Foundation Bottom Extra Reinforcement Plan: Pump Room Pump Room

Uploaded by

Prem Suthar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Foundation Bottom Extra Reinforcement Plan: Pump Room Pump Room

Uploaded by

Prem Suthar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

Y
A B C (NOT TO SCALE)

TO KHORDHA
0.15
0.15 2.68 2.62 0.15

BT ROAD

HP CULVERT
ROW

MANHOLE
MANHOLE

ROW

0.23
ROW

EARTHEN ROW
ROAD

0.45
ROW

BRANCH
AREA

ROAD
INDUSTRIAL
TO SARUA
RO
W

RO
W

RO
W

01

0.30
C1 C1 C1
12 Ø @150 C/C

EARTHEN ROAD
BOTTOM EXTRA

ROW

ROW
0.45
0.30 HAUNCHING
BOUNDARY WALL
103.48 [339'-6"]

5.00 0.45 TBM-3


POWE
R
LINE
KML BOUNDARY
LIMIT

POWER LINE HEIGHT-8.80 M


FROM EX. ROAD LEVEL
E:347734.907
N:2235403.605
RL:99.800

0.45
TBM-2
E:347746.487
N:2235396.655
RL:100.325

4.85
5.00

POWE

R
LINE
75.00

0.45
75.00

BOUNDARY WALL
3.63

EXISTIN

208.72
G
BOUND
ARY

POWE
WALL

R
LINE
TBM-1

SI T E
E:347814.012
N:2235341.039
RL:100.000

115.01

95.81

D
X X'

A
A

O
R
12 Ø @150 C/C TYPICAL HAUNCHING DETAIL 70.00

28.08
57.25

BOTTOM EXTRA FOR SUCTION U.G.R. R O A D

EXISTING BOUNDARY
WALL

0.45
C1 C1 C1

11.50
02
GENERAL NOTES:-

0.45
1.ALL DIMENSIONS ARE IN Meter UNLESS OTHERWISE SPECIFIED.

12 Ø @150 C/C 2. DO NOT SCALE THIS DRAWING. FOLLOW WRITTEN DIMENSIONS ONLY.
BOTTOM EXTRA 12 Ø @150 C/C 3.THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH RELEVANT
BOTTOM EXTRA ARCHITECTURAL & WORKING DRAWING. IF ANY DISCREPANCY FOUND, SHOULD BE
5.23

4.85

IMMEDIATELY BROUGHT TO NOTICE OF THE STRUCTURAL ENGINEER BEFORE


EXECUTION OF WORK.

0.45 0.45 0.45 0.45 4.ONLY WRITTEN DIMENSION ARE TO BE FOLLOWED.


5.00
WALL CUTOUT DETAIL-A 5.FOR SLABS,BEAMS AND COLUMNS AND FOOTING CONC. GRADE SHALL BE OF
12 Ø @150 C/C 300 x 300 MM (PLACE CENTER M30( DESIGN MIX ).
BOTTOM EXTRA
0.45

BETWEEN BOTH COLUMN) JUST REINFORCEMENT DETAILS


03 ABOVE THE RAFT TOP
0.45

0.45

A.HIGH YIELD STRENGTH DEFORMED BARS MARKED AS Ø WITH CHARACTERISTIC


0.15

STRENGTH 500 N/MM2 CONFORMING TO IS 1786-1985, SHALL BE USED.


6.50
B.LAP IN SLAB OF SUPER STRUCTURE CLOSE TO MID SPAN FOR BOTTOM BARS &
Y' CLOSE TO SUPPORT FOR TOP BARS SHALL BE AVOIDED.

300
200 200 6.THE LONGITUDINAL BARS OF BEAM SHALL BE SPLICED ONLY, IF HOOPS
FOUNDATION BOTTOM STRUCTURE ARE PROVIDED OVER THE ENTIRE SPLICE LENGTH AT A SPACING NOT
MORE THAN 150MM, AS SHOWN IN FIG-1. LAP SPLICES SHALL NOT BE PROVIDED.

