ATUL KUDTARKAR AND ASSOCIATES PVT LTD
CONSULTING ENGINEERS * STRUCTURAL DESIGNERS * PROJECT MANAGERS
Annexure -B
FORM-2
[See Regulation 3}
ENGINEER'S CERTIFICATE
(To be submitted at the time of Registration of Ongoing Project and for withdrawal of money from Designated
Account-Project Wise)
Ref. No. AKAPL/PG/2023-24/002 Date: - 30/12/2023
To,
M/s. Walekar Realty, Through Its Partner
Mr. Bhushan Walekar & Others.
Site Add: -S.No.78/2, S.No.79/3B, At Village - Javsai,
Ambernath, Dist Thane .
Office Add :- 107, Globe Business Park, Kalyan Badlapur Road
Ambemath (W)
Ref.
“ATAM/B/2023/APL/00122/CATAM-23/72385 Dated 11/12/2023,
Subject: - Certificate of Cost Incurred for Development of “Walekar Dynasty” having
Registration Number being developed by M/s. Walekar Reslty.
Sir,
1
| ATUL V. KUDTARKAR have undertaken assignment of certifying Estimated Cost
Dynasty” having Maha RERA Registration Number being.
M/s. Walekar Realty.
We have estimated the cost of civil. MEP and allied works required for
apartments and proportionate completion of internal & external works of
specifications mentioned in agreement of sale. Our estimated cost calcul
drawings plans made available to us for the project under refer
Consultants. The Schedule of items and quantity required for
(Mr. Mukeshkumar Singh Quantity Surveyor* appointe
of the cost of material Ey and other inputs
202/29, SHAEE VASHAPT. ABOVE MO
TEproject is Rs.7,92,44,568/-with reference to the Civil, MFP and Allied works required for
completion of the apartments and Proportionated completion of internal & external works, as
per specifications mentioned in agreement of sale and for purpose of obtaining occupation
certificate /completion certificate for the Building(s) / Wingls) / layout / Plotted Development
from the Ambernath Municipal Council being the Planning Authority under whose jurisdiction —
the aforesaid project is being implemented,
a
4. The Estimated cost incurred tll date is calculated at Rs.0/- Total of Table A and 6), The amount of
Estimated Cost Incurred is calculated on the basis of input materials / services and units cost of
these items.
5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the
apartments and proportionate completion of internal & external works, as per specifications
mentioned in agreement of sale, of the project is estimated Rs.7,92,44,568/-_(Total of Table A
and B)
6. | certify that the Cost of the Civil, MEP and allied work for the apartments and proportionate
intemal & external works, as per specifications mentioned in agreement of sale, of 2
Project as completed on the date of this certificate is as given in Table A and 6b
TABLEA
Building/Wing bearing Number 1 cor called “Walekar Dynasty”
Sr.No. | Particulars
|| Total Estimated cost of the Building / Wing / Layout /
Plotted Development as on date 30/12/2023 of Registration is |
2. _ | Cost incurred as on date of certificate 30/12/2023.
Work done in Percentage (as Percentage of the estimated
cost)
4. | Balance Cost to be Incurred**(Based on Estimated Cost)
|S. [Cost incurred on Additional / Extra items not included in the
Estimated Cost (Table — C)