Job Interview Question

The document discusses various topics related to construction including concrete mix designations, architect skills, crack repair methods, bending moment and shear force explanations, foundation types, honeycombing in concrete, cement testing, and curing periods. It also addresses construction manager responsibilities, concrete pumping challenges, and prestressing reinforcement types.

Uploaded by

shamal roy
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
222 views

Job Interview Question

The document discusses various topics related to construction including concrete mix designations, architect skills, crack repair methods, bending moment and shear force explanations, foundation types, honeycombing in concrete, cement testing, and curing periods. It also addresses construction manager responsibilities, concrete pumping challenges, and prestressing reinforcement types.

Uploaded by

shamal roy
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 38

1. What Do You Understand by M25 Concrete?

According to IS 456 : 2000, M refers Mix and 25 refers the characteristic compressive.
Strength of concrete cube of 150mmX150mmX150 mm tested at the end of 28 days should be minimum
25 N/Sq.mm
2. What is the maximum allowable fresh concrete temperature until used as per ASTM ?
32 OC
3. what are the skills required to become an architect ?
1. Conceptual understanding of designing models
2. Basic knowledge of computer and architect related software programs
3. Designing 3D models
4. Engineering ability
5. Business aptitude
6. Legal knowledge
4. What is guniting ?
It is a process in which mixture of cement & sand in proportion of 1:3 is shooted on concrete surface
with the help of cement gun under pressure of 2 to 3 kg/cm2. It is a highly effective process for repairing
concrete walls or damaged surfaces.
5. For filling cracks in masonry structures, the type of bitumen used, is
Plastic bitumen
6. What is the bending moment (BM) & Shear force (SF) – Explain.

A bending moment is the reaction induced in a structural element when an external force or moment is
applied to the element causing the element to bend. The most common or simplest structural element
subjected to bending moments is the beam.
Shear force is the force in the beam acting perpendicular to its longitudinal (x) axis. For design
purposes, the beam’s ability to resist shear force is more important than its ability to resist an
axial force. Axial force is the force in the beam acting parallel to the longitudinal axis.
7. For filling cracks in masonry structures, the type of bitumen used, is
Plastic bitumen
8. What is the process of covering of concrete placed on the exposed top of an external wall ?
Coping
9. A wall constructed to resist the pressure of an earth filling, is known as
Retaining wall
10. What is the minimum curing period?

IS 456 – 2000 recommends that curing duration of concrete must be at least 7 days in case of Ordinary
Portland Cement, at least 10 days for concrete with Mineral admixtures. It also recommends that the
curing duration should not be less than 10 days for concrete of OPC exposed to dry and hot weather
conditions and 14 days for concrete with mineral admixtures in hot and dry weather.
11. What is the minimum weight of fine aggregate for sieve analysis as per ASTM C136 ?
300 g
12. How many hours should CBR samples be soaked ?
96 Hrs
13. What is a bearing capacity of soil?

Bearing capacity is the capacity of soil to support the loads applied to the ground by the foundation of
the structure.
14. What do you mean by honeycomb in concrete?
Honeycomb, also known as air pocket, is nothing but the air voids in concrete. It is usually formed
during concrete casting.
15. What field tests are required for quality check of cement?
Quality of cement can be checked with color, physical properties, etc. Cement should have grey color
with light greenish shade. It should feel smooth when rubbed between fingers. If hand is inserted in a
heap of cement or its bags, it should feel cool. When pinch of cement is thrown in Water then cement
should float for some time before it sink. Also, it should be lump free.
16. What are the types of cement?
There are various types of cement which are: Ordinary Portland Cement (OPC), White Portland
Cement (WPC), Portland Pozzolana Cement (PPC), Low Heat Portland Cement, Coloured Portland
Cement, Hydrophobic cement, Rapid Hardening Cement, Portland Slag Cement, Sulphate resisting
Portland Cement, etc.
17. what is the difference between built area and super built up area?
• Built up area: It includes your carpet area plus area covered by walls, pillars and ducts. It is usually
10% more from the carpet area
• Super built up area: It includes your built up area plus the area that you use as building amenities like
passage to lift, stairs and lifts, gym, club, etc.
18. What is Water-Cement Ratio and How it is related to the strength of concrete?

The water-cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
A lower ratio leads to higher strength and durability, but may make the mix difficult to work i.e. low
workability of Concrete Mix. Workability can be increased with the use of admixtures.
19. Explain what is Hybrid Foundation?
Hybrid Foundation is usually used for high rise building, it contains both soil supported mat and piles.
This type of foundation is helpful in reducing the amount of the settlement.
20 . What are the steps involved in the concreting process, explain?
Steps In Concreting:
1. Batching: The process of measuring different concrete materials such as cement, coarse
aggregate, sand, water for the making of concrete is known as batching.
2. Mixing.
3. Transportation:
4. Compaction.
5. Curing.
21. Explain what is flashing?
Flashing is an extended construction that is done to seal and protects joints in a building from water
penetration. Flashing is installed at the intersecting roofs, walls and parapets.
22. What is Bursting Reinforcement ?
Tensile stresses are induced during prestressing operation and the maximum bursting stress occurs
where the stress trajectories are concave towards the line of action of the load. Reinforcement is needed
to resist these lateral tensile forces.
23. What are the major problems in using pumping for concreting works?
In pumping operation, the force exerted by pumps must overcome the friction between concrete and the
pumping pipes, the weight of concrete and the pressure head when placing concrete above the pumps. In
fact, as only water is pump-able, it is the water in the concrete that transfers the pressure.
The main problems associated with pumping are the effect of segregation and bleeding. To rectify these
adverse effects, the proportion of cement is increased to enhance the cohesion in order to reduce
segregation and bleeding. On the other hand, a proper selection of aggregate grading helps to improve
the pump-ability of concrete.
24. What are the responsibilities of a construction manager?
The responsibilities of a construction manager are
• Cost Estimates
• Pre-purchase of selected materials
• Selection of bidders for bidding phase
• Analysis of proposals
• Construction contract negotiations
• Construction Scheduling and Monitoring
• Cost control of construction
• Construction supervision
25. What is Shear slump ?
Shear slump implies that the concrete mix is deficient in cohesion. Consequently, it may undergo
segregation and bleeding and thus is undesirable for durability of concrete.
26. Why is concrete weak in tension?
Concrete is made up of collection of materials (several aggregate types, cement, pozzolans, water,
air…), which are stick together with a cement paste. The “interface” zone is the weakest link in the
structure. When compressing, that interface only serves to transfer compressive stresses from one
aggregate to the next. That does not require exceptional strength.
Under tension, the aggregates are trying to pull away from each other, and the glue is what holds the
whole system together. Since it is significantly weaker than the aggregates, it is where the failure starts
at much lower stresses.
27. What is grouting?
Grout is a fluid form of concrete which is used to fill the voids.
28. What is the recommended slump for column ?
75 to 125 mm
29. The bearing capacity of granite is generally ?
30 to 35 kg/cm 2
30. What are the specifications of tamping rod used in cube filling for cube test ?
Ans :- According to the IS code 2386, a 16 mm steel rod with rounded edge
31 .What is the minimum curing period ?
IS 456 – 2000 recommends that curing duration of concrete must be at least 7 days in case of Ordinary
Portland Cement, at least 10 days for concrete with Mineral admixtures.
It also recommends that the curing duration should not be less than 10 days for concrete of OPC
exposed to dry and hot weather conditions and 14 days for concrete with mineral admixtures in hot and
dry weather.
32. What are the functions of column in a building ?
Column is a vertical member in building whose Primary function is to support structural load and
transfer it through beams. Upper columns transfers the load to the lower columns and finally to the
ground through footings.
33. What are the uses of Groynes ?
They prevent, or slow down erosion, and stop the longshore drift. This, however, can have bad knock-on
effects somewhere near.
34. What is the initial and final setting time of ideal cement mix?
Initial setting time for ideal cement mix is around 30 minutes for almost all kind of cements. For
masonry cement it can be 90minutes. Final setting time of ideal cement mix should be 10 hours at max.
For masonry cement it shouldn’t exceed 24hours
35. The portion of a brick cut across the width is called
Bat
36. What reinforcements are used in the process of prestressing?
The major types of reinforcements used in prestressing are:
Spalling Reinforcement: The spalling stresses leads to stress behind the loaded area of the anchor
blocks. This results in the breaking off of the surface concrete. The most likely causes of such types of
stresses are Poisson`s effects strain interoperability or by the stress trajectory shapes.
Equilibrium reinforcements: This type of reinforcements are required where several anchorages exist
where the prestressing loads are applied in a sequential manner.
Bursting Reinforcements: These kinds of stresses occur in cases where the stress trajectories are
concave towards the line of action of load. In order to reduce such stresses, reinforcements in the form
of bursting are required.
37. What are the common ways of demolition?
• Hydro-demolition
• Pressure Bursting
• Dismantling
38. What are the main reasons for conducting pull-out tests for soil nails?
There are mainly four reasons for this test:
1. To check and verify the bond strength between soil and grout adopted during the design of
soil nails. This is the main objective of conducting soil nail pull-out test.
2. To determine the bond strength between soil and grout for future design purpose.
However, if this target is to be achieved, the test nails should be loaded to determine the
ultimate soil/grout bond with an upper limit of 80% of the ultimate tensile strength of steel
bars.
3. To check if there is any slippage or creep occurrence.
4. To check the elastic and plastic deformations of test nails. This is observed during the
repeated loading and unloading cycles of soil nails.
39. Explain QA&QC ?
Quality Assurance (QA): Quality Assurance is a set of activities for ensuring quality in the processes by
which works are done. Quality Assurance is the process of managing for quality.
Quality Control (QC): Quality Control is a set of activities for ensuring quality in works. The activities
focus on identifying defects in the actual products produced. Quality Control is used to verify the quality
of the output.
40. What Is The Ratio Of Grades M5, M7.5, M10, M15, M20, M25, M30, M35, M40?
M5 – 1:5:10
M7.5 – 1:4:8
M10 – 1:3:6
M15 – 1:2:4
M20 – 1:1.5:3
M25 – 1:1:2
M30, M35, M40 – Design Mix Followed
41. The length of each fish plate is
457.2mm
42. Rail chairs are used to fix
Double head rails
43. What is guniting ?
It is a process in which mixture of cement & sand in proportion of 1:3 is shooted on concrete surface
with the help of cement gun under pressure of 2 to 3 kg/cm2
44. It is a highly effective process for repairing concrete walls or damaged surfaces
Flat bearing
The main purpose of using bearing plate is to
Distribute the pressure over wider area,eliminate the adzing of wooden sleepers,preventing the widening
of gauge of curves
45. How would you describe the soundness of cement?
Cement soundness can be described as a property which ensures that the cement does not go through
any appreciable expansion pr experience any chance in volume once it has been set. This process helps
get rid of any possibilities of the mortar or concrete from getting disrupted.
46. Creeping of rails can be checked by using
Anchors
47. What Is Rigging ?
In sailing, the ropes used to move the sails around so the boat will move in the right direction when the
wind blows.
48. What Are The Materials Used In Building A Gravity Dam?
There are many gravity dams constructed of compacted earth. High dams are generally concrete. All
dams require a spillway to be safe. The spillway must be armored.
49. What made you decide to become a civil engineer?
I Decided to become a civil engineer because of my father who is a Math teacher. As a child he shared
his great love for solving mathematical equations and other types of puzzles with me. He was always
asking me to look outside the box to solve each dilemma. He encouraged me to have a quizzical mind
and to always explore not only how something was built but also how it worked. He inspired me to
figure out if the design could be improved upon by utilizing a different means.”
50. what The Purpose Of The Gap In The Road On This Bridge?
Purpose of the gap in the road is to allow the road to expand and contract with temperature changes
without causing damage or deformation to the road
51. On Indian railways , minimum formation width in embankment for a single line of board gauge ,is
6.1m
53. The device used for changing the direction of the engines is called
Turn table
54. The device provided to prevent the vehicles from moving beyond the end of rail at terminals is called
Buffer stops
55. What Are Moment Of Inertia And Its Importance In Civil Engineering?
The moment of inertia measures the opposition any kind of body will have against a certain momentum
(along that same axis) trying to rotate that body.
56. The distance between the running edge of the stock and switch rails at the switch heel ,is called
Heel clearance
57. What are various tests for checking brick quality?
We can use water absorption test, hardness test, shape & size, crushing strength test, soundness test, etc.
to check the brick quality. In water absorption test, we dip the brick for 16 hours in water. If weight of
brick after dipping in water doesn’t exceed by 20%, it can be considered as first class brick, if below
22.5% it can be considered as second class brick, if below 25% it can be considered as third class brick.
In crushing test, it crushing strength should be minimum of 10 N/mm2 for first class brick, 7.5 N/mm2
for second class bricks. In hardness test, we scratch the brick with nails. It should be scratch free. In
soundness test we check the metallic sound by striking two bricks with each other
58.The distance between the adjacent faces of the stock rail and the check rail , is called
Flange way clearance
59. What is void ratio?
Void ratio is the ratio of volume of voids to volume of solids.
60 .Stock rails are fitted
Against tongue clearance
61.The switch angle is the angle subtended between the gauge faces of the
Stock rail and check
62. Explain what is Critical Path Method (C.P.M)?
Critical Path Method is strategy and method of representing the respective tasks and activities involved
in the construction through a symbolic diagram.
63. How Do You Determine Specific Gravity Of Cement?
Cement is usually purchased as a powdery substance that is mixed with sand, aggregate, gravel, and
water to form concrete. Since the cement itself is usually a powder, it is hard to measure a standard
value for its specific gravity. In addition, since cement is usually not used by itself, knowing its specific
gravity is not Particularly useful.
A more useful question is “What is the typical density of concrete?” A rule of thumb answer is that
normal cured concrete has a density of about 150 pounds per cubic foot. This includes the weight of the
cement, sand, aggregate, and that PArt of the water that chemically binds with the cement to form the
concrete. Since water weighs about 62.4 pounds per cubic feet, concrete is about 2.4 times as heavy.
Thus, the specific gravity of concrete is about 2.4. If you took cement and mixed it with water, you
would eventually have a hard lump of useless cement and it would also have a specific gravity of
between 2 and 2.4.
64. The distance between the running face of the stock rail and toe of the tongue rail is known as
Throw of switch
65. The maximum value of throw of switch for a broad gauge track is
95mm
66 . In INDIA , the crossing number for passenger turnout is taken as
12
67 .A warner signal ,which is first seen by the driver , is known as
Outer signal
68.