EXTRA REINFORCEMENT PLAN

150
a)WITHIN A JOINT, b) WITHIN A DISTANCE OF '2d' FROM JOINT FACE AND C) WITHIN
A QUARTER LENGTH OF THE MEMBER WHERE FLEXURAL YIELDING MAY
GENERALLY OCCUR UNDER THE EFFECT OF EARTHQUAKE FORCES . NOT MORE
THAN 50% OF THE BARS SHALL BE SPLICED AT ONE SECTION.

AS/DETAIL 250 CONCRETE DETAILS


AS/DETAIL

a.NOMINAL SIZE OF CRUSHED STONE GRADED AGGREGATE SHALL BE 3/4" UNLESS


OTHERWISE STATED.
0.30 0.30 0.30 0.30
0.15

0.15
b.GRADE OF CONCRETE SHALL BE M-30 (DESIGN MIX).

c.CLEAR COVER OF CONCRETE IN MM TO THE MAIN REINFORCEMENT UNLESS


SPECIFIED OTHERWISE SHALL BE :-

PUMP ROOM
3.0

3.0

PARTICULAR INNER SIDE OUTER SIDE


PUMP ROOM ROOF SLAB 35MM 15MM
FLOOR SLAB 25MM 15MM
RETAINING WALL 40MM 20MM
COLUMNS 40MM 40MM
0.20

10 # @150 C/C 25MM 25MM

0.20
10 # @150 C/C 10 # @150 C/C BEAMS

d. EARTHQUAKE PROVISION HAS BEEN TAKEN AS IS-1893 FOR ZONE III


0.50

0.50
0.30

N.G.L.Lvl. 0.00

0.30
FREE BOARD
N.G.L.Lvl. 0.00 FREE BOARD FREE BOARD
SLAB 8. STANDARD HOOKS, BENDS, LAP SPLICES SHALL BE PROVIDED WHEREVER
REQUIRED IN ACCORDANCE WITH IS-456 (2000) & SP-34.
0.30
9. DEVELOPMENT LENGTH 'Ldt' AND LAP LENGTH IN TENSION/COMPRESSION
SHALL BE AS PER IS/456-2000 & SP-34 WHICH SHALL BE FOLLOW BELOW THE

Confind
HORI. BAR

Reinf..
HORI. BAR TABLE ,RESPECTIVELY FOR USING GRADE OF CONCERT M30.

L/4
12 # @100 C/C
HORI. BAR 12 # @100 C/C HORI. BAR HORI. BAR HORI. BAR HORI. BAR HORI. BAR
FROM 2.0M TO TOP HORI. BAR HORI. BAR
10 # @125 C/C FROM 2.0M TO TOP 10 # @125 C/C 12 # @100 C/C 12 # @100 C/C 12 # @100 C/C 12 # @100 C/C
10 # @125 C/C 10 # @125 C/C CONC. GRADE Ldt
(BASE TO TOP) (BASE TO TOP) (BASE TO TOP)
FROM 2.0M TO TOP FROM 2.0M TO TOP FROM 2.0M TO TOP FROM 2.0M TO TOP
(BASE TO TOP)
Ldc
VERT. BAR VERT. BAR
VERT. BAR VERT. BAR VERT. BAR VERT. BAR
M-30 46Ø 36Ø
12 # @150C/C 12 # @150C/C
(FROM 1.2M TO TOP) (FROM 1.2M TO TOP) 12 # @150C/C 12 # @150C/C 12 # @150C/C 12 # @150C/C
(FROM 1.2M TO TOP) (FROM 1.2M TO TOP) (FROM 1.2M TO TOP) (FROM 1.2M TO TOP) 10.FIG-2 DRG NO.SHALL BE FOLLOWED FOR BEAM COLUMN JUNCTION OF
4.20

UNEQUAL DEPTH .
4.20

VERT. BAR VERT. BAR


10 # @200 C/C
FROM 1.2M TO TOP
HORI. BAR
10 # @100 C/C
HORI. BAR
10 # @100 C/C
10 # @200 C/C
FROM 1.2 M TO TOP
VERT. BAR
10 # @200 C/C
FROM 1.2M TO TOP
HORI. BAR
10 # @100 C/C
HORI. BAR
10 # @100 C/C
HORI. BAR
10 # @100 C/C
HORI. BAR
10 # @100 C/C
VERT. BAR
10 # @200 C/C
FROM 1.2M TO TOP
B 11. COLUMN BARS SHALL BE TERMINATED INSIDE A BEAM AS PER FIG-2 AT

39x dia
BASE TO 2.0M BASE TO 2.0M

of bar
0.30 0.30 0.30
BASE TO 2.0M BASE TO 2.0M BASE TO 2.0M BASE TO 2.0M
0.30
ROOF LEVEL IN ULTIMATE CONSTRUCTION.

