PROGRAM OF WORKS
ITEM
ITEM DESCRIPTION QTY UNIT UNIT COST
NUMBER
#ERROR! #ERROR!
A.1 #ERROR! #ERROR! #ERROR!
A.2 #ERROR! #ERROR! #ERROR!
SUB-TOTAL OF PART A
#ERROR! EARTHWORKS
B.1 Clearing and Grubbing 216.00 sq.m
B.2 Batterboard Installation 60.00 m
B.19 Excavation 40.00 cu.m
SUB-TOTAL OF PART B
#ERROR! CIVIL/STRUCTURAL WORKS
C.1 Concrete Works #ERROR! #ERROR!
C.1.1 FOOTING 23.00 CU.M
FORMWORKS
C.2 Masonry Works #ERROR! sq.m
C.3 #ERROR! #ERROR! #ERROR!
SUB-TOTAL OF PART C
#ERROR! #ERROR!
D.1 #ERROR! #ERROR! #ERROR!
D.2 #ERROR! #ERROR! #ERROR!
D.3 #ERROR! #ERROR! #ERROR!
D.4 #ERROR! #ERROR! #ERROR!
SUB-TOTAL OF PART D
B. TOTAL PROJECT COST
Prepared by:
PROGRAM OF WORKS
EQUIPMENT CONTRACTOR'S
MATERIAL COST LABOR COST OCM VAT TOTAL COST
COST PROFIT
-TOTAL OF PART A
-TOTAL OF PART B
-TOTAL OF PART C
-TOTAL OF PART D
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
Item No. B.1
Description Clearing and Grubbing
Length 20
Width 19
Length 20
Width 19
Perimeter 78 l..m
Length 20
Width 19
Height
Natural Volume Number
Volume of Total Volume
Mark Length Width Depth Elevation of
Concrete for Excavation
to Top of Footings
Footing
Footing
Floor Slab Mi
Dimension
Number (Ground and Second
Length Width Height Volume
Floor)
Column 0.3 0.3 4.16 26 9.7344
Column below NGL 0.3 0.3 1.2 13 1.404
Footing 1 1 0.4 13 5.2
Beam 175.5 0.25 0.4 - 17.55
Description Formworks
Dimesion
Dimesion
Lateral
d b Length Perimeter Number of Plywood (6mm) say Board foot
Beam 0.4 0.25 175.5 1.15 70.078125 71 1779.
Description Scaffolding
Metal Reinforcements
Net Length of One Cut Total Number of Cuts Number of Total Number of Cut
Reinforcing Bar in One Footing Footings bars in (n) Footings Number of Cuts in 6 meters
Footing 0.85 12 13 156 7.05882352941176
pcs. 12 mm
Total 533
x6m
x2
pcs. 12 mm
1066 x 6 m
Total 3733.55375
1401.54
Horizontal Reinforcement
Reinforcement of Spacing Vertical Reinforcement Spacing Length of bars in meter
CHB Area cm. Length of bars in meter Layer
410.8075 40 1203.665975 2 1355.66475
Number of 6 m steel
Total Length in meters bar
2559.330725 426.555120833333
Description Formworks
Description Scaffolding
Board feet
2" x 3" 3606.1539 bd. Ft
Board feet
2" x 3" 3736.29 bd. Ft
Mixture Class: A
10.296325 20.59265
9.731345 19.46269
Mixture Class: A
1265.472
Order
193.2
x2
152 kilograms of No. 16 G.I. wire