69. The reception signal is


Outer signal ,home signal
70 .In a shunting signal , if the red band is horizontal , it indicates
Proceed
What the steps involved in Building Construction?
71. There are different steps involved in Building construction like,
 Concreting
 Masonry work
 Plastering work
 Flooring work
 Formwork
 Steel cutting and Bending
72. How do you measure the volume of concrete?
The volume of concrete is calculated by Multiplying its Length, Width, and Thickness together. For
Example – 1m x1m x1m = 1 m³ of volume of concrete.
73. Why Concrete Cover is provided to reinforcement?
Concrete cover for reinforcement is required to protect the rebar against corrosion and to provide
resistance against fire.
74. How to do check level on construction site?
I will check the level on construction site by Spirit level, Dumpy Level and Leveling Pipe.
75. What is the accuracy of the dumpy level or minimum reading we can take?
With the help of a dumpy level we can take up 5mm accurate reading or minimum reading.
76. How do you calculate the weight of 12m long and 10mm dia. Steel on-site?
By multiplying the length of steel bar with its unit weight
(unit wt of 10mm = 0.60 kg/m)
Weight of steel = 0.60x 12
= 7.2 kg
77. Which is the equation used for calculating unit weight of steel bar?
(D²/162)
78. What is the size of a concrete cube?
15 cm x 15 cm x 15 cm
79. What do you do if any concrete cube fails in 28 days compressive strength test?
If the concrete cube fails in strength test, I will conduct a core cutter test on concrete and send a report
to higher authorities.
80. What is the mix ratio for M – 20 Grade of concrete?
1: 1.5: 3
81. What is the Unit weight of 12 mm Steel Bars.
0.89 kg/m
82. Explain what is floating slab foundation?
A floating concrete foundation is a type of mat foundation that consists of the hollow mat formed by a
grid of thick reinforced concrete walls between two thick reinforced concrete slabs .
83. What is the Density of Steel?
7850 kg/m³
84. In Fe – 415 Steel Grade, 415 indicates of Steel.
Tensile Strength
85. The height of low kerb ?
A kerb is a structure used to separate pavement and median, pavement and shoulder, pavement and
footpath. In low kerb height is restricted to 100mm only.
86. What is the Volume of 50 kg bag of cement?
0.035 m³
87. What are the functions of grout inside tendon ducts?
Grout in prestressing works serves the following purposes:
1. Protect the tendon against corrosion.
2. Improve the ultimate capacity of tendon.
3. Provide a bond between the structural member and the tendon.
4. In case of failure, the anchorage is not subject to all strain energy.
88. In Residential Building, Average Value of Stair Width?
900 mm
89. What is the function of shear keys in the design of retaining walls?
In determining the external stability of retaining walls, failure modes like bearing failure,
sliding and overturning are normally considered in design. In considering the criterion of
sliding, the sliding resistance of retaining walls is derived from the base friction between
the wall base and the foundation soils. To increase the sliding resistance of retaining walls,
other than providing a large self-weight or a large retained soil mass, shear keys are to be
installed at the wall base.
90. he Slope of Stair Should not Exceed.
25- 40º
91. What are the major problems in using pumping for concreting works?
In pumping operation, the force exerted by pumps must overcome the friction between
concrete and the pumping pipes, the weight of concrete and the pressure head when placing
concrete above the pumps. In fact, as only water is pumpable, it is the water in the concrete
that transfers the pressure.
The main problems associated with pumping are the effect of segregation and bleeding. To
rectify these adverse effects, the proportion of cement is increased to enhance the cohesion
in order to reduce segregation and bleeding. On the other hand, a proper selection of
aggregate grading helps to improve the pumpability of concrete.
92. Minimum diameter of steel in Column.
12 mm
93. What are the disadvantages of curing by ponding and polythene sheets?
The purpose of curing is to reduce the rate of heat loss of freshly placed concrete to the
atmosphere and to minimize the temperature gradient across concrete cross section.
Moreover, curing serves to reduce of the loss water from freshly placed concrete to the
atmosphere.
Ponding: This method of thermal curing is readily affected by weather condition (cold
wind). Moreover, a large amount of water used has to be disposed off the construction sites
after curing.
Polythene sheet: This method of curing is based on the principle that there is no flow of air
over the concrete surface and thereby no evaporation can take place on top of the freshly
concreted surface by provision of polythene sheets. However, it suffers from the demerit
that polythene sheets can be easily blown off in windy condition and the performance of
curing would be affected. Moreover, for water lost due to self-desiccation, this method
cannot replenish these losses.
94. Standard Size of Brick?
19 cm x 9 cm x 9 cm
95. What is Unit Weight of RCC?
2500 kg/ m³
96. Explain what are the problems one might face while having a Cantilever balcony?
Cantilever balcony are usually unsupported and extend outwards, so the problem with Cantilever
balconies are
• Excess deflection or bounce
• Weakness of the deck structure
• Rot and water damage to the interior of the house
• Unevenness inside the house
• Can’t use the balcony for gardening or other purposes as it is not designed to lift excess amount of
weight
97. One Acre = Sq. ft.
43560 Sq. ft.
98. What is the Full Form of UTM?
Universal Testing Machine
99.What do you understand by segregation?
Segregation is defined as a process of filtering cement & sand separately from the concrete
mixture. In other words, segregation is caused due to vibration between materials forming
a concrete.
One material being high in weight & one being less tend to be uneven while in a liquid
state. The heavier material gets settled at the bottom of the concrete & lighter material
moves on top.
100. Cement Expire After?
3 month
101. What is the IS code for Plain and Reinforced Concrete
IS :456

102. One square meter = Sq. ft?


10.76 Sq. ft

103. What are the standard American codes for steel and concrete
ACI and AISC
104. What is the code of practice for General Construction in steel
IS :800
105. What is unit weight of 25 mm Steel Bars
3.85 kg/m
106 . One Hectare = _______Acres
2.47 Acres
107. One Gallon = Liters 3.78Liters
108 . Which type of cement is used is construction of massive Dam structures
Low heat cement
109. One kilonewton is equal to kilograms
101.97 KG
110. For Steel structures what is permissible vertical deflection
Span / 325
111. One Tonne is equal to kilograms
1000 KG
112. Maximum Free fall of concrete allowed is ?
1.5 m
113. Instrument used for level work on a construction site?
Dumpy Level
114. What is the minimum reinforcement in beams
Ast/b*d = 0.85/ fy
115. What is the maximum reinforcement in beams
0.04*b*d
116. What is the minimum reinforcement in slabs
0.12 % of gross area
117. What is the minimum reinforcement in columns
0. 8% of area
118. What is the maximum reinforcement in columns
4%
119. Minimum Bars in Circular Column Should be_______
6 Nos.
120. What is the Full Form of AAC?
Autoclaved Aerated Concrete
121. What is the Full Form of NDT?
Non – Destructive Test
122. What is the Full Form of JCB?
Joseph Cyril Bamford
123. Which Test is conducted to determine the bearing capacity of Soil?
Plate Load Test
124. Ring and ball test is conducted on which construction material?
Bitumen
125. Where is the section for bending considered
At the face of column
126. What is the maximum no of steps in a flight
12
127. What are various limit states of strength
Flexure, Compression, shear and torsion
128. Minimum hook length as per IS Code?
75 mm
129. What is the extra length in Bent up bars?
0.45 X D
130. What is Least Count of Dumpy?
5mm
131. What is Full of EGL?
Existing ground level.
132. A First Class Brick Should Absorb Water More than?
20 %
133. What are the minimum no of bars to be provided in rectangular column
4
134 .What are minimum no of bars to be provided in circular column
6
135. What are various losses in prestressing
1 Elastic deformation of concrete
2 Shrinkage of concrete
3 Creep of concrete
4 Relaxation of stress in steel

