ATTACHMENT 7.1.6
SYSTEM DISCRIPTION FOR
CONDENSATE SYSTEM
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 2 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
TABLE OF CONTENTS
1. GENERAL DESCRIPTION
1.1 Introduction
Purpose
Purpose of this document is to detail out the description & functions of Condensate system
along with controls envisaged to ensure intended function of the system. with regards to the
overall plant operation. This document also outlines brief operation philosophy of the system.
Scope
Condensate system starts from condenser terminal point and consists of inline equipments
(Condensate extraction pump, condensate polishing unit, gland steam condenser, Low
pressure feedwater heaters), piping and piping components up to the deaerator inlet.
2. SYSTEM DESCRIPTION
Increase the condensate temperature by routing it through the Low Pressure (LP)
Feedwater Heaters.
Remove non condensable gases by deaeration.
Provide cycle make-up through make-up control valves
Provide make-up water through quick fill line control valve during cleanup
operation
Remove excess water from the system through Condenser Hotwell dump control
valve to the condensate storage tank (CST)
Provide sealing to condensate extraction pumps
In addition, the Condensate System will also supply condensate to the following
equipment:
Vacuum pump seal water make-up and condenser vacuum breaker valve seal
water
Main Turbine Gland steam desuperheater spray
Closed Cooling Water (CCW) overhead tank makeup
Low pressure turbine exhaust hood spray
LP turbine bypass desuperheater spray
Dilution water for chemical injection
Condenser Water Curtain Spray
Auxiliary Steam desuperheater spray
Turbine Flash Tank (If Required)
Boiler sealing water requirements
BFP drive turbine drip pot Cooling (If required)
To generator stator coil cooling
The Condensate System includes piping provisions for cycle make-up to allow automatic
transfer from the condensate storage to the condenser hotwell for hotwell level control.
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 7 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
Condensate system shall have the following major components for each 660MW unit:
Condenser ( 2 Nos )
Condensate Extraction Pumps ( 3 x 50% )
Gland Steam Condenser (1 x 100% )
Condensate Polishing Unit ( 3 x 50% )
Low pressure feedwater heaters ( 4 Nos )
Deaerator cum feedwater storage tank ( 1 x 100% )
Deaerator level control valves (1 x 30% and 2 x 100%)
Make-Up Control Station
Condensate quick fill control valve (1 x 100%)
Hotwell excess return control station
Minimum Recirculation Control Station
Various other valves, instruments, piping and Electrical items.
Ammonia, oxygen and hydrazine dosing connections are provided at outlet piping of
Condensate polishing unit.
It is noted that ammonia dosages will be different in the two modes of operation as the pH
is typically maintained in the range of 8.5 to 9.3 with CWT and 9.3 to 9.6 with AVT
Refer to the Boiler feed water quality document issued from Boiler group for further
details on chemical treatment for the condensate system.
3. TECHNICAL PARTICULARS
4. MODE OF OPERATION
Condensate from CEP discharge passes through polishers for removal of dissolved and
suspended solids.
The gland steam condenser is the first heat exchanger in the condensate pumps
discharge line. The condensate absorbs heat as it flows through this heat exchanger
which condenses the turbine gland leak-off steam. A recirculation line with control valve
(08LCA13-AA084) is provided from downstream of GSC to ensure minimum flow through
GSC during low load operation of the unit.
During normal operation after GSC condensate flows through Redundant control valves
(08LCA13-AA091 & 08LCA13-AA092) regulate the flow of condensate to deaerator.
based on level in the Deaerator. One 1x100% bypass MOV is provided across the control
valves. 1 x 30% (08LCA13-AA093) control valve is also provided for the deaeerator level
control during low load operation. The Deaerator level control is accomplished using a
three-element control which utilized deaerator level, condensate flow and feedwater flow.
After that the condensate flows through the LP Feedwater Heaters 1A/2A ,1B/2B, 3 and
4. These feedwater heaters are shell and tube type, with condensate flowing through the
tubes. Steam is supplied to the feedwater heaters from the main turbine extraction points
to heat the condensate.
A bypass is provided across each Duplex Feedwater Heaters 1A/2A and 1B/2B. LP
Heaters 3 and 4 are also provided with individual bypass line with MOV, which will permit
taking out the respective feedwater heaters from the service.
Condensate leaving LP Feedwater Heater 4 is routed to the Deaerator.
Oxygen, ammonia and hydrazine are injected into the condensate piping between the
condensate polisher and the gland steam condenser. Ammonia and oxygen are also
injected at the Deaerator outlet based on requirements. (Please refer to Boiler Feedwater
quality).
