This document is a demand notice from Gujranwala Electric Power Company for a new connection. It provides details of the applicant such as name and address, connection details including location and load, and amounts due for security and service costs totaling Rs. 68,000 by June 21, 2023.

Uploaded by

fivver.expert1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Demand Notice

This document is a demand notice from Gujranwala Electric Power Company for a new connection. It provides details of the applicant such as name and address, connection details including location and load, and amounts due for security and service costs totaling Rs. 68,000 by June 21, 2023.

Uploaded by

fivver.expert1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DUE Date: 21-06-2023 Gujranwala Electric Power Company (12136-CHAND-DA-QILA) Security Cost

19-05-2023 12136010801 2023051004402


New Connection New Connection 22-05-2023
Tubewell 03078124930 22121360051801

Nill

4 (KW) B.O.P Mohafiz Town

220 DIVISION - III

D-2a(49) 0

Muhammad Akram (S/O) Muhammad Sharif (Address) Kot Hanif Grw

30

15000

30

01

Sub-Division Office 12136-CHAND-DA-QILA SDO GEPCO


Line Superintendent 12136-CHAND-DA-QILA SDO GEPCO

Due Date: 21-06-2023 Security Cost

Muhammad Akram (S/O) Muhammad Sharif (Address) Kot Hanif Grw

19-05-2023 12136010801
15000 22-05-2023 2023051004402

22121360051801
B.O.P Mohafiz Town

DUE DATE: 21-06-2023 Security Cost


B.O.P Mohafiz Town 15000

2023051004402 12136010801 2023051004402

15000 22-05-2023

NOTE:- Computer generated demand notice, Hence no signature is required.


This subject cited case has been processed in accordance with documents uploded/produced by the
owner/applicant. In case any doocument is found false at later stages, the said connection is likely to be
cannceled and as a result of concealment of facts or fraud at any stage and if codal formalities are not
follwed and company resrved its rights to take legal action against owner/applicant.
Date & Time: (23-05-2023 14:43:51)
DUE DATE: 21-06-2023 Gujranwala Electric Power Company (12136-CHAND-DA-QILA) Service Cost

19-05-2023 12136010801 2023051004402


New Connection New Connection 22-05-2023
Tubewell 03078124930 22121360051801

Nill

4 (KW) B.O.P Mohafiz Town

220 DIVISION - III

D-2a(49) 0

Muhammad Akram (S/O) Muhammad Sharif (Address) Kot Hanif Grw

30

680000

30

01

Sub-Division Office 12136-CHAND-DA-QILA SDO GEPCO


Line Superintendent 12136-CHAND-DA-QILA SDO GEPCO

DUE DATE: 21-06-2023 Service Cost

Muhammad Akram (S/O) Muhammad Sharif (Address) Kot Hanif Grw

19-05-2023 12136010801
680000 22-05-2023 2023051004402

22121360051801
B.O.P Mohafiz Town

DUE DATE: 21-06-2023 Service Cost

2023051004402 12136010801 2023051004402

680000 22-05-2023

NOTE:- Computer generated demand notice, Hence no signature is required.


This subject cited case has been processed in accordance with documents uploded/produced by the
owner/applicant. In case any doocument is found false at later stages, the said connection is likely to be
cannceled and as a result of concealment of facts or fraud at any stage and if codal formalities are not
follwed and company resrved its rights to take legal action against owner/applicant.
Date & Time: (23-05-2023 14:43:51)

Powered by TCPDF (www.tcpdf.org)

You might also like