136. Vicats apparatus is used for


Consistency test
137. Le chatliers apparatus is used for
Soundness test
138. Number of Bricks used in 1 Cubic meter of Brickwork?
500 Nos.
139. The Normal Consistency of Portland Cement?
25 %
140. The Expansion in Portland cement is tested by…
Soundness Test
141. What is shear center in steel beam
It is point or axis through which load acts
142. What is Strut
Struct is a compression member
143. What is Modular ratio
It is the ratio of Modulus of elasticity of steel to Modulus of elasticity of concrete
144. What is the minimum diameter of bar used in column
12
145. What are bearing piles
Bearing piles transfer the loads to the hard strata
146. What are friction Piles
Friction piles transfer the loads by friction between surface of pile and soil.
147. According to IS Code, Full Strength of Concrete is achieved after?
28 Days
148. What is the Volume of 1 bag of cement?
0.035 m³
149. Minimum Grade of Concrete Used For RCC?
M – 20
149. What is the slenderness limit for column
Less than 12 , it is short column
More than 12 , it is Long column
150. What is the initial and final setting time for cement?
Initial: Less than 30 min and 600 min.
150. Le chatliers apparatus is used for
Soundness test
FAR CALCULATION:
FAR'' কিভাবে বের করবেন ???
আমরা যারা ইঞ্জিনিয়ারিং এ পড়ালেখা করি তাদের ফার জানা খুব দরকার। ধরুন, আপনার ৫ কাঠা জমি রয়েছে। ভেবে
রেখেছেন ৮-১০ তলা উঁচু বাড়ি বানাবেন । টাকা- পয়সা নিয়েও ঝামেলা নেই । কিন্তু আপনি জানেন কি ? আপনি
চাইলেও ৫ কাঠা জমিতে ১০ তলা বানাতে পারবেন না রাজউকের নিয়মানুযায়ী । কারন একটা ভবন বানানোর সময়
বিল্ডিং এর চারপাশে কিছু জায়গা ছেড়ে দিয়ে তারপর ডিজাইন করতে হয় । সেটাকে সেটব্যাক বলে । আমরা শুধুমাত্র
ফার নিয়ে আলোচনা করবো আজকে।
FAR জানার সুবিধাঃ
১. ফার জানলে যেকোনো ভালো অফিসে চাকরির গ্যারান্টি অনেকখানি বেড়ে যায় ।
২. বাড়ি কত তলা করতে পারবেন সেটা নিজেই হিসাব করতে পারবেন অংক করে ।
FAR এর হিসাব করবেন যেভাবেঃ
মনে করি,
ভূ মি- ৫ কাঠা,
রোড- ২০ ফু ট,
ফার- ৩.৫ ( ইঞ্জিনিয়ারিং বইগুলোতে শুধুমাত্র ফার লিখে কত কাঠার জন্য কত ফার সেটা উল্লেখ থাকে কিন্তু হিসাব
থাকে না । অনেক বড় বড় পণ্ডিত মার্কা ইঞ্জিনিয়াররাও ফারের হিসাব পারে না। তাই আপনি যদি ফারের হিসাব শিখে
রাখেন তাহলে বুক চাপড়ে নিজেকে নিয়ে গর্ব করতেই পারেন । কারন ফারের হিসাব জানা অনেকটা আর্থিক বিষয়ে
জড়িত । যেহেতু , ভালো চাকরি করতে চাইলে ফার জানতেই হবে।)
Maximum Build Area (M.B.A)= Land x Far
= 5 katha x 3.5 (far 3.5)
= 5x(720)x3.5 ( 1 katha=720square ft)
= 3600x3.5
=12600 sqft
Maximum Ground Coverage(M.G.C)- 62.5% ( এটাও লেখা থাকে বইতে কিন্তু যারা পারে না তারা এইসব
লেখাকে অনর্থক ভেবে বসে থাকে। হেহেহে )
= 5 katha x 62.5%
= (5x 720) x 62.5%
= 2250 sqft.
Number of Floor (N.O.F)= MBA / MGC
= 12600 / 2250
= 5.6 Floor
Total Floor = Ground floor + 5.6 floor
= 1+ 5.6 floor
= 6.6 floor ( ৬ তলা বাড়ি এবং চিলেকোঠা) ।
এই হিসাবে প্রায় সাত তলা কিন্তু সাত তলা না করাই ভালো যদি ভু মিকম্প থেকে বাঁচাতে চান এবং সারা এলাকাতে
আপনার বাড়িটি যদি মাথা উঁচু করে দাঁড়িয়ে থাকবে সেটা চান !!!
মনে রাখবেনঃ
***এই গাণিতিক হিসাবটা কেউ কাউকে শেখায় না। একমাত্র এই গাণিতিক হিসাব জানার কারনে আপনার বেতন বেড়ে
যাবে। বসের কাছে কদর বেড়ে যাবে । হয়ত আপনার কাছের বন্ধু র কাছে বেশ কবার শিখতে চেয়েছেন কিন্তু সে আপনাকে
আজকাল করে ঘুরাতে থাকবে। কিন্তু আজকে আমি আপনাদের একদম ফ্রিতে দিয়ে দিলাম । আমি চাই, আমার দেশের
প্রতিটা ইঞ্জিনিয়ার দেশের বোঝা না হয়ে সম্পদে পরিণত হোক ।
* বইতে সব কিছুর বিস্তারিত মাপ দেয়া আছে । কেউ যদি এখানে পাঁচ কাঠার পরিবর্তে অন্য কাঠা ব্যবহার করে সেক্ষেত্রে
হিসাব ভিন্ন হবে।
* কখনো কাঠার পরিমান কম বেশি হলে এই হিসাবে দশমিক দিয়ে কোন সংখ্যা নাও আসতে পারে সেক্ষেত্রে যা এসেছে
তাই ব্যবহার করুন । এবং নিজে সুস্থভাবে বেঁচে থাকু ন ।
* গুগলে সার্চ করেও ফার সম্পর্কি ত এই হিসাবটা আপনি পাবেন না । বাংলায় এবং ইংরেজিতে লেখা একমাত্র লেখা
এটা ।
এই ধরনের আরো গুরুত্বপূর্ণ তথ্য পেতে পেইজে ফলো এবং শেয়ার দিয়ে রাখতে পারেন।
আরো জানতে যোগাযোগ
Engr sharif khan joy
আপনার বাড়ি নির্মান করতে ড্রয়িং ডিজাইন এবং কনস্ট্রাকশন ঠিকাদারি কাজের জন্য আমাদের সাথে চু ক্তিবদ্ধ হতে
পারেন।
Civil Engineering Drawing Questions and Answers – Finishing
Work
This set of Civil Engineering Drawing Multiple Choice Questions & Answers (MCQs)
focuses on “Finishing Work”.

1. What are the steps involved in the concreting process?


a) Compacting, Batching, Mixing, Transporting and placing of concrete
b) Mixing, Batching, Transporting, placing of concrete and Compacting
c) Batching, Mixing, Transporting and placing of concrete, Compacting
d) Batching, Placing of concrete, Compacting, Mixing and Transporting
View Answer
Answer: c
Explanation: Steps involved in the concreting process are:
Batching: The process of measurement of the different materials for the making of concrete
is known as batching. Batching is usually done in two ways: volume batching and weight
batching. In case of volume batching the measurement is done in the form of volume
whereas in the case of weight batching it is done by the weight.
Mixing: In order to create good concrete the mixing of the materials should be first done in
dry condition and after it wet condition. The two general methods of mixing are: hand mixing
and machine mixing.
Transportation and placing of concrete: Once the concrete mixture is created it must be
transported to its final location. The concrete is placed on form works and should always be
dropped on its final location as closely as possible.
Compaction of concrete: When concrete is placed it can have air bubbles entrapped in it
which can lead to the reduction of the strength by 30%. In order to reduce the air bubbles
the process of compaction is performed. Compaction is generally performed in two ways: by
hand or by the use of vibrators.
2. The major type of reinforcements used in prestressing is ________
a) circular reinforcement
b) spalling reinforcement
c) rolling reinforcement
d) spiral reinforcement
View Answer
Answer: b
Explanation: The spalling stresses leads to stress behind the loaded area of the anchor
blocks. This results in the breaking off of the surface concrete. The most likely causes of
such types of stresses are Poisson`s effects strain interoperability or by the stress trajectory
shapes.
3. ____________ is a type of slump test indication.
a) Shear slump
b) Moment slump
c) False slump
d) Rigid sump
View Answer
Answer: a
Explanation: This type of slump is characterized by the general drop of the concrete mass
evenly without visible signs of deterioration or disintegration.
Shear Slump: It indicates that the concrete mix is deficient in cohesion. This type of slump
leads to segregation and bleeding. Henceforth in the long run effecting the durability of the
concrete.
Collapse Slump: This type of slump is indicates that the mix of concrete is simply too wet.
The mix is considered to be harsh and lean.
advertisement

4. The foundations are placed below ground level, to increase ____________


a) stability
b) strength
c) workability
d) life span
View Answer
Answer: a
Explanation: The main purpose of the foundation is to distribute the load of the
superstructure to the sub-bearing strata and depth of foundation is below the ground level to
prevent the external force like wind load and hence to stabilized the structure.
5. The process of making the back ground rough, before plastering, is ___________
a) dubbing
b) peeling
c) blistering
d) hacking
View Answer
Answer: d
Explanation: Hacking is done on the finished wall before application of plaster of paris or
tiles. It is the process of roughening the wall surface so that plaster can rest on it otherwise
it would get shear off due to plane surface of the wall. Generally it is adopted for renovation
purpose (applying POP). Earlier mason prepare it with cement plaster and later on if owner
wants to renovate wall of their house with tiles or POP they use this process called hacking.
There are lot of methods to do it but generally, it is been done by chisel.
Note: Join free Sanfoundry classes at Telegram or Youtube
6. The angular steps used for changing direction of the stairs, are called ___________
a) round steps
b) angular steps
c) radial steps
d) winders
View Answer
Answer: d
Explanation: Winders are steps that are narrower on one side than the other. They are used
to change the direction of the stairs without landings. A series of winders form a circular or
spiral stairway. When three steps are used to turn a 90° corner, the middle step is called a
kite winder as a kite-shaped quadrilateral.
7. A projecting piece usually provided to support a truss is __________
a) coping
b) cornice
c) lintal
d) frieze
View Answer
Answer: d
Explanation: In architecture the frieze is the wide central section part of an entablature and
may be plain in the Ionic or Doric order, or decorated with bas-reliefs. Even when neither
columns nor pilasters are expressed, on an astylar wall it lies upon the architrave (‘main
beam’) and is capped by the moldings of the cornice. A frieze can be found on many Greek
and Roman buildings, the Parthenon Frieze being the most famous, and perhaps the most
elaborate. This style is typical for the Persians.
8. Curing is the process of maintaining the moisture and temperature conditions for freshly
deployed concrete.
a) True
b) False
View Answer
Answer: a
Explanation: The methods that are involved in saving the shrinkage of the concrete
includes:
(a) Spraying of water: on walls, and columns can be cured by sprinkling water.
(b) Wet covering of surface: can be cured by using the surface with wet gunny bags or
straw
(c) Ponding: the horizontal surfaces including the slab and floors can be cured by stagnating
the water.
(d) Steam curing: of pre-fabricated concrete units steam can be cured by passing it over the
units that are under closed chambers. It allows faster curing process and results in faster
recovery.
(e) Application of curing compounds: compounds having calcium chloride can be applied on
curing surface. This keeps the surface wet for a very long time.
9. In order to make a elastomeric bearing act/ function as a soft spring it should be made to
allow it to bulge laterally and also the stiffness compression can be increased by simply
increasing the limiting amount of the lateral bulging.
a) True
b) False
View Answer
Answer: a
Explanation: In many cases in order to increase the compression stiffness of the bearing the
usage of metal plates is made. Once steel plates are included in the bearings the freedom
of the bulge is restricted dramatically, also the deflection of the bearing is reduced as
compared to a bearing without the presence of steel plates. The tensile stresses of the
bearings are induced into the steel plates. But the presence of the metal plates does not
affect the shear stiffness of the bearings.
10. Pumping be not used in case of concreting works.
a) True
b) False
View Answer
Answer: a
Explanation: During the pumping operation the pump exerted pressure must overcome any
friction between the pumping pipes and the concrete, also the weight of the concrete and
the pressure head when the concrete is placed above the pumps. Since only water is pump
able, all the pressure generated is by the water that is present in the concrete. The major
problem due to pumping are segregation effects and bleeding. In order to rectify and reduce
these effects, generally the proportion of the cement is increased in order to increase the
cohesion, which leads to the reduction of segregation and bleeding. Also if a proper
selection of the aggregate grading can vastly improve the concrete pump ability.
Sanfoundry Global Education & Learning Series – Civil Engineering Drawing.
To practice all areas of Civil Engineering Drawing, here is complete set of 1000+ Multiple
Choice Questions and Answers.
« Prev - Civil Engineering Drawing Questions and Answers – Roof Covering, Sloping Roof
& Flat Terraced Roof

25 Building Engineer Interview Questions and Answers


Learn what skills and qualities interviewers are looking for from a building engineer,
what questions you can expect, and how you should go about answering them.

Interview Insights
Published Jan 6, 2023

Commercial and institutional buildings, such as hospitals, schools, and office


buildings, have a wide range of mechanical, electrical, and plumbing (MEP)
systems that need to be properly maintained to ensure the comfort and safety
of the people who work in and visit them. That’s where building engineers
come in. They’re responsible for the operation, maintenance, and repair of the
MEP systems in these types of buildings.

If you’re interested in becoming a building engineer, you’ll need to be


prepared to answer some tough interview questions. In this guide, we’ve
compiled a list of the most common questions asked in building engineer job
interviews, along with sample answers.

COMMON BUILDING ENGINEER INTERVIEW QUESTIONS

 Are you familiar with the latest building codes and standards?
 What are some of the most important skills for a building engineer to have?
 How would you handle a situation where the budget for a project was running
over?
 What is your experience with using blueprints and other architectural plans?
 Provide an example of a time when you had to troubleshoot a problem with a
building’s infrastructure.
 If you were given the opportunity to design your own building from scratch,
what features would you include?
 What would you do if you noticed a coworker was violating safety protocols?
 How well do you understand the process of constructing buildings from the
ground up?
 Do you have experience working with new technologies that could improve
the way buildings operate?
 When performing maintenance on an existing building, what is your process
for prioritizing tasks?
 We want to encourage employees to feel comfortable coming to our engineers
with questions or concerns. Is there a particular strategy you use to build
rapport with coworkers?
 Describe your process for documenting your work and maintaining records.
 What makes you the right candidate for this job?
 Which building projects have you worked on in the past?
 What do you think is the most important aspect of building maintenance?
 How often do you perform routine inspections?
 There is a problem with the building’s foundation. What is the first thing you
do?
 What techniques do you use to troubleshoot a building’s electrical system?
 Describe your approach to managing multiple projects at once.
 How often do you communicate with the rest of the maintenance team?
 Do you have any experience working with subcontractors?
 Are there any new technologies or trends that you think could benefit our
buildings?
 How do you stay up to date on changes in building codes and regulations?
 Can you provide an example of a time when you had to make a quick decision
under pressure?
 In what ways can a building engineer contribute to sustainability initiatives?
EXPAND+
1. Are you familiar with the latest building codes and standards?

Interviewers may ask this question to see if you are up-to-date on the latest
building codes and standards. They want to make sure that you can apply
these regulations in your work as a building engineer. In your answer, explain
which building codes and standards you’re familiar with and how they affect
your daily work.

Example: “Yes, I am very familiar with the latest building codes and
standards. Throughout my career as a Building Engineer, I have kept up to
date on all of the changes in the industry by attending seminars and
workshops, reading industry publications, and keeping an eye out for new
developments. I also stay informed through networking with other
professionals in the field.

I understand that safety is paramount when it comes to buildings and


structures, so I make sure to keep myself updated on any relevant regulations
or laws that may affect my work. I take pride in ensuring that all of my projects
are compliant with the most current building codes and standards.