Makeup water to the condenser is required to replenish water loss from the plant cycle.
Makeup line also maintains the condenser hotwell level within specified limits and
ensures the smooth operation of the condensate pumps. Makeup water from the
condensate storage tank enters the Condenser (high pressure shell) through the normal
makeup control valve (08GHC27-AA082) and emergency mak-up control valve
(08GHC27-AA081). This normal level control valve is positioned by the DCS based upon
the level sensed by redundant condenser hotwell level transmitters. The normal make-up
is sized for 1% TG VWO flow and emergency make-up is sized for 5% TG VWO flow.
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 12 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
Detailed procedure for feedwater heaters removal and resuming shall be as per
Feedwater Heater O&M Manual.
The condensate storage tank will provide the initial filling water for the condensate
system. The Quick fill control valve (08GHC27-AA085) will be used to fill the condenser
hotwells and condensate system piping upto deaerator level control valve will be filled by
a separate filling line provided with manual isolation valve (08GHC27AA111).
Boiler fill pump will be used for performing the initial fill of the condensate system.
Condensate system will be filled up by the intial fill line upstream of deaerator level
control station. Deaerator level control valve shall be kept in manually closed condition.
As per the requirements, the deaerator level control valves may be opened in manual
mode to allow condensate flow to the deaerator for condensate system fill
During this operation, the temperature of the condensate flowing through the condensate
polisher must not exceed the limits established by the polishing equipment supplier. If
higher temperatures are expected, the polisher must be maintained in bypass mode until
the condensate temperature drops to within the allowable temperature range.
The condensate system minimum flow individual recirculation valves should be in auto
or full open to maintain minimum continuous stable flow for each pump in operation.
The condensate pumps should never be operated at shutoff conditions to avoid damage
as per the manufacturer’s recommendations.
GSC recirculation control valve should be in auto to maintain a minimum flow through
the condensate system which is adequate to serve as the cold temperature sink for the
gland steam condenser in accordance with manufacturer’s recommendations.
Upon start-up, seal water is provided from the condensate make-up system to prevent
air ingress through the condensate pump seals.
Once all valves have been placed in the correct position and all start permissives have
Normal condensate system shutdown occurs after the boiler feed pumps have been
stopped and feedwater demand has ceased. Condensate flow should be maintained
through the feedwater heaters and other condensate equipment until the equipment has
cooled sufficiently for safe shutdown without undue stress and damage As the required
condensate flow demand to maintain water level in the deaerator at safe levels
decreases, the condensate pumps shall be stopped in succession. Care should be taken
to ensure that CEP shutoff or run out conditions are not experienced during plant
shutdown. The condensate make-up system should be maintained in auto until all
demineralized water demands have ceased.
Functional Description:
The DCS operator is provided with controls enabling him to select any individual pump to
Manual, Auto, Stand-By or Lockout mode. The operator can select any two pumps as
main pumps & third pump as a stand-by pump. Stand-By means selected pump is
available to run but it will start only when running pump trip OR header pressure is low.
Controls for each pump (running or standby) also allow the operator to start or stop the
pump from the DCS by selecting the manual control mode.
Selection of Lockout (offline) mode indicates that a pump is not available to run.
However, selection of Lockout (offline) mode is possible only if the selected pump is not
running.
Stop permissive
When STOP command to CEP is issued from DCS,
None
Close Permissive
Respective condensate pump recirculation control valve in AUTO or full open
for the running pump
5.1.3. GSC INLET & OUTLET MOV WITH INTEGRAL BYPASS MOV (08LCA13AA075,
08LCA13AA076, 08LCA13AA077, 08LCA13AA078)
Purpose:
To isolate Gland Steam Condenser from Condensate side
Functional Description:
This valve will be over-ride open with CEP discharge MOV open command.
Isolation MOV GSC inlet/outlet is operated from the DCS as per the sequence mentioned
below:
Isolation MOV open sequence is initiated: Respective Integral bypass MOV opens
automatically.
Isolation MOV will open on respective integral bypass MOV full open feedback
Bypass MOV will close on Isolation MOV full open feedback
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 21 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
When Isolation MOV is fully opened & respective integral bypass MOV is closed, the
Isolation MOV open sequence in service will reset
Functional Description:
Condenser curtain spray SOV (08LCA13AA088) will be operated automatically from the
DCS. Valve will open whenever turbine trip exists or LP bypass valve position > 5% or
WDC valves open
Condenser curtain spray SOV shall be override open whenever any turbine
trip exists OR LP bypass valve position > 5%.
