.89 762.67 2,290.44 - - 762.67 - - 1,527.78 -
Bottom 16 0.100 40 4.25 1.58 537.28 - - 537.28 - - - 537.28 - - -
Bottom 12 0.100 40 2.12 0.89 150.76 - - 150.76 - - 150.76 - - - -

5.12 Top 20 0.100 40 5.56 2.47 1,098.27 12.00 0.100 104.00 2.20 0.89 406.76 1,505.03 - - 406.76 - 1,098.27 - -

Chairs for Footing


1 F1 10 Chair 20 2 4.80 2.47 237.04 237.04 - - - - 237.04 - -
F2/F3 4 20 4 4.80 2.47 189.63 189.63 - - - - 189.63 - -

-
8,921.75 4,626.52 13,548.27 - 1,527.78 4,685.16 537.28 5,270.27 1,527.78 -
TOTAL 13,548.27 KG
13.55 MT

Billing Engineer Project Incharge3 OF 8 Client / Consultant Representative


SLAB BEAMS
AT +FFL 104.20 mtr.

Beam size Steel at Top


S.no. Beam mark Beam Beam
type nos. No. of
L B D Bar mark bars Bar Dia.

PT Beams - Horizontal
1 PHB 1 1 2 8.82 1.50 1.40 8 20
2
2
2
Side Face Reinforcement 2 12 16

2 PT Beams -
at F2 1 2 2.00 0.50 1.00 4 20
Side Face Reinforcement 2 6 12
BAR BENDING SCHEDULE
5.72

Steel at Top Steel at Bottom Stirrups


Cutting weight in Bar No. of Cutting Unit weight in Spacing
length Unit wt. Kg mark bars Bar Dia. length wt. Kg Type mark Bar Dia.

11.46 2.47 452.74 8 20 11.46 2.47 452.74 1 S1 12


S1 12
S1 10
S1 10
11.58 1.58 439.18

3.84 2.47 75.85 4 20 3.84 2.47 75.85 1 S1 8


2.76 0.89 29.44

997.21 528.59
NDING SCHEDULE

Stirrups
Cutting No.of Total Weight 6mm 8mm 10mm
Spac. Length bars Unit wt. weight in Kg

0.10 4.26 38.00 0.89 287.98 1,193.46 - - -


0.10 1.56 152.00 0.89 421.55 421.55 - - -
0.10 4.26 118.00 0.62 621.01 621.01 - - 621.01
0.10 1.56 472.00 0.62 909.04 909.04 - - 909.04
439.18 - - -
- - -
- - -

0.10 2.26 42.00 0.40 75.00 226.70 - 75.00 -


29.44 - - -
- - -
- -
2,314.57 3,840.38 - 75.00 1,530.05
TOTAL 3.84 MT
12mm 16mm 20mm 25mm 28mm 32mm Remark

287.98 - 905.48 - - -
421.55 - - - - -
- - - - - -
- - - - - -
- 439.18 - - - -
- - - - - -
- - - - - -

- - 151.70 - - -
29.44 - - - - -
- - - - - -

738.97 439.18 1,057.19 - - -


COEP

Sr No Description Nos L B D Qty

1 F1 10 3.70 2.2 0.11 8.95


F2 2 8.59 2.2 0.11 4.16
F3 2 9.92 2.2 0.11 4.80
PCC for tie beam 0.3 0.1 8.55 0.26
0.5 0.1 8.55 0.43
0.5 0.08 8.55 0.34
3 0.5 0.1 9.55 1.43
0.5 0.095 4.6 0.22
0.5 0.1 4.6 0.23
2 0.5 0.1 5.18 0.52
0.5 0.1 5.24 0.26
0.5 0.1 5.24 0.26
0.3 0.1 8.55 0.26
0.5 0.1 8.55 0.43
0.5 0.08 8.55 0.34
3 0.5 0.1 9.55 1.43
0.5 0.095 4.6 0.22
0.5 0.1 4.6 0.23
2 0.5 0.1 5.18 0.52
0.5 0.1 5.24 0.26
0.5 0.1 5.24 0.26

25.81

1 F1 10 3.50 2 0.90 63.00


F2 2 8.39 2 0.8 26.85
F3 2 9.72 2 0.8 31.10
PHB1 2 8.82 1.5 0.9 23.81
Beam At F2 4 1 0.5 1 2.00
146.77

Column @ PT footing
4 1 0.5 1.9 3.80
2 1 0.3 1.9 1.14
4.94

Column upto 2.5 ht 4 1 0.5 2.5 5.00


2 1 0.3 2.5 1.50