In addition, I am knowledgeable about energy efficiency and sustainability


practices, which are becoming increasingly important in the construction
industry. I strive to use the best available materials and techniques to ensure
that each project meets the highest standards of quality and performance.”

2. What are some of the most important skills for a building engineer to have?

This question can help the interviewer determine if you have the skills
necessary to succeed in this role. When answering, it can be helpful to
mention a few of your strongest skills and how they relate to the job.

Example: “As a building engineer, I believe that having strong technical skills
is essential. This includes knowledge of HVAC systems, electrical and
plumbing systems, as well as the ability to troubleshoot any issues that may
arise. It’s also important to have excellent communication and interpersonal
skills in order to work effectively with other team members and customers.

In addition, having an understanding of safety protocols and regulations is


critical for ensuring the safety of everyone in the building. Finally, it’s
important to be organized and detail-oriented in order to keep track of
maintenance schedules and ensure that all tasks are completed on time and
correctly.”

3. How would you handle a situation where the budget for a project was running over?

An interviewer may ask this question to assess your ability to manage a


project’s budget and ensure that it stays within the allocated funds. In your
answer, explain how you would identify the cause of the budget overrun and
implement strategies to keep costs under control.

Example: “If I was faced with a situation where the budget for a project was
running over, my first step would be to analyze the current state of the project
and determine what is causing the overrun. This could include looking at
materials costs, labor costs, or any other factors that may have contributed to
the issue. Once I had identified the cause, I would then work to develop
solutions to address it.

I believe in being proactive rather than reactive when it comes to managing


projects, so I would also look into ways to prevent similar issues from
occurring in the future. This could involve changing the way certain tasks are
completed, negotiating better prices with suppliers, or finding more efficient
methods of completing the job. Finally, I would keep an open dialogue with all
stakeholders involved in the project to ensure everyone is aware of the
changes being made and how they will affect the overall outcome.”

4. What is your experience with using blueprints and other architectural plans?

The interviewer may ask this question to learn more about your experience
with the construction process and how you use blueprints. Use your answer to
highlight your ability to read plans, understand architectural drawings and
apply them to building projects.

Example: “I have extensive experience using blueprints and other


architectural plans. I have worked with a variety of different types of
blueprints, from residential to commercial projects. My understanding of the
various components of a blueprint is very strong, as I am able to quickly
identify symbols and understand the purpose of each component. I also have
experience in reading and interpreting complex architectural plans, such as
those used for large-scale construction projects.

In addition to my knowledge of blueprints, I also have experience working with


computer-aided design (CAD) programs. I have used CAD software to create
detailed drawings and models that accurately represent the desired end result
of a project. This has allowed me to ensure that all aspects of a project are
accounted for before any physical work begins.”

5. Provide an example of a time when you had to troubleshoot a problem with a building’s
infrastructure.

This question is an opportunity to show the interviewer that you have


experience with troubleshooting and problem-solving. Use your answer to
highlight your critical thinking skills, ability to communicate effectively and how
you use technology to solve problems.

Example: “I recently had to troubleshoot a problem with the infrastructure of


an office building. The issue was that the air conditioning system wasn’t
working properly and it was causing discomfort for the employees. I started by
assessing the situation, which included inspecting the HVAC unit and its
components. After my inspection, I determined that the condenser fan motor
was not functioning correctly.

I then researched the best way to repair the motor and found a solution that
would be cost-effective and efficient. I ordered the necessary parts and
replaced the faulty motor. Once the new motor was installed, I tested the air
conditioning system to make sure it was running smoothly. Finally, I
documented all of the steps I took to fix the issue in order to provide a
reference for future maintenance.”

6. If you were given the opportunity to design your own building from scratch, what features would
you include?

This question is a great way to assess your creativity and problem-solving


skills. It also allows the interviewer to see how you would apply your
knowledge of building codes, regulations and other standards to create an
innovative design. Your answer should include details about what makes you
passionate about architecture and engineering.

Example: “If I was given the opportunity to design my own building from
scratch, there are several features that I would include. First and foremost,
safety is a top priority for any structure, so I would ensure that the building
meets all local codes and regulations regarding fire safety, structural integrity,
and energy efficiency.
I would also prioritize sustainability in the design of the building. This could be
achieved through the use of renewable energy sources such as solar panels
or wind turbines, as well as incorporating green materials into the construction
process. Furthermore, I would make sure that the building has adequate
insulation and ventilation systems to reduce its environmental impact.

Lastly, I would strive to create an aesthetically pleasing environment by using


natural light whenever possible, selecting high-quality finishes, and utilizing
modern technology to maximize comfort and convenience. By creating a
space that is both safe and pleasant to inhabit, I believe it would be a great
asset to any community.”

7. What would you do if you noticed a coworker was violating safety protocols?

Employers ask this question to make sure you’re willing to report violations of
safety protocols. In your answer, explain that you would speak with the
coworker privately and offer them a chance to correct their mistake. If they
refuse, you would then report it to your supervisor or building manager.

Example: “If I noticed a coworker was violating safety protocols, my first step
would be to address the issue directly with them. I believe in open
communication and addressing issues head-on. I would explain why their
actions are not safe and how they can correct their behavior.

I would also document the incident and report it to my supervisor or other


appropriate personnel. This is important for ensuring that everyone is held
accountable for their actions and that any necessary changes can be made to
prevent similar incidents from occurring in the future.”

8. How well do you understand the process of constructing buildings from the ground up?

This question can help the interviewer assess your knowledge of construction
and building processes. Use examples from your experience to highlight your
understanding of how buildings are constructed, including the materials used
in construction and the steps involved in the process.

Example: “I have a great understanding of the process of constructing


buildings from the ground up. I have been in the building engineering field for
over 10 years and have worked on projects ranging from small residential
homes to large commercial office spaces.
My experience has given me an in-depth knowledge of all aspects of
construction, including structural design, materials selection, site preparation,
and project management. I am familiar with the latest building codes and
regulations and understand how they must be followed to ensure safety and
quality.

I also have strong problem solving skills which allow me to identify potential
issues early on and develop solutions quickly. My ability to think outside the
box helps me come up with innovative ideas that can help save time and
money. Finally, I am highly organized and detail oriented, ensuring that no
step is overlooked during the construction process.”

9. Do you have experience working with new technologies that could improve the way buildings
operate?

The interviewer may ask this question to see if you’re open to learning new
technologies and integrating them into your work. Use examples from past
projects where you implemented a new technology or helped your team do so.

Example: “Yes, I have experience working with new technologies that could
improve the way buildings operate. In my current role as a Building Engineer,
I have implemented several innovative solutions to increase efficiency and
reduce energy consumption in our building systems. For example, I recently
installed an automated lighting system that adjusts the brightness of lights
based on occupancy levels. This has resulted in significant savings in
electricity costs.

I am also knowledgeable about other emerging technologies such as smart


thermostats, solar panels, and automated HVAC systems. I understand how
these systems can be used to optimize energy use and create cost savings
for the company. I am confident that I can bring this knowledge and expertise
to your organization to help you achieve greater operational efficiencies.”

10. When performing maintenance on an existing building, what is your process for prioritizing tasks?

The interviewer may ask you this question to understand how you prioritize
your work and ensure that the building is operating efficiently. Use examples
from previous experience to explain how you determine which tasks are most
important to complete first.

Example: “When it comes to performing maintenance on an existing building,


I always prioritize tasks based on safety first. This means that any task that
could potentially be hazardous or cause harm to the occupants of the building
is my top priority. After ensuring the safety of the building and its inhabitants, I
then move onto tasks related to functionality and efficiency. These are tasks
such as checking for air leaks, inspecting HVAC systems, and replacing worn
out equipment. Finally, I look at aesthetic issues like painting walls or
repairing broken fixtures.”

11. We want to encourage employees to feel comfortable coming to our engineers with questions or
concerns. Is there a particular strategy you use to build rapport with coworkers?

Building engineers often work with a variety of people, including construction


crews and other professionals. The interviewer may want to know how you
interact with others in the workplace. Describe your interpersonal skills and
how they help you build relationships with coworkers.

Example: “I believe that the best way to build rapport with coworkers is to be
open and honest. I strive to create an environment of trust, where everyone
feels comfortable coming to me with questions or concerns. To do this, I make
sure to take time to get to know my coworkers on a personal level. This helps
us understand each other better and builds a strong foundation for our
working relationship.

Additionally, I always try to be approachable and friendly. I’m willing to listen


to any issues they may have and provide helpful advice whenever possible. I
also like to show appreciation for their hard work by recognizing their
accomplishments and offering support when needed. By creating a positive
atmosphere, I can ensure that my coworkers feel comfortable coming to me
with any problems they might have.”

12. Describe your process for documenting your work and maintaining records.

Building engineers must keep detailed records of their work, including the
materials they use and how much they spend. This information is important for
future projects and to ensure that building owners are billed correctly. Your
answer should show that you understand the importance of documentation
and recordkeeping. You can also mention any specific tools or software you
use to help with this process.

Example: “I take great pride in documenting my work and maintaining


records. I understand the importance of having accurate, up-to-date records
for any building engineering project. My process involves creating detailed
reports that include all relevant information such as materials used, labor
costs, and timelines. I also use digital tools to store and organize documents
so they are easily accessible when needed.

In addition to documentation, I make sure to keep a log of all maintenance


activities performed on the building. This includes regular inspections, repairs,
and upgrades. By keeping track of these activities, I can ensure that
everything is running smoothly and identify potential issues before they
become major problems. Finally, I always strive to stay up-to-date with
industry standards and regulations to ensure compliance.”

13. What makes you the right candidate for this job?

Employers ask this question to learn more about your qualifications and how
you feel you can contribute to their company. Before your interview, make a
list of all the skills and experiences that make you an ideal candidate for this
role. Focus on highlighting your relevant experience and soft skills.

Example: “I believe I am the right candidate for this job because of my


extensive experience in building engineering. I have been working as a
Building Engineer for over five years, and during that time I have gained a
wealth of knowledge and expertise in all aspects of building maintenance and
repair. My experience includes working with HVAC systems, electrical
systems, plumbing systems, and other mechanical systems.

In addition to my technical skills, I also possess excellent problem-solving


abilities and strong communication skills. I am able to quickly identify
problems and develop effective solutions while communicating effectively with
colleagues and customers alike. I am highly organized and detail-oriented,
ensuring that tasks are completed on time and within budget. Finally, I am an
enthusiastic team player who is always willing to take initiative and go above
and beyond what is expected.”

14. Which building projects have you worked on in the past?

This question can help the interviewer get a better idea of your experience
level and what you’ve accomplished in your career. You can use this question
to highlight some of your most recent projects, but it’s also helpful to include
some of your past work that helped you develop your skills as a building
engineer.

Example: “I have worked on a variety of building projects in the past, ranging


from small-scale renovations to large-scale construction. Most recently, I was
part of a team that completed an office renovation project for a local business.
This involved replacing flooring, painting walls, and installing new fixtures.
Prior to this, I managed a multi-million dollar apartment complex construction
project. My responsibilities included overseeing all aspects of the project,
including budgeting, scheduling, and ensuring quality control standards were
met. I also have experience with HVAC installation and repair, plumbing
repairs, and electrical wiring.”

15. What do you think is the most important aspect of building maintenance?

This question is an opportunity to show your interviewer that you understand


the importance of building maintenance and how it can affect a company’s
bottom line. When answering this question, consider what is most important to
the company you’re interviewing with and highlight those aspects in your
answer.

Example: “The most important aspect of building maintenance is ensuring


that the building meets all safety and health standards. This includes making
sure that all electrical systems, plumbing, HVAC, and other components are in
good working order. It also means regularly inspecting the building for any
potential hazards or issues that could cause harm to occupants. As a Building
Engineer, I understand the importance of maintaining a safe and healthy
environment for everyone who visits or works in the building.

I have extensive experience in performing preventative maintenance on all


types of buildings, including residential, commercial, and industrial properties.
I am familiar with local codes and regulations, as well as industry best
practices, so I can ensure that the building is up-to-date and compliant with all
applicable laws. In addition, I have strong problem-solving skills which allow
me to identify and address any issues quickly and efficiently.”

16. How often do you perform routine inspections?

The interviewer may ask this question to learn more about your inspection
process and how often you perform it. This can help them understand the
frequency of your reports, which can be an important part of your job as a
building engineer. When answering this question, consider mentioning any
specific inspections that you regularly perform and when you do them.

Example: “I perform routine inspections on a regular basis. I believe that it is


important to ensure the safety of all building occupants and to maintain the
integrity of the structure itself. As such, I typically inspect the building at least
once per month, checking for any potential issues or areas of concern. During
these inspections, I look for signs of wear and tear, check for proper
functioning of mechanical systems, and evaluate the overall condition of the
building. If any issues are identified during an inspection, I take immediate
action to address them in order to prevent further damage or disruption.”

