4 Date when the lifting machine, chain rope or : Manufacturing year 1998
lifting tackle was first used in the factory/site
5 Date of each examination made under sec 29
i) 18-04-2023 : By Creative Technocrats, Guwahati
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 45 MT
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect
Brake and Crawler movement found O.K.
It is to certify that on 18-04-2023, this crawler mounted Pipe Layer is thoroughly examined and that
the above is a correct report of the result. This Certificate is valid up to 17-04-2024. Subject to any physical
deformation and alteration
For Creative Technocrats
4 Date when the lifting machine, chain rope or : Manufacturing year 2005
lifting tackle was first used in the factory/site
5 Date of each examination made under sec 29
i) 18-04-2023 : By Creative Technocrats, Guwahati
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 45 MT
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect
Brake and Crawler movement found O.K.
It is to certify that on 18-04-2023, this crawler mounted Pipe Layer is thoroughly examined and that
the above is a correct report of the result. This Certificate is valid up to 17-04-2024. Subject to any physical
deformation and alteration
For Creative Technocrats
4 Date when the lifting machine, chain rope or : Manufacturing year 2020
lifting tackle was first used in the factory/site
5 Date of each examination made under sec 29
i) 18-04-2023 : By Creative Technocrats, Guwahati
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 45 MT
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect
Brake and Crawler movement found O.K.
It is to certify that on 18-04-2023, this crawler mounted Pipe Layer is thoroughly examined and that
the above is a correct report of the result. This Certificate is valid up to 17-04-2024. Subject to any physical
deformation and alteration
For Creative Technocrats
4 Date when the lifting machine, chain rope or : Manufacturing year 2005
lifting tackle was first used in the factory/site
5 Date of each examination made under sec 29
i) 18-04-2023 : By Creative Technocrats, Guwahati
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 45 MT
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect
Brake and Crawler movement found O.K.
It is to certify that on 18-04-2023, this crawler mounted Pipe Layer is thoroughly examined and that
the above is a correct report of the result. This Certificate is valid up to 17-04-2024. Subject to any physical
deformation and alteration