SCADA SYSTEM For Transmission
SCADA SYSTEM For Transmission
• Management owned
• Long manager/employee tenure
• 300+ man-years of development
• Technical support embedded with development
• Fastest growing, largest install base
• Customer retention (120/2) 2010
VMS OS
PDP-11/34
RSX-11M OS
ALPHA
11/18/2011 9
Survalent Technology Mexico
11/18/2011 10
Canada
US Customers
11/18/2011 15
• SCADA/DMS in CFE Monterrey
– Flawless performance in two of the worst weather
phenomenon in the region:
• Storrm of March 18th 2008
– Sustained winds > 120 km/hr for more than 12 hours
– More than 60% of the distribution system is out of service
– More than 126,000 events were recorded by the SCADA/DMS
system
– Systems performed flawlessly allowing for the monitoring and
fast power restoration of the system
• AlexHurricane
– Similar performance during the worst weather phenomenon
ever recorded in this Division’s history
11/18/2011 16
11/18/2011 17
11/18/2011 18
11/18/2011 19
11/18/2011 20
SCADA System Applications
11/18/2011 21
SCADA System Applications
11/18/2011 22
SCADA System Applications
11/18/2011 23
SCADA System Applications
11/18/2011 24
SCADA System Applications
11/18/2011 25
SCADA System Applications
11/18/2011 26
Sample Architecture for Typical STC SCADA System
11/18/2011 27
11/18/2011 28
11/18/2011 29
SCOUT
11/18/2011 30
• North American Electric Reliability
Corporation
– Reliability Standards
– Critical Infrastructure Protection
• STC was the first supplier to deliver systems fully
compliant with the NERC – CIP standard
11/18/2011 31
• STC software complies with all availability,
security and reliability tests required by the
NERC CIP (Critical Infrastructure Protection).
• All software releases are tested and certified
to this standard prior to being published on
our web site
11/18/2011 32
Thank You