The document outlines a key plan for stage 1 work over 1 day from 12 AM to 6 AM. The work involves modifying a footpath and excavating 30 cm to lay tiles and kerbstones at a building construction site with hoists and barriers indicated.

Uploaded by

zubair khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

Safety Layout Plan Stage-01

The document outlines a key plan for stage 1 work over 1 day from 12 AM to 6 AM. The work involves modifying a footpath and excavating 30 cm to lay tiles and kerbstones at a building construction site with hoists and barriers indicated.

Uploaded by

zubair khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEYPLAN

STAGE-01
WORK PERIOD:- 1 DAY
TIMINGS:- 12.00 AM TO 6.00AM
PROJECT LOCATION

PARK PLACE TOWER


Hoist 3

PST 01

PST 02

LEGENDS:-
OPEN BELOW

Proposed tile 80mm


Proposed Flush Kerb
Proposed Upstand Kerb Stone
Existing Asphalt
Existing Kerb's
Red and White Concrete barrier
Manual Gate Barrier
Sliding door
Stage-01 Work Area

METHOD OF STATEMENT:-
1. MODIFICATION OF FOOTPATH IN ORDER TO
BUILDING CONSTRUCTION IN CONSTRUCTION

PROGRESS (CONSTRUCTION SITE) 2. EXCAVATION ONLY 30 CM IN ORDER TO PREPARE


SURFACE FOR TILES AND KERBSTONE.
3. LAYING OF ROAD BASE (20 CM) & BLACK SAND (5 CM) AND
COMPACTING PRIOR TO FIX TILES.
4. FIXING KERBSTONE AND 6 & 8 CM INTERLOCK TILES

GENERAL NOTES:-
1. DO NOT SCALE FROM DRAWINGS.

2. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

3. ANY DISCREPANCIES ON THE DRAWINGS TO BE REPORTED


IMMEDIATELY TO THE ARCHITECT/ENGINEER.

PROJECT: EU-372

Existing Access
REV. DRAWN BY DESCRIPTION DATE
BUILDING LINE
PROJECT :
STAGE-01 WORK AREA MODIFICATION OF SERVICE ROAD FOR
Existing Car Parking Area
TEMPORARY ACCESS FOR CONSTRUCTION
Existing Car Parking Area VEHICLES FOR PROPOSED BUILDING B+G+134
EXIT ENTRY FLOORS MIXED USE TOWER ON PLOT NO:3350151

Reduce Speed
Temporary Service Road Close

Men at Work
Temporary Construction Vehicle Access AND CAR PARK BUILDING 9B+G+16 FLOORS +R
Sliding Door E=494757.042 ON PLOT NO:3356231 AT TRADE CENTER FIRST
E=494795.408
N=2790929.344
N=2790984.751 Red and white plastic barriers filled with water
Widening of Existing Service Road Exit 9.32 WATCHMAN ROOM

A Proposed Car Exit Temporary OWNER :

WATCHMAN ROOM
Widening of Existing Service Road Entry CRYSTAL FOUR - FZ

WORKS

0.70
END OF
EXIT

SERVICE ROAD CLIENTS :

1.00 4.50

1.00 4.53
M: +971 50 456 8658 T: +971 4 523 1000 EXT:4455

15.00 7.00 3.13


P.O. BOX: 121385, CONRAD HOTEL, SUITE NO. 1506, 15th FLOOR
SHEIK ZAYED ROAD, DUBAI, UAE
AZIZIDEVELOPMENTS.COM
5.00
15.00 CONSULTANT :
Red and white plastic barriers filled with water
A
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD EXISTING ROAD EXISTING ROAD EXISTING ROAD
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh
www.ae7.com
Hassanicor Building, 6th Floor, Al Barsha 1
PO Box 54115 Dubai, UAE
P: +971 4 3997758 F: +971 4 3997759

MAIN CONTRACTOR :

0.70 4.50 1.00


PEDESTRIAN SUB CONTRACTOR :
WAY WORK UNDER PROGRESS
Plot line

Top of road
DRAWING TITLE :

SAFETY LAYOUT PLAN STAGE-01


(MODIFICATION OF TEMPORARY ROAD)
Existing Footpath Interlock Red and white Concrete
barriers Proposed Flush kerb SCALE : N.T.S DRAWING SIZE : A3 DATE :25-04-2024
Existing Upstand kerb
Proposed Car exit (temporary road) tile (8cm) DRAWN BY : CHECKED BY : APPROVED BY:

Existing Vehicular tile (8cm) with with crushed sand bed & road base layer SJ ZK NQ

crushed sand bed & road base layer DRAWING NUMBER: REV REV.DATE

ESIC-07122023-372-SF-01 00 SHEET NO.


SECTION A-A 00