STAGE-01
WORK PERIOD:- 1 DAY
TIMINGS:- 12.00 AM TO 6.00AM
PROJECT LOCATION
PST 01
PST 02
LEGENDS:-
OPEN BELOW
METHOD OF STATEMENT:-
1. MODIFICATION OF FOOTPATH IN ORDER TO
BUILDING CONSTRUCTION IN CONSTRUCTION
GENERAL NOTES:-
1. DO NOT SCALE FROM DRAWINGS.
PROJECT: EU-372
Existing Access
REV. DRAWN BY DESCRIPTION DATE
BUILDING LINE
PROJECT :
STAGE-01 WORK AREA MODIFICATION OF SERVICE ROAD FOR
Existing Car Parking Area
TEMPORARY ACCESS FOR CONSTRUCTION
Existing Car Parking Area VEHICLES FOR PROPOSED BUILDING B+G+134
EXIT ENTRY FLOORS MIXED USE TOWER ON PLOT NO:3350151
Reduce Speed
Temporary Service Road Close
Men at Work
Temporary Construction Vehicle Access AND CAR PARK BUILDING 9B+G+16 FLOORS +R
Sliding Door E=494757.042 ON PLOT NO:3356231 AT TRADE CENTER FIRST
E=494795.408
N=2790929.344
N=2790984.751 Red and white plastic barriers filled with water
Widening of Existing Service Road Exit 9.32 WATCHMAN ROOM
WATCHMAN ROOM
Widening of Existing Service Road Entry CRYSTAL FOUR - FZ
WORKS
0.70
END OF
EXIT
1.00 4.50
1.00 4.53
M: +971 50 456 8658 T: +971 4 523 1000 EXT:4455
MAIN CONTRACTOR :
Top of road
DRAWING TITLE :
Existing Vehicular tile (8cm) with with crushed sand bed & road base layer SJ ZK NQ
crushed sand bed & road base layer DRAWING NUMBER: REV REV.DATE