0% found this document useful (0 votes)
8 views

Tank 265

Uploaded by

Vipul Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Tank 265

Uploaded by

Vipul Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Report Author: THE CADWORLD

Date: 12 Fab 2024

TANK 265

Organization: Santo Engineering Pvt Ltd Part name: Tank


Operator: Vipul Sharma Part #: 265
E-mail: [email protected] Drawing # : Tank_265
Workspace: Santo Engg. Serial #:

Project: Tank 265 Device: Faro Edge


Organization: Santo Engineering Pvt Ltd Part name: Tank
Operator: Vipul Sharma Part number: 265
E-mail: [email protected] Piece: Faro edge
Feature Table
Length Units Millimeters
Coordinate Systems world
Data Alignments plane, axis, center point 1

67.T2
Control Nom Meas Tol Dev Test Out Tol
2.000 1.999 2.000 1.999 Pass

21.T2
Control Nom Meas Tol Dev Test Out Tol
X Distance 2600.000 2599.657 ±2.000 -0.343 Pass

22.T2
Control Nom Meas Tol Dev Test Out Tol
X Distance 2600.000 2600.432 ±2.000 0.432 Pass

24.T2
Control Nom Meas Tol Dev Test Out Tol
Y Distance 1602.000 1603.244 ±2.000 1.244 Pass

23.T2
Control Nom Meas Tol Dev Test Out Tol
Y Distance 1602.000 1603.457 ±2.000 1.457 Pass

25.T2
Control Nom Meas Tol Dev Test Out Tol
3D Distance 3054.000 3053.823 ±3.000 -0.177 Pass

26.T2
Control Nom Meas Tol Dev Test Out Tol
3D Distance 3054.000 3055.635 ±3.000 1.635 Pass

36.T3
Control Nom Meas Tol Dev Test Out Tol
X Distance 353.000 354.633 ±2.000 1.633 Pass

31.T3
Control Nom Meas Tol Dev Test Out Tol
X Distance 353.000 354.246 ±2.000 1.246 Pass

44.T3
Control Nom Meas Tol Dev Test Out Tol
Y Distance 138.000 138.761 ±2.000 0.761 Pass

Organization: Santo Engineering Pvt Ltd Part name: Tank


Operator: Vipul Sharma Part number: 265
E-mail: [email protected] Piece: Faro edge
41.T3
Control Nom Meas Tol Dev Test Out Tol
Y Distance 138.000 138.346 ±2.000 0.346 Pass

38.T3
Control Nom Meas Tol Dev Test Out Tol
Y Distance 197.000 198.437 ±2.000 1.437 Pass

33.T3
Control Nom Meas Tol Dev Test Out Tol
Y Distance 197.000 198.293 ±2.000 1.293 Pass

37.T3
Control Nom Meas Tol Dev Test Out Tol
Z Distance 290.000 291.824 ±2.000 1.824 Pass

32.T3
Control Nom Meas Tol Dev Test Out Tol
Z Distance 290.000 291.456 ±2.000 1.456 Pass

42.T3
Control Nom Meas Tol Dev Test Out Tol
Z Distance 371.500 369.946 ±2.000 -1.554 Pass

45.T3
Control Nom Meas Tol Dev Test Out Tol
Z Distance 371.500 369.907 ±2.000 -1.593 Pass

46.T3
Control Nom Meas Tol Dev Test Out Tol
X Distance 1037.500 1038.634 ±2.000 1.134 Pass

43.T3
Control Nom Meas Tol Dev Test Out Tol
X Distance 1037.500 1038.457 ±2.000 0.957 Pass

51.T5
Control Nom Meas Tol Dev Test Out Tol
X Distance 80.000 80.146 ±2.000 0.146 Pass

52.T5
Control Nom Meas Tol Dev Test Out Tol
X Distance 200.000 198.543 ±2.000 -1.457 Pass

Organization: Santo Engineering Pvt Ltd Part name: Tank


Operator: Vipul Sharma Part number: 265
E-mail: [email protected] Piece: Faro edge

You might also like