Work Break Down Schedule: Massonery Drainage With Culvert

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views2 pages

Work Break Down Schedule: Massonery Drainage With Culvert

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT:- MASSONERY DRAINAGE WITH CULVERT DURATION:-50 DAYS OF CALANDER TOTAL COST WITH VAT 3,223,831.

22 ETB
LOCATION:- HAILU ABDUQADIR HOUSE TO GORGE COMMECEMENT DATE:- 3/12/2024GC PACKAGE NUMBRE:-YABELLO/STATE/CW/007/2016
CLIENT:- YABELO CITY ADIMINSTRETION COMPLETION DATE:- 5/8/2024GC
CONTRUCTER:- IZEDIN,DUBA & IBRAHIM ROAD AND BRIDGE WORK INTERPRIZE.
MEASUREMENT:-147.00 M
WORK BREAK DOWN SCHEDULE
ID Task Name Duration Start Finish March 2024 April 2024
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
1 MASSONERY DRAINAGE WITH CULVERT 50 days Tue 3/12/24 Wed 5/8/24
2 MOBILAZATION 2 days Tue 3/12/24Wed 3/13/24
3 1, EARTH WORK AND EXCAVETION 12 days Thu 3/14/24 Wed 3/27/24
4 1.1 Remove top soil to an average depth of 20cm 3 days Thu 3/14/24 Sat 3/16/24
thick.
5 1.2 Removingof trees and its deep root from 2 days Mon 3/18/24 Tue 3/19/24
drainage line and cart away from the site to 15km
distance.
6 1.3 excavation for Trench foundation to a 2 days Wed 3/20/24 Thu 3/21/24
depth of flow according to design or culvert
starting from reduced ground level.

7 1.4 Back fill around the foundation wall using 2 days Fri 3/22/24 Sat 3/23/24
selected granular material not exceeding 20cm
thick if needed.
8 1.5 Cart away surplus excavated material from 1 day Mon 3/25/24 Mon 3/25/24
the site to distance of 1.5km
9 1.6 20cm thick ballastick or equivalent stone 2 days Tue 3/26/24 Wed
hard core well rolled or consolidated and blinded 3/27/24
with crushed stone.
10 Earth Work and Excavation Finsh. 0 days Wed 3/27/24 Wed 3/27/24 3/27
11 2, Concrete work 15 days Thu 3/28/24 Sat 4/13/24
12 2.1Apply 5cm thick lean concrete of C-5 under 1 day Thu 3/28/24 Thu 3/28/24
the foundation wall and under hard core.

13 2.2 Apply 10cm thick mass concrete on the hard 3 days Fri 3/29/24 Mon 4/1/24
core with C-25 concrete grade.
14 2.3 supply 20cm thick rc concrete sprecast which 3 days Tue 4/2/24 Thu 4/4/24
is layed on top of stone masonry wall using C-25
concrete grade and compact the RC concrete
which is free from segregation.the cost of
reinforcement and cost of form work shall be
maesured separetlly.
15 2.4 provied cut and fix in position sawn and 3 days Fri 4/5/24 Mon 4/8/24
zigba wood form work for 20cm thick precast
concrete on massonery wall.
16 2.5 temporary passage way made from barza 1 day Tue 4/9/24 Tue 4/9/24
8-10cm dia to sit on excavated area fot the
intrance to their home and also that seve as a peg
and setting out of drainage.
17 2.6 cut,bend and fix 14mm dia deformed bar 2 days Wed 4/10/24 Thu 4/11/24
keeping 12cm C/C.
18 2.7 Ditto but 10mm dia c/c12cm 2 days Fri 4/12/24 Sat 4/13/24
19 Concrete Work Finsh 0 days Sat 4/13/24 Sat 4/13/24 4/13
20 3, Massonery Work 19 days Mon 4/15/24 Mon 5/6/24
21 3.1 construct balastic stone massonry wall using 15 days Mon 4/15/24 Wed 5/1/24
1:3 cement sand mortar below and above NGL
according to design.

Task Project Summary Inactive Milestone Manual Summary Rollup Progress


PROJECT:- MASSONERY DRAINAG Split External Tasks Inactive Summary Manual Summary Deadline
WITH CULVERT
Date: Sat 2/17/2024 Milestone External Milestone Manual Task Start-only
Summary Inactive Task Duration-only Finish-only

PREPARED BY Eng. IZADIN YUNUS


PROJECT:- MASSONERY DRAINAGE WITH CULVERT DURATION:-50 DAYS OF CALANDER TOTAL COST WITH VAT 3,223,831.22 ETB
LOCATION:- HAILU ABDUQADIR HOUSE TO GORGE COMMECEMENT DATE:- 3/12/2024GC PACKAGE NUMBRE:-YABELLO/STATE/CW/007/2016
CLIENT:- YABELO CITY ADIMINSTRETION COMPLETION DATE:- 5/8/2024GC
CONTRUCTER:- IZEDIN,DUBA & IBRAHIM ROAD AND BRIDGE WORK INTERPRIZE.
MEASUREMENT:-147.00 M
WORK BREAK DOWN SCHEDULE
ID Task Name Duration Start Finish March 2024 April 2024
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
22 3.2 pointing work on stone massonry above the 3 days Thu 5/2/24 Sat 5/4/24
mass concrete and for exposed masonry using
1:2cement sand mortar.
23 3.3 5cm thick cement lean at the top of stone 1 day Mon 5/6/24 Mon 5/6/24
masonry using 1:3 cement sand mortar.

24 construction finsh 0 days Mon 5/6/24 Mon 5/6/24 5/6


25 DEMOBALIZATION 1 day Tue 5/7/24 Tue 5/7/24
26 SITE HAND OVER 1 day Wed 5/8/24 Wed 5/8/24

Task Project Summary Inactive Milestone Manual Summary Rollup Progress


PROJECT:- MASSONERY DRAINAG Split External Tasks Inactive Summary Manual Summary Deadline
WITH CULVERT
Date: Sat 2/17/2024 Milestone External Milestone Manual Task Start-only
Summary Inactive Task Duration-only Finish-only

PREPARED BY Eng. IZADIN YUNUS