Time and Work
Time and Work
Formulae
1. If A can do a piece of work in n days,
then A’s 1 day work = 1/n
2. If A’s 1 day work = 1/n,
Then A can finish the work in n days.
3. The ratio of work done by A and B = 3 : 1, then
The ratio of time taken by A and B to complete the
work = 1 : 3
3 13 = 4 days
1
Ans:
16 days. How long will it take for both A and B to complete the job
Type – II
B ------ 1/20
h o w m an y d ay s? (sy n erg y )
Soln: a = b+c
(a+b+c) = 6/50
(a +a) = 6/50
2a =6/50
a=3/50
Ans:25 days
5. Acan do a piece of work in 4 hours, Band Ctogether can
hours.
Solution:
1/2
Type - 3
6. If 6 men and 8 boys can do a piece of work in 10 days
Calculation
⇒ M = 2B
⇒ B = M/2 ----(1)
Now, 6M + 8B in 10 days
⇒ D = 4 days.
∴ The time taken by 15 men and 20 boys to do the same type of work
will be 4 days.
7. 4 men and 6women can complete a work in 8 days, while
8. If 2 m en an d 3b o y s can d o a p iece o f w o rk in 10 d ay s,
:12 2 days
1
work? Ans
Solution:
2x + 3y = 1/10
3x + 2y = 1/8
x=7/200 , y= 1/100
=16/200 = 2/25
So, 2 men and 1 boy can finish the work in 25/2 = 12 ½ days
Type – 4
9. A contractor undertakes to do a job in 40 days. He
h ad n o t en g ag ed th e ad d itio n al m en . H o w m an y d ay s
=100x35 + 200x5
=3500 + 1000
W=4500 units
in 38 d ay s. A fter 25 d ay s, h e em p lo y ed 5 m en m o re an d
the work was finished one day earlier. How many days he
A n s: 39 d ay s
=14 days
25 + 14 = 39days
Type - 5
th e sam e w o rk in 12 d ay s. T h ey w o rk to g eth er fo r 3 d ay s
in 15 d ay s. T h ey w o rk to g eth er fo r 4 d ay s an d th en B
w o rk in 54 d ay s. T h ey w o rk to g eth er fo r 12 d ay s an d th en
days
Type – 6
72 h rs. T h en B can d o it in ? A n s : 6
1
piece of work in
h rs
16. A is 30% m o re efficien t th an B . H o w m u ch tim e
A alo n e co u ld h av e d o n e in 23 d ay s? A n s:13 d ay s
Solution: A B
A = 10+3 = 13
2 nd method