SCHEDULE OF RATES
DESCRIPTION OF WORKS ASSUMED ASSUMED ASSUMED UNIT
ITEM No. TOTAL AMOUNT
UNIT QUANTITY PRICE
4.0. DRAINAGE WORK
4.1 TRENCH EXCAVATION WITH BACKFILL
Supply all labor, equipment and tools needed in the
excavation of trenches for the drainage line to the specified CU.M.
line and grade including necessary works to backfill and
compact trench of completed drainage line to the required
elevation as shown in the plans.
4.2. REINFORCED CONCRETE PIPE CULVERT
Supply of all materials, labor, and equipment necessary for
the installation of RCPipe Culvert as specified.
4.2.1 36"Ø RCCP L.M.
4.2.2 30"Ø RCCP L.M.
4.2.3 24"Ø RCCP L.M.
4.2.4 18"Ø RCCP L.M.
4.2.5 12"Ø RCCP L.M.
4.3 CHB CONCRETE MANHOLE WITH CONCRETE COVER
Supply of all materials, labor, and equipment necessary for
the construction of CHB Concrete Inlet Manhole (CIM) as
specified including excavation, backfilling, compaction and
all associated works as shown and/or specified.
4.3.1 CIM for 36"Ø RCP UNIT
4.3.2 CIM for 30"Ø RCP UNIT
4.3.3 CIM for 24"Ø RCP UNIT
4.3.4 CIM for 18"Ø RCP UNIT
4.3.4 CIM for 12"Ø RCP UNIT
4.4 HOUSE SERVICE CONNECTION
Supply of materials, labor, and tools necessary for the
installation of 100mm PVC house service connection
UNIT
including excavation, dewatering, backfilling, compaction
and all associated works as shown.
4.4.1 100mm x 0.30m PVC Service Drain
4.5 WASTE WATER TREATMENT FACILITY
Supply of all materials, labor, and equipment necessary for UNIT
the construction of Waste Water Treatment Facility as
specified.
SUB-TOTAL -
9.0. ROADWORKS
9.1 ROADWAY EXCAVATION
Supply of all labors, equipment and tools needed in the
CU.M.
excavation of roadways to thespecified line and grade.
9.2 SUB-GRADE PREPARATION
Supply of all labor, equipment and tools needed for the
trimming and compaction to line and grade in preparation
SQ.M.
for the placement of aggregate sub-base course and/or
aggregate base course.
9.3 AGGREGATE BASE COURSE
Supply of all materials, labor and equipment needed for the
placing, spreading and compacting of base course materials CU.M.
to the required line and grade as specified.
9.4 PORTLAND CEMENT CONCRETE PAVEMENT, 150MM THK
Supply of all materials, labor, equipment and formworks
necessary for pouring, spreading and curing of concrete to CU.M.
a specified thickness, line and grade.
9.5 PORTLAND CEMENT CURVES & GUTTER
Supply of all materials, labor, equipment and formworks
necessary for pouring, spreading and curing of concrete to L.M.
a specified thickness, line and grade.
9.6 PORTLAND CEMENT CONC. SIDEWALK, 100MM THK
Supply of all materials, labor, equipment and formworks
necessary for pouring, spreading and curing of concrete to SQ.M.
a specified thickness, line and grade.
SUB-TOTAL -
Total Land Development Cost -