GNA FAQs
GNA FAQs
Application Form
1. Is there any other way of submission of application other than NSWS portal?
No. All applications should be applied online through NSWS portal only. The link for
NSWS portal is https://www.nsws.gov.in/
Application shall have a legally valid digital signature certificate (Class 3 - SHA2 –
Signing Component) mapped with the name of applicant company as per
Interoperability guidelines of Controller of Certifying Authorities (CCA) of India.
3. Can connectivity be applied for less than installed capacity in case generator is already
connected or intending to connect to intra-state transmission system also?
Yes, however, the applicant has to submit copy of application already made to STU or
intimation issued by STU clearly indicating actual quantum of STU Connectivity (out of
installed capacity) and for the balance quantum (Installed Capacity – STU
Connectivity) application to be submitted to CTU.
Affidavit
Yes, affidavit should be signed by the authorized person submitting the application.
Yes
Yes, a new affidavit is required each time a new application is filed. If an application is
reverted for deficiencies, the affidavit submitted in the original application may be used
in the corresponding revised application.
7. Can applicant submit affidavit with affixed revenue stamps / special adhesive stamps
in place of non-judicial stamp paper?
Affidavit shall be on Non-judicial Stamp Paper of min Rs. 10/-. Affidavits with affixed
revenue stamps / special adhesive stamps in place of non-judicial stamp paper shall
not be accepted. Affidavit shall be complete i.r.o all the formalities including physical
signatures, attestation from Notary, placement of company seal and name of signatory.
LoA/PPA
Total cumulative Connectivity quantum should not be more than quantum of LOA/PPA.
Further, same LoA can be utilized in cases where LoA has been issued on RTC basis
for multi located REGS projects. In such cases, details of each location and capacity
at each location duly submitted by REIA/distribution licensee shall have to be
submitted.
10. Can the LOA/PPA issued in the name of parent company be used for grant of
Connectivity to subsidiary.
For Connectivity Application, LOA/PPA should be issued in the name of the Applicant
company only.
Bank Guarantee
11. On whose name should the stamp paper for Bank Guarantee be purchased?
Text of the Bank Guarantee shall be strictly as per the format available on CTU
website. No deviation is acceptable.
Authorization Certificate
13. What are the details to be mentioned in the authorization certificate to be submitted by
RPPDs?
Certificate may be obtained from Central / State Govt authorizing the RPPD to
undertake infrastructural activities including arrangement for Connectivity on behalf of
solar/wind power generators as per Para 5.8 (vii)(a) of CERC Connectivity
Regulations.
Board Resolution
14. Is there any specific format for Board Resolution to be submitted along with the
application? What should be the contents of BR?
There is no specific format for Board Resolution. However, the same should authorize
a designated person for filing of application for grant of Connectivity/GNA. Additionally,
the following para may preferably be inserted in the BR: “The nominated person is
authorized to carry out all activities related to Connectivity and GNA under GNA
Regulations, 2022”.
URN
15. Do I have to mandatorily register my project with CEA e-gen portal before applying for
Connectivity?
Yes, CEA vide its Order dated 09.11.2020 (Ref. No.: CEA-PL-15-13(11)/1/2020-PSLF)
has directed that all power generating units of the country having installed capacity of
0.5 MW or above are required to register themselves on CEA e-GEN portal,
http://egen.cea.gov.in. URN need to be entered in the connectivity application form.
Application Fees
16. Can I deposit the application fees directly in the Bank account of CTUIL or any other
means in addition to the options available on NSWS portal?
No. All the Connectivity/GNA applications to CTU are now being received through
NSWS Portal only. Accordingly, the application fee (plus 18% GST) as prescribed in
the CERC GNA Regulations, 2022 is to be paid online through NSWS portal at the
time of submission of the application.
Land Documents
17. Which type of land documents are acceptable as per 5.8(xi)(b) and 5.8(vii) of CERC
Connectivity & GNA Regulations 2022?
18. Our company has signed sub-lease deed with our parent company, who in turn has
signed Lease Deed with landowners. Can I submit the lease as well as sub-lease deed
as part of land documents?
No. As stated above, only title deed, lease deed and land use agreement are
acceptable. Sub-lease deed, leave and license agreement, power of attorney,
agreement to sale/lease are not acceptable documents for grant of Connectivity.
19. Can applicant submit land documents having possession of land on a future date?
No. All land documents should bear clear and existing vesting of land rights including
the rights to use and possess the land in favour of applicant at the time of application.
No land documents shall have a reference for future date towards possession of land,
effective date of agreement/ Sale deed etc. and all rights shall be enforceable as on
the date of application. Further, the land rights should correspond with the life of the
project.
20. What are the additional documents to be submitted for Connectivity application on
Land Route?
Along with title deed/ lease deed / land use right documents, applicants should submit
the following documents:
a. An Undertaking towards submission of Land Documents as per FORMAT-UD-
LAND. (www.ctuil.in >> Open Access >> Formats and Agreements)
b. ‘Title Report’ in the applicant’s favour executed by a registered advocate
holding inter alia clear and present vesting of land rights (ownership or lease
rights or land use rights) as per FORMAT-TITLE-REPORT. (www.ctuil.in >>
Open Access >> Formats and Agreements)
In such case, the land documents should be submitted in the name of entity on whose
behalf connectivity is being sought by Lead Generator.
Common errors encountered in the Connectivity / GNA applications submitted under
GNA Regulations 2022