0% found this document useful (0 votes)
71 views7 pages

FC CV English New Updated

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views7 pages

FC CV English New Updated

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

____________________________________________________ Fernando M Castillo León

CURRICULUM VITAE

Personal Details

Name: Fernando Manuel Castillo León


Address: Calle Fonoll 1, Esc. D, 4-2
43840 Salou, Tarragona, Spain
D.O.B.: 02.01.1973
Place of birth: Lima (Perú)
Marital status: Married
Spanish Passport: PAD346934
Telephone +34 649 340 054 (Spanish Mobile)
+34 977 469 103 (Home)
Email: [email protected]

Professional Experience

Dic 2023-Feb 2024: DLaredo (Spain)

Barcelona Metro L9 Project S-442.1 , Barcelona, Spain


Ø12,060 mm EPB Machine (Herrenknecht)
TBM Mechanical Fitter

Sept 2023-Nov 2023: Global Tunnelling Experts (Denmark)

Cairo Metro Line 4 Project S-1237, Giza, Egypt


Ø6,700 mm Mixshield Machine (Herrenknecht)
TBM Mechanical Supervisor

Jan 2023-Aug 2023: Global Tunnelling Experts (Denmark)

Western Sydney Airport Project S-1340, S-1341, Sydney, Australia


Ø6,990 mm EPB Machine (Herrenknecht)
TBM Mechanical Foreman

1
____________________________________________________ Fernando M Castillo León

Sydney Metro West CTP Project S-1324, S-1325, Sydney, Australia


Ø7,010 mm Double Shield Hard Rock Machine (Herrenknecht)
TBM Mechanical Foreman

Western Sydney Airport 1 Project S-1338, S-1339, Sydney, Australia


Ø6,960 mm Double Shield Hard Rock Machine (Herrenknecht)
TBM Mechanical Foreman

Sept 2022-Dic 2022: Global Tunnelling Experts (Denmark)

Pawtucket Tunnel Project S-1273, Providence, USA


Ø10,300 mm Multimode Hard Rock/EPB Machine (Herrenknecht)
TBM Hydraulic Fitter

Chesapeake Bay Bridge Tunnel Project S-1121, Virginia Beach, USA


Ø13,210 mm EPB Machine (Herrenknecht)
TBM Mechanical Supervisor

Sept 2021-Sept 2022: RedPath Mongolia LLC (Mongolia)

Oyu Tolgoi Mine Project, Ömnögovi, Mongolia


BBR1500 (Herrenknecht), Raisebore Machines (Epiroc, RedPath)
Raisebore Mechanic

April 2019-Sept 2021: Entreprenørservice AS (Norway)

Tunnels for Hydropower Plants in all Norway


Ø2,800 mm Main Beam Open Gripper Machine (Robbins)
TBM Mechanical Fitter

Jan 2019-April 2019: Global Tunnelling Experts (Denmark)

Jansen Mine Project, Leroy, Canada


MI- 003/004 Shaft Boring Roadheader Machine (Herrenknecht)
SBR Mechanical Fitter

Oct 2018-Dic 2018: Global Tunnelling Experts (Denmark)

Nezhinsky Potash Mine, Slavkaliy, Belraus


MI-029/030 Shaft Boring Roadheader Machine (Herrenknecht)
Hydraulic Fitter

Aug 2018-Sept 2018: Global Tunnelling Experts (Denmark)

Jansen Mine Project, Leroy, Canada


MI- 003/004 Shaft Boring Roadheader Machine (Herrenknecht)
Mechanical Fitter

2
____________________________________________________ Fernando M Castillo León

May 2018-Aug 2018: Mühlhauser (Germany)

Assembling Hydraulic Men-raiders, for Brenner Basis Tunnel.