17. There is a problem with the building’s foundation. What is the first thing you do?

This question is an opportunity to show your problem-solving skills. You can


answer this question by describing the steps you would take to solve a
foundation issue and how you would communicate with other team members
during the process.

Example: “The first thing I would do when presented with a problem with the
building’s foundation is to assess the situation. This includes evaluating the
extent of the damage, identifying any potential safety risks, and determining
what resources are available for repair. After assessing the situation, I would
then create a plan of action that outlines the steps needed to fix the issue.
This plan should include an estimate of cost, timeline, and materials required.
Finally, I would communicate this plan to all relevant stakeholders and ensure
they understand the scope of the project.

My experience as a Building Engineer has taught me how to effectively


troubleshoot problems and develop solutions quickly and efficiently. With my
knowledge and expertise, I am confident I can identify the root cause of the
issue and provide a comprehensive solution that meets the needs of the
building.”

18. What techniques do you use to troubleshoot a building’s electrical system?

The interviewer may ask you a question like this one to assess your
troubleshooting skills and how you apply them in the field. Use examples from
past experiences to highlight your problem-solving abilities, communication
skills and attention to detail.

Example: “When troubleshooting a building’s electrical system, I use a


combination of both technical and non-technical techniques. First, I always
start by assessing the situation to determine what type of problem I am
dealing with. This helps me narrow down my options for potential solutions.

Next, I use a variety of tools such as multimeters, circuit testers, and other
diagnostic equipment to assess the condition of the electrical components. By
doing this, I can identify any faulty wiring or connections that may be causing
the issue.

I also have experience in using software programs to analyze data from the
electrical system and pinpoint any issues. Finally, I make sure to document all
of my findings so that I can refer back to them if needed. This helps ensure
that any future problems are addressed quickly and efficiently.”

19. Describe your approach to managing multiple projects at once.

Building engineers often have multiple projects they’re working on at the same
time. Employers ask this question to make sure you can manage your time
effectively and prioritize tasks when necessary. In your answer, explain how
you plan out your schedule and keep track of all your assignments. Try to
show that you are organized and dependable in your approach to managing
multiple projects.

Example: “My approach to managing multiple projects at once is based on


organization and communication. I like to break down each project into
smaller tasks, prioritize them according to importance, and create a timeline
for completion. This helps me stay focused on the most important tasks first
and ensures that all deadlines are met.

I also make sure to communicate regularly with my team members so


everyone knows what needs to be done and when it needs to be completed.
This allows us to work together efficiently and effectively while staying on
track. Finally, I use various tools such as Gantt charts and project
management software to help keep everything organized and up-to-date.”

20. How often do you communicate with the rest of the maintenance team?

Building engineers often work with other members of the maintenance team,
such as electricians and plumbers. Employers ask this question to make sure
you’re comfortable working in a collaborative environment. In your answer,
explain that you enjoy collaborating with others on projects. Explain that you
prefer to communicate through email or instant messaging rather than phone
calls so everyone can easily access the information they need.

Example: “I believe communication is key when it comes to working as part


of a maintenance team. I make sure that I am in regular contact with my
colleagues to ensure we are all on the same page and can work together
effectively. I also like to check in with them regularly to see if there is anything
they need help with or any advice I can offer.

I usually communicate with the rest of the maintenance team at least once a
day, either through email, text message, or face-to-face conversations. This
helps us stay up-to-date on what needs to be done and allows us to quickly
respond to any issues that may arise. It also ensures that everyone is aware
of their responsibilities and can provide assistance where needed.”

21. Do you have any experience working with subcontractors?

Subcontractors are the people who help you complete your work. They may
be other engineers, architects or construction workers. Employers ask this
question to make sure you have experience working with subcontractors and
can manage them effectively. In your answer, explain how you plan to
collaborate with any subcontractors on a project.

Example: “Yes, I have extensive experience working with subcontractors. In


my current role as a Building Engineer, I’ve been responsible for managing
and coordinating the work of multiple subcontractors on various projects. I’m
comfortable communicating with all types of subcontractors, from electricians
to plumbers, and I understand how to ensure that their work meets the highest
standards.

I also have experience negotiating contracts with subcontractors, ensuring


that they are fairly compensated for their work while still meeting our budget
requirements. Finally, I’m familiar with safety regulations and protocols when it
comes to subcontractor work, and I always make sure that everyone is
following them properly.”

22. Are there any new technologies or trends that you think could benefit our buildings?

This question can help the interviewer get an idea of your knowledge and
interest in new developments. It can also show how you might contribute to
the company’s success by implementing these technologies or trends into
their projects. When answering this question, it can be helpful to mention a
specific technology that you’ve used before or one that you’re excited about
learning more about.

Example: “Yes, there are a number of new technologies and trends that I
think could benefit our buildings. For example, one trend that is gaining
traction in the industry is building automation systems. These systems allow
for automated control of lighting, temperature, security, and other aspects of a
building’s operations. This can help to reduce energy costs and improve
occupant comfort.

Another technology that could be beneficial is the use of sensors to monitor


air quality and energy usage. Sensors can detect changes in air quality or
energy consumption and alert building engineers when an issue arises. This
can help ensure that any potential problems are addressed quickly and
efficiently.”

23. How do you stay up to date on changes in building codes and regulations?

Building codes and regulations can change frequently, so an interviewer may


ask this question to see if you have a plan for staying up to date on these
changes. In your answer, explain how you stay informed about the latest
building codes and regulations in your area. You can also mention any
specific resources that you use to learn more about these updates.

Example: “Staying up to date on changes in building codes and regulations is


an important part of being a successful Building Engineer. I make sure to stay
informed by regularly attending seminars and workshops related to the
industry, as well as reading relevant publications. I also keep tabs on any new
legislation or amendments that may affect my work. Finally, I have established
relationships with local authorities and other professionals in the field so that I
can ask questions and get advice when needed. By taking these steps, I am
able to ensure that I remain current on all changes in building codes and
regulations.”

24. Can you provide an example of a time when you had to make a quick decision under pressure?

This question can help the interviewer understand how you make decisions
and whether or not you are able to think critically under pressure. When
answering this question, it can be helpful to provide an example of a time
when your decision-making skills helped you solve a problem quickly.

Example: “Yes, I can provide an example of a time when I had to make a


quick decision under pressure. Last year, I was working on a project where
we were renovating the electrical system in an old building. We ran into some
unexpected issues with the wiring and needed to find a solution quickly. After
assessing the situation, I decided that the best course of action would be to
rewire the entire system. This meant that we had to work around the clock to
get it done before the deadline.
I took charge of the project and worked closely with my team to ensure that
everything went according to plan. We managed to finish the job on time and
within budget, which was a great success for us all. It was a difficult situation,
but I was able to make a quick decision under pressure and lead my team to
success.”

25. In what ways can a building engineer contribute to sustainability initiatives?

The interviewer may ask this question to assess your knowledge of green
building practices and how you can apply them in the workplace. Use
examples from your previous experience that show your commitment to
sustainable initiatives, such as reducing waste or using renewable energy
sources.

Example: “As a building engineer, I understand the importance of


sustainability initiatives and how they can benefit both the environment and
the people who use the building. My experience in this field has taught me
that there are many ways to contribute to these initiatives.

One way is by reducing energy consumption through the use of efficient


lighting systems, HVAC systems, and other energy-saving technologies. By
implementing these technologies, buildings can reduce their carbon footprint
while also saving money on utility bills.

Another way to contribute to sustainability initiatives is by using renewable


energy sources such as solar or wind power. This not only reduces the
amount of fossil fuels used but also helps to create clean, green energy for
the building.

Lastly, I believe it’s important to educate occupants about sustainable


practices such as recycling, composting, and water conservation. As a
building engineer, I would be able to provide guidance and resources to help
tenants become more aware of their impact on the environment.”

