MO 201 Questions
MO 201 Questions
MO-201 Exam
Microsoft Excel Expert (Excel and Excel 2019 Exam
Version: 4.0
Question: 1
SIMULATION
Instructions
Exam Environment
Exam Interface and Controls
The exam panel provides access to the project task(s). Each project has an associated file in which
you will perform the project tasks.
1. Project file
2. Split bar
3. Exam panel
You can modify the exam interface to fit your needs in the following ways:
To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
To change the height of the exam panel, drag the split bar between the project file and the exam
panel.
To minimize the exam panel, click the Collapse Panel arrow • in the upper-left corner of the exam
Questions & Answers PDF Page 3
panel. The minimized exam panel displays the Expand Panel button, the project number and name,
the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you
must expand the exam panel.
To restore the interface to the default appearance, click the Restore button near the upper-right
corner of the exam panel.
4. The Information bar at the top of the exam panel displays the current project and total number of
projects, the remaining exam time, and the following commands:
• Collapse Panel. Minimizes the exam panel to provide more space for the project file.
• Restart Project. Closes and reopens the current project file without saving your changes.
• Submit Project. Saves your changes, submits the project file, and moves to the next project.
• Calculator. A calculator is available in some exams. You are not required to use the calculator.
• Restore. Restores the size and position of the project file and exam panel to the defaults.
• Help. Displays information about the exam interface.
5. The Content area displays the task tabs and the current task description.
6. The Navigation area at the bottom of the exam panel contains the following commands.
• Previous Task/Next Task. Saves your response and moves to the previous or next task in the current
project.
• Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after
the exam.
• Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
• Mark as complete. Flags the task to indicate that you feel you have completed the task.
In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next
Task button, or Previous Task button.
End of the instructions.
You are analyzing data about the number of visitors to U.S. National Parks.
Configure Excel so that you can edit content using Albanian as the editing language.
Do not make Albanian the default editing language. If you are prompted to restart Office, dismiss the
prompt but do not restart Excel.
Answer:
https://www.windowscentral.com/how-change-proofing-language-settings-office
Question: 2
SIMULATION
Instructions
Exam Environment
Exam Interface and Controls
The exam panel provides access to the project task(s). Each project has an associated file in which
you will perform the project tasks.
1. Project file
2. Split bar
3. Exam panel
You can modify the exam interface to fit your needs in the following ways:
To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
To change the height of the exam panel, drag the split bar between the project file and the exam
panel. • To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of
the exam panel. The minimized exam panel displays the Expand Panel button, the project number
and name, the remaining time, and the Restart Project and Submit Project buttons. To move
Questions & Answers PDF Page 5
4. The Information bar at the top of the exam panel displays the current project and total number of
projects, the remaining exam time, and the following commands:
• Collapse Panel. Minimizes the exam panel to provide more space for the project file.
• Restart Project. Closes and reopens the current project file without saving your changes.
• Submit Project. Saves your changes, submits the project file, and moves to the next project.
• Calculator. A calculator is available in some exams. You are not required to use the calculator.
• Restore. Restores the size and position of the project file and exam panel to the defaults.
• Help. Displays information about the exam interface.
5. The Content area displays the task tabs and the current task description.
6. The Navigation area at the bottom of the exam panel contains the following commands.
• Previous Task/Next Task. Saves your response and moves to the previous or next task in the current
project.
• Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after
the exam.
• Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
• Mark as complete. Flags the task to indicate that you feel you have completed the task.
In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next
Task button, or Previous Task button.
End of the instructions.
On the “2019 Visitors” worksheet, modify the conditional formatting rule to format rows for parks
that have a “Size” greater than 1,000 square miles.
Answer:
Question: 3
SIMULATION
Instructions
Exam Environment
Questions & Answers PDF Page 6
1. Project file
2. Split bar
3. Exam panel
You can modify the exam interface to fit your needs in the following ways:
To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
To change the height of the exam panel, drag the split bar between the project file and the exam
panel.
To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the
exam panel. The minimized exam panel displays the Expand Panel button, the project number and
name, the remaining time, and the Restart Project and Submit Project buttons. To move between
tasks, you must • expand the exam panel.
To restore the interface to the default appearance, click the Restore button near the upper-right
corner of the exam panel.
Questions & Answers PDF Page 7
4. The Information bar at the top of the exam panel displays the current project and total number of
projects, the remaining exam time, and the following commands:
• Collapse Panel. Minimizes the exam panel to provide more space for the project file.
• Restart Project. Closes and reopens the current project file without saving your changes.
• Submit Project. Saves your changes, submits the project file, and moves to the next project.
• Calculator. A calculator is available in some exams. You are not required to use the calculator.
• Restore. Restores the size and position of the project file and exam panel to the defaults.
• Help. Displays information about the exam interface.