Assembling Flat Cars, Concrete Remixers and Segments Cars , for different projects,
Michelstadt , Germany.
Mechanical Supervisor

Mar 2018-Apr 2018: Mühlhauser-NFM (France)

Semmering Base Line Tunnel, Le Creusot, France


Ø10,130 mm Single Shield Hard Rock Machine (NFM)
Mechanical Supervisor

Jan 2018-Feb 2018: Global Tunnelling Experts (Denmark)

D-775 Tokyo Outer Ring Road Line, Tokyo, Japan


Testing & Commissioning Gantries, Quick Unloader, Pivot Crane (Herrenknecht)
TBM Mechanical Foreman

Dic 2017-Jan 2018: Global Tunnelling Experts (Denmark)

Wuhan Metro Line 7 Project S-908, S-909, Sanyang Lu, China


Ø15,760 mm Mixshield Machine (Herrenknecht)
TBM Mechanical Foreman

Aug 2017- Nov 2017: Global Tunnelling Experts (Denmark)

Istambul Metro Ikitelli-Ataköy Project S-1030, S-1031, Istambul, Turkey


Ø6,540 mm EPB Machine (Herrenknecht)
TBM Hydraulic Fitter

Feb 2017-Jul 2017: Global Tunnelling Experts (Denmark)

Shanghai Bei Heng Lu Motorway Project S-1000, Shanghai, China


Ø15,560 mm Mixshield Machine (Herrenknecht)
TBM Mechanical Supervisor

Dec 2016-Jan 2017: Global Tunnelling Experts (Denmark)

Wuhan Metro Line 7 Project S-908, S-909, Sanyang Lu, China


Ø15,760 mm Mixshield Machine (Herrenknecht)
TBM Mechanical Supervisor

Feb 2016-Dec 2016: Global Tunnelling Experts (Denmark)

Thomson Metro Line T217 Project S-930, Singapore


Ø6,670 mm Mixshield Machine (Herrenknecht)
TBM Mechanical Supervisor

3
____________________________________________________ Fernando M Castillo León

Dic 2015-Feb 2016: Global Tunnelling Experts (Denmark)

Stamford Canal Diversion Project S-975, Singapore


Ø5,250 mm EPB Machine (Herrenknecht)
TBM Mechanical Foreman

Oct 2015-Dic 2015: Global Tunnelling Experts (Denmark)

Wonju Gangneung Railway Project S-962, Gangneung, South Korea


Ø8,390 mm Mixshield Machine (Herrenknecht)
TBM Mechanical Foreman

Jan 2015-Oct 2015: PSH Greenline JV (Qatar)

Greenline Project S-844, S-845, S-846, S-847, Doha, Qatar


Ø7,100 mm EPB Machine (Herrenknecht)
Tunnelling Mechanical Superintendent

Oct 2013-Jan 2015: Global Tunnelling Experts (Denmark)

DTL3 C933 Project S-739, S-740, S-741, S-742, Singapore


Ø6,600 mm EPB Machine (Herrenknecht)
TBM Mechanical Supervisor

DTL3 C923 Project S-761, Singapore


Ø6,630 mm EPB Machine (Herrenknecht)
TBM Mechanical Supervisor

Jan 2011-Oct 2013: Interocean Personnel Services (UK)

Hallandsas Railway Tunnel Project S-246, Förslöv, Sweden


Ø10,560 mm Multi Mode Shield Machine (Herrenknecht)
TBM Mechanic

Oct 2010- Jan 2011: FCC SA, Spain

UTE Tuneles de Sorbas Project S-286, Almeria, Spain


Ø9,510 mm Hard Rock Double Shield Machine (Herrenknecht)
TBM Mechanic

June2010-Set 2010: FCC SA, Spain

UTE Ave Girona Project S-362, Girona, Spain


Ø12,110 mm EPB Machine (Herrenknecht)
TBM Mechanic

4
____________________________________________________ Fernando M Castillo León

May 2008-May 2010: FCC SA, Spain

L9 Metro Project S-279, S-302, Barcelona, Spain


Ø9,370 mm EPB Machine (Herrenknecht)
TBM Mechanic

Dec 2007-May 2008: Interocean Personnel Services (UK)