“ফেয়ার_ফেস_প্লাস্টার" এটি ইন্টেরিয়র ও এক্সটেরিয়র উভয় স্থানেই ব্যবহার করা যায় ফেয়ারফেস প্লাস্টার। ফেয়ারফেস
প্লাস্টার ব্যবহার করলে পেইন্ট করতে হয় না। এটি দেখতে অত্যন্ত মসৃণ,আভিজাত্য ও অনন্য সুন্দর। বাংলাদেশে এর
চাহিদা দিন দিন বেড়ে যাচ্ছে। ঢাকা শহরের অভিজাত এলাকায় অনেক বিল্ডিংয়েই ব্যবহৃত ফেয়ারফেস প্লাস্টার আপনার
নজর কেড়ে নেয়। এটি দেখতে যেমন সুন্দর, তেমনি চলে যুগের পর যুগ। ফেয়ার_ফেস_প্লাস্টারের কেন করবেন? ১। ডাস্ট
ফ্রি। ২।স্যাঁত স্যাঁত হবে না। ৩। শ্যাওলা পরবে না ।। ৪। ড্যাম্প প্রুভ। দেয়াল ড্যাম্প হবে না। ৫। হট রিডিউস করে।
৬। কঙ্ক্রিট হয় মোজবুত এবং শক্তি শালি আর দেরী না করে এখনই যোগাযোগ করুন আমাদের সাথে। Phone: +880
1844652486 +880 1924-424342 duconchemical.comAddress:House-118 (Level-4), Road-9, Niketon,
Gulshan-1, Dhaka-1212, Bangladesh #Fairfaceplaster #Skimcoat #Heatproofing
#Waterproofing342Web:
ওয়াটারপ্রুফিং সলিউশন
১.ওয়াটারপ্রুফিং কি?
২.ওয়াটার প্রুফিংয়ের ক্ষেত্রগুলো কোথায়?
৩.ওয়াটারপ্রুফিং কয় ধরণের হয়?
#ওয়াটারপ্রুফিং কি: ওয়াটারপ্রুফিং একটি সলিউশন অথবা পদ্ধতি যার মাধ্যমে ছাদের কংক্রিটের শোষণকৃ ত পানি
অপসারণ করা যায় অথবা কংক্রিটে পানি যাতে শোষিত না হয় তাহার যথাযথ ব্যবস্থা করা যায়। ওয়াটারপ্রুফিং না
করার কারণে আমাদের দেশের অধিকাংশ ঘরবাড়িতে লোনা অথবা ড্যাম্প দেখা দেয়। ওয়াটারপ্রুফিং এর প্রধান
উপকারিতা হচ্ছে আপনার নির্মিত স্থাপনাকে শুষ্ক,সাস্থ্য সম্মত ও নিরাপদ রাখে।
#ওয়াটারপ্রুফিংয়ের ক্ষেত্রগুলো কোথায়:
১.বেইজমেন্ট ওয়াটারপ্রুফিং।
২.সুইমিংপুল ওয়াটারপ্রুফিং।
৩.ওয়াটারট্যাংক ওয়াটারপ্রুফিং।
৪.টেরেস বা ছাদ ওয়াটারপ্রুফিং।
৫.ভিতর বা বাহিরের দেয়াল ওয়াটারপ্রুফিং।
#ওয়াটারপ্রুফিং কয় ধরণের হয়:
ওয়াটারপ্রুফিং কয়েকধরণ হয়ে থাকে যেমন:
(ক)সিমেন্টেশিয়াস ওয়াটারপ্রুফিং
(খ)বিটু মিনাস মেমব্রেন ওয়াটারপ্রুফিং
(গ)পিইউ/ইপোক্সি ইনজেকশন
(ঘ)এ্যাকরেলিক ওয়াটারপ্রুফিং
(ঙ)পলিউরিয়া স্প্রে ওয়াটারপ্রুফিং
এরই মধ্যে বাংলাদেশের আবহাওয়া অনুসারে সচরাচর ৩(তিন) ধরণের ওয়াটারপ্রুফিং সলিউশন/পদ্ধতি সর্বাধিক
প্রচলিত যথাক্রমে:
(ক)সিমেন্টেশিয়াস ওয়াটারপ্রুফিং
(খ)বিটু মিনাস মেমব্রেন ওয়াটারপ্রুফিং
(গ)এ্যাকরেলিক ওয়াটারপ্রুফিং
বি:দ্র: পরবর্তী ধারাবাহিকের জন্য অপেক্ষা করুন।
#বিস্তারিত জানতে যোগাযোগ:
০১৩২৪৭৩৬৩৪৫, ০১৮৮৮৮১৮৪৭৮
www.duconchemical.com
Like
Comment
Share
কাস্ট-ইন শিটু পাইল নিয়ে বিস্তারিত কিছু আলোচনাঃ
★কাজ শিখুন টাইমলানে রাখুন★
১/ প্রথমে পাইলের জন্য পর্যাপ্ত মালামাল সাইটে আছে কি না তা দেখতে হবে।
২/ যারা পাইল করবে তাদের জনবল এবং যন্ত্রপাতি ঠিক মতো আছে কি না তা দেখতে হবে ।
৩/ তার পরে কলামের সেন্টার লাইন থেকে মাপ নিয়ে পাইলের পয়েন্ট দিতে হবে।
৪/ এবং পাইল পয়েন্টে ১০মিমি ১' রডের টু করা পুঁতে দিয়ে টা ঢালাই করি দিতে হবে।
৫/ তার পরে বোরিং এর সময় চিজেল টা কে তাদের যে তেপায়া টা আছে। ওটায় সেট করতে হবে। এবং ওই তিন
পায়ার সব গুলো পায়ার নিছে কাঠ বা বালির বস্তা দিয়ে সঠিক ভাবে বসাতে হবে যাতে এটি নড়ে না যায় এটি নড়ে
গেলে বোরিং ঠিক হবে না।
৬/ চিজেলের মাথা পাইলের জন্য পুঁতে দেওয়া রডের সেন্টারে এনে চিজেলের মাথায় পানি দিতে হবে যদি পানি
গুলো রডের মাথায় ঠিক ভাবে পড়ে তা হলে বুঝতে হবে চিজেল সঠিক অবস্থানে আছে। তবে এই ক্ষেত্রে চিজেলের
মাথা টা ভালো করে দেখতে হবে যাতে এটাতে কোন বাকা না থাকে। যদি বাকা থাকে তা হলে সমস্যা হবে। বোরিং
ঠিক মতো হবে না। তারপর পাইলের ডায়গোনাল চেক দিতে হবে। এরপর ১.৫ মিটার পর্যন্ত আনকেস্ড অবস্থায়
বোরিং করা হয় তার পর কেসিং প্রবেশ করানো হয়।
৭/ বোরিং কাজ শেষ হলে মিনিমাম ৩০ মিনিট পাইল ওয়াশ দিতে হবে তবে যতক্ষন পরিষ্কার পানি না বের হয়
ততক্ষণ ওয়াশ দিতে হবে ।
৮/ প্রয়োজন বেঁধে পাইল ওয়াশ দেওয়ার সময় পানির সাথে বেন্টনাইট কেমিক্যাল ব্যবহার করা যেতে পারে ।এতে
ওয়াশের সময় পাইলের পাশ্ব হতে মাটি ভেঙ্গে পড়বে না।
৯/বোরিং কত টু কু হয়েছে তা নিশ্চিত হওয়ার জন্য আপনাকে তারা যখন তাদের বোরিং যন্ত্রপাতি সাইটে আনবে
তখন সেই গুলো মাপ দিয়ে নিতে হবে।
১০/ পাইলের খাঁচা বাধার সময় দেখেতে হবে spiral রড গুলোর ওয়েল্ডিং ঠিক ভাবে করেছে কি না৷এটা পরিক্ষার
জন্য একটা হাতু ড়ি দিয়ে জয়েন্ট গুলোতে আঘাত করলে যদি জয়েন্ট ছুটে যায় তা হলে আবার ওয়েল্ডিং করিয়ে
নিতে হবে। যদি ডিজাইনে একটা স্পাইরাল ওয়েল্ডিং আরেকটা বুনন তার দিয়ে বাঁধাই করতে বলে, তাহলে ডিজাইন
মতে কাজ করতে হবে।
১১/স্পাইরাল রড গুলো ল্যাপিং যেই খানে হবে ওখানে যাতে মিনিমাম দুইটা মেইন রড এর শেষে ল্যাপিং যেনো শেষ
হয়। এবং লেপিং করা পুরো জায়গায় ওয়েল্ডিং করিয়ে নিতে হবে।
১২/ পাইলের স্পাইরাল টাই বাঁধার সময় মেইন রড গুলো কে সোজা রেখে বাঁধাই করতে হবে না হলে ওয়েলডিং এর
পর পাইলের খাঁচা মোচড় অবস্থা হয়ে থাকবে।
১৩/ মিনিমাম ৫' পর পর পাইলের ৩ দিকে ৩" পরিমান কাভারিং ব্যবহার করা হয়।
১৪/ পাইলের মেইন রডের ল্যাপিং মিনিমাম ২.৫'/৩' দেওয়া উচিত এবং ল্যাপিং এর জায়গায় ১.৫"-২" এর মতো
ওয়েল্ডিং করা ৩ স্থানে উচিত।। তবে এই ক্ষেত্রে ডিজাইন ফলো করতে হবে।
১৫/ খাঁচা ঢু কানোর সময় যাতে সোজা করে খাঁচা ঢু কায় যদি বাঁকা করে খাঁচা ঢু কায় তখন কাভারিং ব্লক গুলো ভেঙ্গে
যাবে।।
১৬/ এবং পাইলের যেই স্থানে ধরে পাইলটির খাঁচা বোরিং এ ঢু কাবে ওই জায়গায় স্পাইরাল গুলো ভালো করে
ওয়েল্ডিং করে দিতে হবে।
১৭/ ডিজাইন মতো রডের ডায়া এবং স্পাইরাল গুলোর স্পেসিং ঠিক আছে কি না দেখতে হবে।
১৮/ কাস্টিং এর সময় ট্রিমি পাইপ টি পাইলের বটম থেকে ৬" উপর থেকে কংক্রিট ফেলা উচিত এর বেশি উপর
থেকে কংক্রিট ফেললে কংক্রিটের সাথে কাঁদা পানি মিশে কংক্রিটের শক্তি কমিয়ে দিবে।
১৯/ ট্রিমি পাইপের ডায়া মিনিমাম ৬" হয়ে থাকে
২০/ কিছুক্ষন কংক্রিটিং করার পর ট্রিম্বি পাইপ টি কে উপর নিছে উঠা নামা করে ভাইব্রেট করে দিতে হবে যাতে
পাইলে ভয়েড না থাকে।
২১/ পাইলের সাধারণত ১ঃ১.৫ঃ৩ রেশিও তে কংক্রিটিং করা হয়ে থাকে।
২২/ কংক্রিটিং এর সময় ট্রিম্বি পাইপ টি কে পরিস্কার করে নিতে হবে যাতে আগের কোন কংক্রিট এর ভিতর না
থাকে।
২৩/ ২৪ ঘন্টার ভিতর ১০' এর মধ্যে অন্য পাইল করা যাবে না এতে নতু ন করা পাইলটি ক্ষতিগ্রস্থ হবে।
২৪/পাইলের Cut of level এ রেশিও ১ঃ২ঃ৪ রাখতে হবে। কারন এটি ভেঙ্গে ফেলা হয়।
Everyone

All reactions:
271271
উপকৃ ত হলে তথ্যগুলো শেয়ার করতে পারেন ...
**** কলামের ল্যাপিং কোথায় দেওয়া হয়?
_______কলামের নিচের ফ্লোর এবং উপরের ছাদ থেকে L/3 পর্যন্ত টেনশন হয় বা জোন ধরা হয় এবং মাধ্যভাগে
কম্প্রেসিভ জোন বিবেচনা করা হয়। সুতরাং কলাম রকের ল্যাপিং সব সময় ফ্লোর থেকে L/3 (2.5 ফিট) উপরে এবং
ছাদ থেকে L/3 নীচে দিতে হয়।
**** রডের মাথায় ক্যাপ লাগানো থাকে কেন?
_____রডের সম্পূর্ণ উপরের পৃষ্ঠ মরিচারোধী করে তৈরি করা হয় কিন্তু দুই প্রান্ত কাটা থাকে। এ কারণে রঙের দুই প্রান্তে
যাতে মরিচা না পড়ে, এছাড়াও দুই পান্ত অনেক ধারালো থাকে, এবং দুর্ঘটনা ঘটতে পারে, এজন্য রডের দুই প্রান্তে ক্যাপ
লাগানো থাকে।
**** একটি রড সর্বোচ্চ কত ফু ট লম্বা হয়ে থাকে?
_____একটি রডের দৈর্ঘ্য ১২ মিটার m বা ৩৯ ফিট হয়ে থাকে।
**** ফু টিং এর শর্ট ও লং রডের প্লেসমেন্ট কি হবে ?
_____ফু টিং ফাউন্ডেশনের লং রড নীচে এবং শর্ট ডিরেকশনের রড উপরে বসে। অর্থাৎ স্লাবের বিপরীত সূত্র প্রয়োগ
করতে হবে।
**** রডের বদলে বাঁশ ব্যবহার করা যাবে কিনা ?
____বাঁশ খুবই কম পরিমাণে টেনশন বল নেয় যা আমাদের কার্যক্ষেত্রে অগ্রাহ্য করা হয়। তাই সকল প্রকার RC.C.
কাজে বাশেঁর পরিবর্তে রড-ই ব্যবহার করা হয়।

