The document discusses various word problems involving time and work. It provides formulas and examples to calculate the time taken by individuals or groups to complete a piece of work. The problems cover scenarios where people work individually as well as together and include concepts like efficiency and leaving/joining the work.

Uploaded by

Godwin Anto
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Time and Work

The document discusses various word problems involving time and work. It provides formulas and examples to calculate the time taken by individuals or groups to complete a piece of work. The problems cover scenarios where people work individually as well as together and include concepts like efficiency and leaving/joining the work.

Uploaded by

Godwin Anto
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Time and work

Formulae
1. If A can do a piece of work in n days,
then A’s 1 day work = 1/n
2. If A’s 1 day work = 1/n,
Then A can finish the work in n days.
3. The ratio of work done by A and B = 3 : 1, then
The ratio of time taken by A and B to complete the
work = 1 : 3

I. Answer the following :


Type -I
1. If Roger can do a piece of work in 8 days and Antony can
complete the same work in 5 days, In how many days will
both of them together complete it.

3 13 = 4 days
1
Ans:

2. A can do a job in 12 days and B can do the same job in

16 days. How long will it take for both A and B to complete the job

if they work together?


Ans: 7 days
Soln:
A’s 1 day work= 1/12
B’s 1 day work = 1/16
(A + B)’s 1 day work = 1/12 +1/16= 7/48
(A+B) can finish the job in 48/7 = 6.87 = 7 days

Type – II

3. If A and B together can complete a piece of work in 15

days and B alone in 20 days. In how many days can A

alone complete the work? Ans:60 days

Soln: A+B -----1/15

B ------ 1/20

A+B – C ------- 1/15 -1/20

4. A can do a certain work in the same time in which B and

Ctogether can do it . If Aand Btogether could do it in 10


d ay s an d C alo n e in 50d ay s,th en B alo n e co u ld d o it in

h o w m an y d ay s? (sy n erg y )

Soln: a = b+c

(a+b)’s 1 day work = 1/10

c’s 1 day work =1/50

(a+b+c)’s 1 day work = 1/10 +1/50 = 6/50

(a+b+c) = 6/50

(a +a) = 6/50

2a =6/50

a=3/50

b =(a+b)-a = 1/10 – 3/50 = 1/25

Ans:25 days
5. Acan do a piece of work in 4 hours, Band Ctogether can

do it in 3 hours, while Aand Ctogether an do it in 2

hours.

Howlong Balone will take to do it? (synergy) Ans: 12 hrs

Solution:

A’s 1 hr work = ¼ , (B+C)’s 1 hr work = 1/3 , (A+C)’s 1 hr work=

1/2

C’s 1 hr work = ( A+C) –A=½- ¼=¼

B’s 1 hr work = (B+C)- C = 1/3 – ¼ =1/12

B can complete the work in 12days

Type - 3
6. If 6 men and 8 boys can do a piece of work in 10 days

hile 26 men and 48 boys can do the same in 2 days,


W

what is the time taken by 15 men and 20 boys in doing

the same type of work? (synergy) Ans: 4 days

Soln: 6 men and 8 boys can do a piece of work in 10 days


26 men and 48 boys can do the same in 2 days

Calculation

As the work done is equal,

10(6M + 8B) = 2(26M + 48B)

60M + 80B = 52M + 96B

⇒ M = 2B

⇒ B = M/2 ----(1)

Now substitute (1) in 15M + 20B

⇒ 15M + 10M = 25M

Now, 6M + 8B in 10 days

⇒ (6M + 4M) 10 = 100M

Then D(25M) = 100M

⇒ D = 4 days.

∴ The time taken by 15 men and 20 boys to do the same type of work
will be 4 days.
7. 4 men and 6women can complete a work in 8 days, while

3men and 7women can complete it in10 days. In how

many days will 10 women complete it ?Ans: 40 days

Let 1 man's 1 day's work =x


1 woman's 1 day's work =y.
Then, 4x+6y=1/8
3x+7y=1/10.
Solving the two equations,
x=11/400,y=1/400
∴ 1 woman's 1 day's work =1/400.
⇒ 10 women's 1 day's work =(1/400×10)=1/40.
Hence, 10 women will complete the work in 40 days.

8. If 2 m en an d 3b o y s can d o a p iece o f w o rk in 10 d ay s,

while 3 men and 2 boys can do the same work in 8 days.