WDC valve not closed
Override Close
LP bypass valve position < 5%
WDC valve closed
Functional Description:
Deaerator level control MOV (08LCA13AA013) must be kept in Auto mode to enable the
CPU bypass Clean-up operation. However this MOV will be in closed position during the
normal operation. In case of operational requirements operator can operate this valve in
manual mode.
Functional Description:
Isolation MOV for the Deaerator level CV is operated manually from the DCS as per the
sequence mentioned below:
Isolation MOV open sequence is initiated: Respective Integral bypass MOV opens
automatically.
Isolation MOV will open on respective integral bypass MOV full open feedback
Bypass MOV will close on Isolation MOV full open feedback
When Isolation MOV is fully opened & respective integral bypass MOV is closed, the
Isolation MOV open sequence in service will reset
5.1.7. HEATER INLET MOV & THEIR INTEGRAL BYPASS MOV (08LCA13AA015 & 08LCA13AA016
FOR HEATER 1A/2A, 08LCA13AA036 & 8LCA13AA037 FOR HEATER 1B/2B,
08LCA13AA021& 08LCA13AA022 FOR HEATER 3, 08LCA12AA027 & 08LCA13AA028 FOR
HEATER 4)
Purpose:
To isolate corresponding heater from condensate side (working in conjunction with heater
bypass & heater outlet MOV).
Functional Description:
Condensate Inlet MOVs for feed water heaters are operated manually from the DCS as
per the sequence mentioned below:
Isolation MOV open sequence is initiated: Respective Integral bypass MOV opens
automatically
Isolation MOV will open on respective integral bypass MOV full open feedback
Integral Bypass MOV will close on Isolation MOV full open feedback for 10 seconds
When Isolation MOV is fully opened & respective integral bypass MOV is closed, the
Isolation MOV open sequence in service will reset
5.1.8. HEATER BYPASS MOV & INTEGRAL BYPASS MOV (08LCA13AA019 & 08LCA13AA020
FOR HEATER 1A/2A, 08LCA13AA038 & 8LCA13AA039 FOR HEATER 1B/2B, 08LCA13AA025
& 08LCA13AA026 FOR HEATER 3, 08LCA12AA031 & 08LCA13AA032 FOR HEATER 4)
Purpose:
To isolate corresponding heater (working in conjunction with heater inlet & heater outlet
MOV).
Functional Description:
Heater bypass MOV for feed water heaters are operated manually from the DCS as per
the sequence mentioned below:
Isolation MOV open sequence is initiated: Respective Integral bypass MOV opens
automatically.
Isolation MOV will open on respective integral bypass MOV full open feedback
Integral Bypass MOV will close on Isolation MOV full open feedback for 10 seconds
When Isolation MOV is fully opened & respective integral bypass MOV is closed, the
Isolation MOV open sequence in service will reset
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 26 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
5.1.9. HEATER OUTLET MOV (08LCA13AA015 & 08LCA13AA016 FOR HEATER 1A/2A,
08LCA13AA036 & 8LCA13AA037 FOR HEATER 1B/2B, 08LCA13AA021& 08LCA13AA022
FOR HEATER 3, 08LCA12AA027 & 08LCA13AA028 FOR HEATER 4)
Purpose:
To isolate corresponding heater (working in conjunction with heater bypass & heater inlet
MOV).
Functional Description:
Outlet condensate MOV for feed water heaters are operated manually from the DCS as
per the sequence mentioned below:
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 27 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
Isolation MOV open sequence is initiated: Respective Integral bypass MOV opens
automatically.
Isolation MOV will open on respective integral bypass MOV full open feedback
Bypass MOV will close on Isolation MOV full open feedback
When Isolation MOV is fully opened & respective integral bypass MOV is closed, the
Isolation MOV open sequence in service will reset
Functional Description:
This valve will be opened immediately after CEP is started plant clean-up operation for
blowing out the condensate to atmospheric flash tank. The valve will be closed after the
desired water quality is achieved.
v. Auto interlock
Auto Open interlock
Condensate clean up Blow
Condensate CPS bypass blow
Auto Close interlock
Valve opening position is higher than XX%
5.1.11. HOTWELL MAKE-UP CONTROL STATION BYPASS MOV (08GHC27AA004)
Purpose:
To provide alternate path for the make-up water to condenser in case of failure of Normal
and Emergency Make-up control valves
Functional Description:
This valve will be operated in manual mode only.
Functional Description:
These control valves are normally controlled automatically from the DCS based on
Hotwell level. The level control valves are operated from DCS either in auto or manual.
