cs615 Solved Mcqs Final Term by Junaid
cs615 Solved Mcqs Final Term by Junaid
CS615-Software
Project Management
(Solved MCQ’s)
LECTURE FROM
(23 to 45)
[email protected] FOR MORE VISIT JUNAID MALIK
[email protected]
VULMSHELP.COME 0304-1659294
Managerial position PG # 58
Developer
Customer
None of the given
3. Resource allocation task is performed in phase
Project initiation PG # 78
Project closedown
Project planning, control, and tracking
Product implementation
4. Auditing is activity of
o Construction
o Design
o SCM PG # 110 & 114
o Testing
5. associated with constraints imposed by management or the marketplace.
Training Courses
Training Schedule
Three
Four PG # 193
Five
Two
9. Traditional structures of business organization are of types
o 4 PG # 201
o 5
o 1
o 3
10. Specify any company or industry-specific standards that are relevant
to performing the work is called
Deliverables Schedule
Applicable Standards PG # 221
Acceptance Criteria
Special Requirements
11. To calculate the estimated effort using the intermediate COCOMO technique, you use
the formula:
E = AEF *Ei
E = FEA *Ei
E = AFE *Ei
E = EAF *Ei PG # 236
12. Using the intermediate COCOMO technique effort is calculated in
Classification
Interdependence
Decomposition PG # 288
Validation criteria
15. Dividing a software project into phases helps you in managing
the_____involved in the softwareproject.
Complexities
Uncertainties
Complexities, Uncertainties PG # 66
Size
16. Unstructured and hurried software development is a
Technology-related problem
Product-related problem
Process-related problem PG # 87
People-related problem
17. We use when the organization is small, geographically
centralized, and provides few goodsand services.
PERT
CPM
Both PERT and CPM PG # 296
Neither PERT nor CPM
21. is/are common component/s of PERT and CPM.
Activities
Nodes and Network
Critical path
Activities, Critical path. Nodes and Network PG # 296
22. Risk Identification involves except
Reliability
Recoverability
Availability
User-friendliness PG # 368
25. Resources are assigned to tasks for the following reason
Standard rate: The normal rate at which a resource is procured
Overtime rate: The rate that you pay if you overuse a work resource
Both Standard rate and Overtime rate PG # 389
Neither Standard rate nor Overtime rate
26. committee is set up to monitor implementation committee
Implementation department
Implementation
Implementation coordination PG # 404
Configuration
27. The user-representative gives the sign-off after
Project Resources PG # 71
Project Cost
Project schedule
Verifiable
Traceable
Modifiable
Complete
32. Which of the following is an output from Software Development Process (SDP)?
0
1
2
3
36. Which of the following planning is highly affected by organizational planning?
Scope planning
quality planning
Testing planning
Communication planning PG # 202
37. Which of the following is not a size metric?
LOC
Function count
Program length
Cyclomatic complexity
38. The model that assumes that effort and development time are functions of product size
alone is
Platform-Dependent
Language-Dependent PG # 230 (Lec # 30)
Technique-Dependent
Functional-Dependent
45. Scheduling for software engineering projects can be viewed from ... rather different
perspectives.
one
Two PG # 284 (lec # 37)
Three
Four
46. Estimation of following Critical factors are essential EXCEPT .
Transaction Logs
Testing for adherence to spec
Setup schedule for reviews
Business Development PG # 159 (lec # 25)
Work results
Change request PG # 156 (lec # 24)
Change schedule
Change scope
59. The of scope planning are the scope statement and scope
management plan, with the supportingdetail.
Formal
Informal
highly detailed
All of the above PG # 204 (lec # 28)
61. is one of the most important management activity and is an ongoing effort
throughout the lifeof the project.
Analysis
Planning PG # 142 (lec # 23)
Organizing
Leading
62. All of the following are descriptions of how new system is to be
developed in Technical Approach EXCPET .
Technologies
Incremental
RAD
Prototyping
Waterfall PG # 163 (lec # 26)
66. The DIDs (Data Item Description) includes a section called
Formal Documentation
Preparation Instruction PG # 171 (lec # 26)
Associated Documentation
Effective Resolution
67. It is the responsibility of to select the structure best suited for the
project.
Team Lead
Project Manager PG # 48 (lec # 6)
Supervisor
Group
68. People are managed through a(n) .
Nature
Organizational structure PG # 193 (lec #27)
Organizational culture
Culture
69. PMIS Stands for .