Project Report
Project Report
PROJECT REPORT
ON
SUBMITTED
TO
MASTER OF COMPUTER
APPLICATIONS SEMESTER-II (2022 - 23)
BY
Mr. Pavan Digambar Chincholkar
Mr. Chaitanya Siddhappa
Birajdar UNDER THE
GUIDANCE OF
Prof S. N. Gambhire
(B.Sc., M.C.A., M.Phil)
THROUGH
DIRECTOR
BHARATI VIDYAPEETH (DEEMED TO BE) UNIVERSITY, PUNE
Siddhappa Birajdar
PRN 2223100020
2223100021
Batch 2022-23
CERTIFICATE
This is to certify that Mr. Pavan Digambar Chincholkar & Mr. Chaitanya Siddhappa Birajdar
having Exam Seat No. 2323760011 & 2323760012 are bonafide student of this Institute studying in
MCA SEM–II have completed the project report entitled “Hostel Management System” for the
Place: Solapur
Date:
Dr. S. B. Sawant
Director
CERTIFICATE
This is to certify that Mr. Pavan Digambar Chincholkar & Mr. Chaitanya Siddhappa Birajdar
having Exam Seat No. 2323760011 & 2323760012 are bonafide student of this Institute studying in
MCA SEM–II have completed the project report entitled “Hostel Management System” for the
Place: Solapur
Date:
Dr. A. B. Nadaf
CERTIFICATE
This is to certify that Mr. Pavan Digambar Chincholkar & Mr. Chaitanya Siddhappa Birajdar
having Exam Seat No. 2323760011 & 2323760012 are bonafide student of this Institute studying in
MCA SEM–II have completed the project report entitled “Hostel Management System” for the
UNIVERSITY, PUNE.
Date:
Prof. S. N. Gambhire
To,
The Director,
I undersigned hereby declare that the project report entitled “Hostel Management System” written
and submitted under the guidance of Prof. S.N.Gambhire, it’s my original work. The empirical
findings in this project are based on the data collected by myself while preparing this project. I have
not copied from any other project report.
I understood that, any such copying is liable to be punished in a way the University authorities may
deem fit.
Place: Solapur
Date:
The happiness of anything depends on what we give more than what we get. I would like
to give the words of thanks, but the words are not enough to express my deep sense of gratitude to
many persons who spread their time and efforts during the course of study work without their whole
hearted assistance and co-operation the project won’t be successful
I would like to give special thanks to our Director Dr. S.B. Sawant for giving an opportunity to
complete my project.
I got the opportunity to express my sincere thanks to project guide Prof. S.N.Gambhire for their
valuable guidance and contribution in preparing the project.
I am especially thankful to Dr. A.B.Nadaf for his valuable guidance and contribution in preparing the
project.
I also, thank to my classmates everyone of my family and all the people who helped me directly and
indirectly to complete this project.
3 Feasibility Study 12
Technical feasibility
Economical feasibility
Operational feasibility
4 Project Work Plan 13
5 Configuration Needed 14
Hardware Specification
Software Specification
DFD Diagram 15
Use Case Diagram 17
ER Diagram
18
7 Database design 19
8 Screens layout 22
9 Testing 34
10 Conclusion 35
11 Suggested References 36
For the past few years the number of educational institutions are increasing rapidly. Thereby the
number of hostels are also increasing for the accommodation of the students studying in this
institution. And hence there is a lot of strain on the person who are running the hostel and software’s
are not usually used in this context. This particular project deals with the problems on managing a
hostel and avoids the problems which occur when carried manually
Identification of the drawbacks of the existing system leads to the designing of computerized
system that will be compatible to the existing system with the system which is more user friendly
and more GUI oriented. We can improve the efficiency of the system, thus overcome the following
low security
Data redundancy
difficult to handle
The aim of proposed system is to develop a system of improved facilities. The proposed system can
overcome all the limitations of the existing system. The system provides proper security and reduces
the manual work.
The proposed system is having many advantages over the existing system. It require less overhead
and very efficient. The proposed system deals with the mess calculation and allotment process
efficiently.
Security of data.
Greater efficiency.
Better service.
Admin can edit notice board and each student can view it.
Introduction:
The preliminary investigation tells us whether the system that we are Developing is
practical or not. The feasibility study helps in that matter. Feasibility study is a very important stage
in the system development. It helps to obtain an overview of the problem and to get rough
assessment of whether feasible solutions exist. It can define problems, objectives involved in the
project.
1. Technical Feasibility:
The technical feasibility in the proposed system deals with the technology used in the
system. It deals with the hardware and software used in the system whether they are of latest
technology or not. It happens that after a system is prepared a new technology arises and the user
wants the system based on that technology. This system use windows platform, .net as front end
technology and sql server as backend technology. Thus ONLINE HOSTEL MANAGEMENT
SYSTEM is technically feasible.
2. Economic Feasibility: -
Economic analysis is the most frequently used method for evaluating the effectiveness of a
new system. More commonly known as cost/benefit analysis. .net using visual C# and sql datdabase
easily available in internet.
3. Operational Feasibility:
The project has been developed in such a way that it becomes very easy even for a person
with little computer knowledge to operate it. This software is very user friendly and does not
require any technical person to operate .Thus the project is even operationally feasible.
Hostel Management System 12
Project Work Plan
For developing major software project work, I have chalked out the project development
plan as:
1. Pentium IV Processor
2. 512 MB RAM
3. 40GB HDD
Software requirements:
1. OS : Windows XP
User Signup
User Sign in
User Dashboard
Admin Dashboard
System is neither designed as entire system nor tested as single system. System design,
development, debugging and testing is carried out in modules. These modules are integrated to
have entire fully fledged system.
Unit Testing:
The software units in a system are modules and routines that are assembled and integrated to
perform a specific function. Unit testing focuses first on modules, independently of one another,
to locate errors. This enables, to detect errors in coding and logic that are contained within each
module. This testing includes entering data and ascertaining if the value matches to the type and
size supported by java. The various controls are tested to ensure that each performs its action as
required.
System Testing:
System testing checks for the integration of each module in the system. It also searches
for the discrepancies between the system and its original objectives, current specification, and
system documentation. The primary concern is the compatibility of the individual modules.
The system is tested with these methods of testing. Testing is carried out using the test
data and checked for discrepancies. The dummy data was provided in each & every possible way
to ensure consistency of the system. The system with the validation at every stage handles all the
data and also provides relevant message to the user in case of incorrect information.
To conclude the description about the project : The project, developed using PHP and MySQL
is based on the requirement specification of the user and the analysis of the existing system,
software development. This hostel management software is designed for people who want to
manage various activi-ties in the hostel. For the past few years the number of educational
Thereby the number of hostels are also increasing for the accommodation of the students studying
in this institution. And hence there is a lot of strain on the person who are running the hostel and
software’s are not usually used in this context. This particular project deals with the problems on
managing a hostel and avoids the problems which occur when carried manually.
Identification of the drawbacks of the existing system leads to the designing of computerized
system that will be compatible to the existing system with the system which is more user
1. www.w3schools.com
2. in.php.net
3. en.wikipedia.org/wiki/PHP
4 . www.hotscripts.com/category/php/
5. www.apache.org/