During normal operation valve will remain in auto and modulate according to hotwell
level. The level signal (Median selection of level transmitters 08LCA02CL101A,
08LCA02CL101B & 08LCA02CL101C) shall be used as process variable (PV) for control
of Make up control valves while level signal (Median selection of level transmitters
08LCA02CL102A, 08LCA02CL102B & 08LCA02CL102C) shall be used for Hotwell
overflow control valve (08LCA13AA085). The PID controller generates a control signal to
modulate the hot well level Control Valves according to error generated by the difference
in the process variable (PV) and set point (SP), rate of change of condensate flow is also
taken as a parameter in the control loop to maintain hotwell level under sudden load
fluctuation.
Set point for normal make up CV will be NWL & Set point for Emergency make up CV will
be NWL1 (NWL >NWL1). During the normal operation, condenser normal make up CV
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 30 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
maintains the level of the hotwell at level NWL (normal level). In case of any disturbances
causing the hotwell level to fall to level NWL1, the normal make-up CV will open fully and
emergency make-up CV will start controlling the hotwell level at the set point.
In the event of any condition that results hot well levels in excess/overflow of the normal
level, Hotwell overflow control valve opens and condensate is directed to the condensate
storage tank.
Functional Description:
Purpose:
To meet the minimum flow requirement of the Gland Steam condenser, also ensuring
(manual quality checking & modulating the valve by operator) that required quality water
is fed to the Boiler.
Functional Description:
Functional Description:
During Normal operation, operator selected primary 100 % LCV (i.e. either
08LCA13AA091 OR 08LCA13AA092) will be modulated by (means greater than 30%
load) three element control. It consist of
i) Deaerator level (median of 08LAA04CL001, 08LAA04CL002,
08LAA04CL003),
ii) Deaerator inlet flow consist of condensate flow to Deaerator (median of
08LCA13CF106A, 08LCA13CF106B, 08LCA13CF106C), IP Extraction
steam flow(08LCD11CF103), Heater-6A drain flow (08LCH15CF101) &
Heater-6B drain flow (08LCH15CF102)
iii) Deaerator outlet flow consists of Feed water flow at Economizer inlet flow
(median of 08LAB14CF110A, 08LAB14CF110B, 08LAB14CF110C) &
Reheater attemperation flow (addition of Reheater A & B spray flow i.e.
08LAF01CF111A, 08LAF01CF111B, 08LAF01CF112A &
08LAF01CF112B) are used for controlling deaerator level.
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 33 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
Controller compares level set point and modulates 100% level control valve using
deaerator inlet flow, outlet flow and deaerator level. The output of level controller shall
be added with Deaerator outlet flow, this will be the set point for the condensate inlet
flow controller which modulates deaerator 100% valve.
During any trouble in Primary control valve, redundant control valve will control the
Deaerator level.
During Transition from Start-up mode to normal operation mode opening of 30 % LCV
shall be kept constant and 100 % LCV shall be modulated as per feed water increase
in demand, then slowly 30 % LCV will be closed and 100 % LCV will take over the
complete loop control.
Protective Commands:
Override close for Deaerator level high-high.
Valve Number Start-Up Shut Down Normal Unit Trip Valve Fail
Operation Position
08GHC27AA092 CLOSE CLOSE AUTO/ MODULATING LOCK
MODULA
TING
08GHC27AA091 CLOSE CLOSE AUTO/ MODULATING LOCK
MODULA
TING
08GHC27AA094 MODULATING CLOSE OPEN MODULATING LOCK
Functional Description:
This valve (08GHC27AA085) will be operated in manual during condenser hotwell bottom
clean-up blowout operation. After completion of this operation, the valve will be kept in
auto for further cleanup operation and this will modulate based on hotwell level. This
valve will be in closed conditions during the normal operation.
Protective Commands
Override Close for Boiler fill pump stop
KORADI TPS EXPANSION PROJECT – 3 x 660
LARSEN & TOUBRO LIMITED MW (UNIT #8, 9 & 10), KORADI, L&T-S&L LIMITED
MAHARASHTRA
SYSTEM DESCRIPTION, OPERATION & Rev.: B
MAIN PLANT PACKAGE
CONTROL FOR CONDENSATE SYSTEM Date: 12/06/2012
L&T Project No. : C10901 Page: 34 of 37
Document No.: L555-00M-00906
L&T-S&L Job No.: L555000
Valve Number Start-Up Shut Down Normal Initial Clean-up Valve Fail
Operation Position
08GHC27AA092 CLOSE CLOSE CLOSE MODULATING LOCK
Condensate Flow