5. The Content area displays the task tabs and the current task description.
6. The Navigation area at the bottom of the exam panel contains the following commands.
• Previous Task/Next Task. Saves your response and moves to the previous or next task in the current
project.
• Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after
the exam.
• Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
• Mark as complete. Flags the task to indicate that you feel you have completed the task.
In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next
Task button, or Previous Task button.
End of the instructions.
On the “Summary” worksheet, starting in cell A4, consolidate data from the 2014-2018 “by Region”
worksheets. Display the average number of the “Recreation Visits” for each “Region”. Use labels in
both the top row and left column.
Delete the blank “Park Name” column from the consolidated data.
Answer:
display sheet name followed by an exclamation mark followed by the row and column range in the
references column (For example: "Q1SalesSheet!$A$2:$F$5").
• Click Add. It's to the right of the "All References" list box. This adds the reference and range you
select to the list of references. Repeat steps 6 through 10 for all sheets and files you want to
consolidate.
• Select the row or column for the labels. Click one or both checkboxes next to "Top row" and/or
"Left column" to select which row or column contains the labels.
• Click the checkbox next to "Create links to sources" (optional). By checking this option, the
consolidated data will be updated automatically if one of the source references is updated
• Click Ok. This adds the consolidated data to the “Summary” worksheet. You can see the source
data from the consolidated data by clicking the plus icons (+) to the left of the cell numbers on the
left side.
1. With your spreadsheet open, press F5 on the keyboard. The ‘Go To’ window will open.
2. Click on the ‘Special’ button
4. This will select all the empty fields within your table.
5. In the ‘Home’ ribbon, click on the arrow below the ‘Delete’ button then click on ‘Delete Sheet
Columns’
Question: 4
SIMULATION
Instructions
Exam Environment
Exam Interface and Controls
Questions & Answers PDF Page 10
The exam panel provides access to the project task(s). Each project has an associated file in which
you will perform the project tasks.
1. Project file
2. Split bar
3. Exam panel
You can modify the exam interface to fit your needs in the following ways:
• To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
• To change the height of the exam panel, drag the split bar between the project file and the exam
panel.
• To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the
exam panel. The minimized exam panel displays the Expand Panel button, the project number and
name, the remaining time, and the Restart Project and Submit Project buttons. To move between
tasks, you must expand the exam panel.
• To restore the interface to the default appearance, click the Restore button near the upper-right
corner of the exam panel.
4. The Information bar at the top of the exam panel displays the current project and total number of
Questions & Answers PDF Page 11
Answer:
If a chart has multiple fields in the Axis box, you set it to show levels and you see only one level at a
time, starting with the top level.
To enable drill-down, access the Design tab > Show Levels > Enable Drill Down One Level at a Time.
if you double-click on one of the bars, you will see the bars for the underlying data.
Reference:
https://support.microsoft.com/en-us/office/add-drill-down-to-a-power-view-chart-or-matrix-
d67c5026-62f7-4766-9b22-3a8448c13ecd
Question: 5
SIMULATION
Instructions
Exam Environment
Exam Interface and Controls
The exam panel provides access to the project task(s). Each project has an associated file in which
you will perform the project tasks.
Questions & Answers PDF Page 12
1. Project file
2. Split bar
3. Exam panel
You can modify the exam interface to fit your needs in the following ways:
• To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
• To change the height of the exam panel, drag the split bar between the project file and the exam
panel.
• To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the
exam panel. The minimized exam panel displays the Expand Panel button, the project number and
name, the remaining time, and the Restart Project and Submit Project buttons. To move between
tasks, you must expand the exam panel.
• To restore the interface to the default appearance, click the Restore button near the upper-right
corner of the exam panel.
4. The Information bar at the top of the exam panel displays the current project and total number of
Reference: projects, the remaining exam time, and the following commands:
• Collapse Panel. Minimizes the exam panel to provide more space for the project file.
Questions & Answers PDF Page 13
• Restart Project. Closes and reopens the current project file without saving your changes.
• Submit Project. Saves your changes, submits the project file, and moves to the next project.
• Calculator. A calculator is available in some exams. You are not required to use the calculator.
• Restore. Restores the size and position of the project file and exam panel to the defaults.
• Help. Displays information about the exam interface.
5. The Content area displays the task tabs and the current task description.
6. The Navigation area at the bottom of the exam panel contains the following commands.
• Previous Task/Next Task. Saves your response and moves to the previous or next task in the current
project.
• Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after
the exam.
• Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
• Mark as complete. Flags the task to indicate that you feel you have completed the task.
In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next
Task button, or Previous Task button.
End of the instructions.
You are creating a workbook for the regional meeting of Southridge Video.
On the “Regional Sales” worksheet, in cells D4:F7, use the Fill Series feature to complete the sales
projections using a linear growth rate of 500,000 per year.
Answer:
Explanation:
https://support.microsoft.com/en-us/office/project-values-in-a-series-5311f5cf-149e-4d06-81dd-
5aaad87e5400