Hallandsas Project S-249, Förslöv, Sweden


Ø10,530 mm Mixshield Hardrock Machine (Herrenknecht)
TBM Mechanic

June 2005-Dec 2007: Cavosa SA, Spain

L9 Metro Project S-279, Barcelona, Spain


Ø9,370 mm EPB Machine (Herrenknecht)
TBM Mechanic

UTE Canal de Navarra Project TB619 E/T, Navarra, Spain


Ø6,190 mm Hard Rock Telescopic Shield Machine (Wirth)
TBM Mechanical Supervisor

April 2003-May 2005: Herreknecht Iberica SA, Spain

L9 Metro Project S-221, Barcelona, Spain


Ø12,095 mm EPB Machine (Herrenknecht)
TBM Mechanic

Nov 2001-May 2005: Herrenknecht Iberica, Madrid, Spain


Mechanic for assembly and maintenance of tunneling machines. My first assignment with
Herrenknecht was from November 2001 until April 2002 in Herrenknecht AG, Schwanau,
Germany. Other projects were in Segovia (GuadarramaTunnel), Madrid (Metro Sur-Alcorcón) and
Barcelona (L9 Metro).

March 2001-Sept 2001: Microser SA, Madrid, Spain


Electric maintenance mechanic involved in the preventative and corrective maintenance of circuit
printing machinery as well as electrolyte and chemical treatment lines.

Jan 1998-Dec 1998: Bakelita y Anexos SA, Lima, Perú


Maintenance mechanic in glass-blowing and injection machinery, regulation and calibration of
molding machines, quality control of plastic products and changing and setting of molds.

Dec 1996-July 1997: Schlumberger Surenco SA, Lima, Perú


Wiring & testing technician responsible for the maintenance and repair of oil, drilling and plugging
equipment.

5
____________________________________________________ Fernando M Castillo León

June 1995-Oct 1996: Tech Pak, Lima, Perú


Maintenance mechanic involved in the preventive and corrective maintenance of machinery
dedicated to the printing of plastic sheets and flexography. Maintenance of pneumatic and oil-
hydraulic equipment and design of pneumatic and hydraulic diagrams.

April 1995-May 1995: Copesa, Lima, Perú


Technician for plastic lamination and injection machinery responsible for the installation and repair
of pumping equipment and application of basic electric oxyacetylene welding knowledge to the
construction and reconstruction of parts.

Jan 1995-April 1995: Servicios Hidrostal, Lima, Perú


Assistant in the maintenance and repair of electric and non-electric water pumps, reconstruction of
parts via electric welding, installation of pumping equipment for buildings and the construction of
pumping systems for pools.

Aug 1994-Jan 1995: Universal Textil SA, Lima, Perú


Assistant in the Spinning and Annexing section for the maintenance of textile machinery, control of
production orders, coding and checking of replies and the planning and control of maintenance
programs.

Jan 1993-March 1993: Unión Metalúrgica SA, Lima, Perú


Mechanics assistant – Fault diagnosis in the OTTO and Diesel group of electric generators.

6
____________________________________________________ Fernando M Castillo León

Education

Primary & Secondary: C.E.N. Hipólito Unanue – Lima (Perú)

University: Instituto Superior Tecnológico – TECSUP – Lima (Perú)


March 1991-December 1994 (Diploma Course)
- Plant Machinery Maintenance Technician

Courses Taken:
Certify Education & Assessment – Barcelona (Spain)
March 2024
-IELTS General Training Certificate

CFO Léganes – Madrid (Spain)


May 2000-November 2000
- Hydraulic and Pneumatic Systems Course

BASA – Lima (Perú)


April 1998-June 1998
- Plastic Molding Course

Schlumberger Specialist Completion Training Center – Louisiana (USA)


May 1997-August 1997
- Petrol Well Drilling Course

New England School of English – Boston (USA)


March 1997-May 1997
- English Course

Schlumberger Surenco SA – Bogotá (Colombia)


Jan 1997-March 1997
- Wireline & Testing Course

Languages: Spanish: Native