ফেয়ার ফেস কংক্রিট


============================
Mehedi Hasan
Sales & Technical Officer
Cell & What's app : +88 01854 750653
ফেয়ার ফেস কংক্রিট বলতে ঐ কংক্রিট কে বুঝানো হয়, যেটার ফর্মওয়ার্ক খুলে ফেলার পর সরফেসটা এতটাই মসৃণ
হয় যে সেটাকে নতু ন করে ফিনিশিং করার জন্য প্লাস্টারের প্রয়োজন পরে না।
.
সময়ের পরিবর্ত নের সাথে সাথে ইন্টেরিয়র এবং এক্সটেরিয়র উভয় ডিজাইনেই সৌন্দর্য ও দীর্ঘস্থায়িত্বের কথা বিবেচনা
করে ম্যাটেরিয়ালসের নানান পরিবর্ত ন-পরিবর্ধন, সংযোজন-বিয়োজন ও নতু নত্ব যোগ হচ্ছে। তেমনি একটি
ম্যাটেরিয়ালস ‘ফেয়ার ফেস প্লাস্টার’। ফেয়ার ফেস প্লাস্টার ইন্টেরিয়র ও এক্সটেরিয়র উভয় স্থানেই ব্যবহার করা যায়।
ফেয়ার ফেস প্লাস্টার ব্যবহার করলে আর নতু ন করে পেইন্ট করতে হয় না। এটি দেখতে সুন্দর এবং দীর্ঘস্থায়ী।
.
ফেয়ার ফেস প্লাস্টারের কিভাবে তৈরি
=============================
ফেয়ার ফেস হচ্ছে, উচ্চ ক্ষমতাসম্পন্ন সিমেন্ট বেইজ এক ধরনের প্লাস্টার। এটি মূলত ৬০ শতাংশ সাদা সিমেন্ট ও ৪০
শতাংশ গ্রে সিমেন্ট এবং প্রয়োজন অনুযায়ী স্টোন চিপসের সমন্বয়।
.
ফেয়ার ফেস প্লাস্টারের কাজ:
=========================
ইটের শুকনো দেয়ালে ফেয়ার ফেস প্লাস্টারের আস্তর লাগাতে হয়। সাধারণ বালু সিমেন্টের আস্তর করার মতোই ফেয়ার
ফেস প্লাস্টারের আস্তর করতে হয়। সাধারণ প্লাস্টার করার পরও ফেয়ার ফেস প্লাস্টার করা যায়। সে ক্ষেত্রে সাধারণ
প্লাস্টারকে রাফ করে নিতে হয়।
Call & What's app: 01854 750653
01858 411604
.
স্থায়িত্ব
=========
ফেয়ার ফেস প্লাস্টারের পুরুত্ব ৮ মিলিমিটার। ফেয়ার ফেস প্লাস্টার দেখতে উজ্জ্বল ছাই রঙা ধরনের। সিমেন্ট বেইজ
হওয়ায় এটি অত্যন্ত মসৃণ ও গ্লসি হয়ে থাকে। একবার ব্যবহার করলে সারাজীবন চলে। সাধারণত ২০-৩০ বছরের
স্থায়িত্বের গ্যারান্টিতে ফেয়ার ফেস প্লাস্টারের কাজ করা হয়।
.
গ্রুভ
======
ইন্টেরিয়র এবং এক্সটেরিয়র উভয় স্থানেই ব্যবহার করা গেলেও এক্সটেরিয়েরই ব্যবহার করা হয় বেশি। ফেয়ার ফেস
প্লাস্টারের কাজ করার সময় ইচ্ছে অনুযায়ী গ্রুভ ব্যবহার করা যায়। সাধারণত প্রতি ২ ফিট পর পর ১-২ ইঞ্চি গ্রুভ ব্যবহার
করা হয়। ইচ্ছে করলে এর কম-বেশিও করা যায়।
.
কিউরিং
=============
ফেয়ার ফেস প্লাস্টার কাজ করার পর তিন থেকে সাত দিন কিউরিং করলে ভালো হয়। আস্তরে চু ল ছেঁ ড়া দাগ হয় না।
আমাদের রয়েছে অত্যন্ত সুদক্ষ এবং অভিজ্ঞ টেকনিক্যাল টিম। সুতরাং নিশ্চিন্তে আপনার বাড়ির কাজটা আমাদের
দিতে পারেন।
SB Building Solution BD LTD
Contact our address :
House # 161 (6th Floor), Road # 13, Sector # 10, Uttara , Dhaka -1230
Mehedi Hasan
Sales & Technical Officer
Cell & What's app : +88 01854 750653
খোয়ার হিসাব
* ১ টি ইটে = ০.১১ cft খোয়া হয়।
* ১০০ টি ইটে = ১১ cft খোয়া হয়।
* ১০০০ টি ইটে = ১১১.১১ cft খোয়া হয়।
বালির হিসাব
* ১০৯ ফিট = ১২.২৫ cft,
* ১০০ sft ৫” গাথুনীতে ১:৫ অনুপাতে সিমেন্ট লাগে ২ ব্যাগ।
* ১০০ sft ১০” গাথুনীতে ১:৫ অনুপাতে সিমেন্ট লাগে ৪ ব্যাগ। বালু লাগে ২৪ cft।
ঢ়ালাই এর হিসাব
* ১০০ cft ঢ়ালাই এ ১:২:৪ অনুপাতে সিমেন্ট ১৭ ব্যাগ, বালু ৪৩ cft, খোয়া ৮৬ cft লাগে।
* ১ cft ঢ়ালাই এ ১:২:৪ অনুপাতে সিমেন্ট ০.১৭, বালু ০.৪৩ cft, খোয়া ০.৮৬ cft লাগে।
Md Amjad Hossain
Deputy Project Engr.
Soc Consultant And Development Ltd.
খুব সহজে এস্টিমেট শিখি প্রয়োজনীয় তথ্যাবলী
এস্টিমেট শিখুন সিভিল ইঞ্জিনিয়ার হলে টাইমলাইনে রেখে দিন
1. এক ঘনমিটার ইটের গাঁথুনীর কাজে প্রচলিত ইটের প্রয়োজন= ৪১০ টি।
2. এক ঘনফু ট ইটের গাঁথুনীর কাজে প্রচলিত ইটের প্রয়োজন=১১.৭৬=১২ টি
3. এক ঘনমিটার ইটের গাঁথুনীর কাজে মেট্রিক ইটের প্রয়োজন= ৫০০ টি।
4. এক ঘনফু ট ইটের গাঁথুনীর কাজে মেট্রিক ইটের প্রয়োজন= ১৪.২৮ টি।
5. এক বর্গমিটার জায়গায় একস্তর ইটের ফ্লাট সোলিং এর জন্য ইটের প্রয়োজন=৩১ টি।
6. এক বর্গমিটার সোলিং এ চিকন বালির প্রয়োজন=০.০১৫ ঘনমিটার
7. এক বর্গমিটার জায়গায় একস্তর ইটের হেরিং বোন বন্ডের জন্য ইটের প্রয়োজন=৫২ টি।
8. এক বর্গমিটার হেরিং বোন বন্ডের জন্য চিকন বালির প্রয়োজন=০.০৩ ঘনমিটার
9. ইটের গাঁথুনীর কাজে শুকনা মসল্লা এর পরিমাণ=৩৫%
10. এক ঘনমিটার সিমেন্ট=৩০ ব্যাগ....
11. এক বর্গমিটার নীট সিমেন্ট ফিনিশিং এর জন্য(NCF) সিমেন্টের প্রয়োজন=২.৭-৩ কেজি
12. ডিপিসি এ পাডলোর পরিমাণ সিমেন্টের ওজনের ৫% অর্থাৎ প্রতি ব্যাগ সিমেন্টের জন্য ২.৫ কেজি।
13. এক ঘনমিটার এম,এস রডের ওজন =৭৮৫০ কেজি বা ৭৮.৫০ কু ইন্টাল
14. এক ব্যাগ সিমেন্টের ওজন=৫০ কেজি এবং আয়তন=০.০৩৪৭ ঘনমিটার
15. এক ব্যাগ হোয়াইট সিমেন্টের ওজন=৪০ কেজি
16. আবাসিক দালানের জন্য বাসযোগ্য ক্ষেত্রফল প্লিন্থ ক্ষেত্রফলের ৫০%-৫৬% হওয়া উচিত।
17. ১ রানিং মিটার দৈর্ঘে এন্ড এজিং এ ইটের পরিমাণ=১/.১২৭=৮ টি।
18. আর.সি.সি কাজে ব্যবহৃত প্রতি মিটার এম.এস.রড এর ওজন নির্ণয়ের সুত্র =d2/১৬২.২ কেজি।
19. এক ঘনমিটার ছোট সাইজের খোয়ার জন্য ইটের প্রয়োজন ৩২০ টি এবং বড় সাইজের খোয়ার জন্য ৩০০ টি।
20. আর.সি.সি কাজে ব্যবহৃত প্রতি কেজি এম.এস.রড এর র্দৈ ঘ্য নির্ণয়ের সুত্র =১৬২.২/d2 মিটার
21. নির্মাণ সামগ্রী বহনের জন্য চালনা দুরুত্ব ৩০ মিটার এবং উত্তোলন দুরুত্ব ১.৫ মিটার।
22. কম্প্রেশন বারে হুক ছাড়া ল্যাপিং ২৪ D এবং হুকসহ ৪৪ D আবার, টেনশনে হুক ছাড়া ল্যাপিং ৩০ D এবং হুকসহ
৬০ D.
23. জলছাদের কাজে খোয়া,চু ন,সুরকির অনুপাত=৭:২:২
24. সেপটিক ট্যাংক এর নুন্যতম প্রস্থ ৬০সেমি এবং তরলের নুন্যতম গভীরতা ১ মিটার।
25. সোক ওয়েলের নুন্যতম ব্যাস ৯০ সেমি এবং গভীরতা ইনভার্ট সমতল হতে ১.৫ মিটার।
26. কালভার্ট এর স্প্যান ৬ মিটারের কম এবং ব্রিজের স্প্যান ৬ মিটারের বেশি
27. ব্রিজ এর স্ল্যাবকে ডেকস স্ল্যাব বলে।
28. ঢেউটিনের প্রমাণ দৈর্ঘ্য: (১.৮০,২.২০,২.৫০,২.৮০,৩.২০)মিটার এবং প্রস্থ ০.৮০মিটার এবং ঢেউয়ের গভীরতা ১৮
মি.মি
29. এক মিটার এম.এস অ্যাঙ্গেলের ওজন=০.০০৭৮৫ A কেজি
30. একটি এক টনি ট্রাক পাকা রাস্তায় সিমেন্ট বহন করে ২০ ব্যাগ
31. একটি এক টনি ট্রাক পাকা রাস্তায় ইট বহন করে 333 টি
32. একটি এক টনি ট্রাক কাঁচা রাস্তায় সিমেন্ট বহন করে ১৩.৩৩ ব্যাগ।
সিভিল ইঞ্জিনিয়ার হলে টাইমলাইন রেখে দেন
সাইট ইঞ্জিনিয়ারদের জন্য দরকারি সব প্রশ্নের উওর:
...............................................................
১। Specification কি?
উ: কি ভাবে, কি অনুপাতে কাজ করতে হবে তার বিস্তারিত বিবরণ যে নির্দে শিকায় লেখা থাকে তাকে specification
বলে।
.
২।সিডিউল কি?
উ:যে নির্দে শিকায় specification, BOQ ও রেট লেখা থাকে তাকে সিডিউল বলে।
.
৩।project lauch করতে হলে কি কি দরকার হয়?
উ:ড্রইং, ডিজাইন,জায়গা,ডিসিশন, লোকবল ও মালামালের দরকার হয়।
.
৪। Method of procurement কত প্রকার ও কি কি?
উ:৬ প্রকার, যথা-
Open tendering method ( OTM)
Restricted tendering method (RTM)
Request for quotation method(RFQM)
Direct procurement method(DPM)
Two stage tendering method (TSTM)
Internal tendering method(ITM)
.
৫।লে আউট কি?
উ:ড্রয়িং সিটে যে ড্রইং করা আছে তা হুবহ মাঠে সেট করাকে লে আউট বলে।
.
৬।গ্রিড লাইন কাকে বলে?
উ:কাজ করার সুবিধার জন্য ড্রইং এ নির্দি ষ্ট দূরে দূরে উওর -দক্ষিণ ও পূর্ব পশ্চিমে যে রেখাগুলো টানা হয় তাকে গ্রিড
লাইন বলে।
.
৭।সেন্টার লাইন কাকে বলে?
উ:যে রেখা কলাম বা ফু টিং এর ঠিক মাঝ বরাবর টানা হয় তাকে সেন্টার লাইন বলে।
.
৮.একটি কলাম ফু টুং এর কোন স্থানে বসবে?
উ:কলামের সেন্টার লাইন ও ফু টিং এর সেন্টার লাইন অবশ্যই একই বিন্দুতে থাকতে হবে। বিশেষ কোন কারণ ছাড়া এর
ব্যতিক্রম হতে পারবে না।
.
৯।layout করার সময় মাটাম পরীক্ষা কিভাবে করা হয়?
উ:প্রতি কর্ণারে সুতার সাহায্যে একটি সমকোণী ত্রিভু জ তৈরি করতে হবে। যার দুই বাহুর পরিমাপ যথাক্রমে ৩' ও ৪'
এবং এর অতিভু জের পরিমাপ ৫'। এর সাহায্যে প্রত্যেক কর্ণারে ৯০ ডিগ্রি সেট করা যাবে ।
.
১০।পাইল লে আইট কিভাবে করতে হয়?
উ: বিল্ডিং লে আউট ফাইনাল করার পর পাইল লে আউট দিতে হবে। ড্রইং অনুসারে পাইল পয়েন্ট দিতে হবে। পাইল
পয়েন্ট ঠিক রাখার জন্য প্রতি পয়েন্ট এ একটি করে ৮মিমি/১০ মিমি রড ১ ফু ট পরিমাণ ফুঁ তে দিতে হবে। রডটির ১ বা
১.৫" বাহির করে গোড়ায় সামান্য পরিমাণ ঢালাই করে দিতে হবে। যাতে পাইল পয়েন্ট দুরে সরে না যায়।
.
১১।১৮" ডায়া পাইল এ কতটু কু চিসেল ব্যবহার করতে হবে?
উ: ১৬" ডায়া চিসেল ব্যবহার করতে হবে।
.
১২। যে পাইপ দিয়ে পাইল ঢালাই করা হয় তার নাম কি?
উ: ত্রিমি পাইপ
.