MID SPAN
Typ.
300
VERT. BAR VERT. BAR VERT. BAR VERT. BAR
VER.. BAR VER.. BAR
10 # @100 C/C 10 # @100 C/C 10 # @100 C/C 10 # @100 C/C
12 # @75C/C 12 # @75C/C VER.. BAR VER.. BAR VER.. BAR VER.. BAR
1.2M FROM BASE 1.2M FROM BASE 1.2M FROM BASE 1.2M FROM BASE
1.2M FROM BASE 12 # @75C/C 12 # @75C/C 12 # @75C/C 12 # @75C/C
0.90

0.90

1.2M FROM BASE


0.90

0.90
1.2M FROM BASE 1.2M FROM BASE 1.2M FROM BASE 1.2M FROM BASE

39x dia
of bar
12 Ø @100 C/C 12 Ø @100 C/C
12 Ø @100 C/C BASE 12 Ø @100 C/C
12 Ø @100 C/C BASE 12 Ø @100 C/C
0.45

0.45

Confind
Reinf..
L/4
0.15

0.90 0.90
0.15

10 Ø @150 B/W THRU. PCC SUBMITTED BY -


0.90 10 Ø @150 B/W 0.90 PCC
0.45 5.00 0.45 0.45 0.15
0.30 0.30 0.15 0.45 4.85 4.85 Egis India Consulting Engineers Pvt Ltd.
5.60
0.30 0.30
10.60
0.30
egis Egis Tower | Plot No. 66, Sector - 32 |
Gurugram, Haryana-122001, India

SECTION X-X' SECTION Y-Y' SLAB CLIENT -

idco ODISHA INDUSTRIAL INFRASTRUCTURE


DEVELOPMENT CORPORATION, IDCO, IDCO TOWERS,

Confind
YOUR POWER

Reinf..
JANPATH, BHUBANESWAR.

L/4
10 DIA TO GROW
OVERLAPPING
LENGTH Ld

300 PROJECT WORKER'S HOSTEL AT JAYAMANGALA ,


ODISHA
B

39x dia
of bar
TO BE SPOT WELED
TO NEAREST REINF.

MID SPAN
TO RETAIN IN POSITION

Typ.
300
DRAWING

39x dia
UGR FOUNDATION PLAN & DETAIL

of bar
FIXING DETAIL OF PIPE
40

TILL L/4 SPAN FROM BOTH END,


SHOULD NOT DO OVERLAPPING, FIXTURES IN R.C.C.

Confind
Reinf..
ONLY IN CENTER HALF ITS ALLOWED.

L/4
ALL THE BARS SHOULD NOT BE SCALE NTS DATE 07-05-2024
OVERLAPPED AT SAME HEIGHT,
DO ALTERNATE LAPPING DRAWN CHECKED DESIGNED APPROVED
COLUMN SCHEDULE FOUNDATION TO TOP
WALL THICKNESS
10 STIRRUPS
Ø DETAIL-B 10Ø S.NO. COL. COL.
REINF. SECTION RINGS
NO. SIZE END REGION MID REGION

D
Ld Ld

150
1. C1 300x450 6-#16 8#@100c/c 8#@150c/c Length
FOR 135° HOOK
REVISIONS
PCC (1:4:8) DRG. NO. WH/JMA/UGR/STR-02
0 1
TYPICAL DETAIL OF HOOK DETAIL OF STIRRUPS IN COLUMN CORE REGION REVISIONS
TYPICAL COLUMN-WALL SECTION IDCO DRG. NO.
0