RA - Matrix
RA - Matrix
:
Rev. : AA
INTRODUCTION Page : 1 of 3
Hazard and effect management process is intended for carrying out all jobs safely without any harm to the people, environment and
damage or loss to the assets. The document demonstrates that all hazards with potential for causing harm to people, environment and
assets are identified and control measures to be implemented are specified. Supervisor’s in-charge of each task shall ensure that all
control and recovery measures are in place and identified.
The process followed in preparing the document involves following steps:
Identifying the activity. Eliminating the hazards where possible.
Breakdown the activity into tasks. Assessing the consequences from the remaining hazards.
Prepare inventory of activities. Specifying controls.
Identifying the hazards and risks. Specifying recovery measures.
MATRIX USED FOR ASSESSING RISK RANKING
PROBABILITY OF HAPPENING AGAIN
CONSEQUENCES
(If nothing is done to prevent it)
VERY LOW LOW MEDIUM HIGH VERY HIGH
P A E R A B C D E
Severity People Assets Environment Reputation Never heard of in Incident has Happens Happens
(Injury) (Damage or Loss) (Total effect) (Impact) Civil Construction Heard in industry occurred in Several times per Several times per
Industry Company year in Company year at project
Where any other hazard is identified during the planning/execution of a particular activity or where any activities are left out
from the hazard analysis or any other observations/comments are noted, follow change control procedure and inform HSE
Manager about such activity in the “User Feedback Form” to update the Hazard & Effect Management document.
The activities enlisted in the document are based on five major groups, as under:
(1) General Engineering (2) Civil Engineering (3) Mechanical Engineering (4) Electrical Engineering (5) Instrumentation
Engineering