The document provides a progress report for the feasibility study of the Hai Ha Thermal Power Plant project. It includes sections on project justification, construction site selection, fuel supply, environmental impact assessment, economic analysis, and engineering drawings. The report indicates the estimated completion dates for open tasks and lists the completed sections.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
25 views
Statistic of Complete Documents
The document provides a progress report for the feasibility study of the Hai Ha Thermal Power Plant project. It includes sections on project justification, construction site selection, fuel supply, environmental impact assessment, economic analysis, and engineering drawings. The report indicates the estimated completion dates for open tasks and lists the completed sections.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
Estimated
NAME Condition time of
completion FEASIBILITY STUDY REPORT DESCRIPTION VOL 1: FEASIBITLITY STUDY REPORT DESCRIPTION C.1 Overview 14/08/2020 C.2 The justification for the need for project investment Completed C.3 Construction site of Hai Ha Thermal Power Plant Completed Selection of technological solutions and unit C.4 Completed capacity of Hai Ha 1 Thermal Power Plant C.5 Supply fuel and raw materials to the plant Completed C.6 Selection of technical options Completed C.7 Connect the plant to the national electricity system 10/08/2020 C.8 Land clearance, compensation, and resettlement 07/08/2020 C.9 Organization of construction and project progress Completed C.10 Environmental impact assessment 12/08/2020 C.11 Plant management and operation Completed C.12 Total investment 10/08/2020 C.13 Economic - Financial Analysis 10/08/2020 C.14 Conclusions and recommendations 14/08/2020 VOL 2: LEGAL DOCUMENTS AND SPECIALIZATION REPORTS PART I: LEGAL DOCUMENTS Approval for supplementation and adjustment 1 Completed of electricity development planning 2 Document to ensure coal supply for the project 3 Agreement on construction power supply 4 Agreement on construction water supply Required 5 EIA approval document of MONRE Owner Agreement with NPT on connection to the 6 support national electricity system Agreement of stack position and height with 7 QP 8 Other documents (if any) PART II: SPECIALIZATION REPORT PECC1 RESPONSIBILITY 1 Geological survey report Completed 2 Topographic survey report 12/08/2020 3 Meteorological survey report Completed 4 Fire protection report 10/08/2020 Report on compensation, land acquisition and 5 10/08/2020 resettlement Report on transporting super-weight super- 6 10/08/2020 sized equipment 7 Report of coal port and shipping route 12/08/2020 8 Coal supply report Completed Estimated NAME Condition time of completion 9 Report the connection to the national grid 12/08/2020 10 Environmental impact assessment report 12/08/2020 11 Fresh water supply report Completed 12 Report handling and reuse of ash Completed BASIC DESIGN VOL 1: BASIC DESIGN DESCRIPTION C.1 Overview 14/08/2020 C.2 Natural conditions of the project area Completed C.3 Basis of design 10/08/2020 C.4 Technology design solutions Completed Basic design of electrical parts, C&I and C.5 Completed communications C.6 Construction part design solutions 12/08/2020 C.7 Environmental protection solutions 12/08/2020 VOL 2: CALCULATION APPENDICES Appendix Appendix for heat balance Completed 01 Appendix The calculated input figures 10/08/2020 02 Appendix The main equipment of the unit 10/08/2020 03 Appendix Calculating the coal supply system Completed 04 Appendix Calculating DO oil supply system Completed 05 Appendix Calculation of limestone transport system Completed 06 Appendix Calculation of water supply and wastewater Completed 07 Appendix Calculate water balance Completed 08 Appendix Calculation of ash removal system Completed 09 Appendix Calculation of fire protection system Completed 10 Appendix Calculation of environmental parameters 12/08/2020 11 Calculating the load capacity of pile types Appendix Calculating the Turbine Space 12 Calculation of the central control house Chimney Calculation VOL 3: TOTAL INVESTMENT & FINANCIAL ECONOMIC ANALYSIS Appendix Tính toán tổng mức đầu tư Estimated NAME Condition time of completion 01 Appendix Bảng tính phân tích Kinh tế - Tài 02 chính VOL 4: DRAWINGS PART I: GENERAL 5/5 Completed Phần II: Phần công nghệ 27/37 14/08/2020 Phần III: Phần điện 15/15 Completed Phần IV: Phần đo lường - điều khiển 2/2 Completed Phần VI: Phần xây dựng 233/254 14/08/2020
Energy Sprawl Solutions Balancing Global Development and Conservation 1st Edition Joseph M. Kiesecker - Read the ebook online or download it to own the complete version