১৩।ত্রিমি পাইপের ডায়া কত?
উ: ৬" থেকে ৭"
.
১৪। কত সময় বোরিং ওয়াস করতে হবে?
উ:কমপক্ষে আধাঘন্টা বা যতক্ষণ পানিতে কাদা আসে ততক্ষণ বোরিং ওয়াস করতে হবে।
.
১৫।প্রত্যেকটি পাইলে মাটির নিচে রডের মাথা কিভাবে একই সমানে রাখাযাবে?
উ:প্রজেক্টে এর সুবিধামত জায়গায় ২' উচ্চতা বিশিষ্ট একটি লেভেলিং পিলার তৈরি করতে হবে এর ভিত্তিতে ওয়াটার
পাইপ বা লেভেলিং মেশিনের সাহায্যে ক্যাসিং পাইপের মাথায় লেভেল দিতে হবে। পাইলিং রডের খাচার মধ্যে একটি
১০ মিমি ব্যাসের রডের হুক লাগিয়ে লেভেলের পরিমাপ মত একটি রড ক্যাসিং পাইপের মাথায় হুক করে লাগাতে হবে।
.
১৬।এগ্রিগেট হিসাবে পাইলে কি ব্যবহার করা হয় এবং অনুপাত কত?
উ:পাইল এগ্রিগ্রেড হিসাবে stone chips/singles ব্যবহার করা হয়ে থাকে। ইহার অনুপাত সাধারণত 1:1.5:3 হয়ে থাকে।
.
১৭। কাট অফ লেভেলে কেন কম রেশিং তে কাস্টিং করা হয়?
উ: কাস্টিং করার পর কাট লেভেল ভেঙ্গে ফেলতে হয়, সেজন্য কম রেশিও তে অর্থাৎ ১:২:৪ বা ১:৩:৬ অনুপাতে
কাস্টিং করতে হয়।
.
১৮। একটি পাইল বোরিং করার পর কতটু কু দুরে পরের পাইলটি করা যেতে পারে?
উ: একটি পাইল হতে আরেকটি পাইলের ডিসট্যান্স মিনিমাম ৬' হতে হবে, বেশি হলে আরও ভাল হয়।
.
১৯।একদিনে একটি মেশিনে সাধারণত কয়টি পাইল করতে পারে?
উ: ৫০ ফু টের নিচে হলে তিনটা এবং এর উপরে হলে দুইটা করা যেতে পারে।
.
২০। পাইলের ভারবহন ক্ষমতা বলতে কি বোঝায়?
উ: একটি পাইল প্রতি বর্গফু টে যত টু কু ভার নিরাপদে বহন করতে পারে, তাকে পাইলের ভারবহন ক্ষমতা বলে।
.
২১।ফু টিং এর মাটি কাটার পূওর্বে একজন সাইট ইঞ্জিনিয়ারকে কি চিন্তা করতে হবে?
উ: যে ফু টিং এর গভীরতা বেশি সেই ফু টিং এর মাটি আগে কাটতে হবে, এবং মাটির অবস্থা দেখে সেফটির ব্যবস্থা নিতে
হবে।
.
২২।শোরিং কি?
উ: রাস্তা বা নেওলের মাটি কে বাঁধা দেওয়ার জন্য ইহার দুইপাশে খাড়া ভাবে কাঠের তক্তা ব্যবহার করা হয়, একে শোরিং
বলে।
.
২৩। ফেরু - সিমেন্ট কি?
উ: Expended metal বা coil rod দিয়ে খাচা তৈরি করে এর উপর সিমেন্ট ও সিলেট স্যান্ড দিয়ে হালকা কাস্টিং
করাকে ফেরু সিমেন্ট বলে। ইহা সাধারণত ১" -২" পর্যন্ত ওয়াল থিকনেস তৈরির ক্ষেত্রে ব্যবহৃত হয়ে থাকে। ইহা সাধারণত
ছাদের উপরে পানির ট্যাংক হিসাবে ব্যবহার করা হয়ে থাকে।
.
২৪।ব্লিডিং কি ও লেটেন্স কি?
উ: কংক্রিট হতে সিমেন্ট থিতিয়ে পড়াকে ব্লিডিং বলে। ইহার ফলে কংক্রিট এ হানিকম ও হেয়ার crack দেখা দিতে
পারে।
আর কংক্রিটে ওয়াটার সিমেন্ট রেশিও বেশি হলে, কখনও কখনও ঢালাইয়ের উপরের অংশে ফেনার মত দেখা যায়,
একে লেটেন্স বলে।
.
২৫। slump cone ও cylinder এর সাইজ কত?
উ: স্লাম্প কোন এর উপরের মাথা ৪", নিচের মাথা ৮" এবং উচ্চতা
১২" আর সিলিন্ডারের সাইজ ৪" ডায়া, ৮" লম্বা।
.
২৬। সিমেন্টের কয়েকটি টেস্ট এর নাম বল?
উ:
* compressive strength
* Bonding strength
* intial setting time
* Final setting time
* Finess test ইত্যাদি।
.
২৭।একই লেভেলে কতটু কু ল্যাপিং দেয়া যাবে?
উ: একই লেভেলে ২৫% এর বেশি ল্যাপিং দেয়া যাবে না।
.
২৮।সেপারেটর হিসাবে কত ইঞ্চি ডায়া রড ব্যবহার করতে হবে?
উ: ২৫ মিমি ডায়া রড।
.
২৯। সানশেড এর বাউন্ডার রড, মেইন রডের কোন দিকে দিতে হয়?
উ: বাইন্ডার মেইন রডের নিচে দিতে হয়।
আর রিটেইনিং ওয়াল ও শিয়ার ওয়ালের ক্ষেত্রে মেইন রডের বাহিরে বাইন্ডার দিতে হয়।
.
৩০। কংক্রিটের শক্তির উপর অনুপাতের কোন প্রভাব আছে?
উ: হ্যাঁ আছে।
১:২:৪ অনুপাতে 3000 psi এবং ১:১.৫:৩ অনুপাতে 3500 psi চাপশক্তি পাওয়া যায়।
.
৩১.এক গ্যালন পানির ওজন কত?
উ: ১০ পাউন্ড বা ৪.৫ কেজি।
.
৩২.এক পাউন্ড সমান কত কেজি?
উ: ০.৪৫ কেজি।
.
৩৩.১ ঘনমিটার কত ঘনফু ট?
উ: ৩৫.২৮ ঘনফু ট।
ইটের গাথুনী এবং প্লাস্টারের হিসাব
অবশ্যই টাইম লাইনে রেখে দিন অত্যন্ত গুরুত্বপূর্ণ
১০” ওয়াল গাথুনীতে প্রতি ০১’ (স্কয়ার ফিট) গাথুনীতে ১০ টি ইট লাগে।
০৫” ওয়াল গাথুনীতে প্রতি ০১’ (স্কয়ার ফিট) গাথুনীতে ০৫ টি ইট লাগে।গাথুনী এবং প্লাস্টারে ১ বস্তা সিমেন্টে ৪ বস্তা
বালি। তবে ৫ বস্তাও দেওয়া যায়।
নিচের ছলিং এ প্রতি ০১’ (স্কয়ার ফিট) এর জন্য ৩ টি ইট লাগে।পিকেট ইট দিয়ে খোয়া করতে হয়।
৯ টি পিকেট ইট দিয়ে ০১ সিএফটি খোয়া হয়।সিএফটি অর্থাৎ ঘনফু ট।
এসএফটি অর্থাৎ দৈর্ঘ্য এবং প্রস্তের দিক দিয়ে।কলাম এবং লিংটেল এর হিসাব সিএফটি তে করতে হয়।
ইঞ্চিকে প্রথমে ফু টে আনতে হবে। ( ১০” ÷ ১২ = ০.৮৩৩)এবং গাথুনীতে ও প্লাস্টারের হিসাব এসএফটি তে করতে হয়।
* ১ ঘনমিটার ইটের গাথুনীর ওজন ১৯২০ কেজি।
* ১ ব্যাগ সিমেন্টে পানি লাগে ২১ লিটার।
* ১০০ এস,এফ,টি প্লাষ্টারে ১:৪ অনুপাতে সিমেন্ট লাগে ২ ব্যাগ।
* গাথুনীর প্লাষ্টারে ১:৫ অনুপাতে সিমেন্ট দিতে হয়। সিলিং প্লাষ্টারে ১:৫ অনুপাতে সিমেন্ট দিতে হয়।
* প্রতি এস,এফ,টি নিট ফিনিশিং করতে = ০.০২৩৫ কেজি সিমেন্ট লাগে।
* মসলা ছাড়া ১ টি ইটের মাপ = (৯ ১/২”*৪ ১/২”*২ ৩/৪”)
মসলাসহ = (১০”*৫”৩”)10 mm =1 cm
100 cm = 1 m (মিটার)Convert
1″ = 25.4 mm
1″ = 2.54 cm
39.37″ = 1 m
12″ = 1′ Fit
3′ = 1 Yard (গজ)
1 Yard = 36″
™ প্রতি ব্যাগ সিমেন্টের আয়তন = 0.033 ঘন মিটার / 1.25 ঘন ফিট
™ আর ওজন = 50 kg / 112 lb
™ 1 ঘন মিটার সিমেন্ট = 30 Bag Cement
™ 1 ঘন ফিট সিমেন্ট = 0.80 Bag Cement
™ 1 ঘন মিটার ইটের কাজ = 410 টি ইট (25.4 X 12.7 X 7.6 cm)
™ 1 ঘন ফিট (10" গাথুনী) = 12 টি ইট
™ 1 বর্গ মিটার ফ্লাট সোলিং = 31 টি ইট
™ 1 বর্গ মিটার সোলিং এ চিকন (F.M 1.2 -1.5) বালির পরিমাণ = 0.015 ঘন মিটার।
™ 1 ঘন মিটার খোয়া (Brick chips) এর জন্য ইট (25.4 X 12.7 X 7.6 cm) প্রয়োজন
ছোট খোয়া = 320 Nos Bricks
বড় খোয়া = 300 Nos Bricks
™ প্রতি ঘনফু ট খোয়ার জন্য ইট = 9 টি
™ ইটের গাথুনির মসলার শুকনো আয়তন = ভেজা আয়তনের 35% / 0.35 গুণ
™ কংক্রিট এর শুকনো আয়তন = ভেজা আয়তনের 150% / 1.5 গুণ
™ R.C.C কাজে ব্যবহৃত M.S rod - এর ওজন নির্ণয় :
ক. W = ( D ^2 / 162.2 ) kg /Meter [ Becareful এখানে, D = mm এককে ]
খ. W = ( সুতা ^2 / 24) lb/ft
™ 1 ঘন মিটার M.S rod এর ওজন = 7850 kg / 78.50 কু ইন্টাল
™ 1 ঘন ফিট M.S rod = 490 lb (পাউন্ড) (1kg = 2.20 lb)
™ 1 বর্গ মিটার নিট সিমেন্ট ফিনিসিং = 3 kg Cement
™ জলছাদ এ চু ন : সুরকি : খোয়া এর অনুপাত = 2 : 2 : 7
™ 1 ঘন মিটার সিমেন্ট কংক্রিট M-10 (1:3:6) এর কাজে নির্মাণ সামগ্রী নির্ণয় :
প্রথমে,
অনুপাতগুলোর সমষ্টি : (1+3+6) = 10
শুকনা আয়তন : 1 X 1.5 = 1.5 ঘন মিটার। সুতরাং,
ক. সিমেন্ট = (1 / 10 ) X 1.5 X 30 = 4.5 bag
খ. বালু = ( 3 / 10 ) X 1.5 = 0.45 ঘন মিটার
গ. খোয়া = (6 / 10 ) X 1.5 = 0.9 ঘন মিটার
ধরি, খোয়া ছোট সাইজের। সুতরাং, খোয়া তৈরিতে ইট প্রয়োজন :
320 X 0.9 = 288 টি (Nos)
™ Concrete Grade ::
Cement : Sand : Coarse Aggregate
M- 10 = 1 : 3 : 6
M- 15 = 1: 2 : 4
M- 20 = 1 : 1.5 : 3
M- 25 = 1 : 1 : 2 ( Never Used ! / rare )
™ Unit Weight per Meter Cube ( একক ওজন ঘন মিটারে)
ক. Plain Concrete (1 : 3 : 6) : 2300
খ. R.C.C = 2400
গ. Brick Masonry : 1920
ঘ. Water at 4° C : 1000
ঙ. Brick Concrete : 2350
চ. Stone Concrete : 2450
™ চালনা দুরত্ব ( lead) 30 meter (Max) এবং উত্তোলন দুরত্ব 1.5 meter (Max) ধরা হয়।
#amengineering20
#Slump Test- কংক্রিটের কার্যক্ষমতা কেমন হবে পরীক্ষা না করেই তা ব্যবহার করে থাকি।সেক্ষেত্রে ঝুঁকিতো থেকেই
যায়। বড় বড় মেগা প্রজেক্টে এই পরীক্ষা করে নেয়াটা যেমন বঞ্ছনীয় তেমনি সকল ধরনের ভবনের কাজে এই পরীক্ষা
করাটা খুবই জরুরী...
এই #টেস্টের মাধ্যমে কংক্রিট এ #পানি_ও_সিমেন্ট_রেশিও ঠিক আছে কিনা জানতে পারি । কংক্রিট এর জন্য
#পানি_ও_সিমেন্ট_রেশিও খুবই গুরুত্ত্বপূর্ণ, এর উপর নির্ভ র করে কংক্রিট এর চাপ শক্তি/compressive strength এর
মান #স্ট্যান্ডার্ড _পানি_ও_সিমেন্ট_রেশিও_মান ০.৪ থেকে ০.৫
#ল্যাম্প_টেস্ট_করার_পদ্ধতি -
প্রথমে একটি স্ল্যাম কোন নিতে হবে সাইজ নীচের অংশ ৮ইঞ্চি , উপরের অংশ ৪ইঞ্চি এবং উচ্চতা ১২ ইঞ্চি বিশিষ্ট
কোণাকৃ তি যন্ত্রটিকে একটি সমতল প্লেট এর উপর বসাতে হবে। স্ল্যাম কোন অবশ্যই পরিস্কার করতে হবে এবং উহার
ভিতরের পৃষ্ঠে তেল ব্যবহার করতে হবে।
স্ল্যাম কোন এর তিন ভাগের এক ভাগ কংক্রিট দ্বারা পূরণ করে ১৬ মিলি প্লেন রড দ্বারা ২৫ বার আঘাত করতে হবে।
এমনি ভাবে তিন বার দ্বারা পূরণ করে ১৬ মিলি রড দ্বারা ২৫ বার আঘাত করে স্ল্যাম্প পূর্ণ করতে হবে।
স্ল্যাম কোন টি আস্তে আস্তে উপরের দিকে উঠাতে হবে, দেখা যাবে কোণ উঠানোর পরে পূর্বের উচ্চতা থেকে কিছু
অংশ নিচের দিকে নেমে গেছে।
যতটু কু নেমে গেল ঠিক ততটু কু ই স্ল্যাম্প ধরতে হবে।