Transformer USS-01
Transformer USS-01
3. ELECTRICAL TESTS.
IR value
IR value
Applied points Applied Polarization Index
1 min ( G. 10 min ( G.
between voltage (PI)
Ohms ) Ohms )
Primary Winding:
COMPANY ECO LIMITED ARABIA
NAME AMJAD KHAN
SIGNATURE
DATE 21-04-2024
TEST EQUIPMENT USED: METREL,IR
RXMB1 Page 2 of
3
INSPECTION AND TEST RECORD
Description: Contract no.:
13.8KV Transformer USS-01 082-C01
Customer: End Client: Sheet:
Page 3 of 3
ALHARBI ROYAL COMMISSION
Site: Panel / Designation / Location #: Project no.:
Secondary infrastructure 097-c73R
ALHARBI JUBAIL Transformer-USS-01
Measured Resistance
Tap no. Remarks
U-V(Ω) V-W(Ω) W-U(Ω)
1 5.142 5.11 5.162 OK
2 5.144 5.137 5.112 OK
3 (Nominal) 5.180 5.129 5.128 OK
4 5.151 5.160 5.196 OK
5 5.131 5.166 5.112 OK
Secondary Winding:
Tap no. Measured Resistance Remarks
Remarks:
Testing ok but physical condition of transformer is not ok oil already leaked inside condition of LV
side bushing is also not ok check for LV side the IR value is not coming good as per standard