Full Report 3
Full Report 3
PETROL STATION
Project
PERMOHONAN PELAN BANGUNAN DIBAWAH AKTA
133 BAGI: CADANGAN MEMBINA SEBUAH STESEN
MINYAK SERTA RESTORAN MAKANAN SEGERA/
PANDU LALU & KEDAI SERBANEKA DI ATAS
HAKMILIK TANAH GRN 67905 LOT 20104 ( LOT BARU
PT 8076), MUKIM JASIN, DAERAH JASIN, MELAKA
UNTUK TETUAN PARKLAND ENERGY SDN. BHD.
Project: PERMOHONAN PELAN BANGUNAN DIBAWAH AKTA 133 BAGI: CADANGAN
MEMBINA SEBUAH STESEN MINYAK SERTA RESTORAN MAKANAN SEGERA/
PANDU LALU & KEDAI SERBANEKA DI ATAS HAKMILIK TANAH GRN 67905 LOT
20104 ( LOT BARU PT 8076), MUKIM JASIN, DAERAH JASIN, MELAKA UNTUK TETUAN
PARKLAND ENERGY SDN. BHD.
Brief: The scope of the project to design a steel structure that will be placed on reinforced concrete
structure.
1 Design Code BS6399 (Part 1) – Code of Practice for Dead & Imposed Load
BS5950 – Structural Use of Steelwork in Building
MS 1553 – Wind Loading Wind Structure
/ BEAM LOADS
DIST GL FX2 -0.38 B 9999 TO 10128
/ BEAM LOADS
SELF X2 -1. B 1 3 TO 23 25 TO 28 31 32 35 37 TO 79 81 84 89 TO 235
238 TO 243 565 TO 944 946 TO 950 952 TO 1069 1071 TO 1105 1108 1110 1114
1116 1120 1122 1126 1128 1132 1134 1138 1140 1144 1146 1150 1152 1156 1158
1162 1164 1168 1170 1174 1176 1180 1182 1186 1188 1192 1194 1198 1200 1204
1206 1210 1212 1216 1218 1222 1224 1228 1230 1234 1236 1240 1242 1245 1247
1251 1253 1257 1259 1263 1265 1269 1271 1275 1277 1281 1283 1287 1289 1293
1294 1296 TO 1298 1300 TO 1306 BY 3 1307 1310 1311 1314 1315 1318 1319 1322
1323 1326 1327 1330 1331 1334 1335 1338 1339 1342 1343 1346 1347
1350 TO 1354 BY 2 1355 1356 1362 1363 9999 TO 10128
/ BEAM LOADS
SELF X2 -1. B 1366 TO 1400 1402 TO 1404
/ BEAM LOADS
SELF X2 -1. B 1410 1411
/ END
FORCE SUMMATION
FX1=0. kN
FX2=-626.36 kN
FX3=0. kN
/ BEAM LOADS
DIST GL FX2 -0.3 B 9999 TO 10128
/ END
FORCE SUMMATION
FX1=0. kN
FX2=-219.32 kN
FX3=0. kN
/ BEAM LOADS
DIST GL FX2 -0.78 B 9999 TO 10128
/ END STATIC
FORCE SUMMATION
FX1=0. kN
FX2=-570.23 kN
FX3=0. kN
PETROL STATION
Page: 1
Prepared by:
GEOMETRY
PETROL STATION
Page: 2
Prepared by: