Case Study - PPAP
Case Study - PPAP
OrganizationEngineering Approval-
As noted on design record
Control Plan
Other Observations
Organization PPAP Submission Checklist (4th Ed.)
Part Number: xyz-001 Part Rev Level: 0
Description: Special O-Ring Checklist date: 10.11.20
Supplier Name: ABC Aeronotics PPAP Leader: Mr. Ram
Submission Level: 4 ROHS/Regulatory Requirements: Target for PPAP Submission Date: 22.03.21
PPAP Team; PPAP Team Leader to determine PPAP Team and document name members.
R&N TECH TEAM FOR PPAP AUDIT
Organizationhas to mark in "Req." box and Supplier has to mark the "Status" box as follows:
S= Element submitted with package R= Element retained at supplier location N= Element not applicable to submission or waived
PPAP Elements (Submission to be organized in this order and included in PPAP submission)(all documents must have supplier stamp and
sign of quality head or above) Req. Status
1 Part Submission Warrant. S S
2 OrganizationDesign Record- Saleable product including supplier/sub component dwgs as applicable S S
3 Any authorized engineering change documents- Include copy of the OrganizationECN S S
4 OrganizationEngineering Approval- As noted on design record S S
5 Design FMEA- If the supplier is responsible for design. S N/A (
W
h
6 Process Flow Diagram and Supply Chain Documentation- Include sub tier names, location and material/service supplied S S e
n
I affirm that 300 consecutive production parts were produced for this PPAP and that these parts were made at the production rate_35 NOS/HOUR________,
from specified materials, on regular production tooling, with no operations other than the regular production process
Print Name Mr. Ram Title QUALITY HEAD Phone Number 9876543222
Supplier Authorized Signature
b) Tooling / Fixture Photograph- Pictures of OrganizationTool number, Organizationownership and complete tool S S
Additional requirements as documented below:
c) Evidence of Tool design approval from OrganizationEngineering team S N/A
d) Photographs of Reference sample (for aesthetic) sign off by OrganizationQuality team S S
e) Packing approval from OrganizationQuality team S S
f) ROHS/ELV Certificate S S
g) Sub supplier declarition for child part, special process and Raw materai S S
h) OrganizationINSPECTION STANDARD- PARTS (MIS-P) and supplier PDQAS (with report) S S
Results of test specified in drawing (e.g. Hardness, plating, SST, Torque, force etc.) and audit report if services take from
i) S S
sub-supplier
j) IMDS for part to be submitted at OrganizationId 81745 S S
k) Self QAV audit report and closure S S
L) Supplier Capicity confirmation S S
F/09/PPAP/ABC
(
W
h
e
n
s
u
b
m
i
t
t
e
d
t
o
H
-
D
)
Part Name Special O-Ring
Part Submission Warrant Cust. Part number xyz-001
Shown on drawing xyz-001 Org. part number xyz-001
Engineering change level Dated
Additional Engineering Changes Dated
Safety and/or Government Regulation Purchase Order No. Weight (10 gms)
Checking Aid No. Checking Aid Engineerig change l Dated:-
Address:-Sec-09/ IIDSC
Buyer/Buyer code
94
City Regoin Postal code Country Application
MATERIAL REPORTING
Has customer-required substance of concern information been reported?
SUBMISSION RESULTS
The results for dimensional measurements material and functional tests appearance criteria statistical process package
These result meet all design record requriment (if no-explanation required)
Mold / Cavity / Production Process
DECLARATION
I affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable parts which are made
by a process that meets all production part approval process manual 4th edition requirement.
I further affirm that these samples were produced at the production rate of 300 per 8 hrs
I also certify that documented evidence of such compliance is on file and avilablefor review. I have noted any deviation from thisdeclaration below
EXPLANATION/COMMENTS:
PROCESS FL
CROSS FUNCTIONAL TEAM CATEGORY
QA- 1.Ram .
2.Mr. Mohan. PROTOTYPE
3.Mr. Sohan
OPR. TRANSPO -
S. NO. PROCESS FLOW OPERATION DESCRIPTION & PROCESS SHEET REFERENCE
No RTATION
5 30 Injection moulding
9427-3X
6 of
6 BY HAND Unloading
7 40 Cleaning/Curing
8 BY HAND Placement
9 50 Thorogh Inspection
11 60 Trimming
13 70 Deflashing
9427-3X
7 of
15 80 FINAL INSPECTION
Packing
17 90
19 100
Dispatch
RAW
33 TRANSPORT OPERATION OPERATION & INSPECTION
MATERIAL
9427-3X
8 of
9427-3X
9 of
SS FLOW CHART
CUSTOMER PFC No 04
PRODUCT NAME
Special O-Ring ORI. ISSUE DATE 10.10.1
9427-3X
10 of
9427-3X
11 of
MISTAKE PROOFING
TEMP. STORAGE INSPECTION PREM. STORAGE
OPERATION
9427-3X
12 of
9427-3X
13 of
10.10.19
Supplier Details
9427-3X
14 of
9427-3X
15 of
9427-3X
16 of
9427-3X
CONTROL PLAN
Prototype Prelaunch Production Key Contact Date (Orig) Rev. No. &
22.02.21 0
Date.:
Control Plan No Core Team ABC Customer Engg. Approval / Date
STRUCTURE ANALYSIS (STEP 2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4) RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)
Occurance (O)
Detection (D)
3. Next Lower level or (Untouched,
Severity (s)
DFMEA AP
3. Next Lower Level 1. Failure Effects (FE)
Characteristic Type 1. Next Higher Level 2. Focus Element 3. FAILURE CAUSE (FC) Current Target under Action Taken
Function and to Next Higher Level 2. FAILURE MODE (FM) of Current Detection Responsibile Completion
AP
1. Next Higher Level 2. Focus Element (Geometry, Material, Function and Function and of the Next Lower Element Prevention Prevention Action Detection Action Completion consideration, with Pointer to Remarks
Requirement or Element and/or the Focus Element Controls Person Date
Surface Finish, Requirement Requirement or Characteristic Controls Date in progress, Evidence
Characteristic Vechile End User
Coating, etc.) completed,
discarded)
Window Lifter Commutation system Brush card base body Converts electrical Commutation system Brush card body Torque and rotating 6 Angle deviation by Brush card body bends in Simulation of 2 Sample test: 2 L None Final Product test: Test Engineer Mr. DD.MM.YYYY Planned
energy into transports the transports forces velocity of the window commutation system contact area of the carbon dynamic forces on measuring the measuring the current Max Mueller
mechanical energy electrical current between spring and lifter motor too slow intermittently connectsthe brush brush card body elastic and plastic under worst case
acc to parametrization between coil pairs of motor body to hold wrong coils (L1, L3 and L2 acc. FEM 8370 deformation conditions acc. Test
spec/ MRJ1140
the electromagnetic the brush spring instead of L1, L2 and L3) effects of brush
converter. system in x, y, z card body acc.
position (support Test spec.
commutating contact MRJ8/60
point)
Helmet Shell Raw Material (Plastic To provide protection High impact injection Provides chemical & Rider may get serious 10 Helmet gets shattered Shell raw material is not Design of shell by 2 Material to be 2 L AA, MS
Granual) ABS- HI (40 B) by reducing the force molding thermal stability head injury incase of during fall & rider's head as per specified using high impact ensured by TC &
of the falling object strike & impact leading to get insufficient properties material & material third party
striking or impacting protection grade has been inspection
on the users head specified as ABS
HI -40 B by
following standard
IS 4151:2015
Shell Thickness is less Shell thickness is 1 Shell thickness to 1 L AA, MS
than 3 mm always kept more be checked during
than 3 mm. in product design
moulding tool
design
special feature
Occurance (O)
2. Function of the
Detection (D)
1. Function of Process (Untouched,
Severity (s)
1. Process Item, Process Step and 3. Function of the 1. Failure Effects (FE)
2. Process Step, Item, System, Current Current Detection Target under Action Taken
System, Subsystem, 3. Process Work Product Process Work Element to the Next Higher 2. Failure Mode (FM) of the 3. Failure Cause (FC) of Responsibile Completion
AP
AP
Station No. and Name Subsystem, Part Prevention Controls of FC or Prevention Action Detection Action Completion on consideration, with Pointer to Remarks
Part Element or Name Element - 4M Type Characteristics and Process Level Element and/or Focus Element the Next Lower Element Person Date
of the Focus Element Element or Name of Controls of FC FM date in progress, Evidence
of the Process (Quantity value is Characteristics End user or Characteristics
the Process completed,
optional)
discarded)
Electrical Motor Assy [OP30] Sintered Operator Your Plant Press in sintered Operator press the Your Plant 8 Axial position of sintered Machine stops before None 10 Lot Release 6 H
Line Bearing Press-in Assembly of shaft into bearing to achieve button of machine for Clearance too small to bearing is not reached reaching final position Protocol Objective
Process pole houring axial position in pole releasing the press-in assemble shaft (Effectivity 100%)
assembly. housing to max gap process when loading Visual Gauge
Ship to Plant per print. is completed Ship to Plant inspection of axial
Assembly of motor to Assembly of motor to gap of bearing to
vehicle door without vehicle door is not pole housing seat
line stoppage sort or possible. by Operator
containment. Detection
End User End User indicator OK/NOK
Window raises and Comfort closing time
lowers. too long.
Cluster [Op No. 10] Air Core Man Your Plant - Final Electric Managnetic Picking of air core Meter Not working 6 Dry Soldering Soldering NOT as per the Work Instruction 3 No Control 8 L
Assembly testing at assemmbly Force result in the movement and placing specified time (2 to 3 for Soldering Time
stand rotation of magnet in ampere machine to second)
pointer charge.
Ship to Plant - Proper
Fitment in the vehicle Press power supply to
panel charge and fitment in
the fixture for winding
End User - Indicate the operation
fuel level of vehicle
Carbon Flim Resistor
soldering on the
terminal for specified
time
MTC from Lab
Source - http://www.maishimfg.com/products/windows-doors/security-screen-mesh/certificate/101.html
PROCESS CAPABILITY STUDY (INITIAL) Ppk
PART No. : xyz-001 DATE :
Pp = 1.67(Min.) SPECIFICATION : 10+2
Required
PART NAME : Special O-Ring (Std.) Ppk = 1.67(Min.)
SAMPLE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
READING 10 10 10 10 10 10 10 10 9 9 10 10 10 10 9 9 10 10 10 10 10 10 10 10 10 10 10 10 10 10
Xbar 9.867
USL 12.000
LSL 8.000
Ppk = 1.80
RESULT :-
9793X
Company Name
QUALIFIED LABORATORY Company Logo
FOR TESTING & CALIBRATION
Reviewed : Approved:
INSTRUM CALIBRAT
INSTRUMENT LEAST CALIBRATIO MSA
SR. ENT ID RANGE ION PHOTO
DESCRIPTION COUNT N DUE DATE (Y/N)
NO. FREQ.
REMARKS
Measuring Instrument
0 ~ 200
1 DVC DVC-01 0.01mm 09.10.20 08.10.21 Y
mm
0 ~ 150
2 DVC DVC-02 0.01mm 09.10.20 08.10.21 Y
mm
0 ~ 150
3 DVC DVC-03 0.01mm 09.10.20 08.10.21 N
mm
0 ~ 150
4 DVC DVC-04 0.01mm 09.10.20 08.10.21 N
mm
HIEGHT 0 ~ 300
5 HG-01 0.001 mm 09.10.20 08.10.21 Y
GUAGE mm
DIGITAL
6 MICROMET DM-01 0~25mm 0.001mm 09.10.20 08.10.21 Y
E
STEP(0.0
7 Pin Gauge Set MPG-01 1 ~ 2 mm 09.10.20 08.10.21 N
2MM)
STEP(0.0
8 Pin Gauge Set MPG-02 1 ~ 2 mm 09.10.20 08.10.21 N
01MM)
STEP(0.0
Pin Gauge Set MPG-03 1 ~ 2 mm 09.10.20 08.10.21 N
02MM)
DIG PUSH
0-
9 PULL PPT-01 0.01mm 08.10.2020 07.10.21 N
TESTER 300KGF
Rivision History
S No. Rev. No. Change Detail Preprared By Approved By
Polymbag - L X W X T
Material - XX
ROHS Certificate (as per standard norms) from NABL approved
testing agency
Source - https://www.qima.com/samplereport/rohs
GAUGE REPEATABLITY & REPRODUCIBLITY
GAGE NO. : ABC-MM-02 PART NAME : 6.4 MW Terminal Thickness
GAGE NAME : Micrometer CHARACTERSTIC : 0.001mm. (Range : Length-0-25mm
GAGE L.COUNT : 0.001mm. SPECS. : 0.38 ± 0.02
NDC1.41( 11.59867
As %
R&R is
below
Acceptable10% &
ndc is in
apllicable
Not Acceptable
range.
Above
Remarks gauge is
acceptable for above users.
Approved by
APPROVED SUPPLIER LIST
GZB/
1 ABC O-Ring RM ABC PANTNAGA [email protected]
R
Original Date: 09.08.20
R LIST Revision No. & Date: 22.03.21
Updated on :
Self Organization
Lead time Selection
Contact Numbers Contact Person Certified approved approved Scope of Supply
for Supply Criteria
date date
REV. LEVEL /
PART NAME DATE
DATE
APPEARANCE EVALUATION
S.NO. APPERANCE ITEMS QUALIFICATION STANDARD/ CRITERIA REMARK
COMMENTS :
COMMENTS :
RS
REMARK
DATE
PREPARED BY APPROVED BY