In h o w m an y d ay s can b o y s can 2 m en an d 1 b o y d o th e

:12 2 days
1
work? Ans

Solution:

1 man’s 1 day work =x,

1 boy’s 1 day work = y

2x + 3y = 1/10

3x + 2y = 1/8

Solving for x & y

x=7/200 , y= 1/100

2 men + 1 boys 1 day work = 2x7/200 + 1x 1/100

=16/200 = 2/25

So, 2 men and 1 boy can finish the work in 25/2 = 12 ½ days

Type – 4
9. A contractor undertakes to do a job in 40 days. He

em p lo y ed 100 m en at th e b eg in n in g an d 100 m o re after

35 d ay s, an d co m p letes th e w o rk in stip u lated tim e, If h e

h ad n o t en g ag ed th e ad d itio n al m en . H o w m an y d ay s

b eh in d sch ed u led w o u ld it b e fin ish ed ? A n s: 5 d ay s

Soln: work = men x days

=100x35 + 200x5

=3500 + 1000

W=4500 units

If he had not engage additional man, then

Work = men x days

4500 = 100 x days

Days = 4500/100 =45 days

Additional days = 45- 40 = 5 days

10. A C o n tracto r em p lo y ed 30m en to d o a p iece o f w o rk

in 38 d ay s. A fter 25 d ay s, h e em p lo y ed 5 m en m o re an d
the work was finished one day earlier. How many days he

would be behind, if he had not employed additional men

A n s: 39 d ay s

Solution: 30m------ 38 days

A fter 25 d ay s-- +5m (30+5=35men)

Now35 m----- 38- 25=13 days

They complete the work1 day earlier

So, (13 -1)= 12 days

Now, 35 men ----12 days x= 35 x 12

30 men --- ? days 30

=14 days

25 + 14 = 39days
Type - 5

11. “A” can do a piece of work in 16 days and Bcan do

th e sam e w o rk in 12 d ay s. T h ey w o rk to g eth er fo r 3 d ay s

an d th en “A ” leav es. In h o w m an y m o re d ay s w ill B

co m p lete th e rem ain in g w o rk ? A n s:6 4 = 7d ay s


3

12. A can d o a w o rk in 10 d ay s an d B can d o th e sam e w o rk

in 15 d ay s. T h ey w o rk to g eth er fo r 4 d ay s an d th en B

leav es. In h o w m an y m o re d ay s w ill A co m p lete th e

rem ain in g w o rk ? A n s :4d ay s


13. A can d o a w o rk in 36 d ay s an d B can d o th e sam e

w o rk in 54 d ay s. T h ey w o rk to g eth er fo r 12 d ay s an d th en

A leav es. In h o w m an y m o re d ay s w ill B co m p lete th e

rem ain in g w o rk ? A n s :24 d ay s

Solution: A’s 1 day work = 1/36

B’s 1 day work = 1/54

(A + B )’s 1 d ay w o rk = 1/36 + 1/54 = 5/108

(A + B )’s 12 d ay w o rk = 12 x 5/108 = 5/9

Remaining work = 1- 5/9 = 4/9

B can co m p lete th e rem ain in g w o rk in 54 d ay s = 4/9 x 54


= 24

days

Type – 6

14. Kamal can do a work in 15 days. Vimal is 50% more

efficient than Kamal. How many days Vimal will take to

do the same piece of work? Ans : 10 days

15. A d o es 20% less w o rk th an B . If A co m p letes a

72 h rs. T h en B can d o it in ? A n s : 6
1
piece of work in

h rs
16. A is 30% m o re efficien t th an B . H o w m u ch tim e

w ill th ey w o rk in g to g eth er, tak e to co m p lete a jo b w h ich

A alo n e co u ld h av e d o n e in 23 d ay s? A n s:13 d ay s
Solution: A B

13 10 30% = 30/100 = 3/10

A = 10+3 = 13

A + B can do the job in 13 + 10 =23 days

Therefore” A” can do in (13 x 23)/23 =13days

2 nd method

Ratio of times taken by A and B =100:130=10:13.


Suppose B takes x days to do the work.
Then, 10:13::23:x ⇒ x=(23×1310)⇒x=29910.
A's 1 day's work =123;
B's 1 day's work =10299;
(A+B)'s 1 day's work =(123+10299)=23299=113
Therefore, A and B together can complete the work in 13 days.