Testing of Questionnaire Print Out Staging Server
Testing of Questionnaire Print Out Staging Server
IDENTIFICATION
Plant 10D1
Yes No NoAnsw
________________________________________________________________________
GENERAL
Activity?
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
Yes No NoAnsw
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
documented?
________________________________________________________________________
<U><H><K>HAZARD CONTROL</></></>
Are H2S sensors and alarm adequate and in good working order?
quiz?
________________________________________________________________________
Yes No NoAnsw
these equipment?
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
ENTRANCE AREA
Yes No NoAnsw
________________________________________________________________________
Condition of gauges is ok
Yes No NoAnsw
________________________________________________________________________
________________________________________________________________________
Yes No NoAnsw
________________________________________________________________________
TONGS
Clamps used on jerk line / snub lines / guy ropes / cat line as per
safety rules
Condition of Elevators is ok
Yes No NoAnsw
Yes No NoAnsw
Whether side rails of stairs, rig floor and mud tanks in position
________________________________________________________________________
GUARDS
GENERAL HOUSE
Yes No NoAnsw
Provision of battery boxes & battery cut off switch / earth switch is
made
Yes No NoAnsw
GENERAL
Drillometer condition
First aid box with anti snake bite kit and stretcher is availiable
Yes No NoAnsw
storage of P.O.L
________________________________________________________________________
RECORDS
________________________________________________________________________
________________________________________________________________________
Yes No NoAnsw
________________________________________________________________________
________________________________________________________________________
Installation Manager.
________________________________________________________________________
Location?
________________________________________________________________________
Date of Audit.
________________________________________________________________________
Audited by.
________________________________________________________________________
PART -1 GENERAL
SPUDDING CONFERENCE
________________________________________________________________________
________________________________________________________________________
Yes No NoAnsw
________________________________________________________________________
Recommendation:
________________________________________________________________________
operating procedures?
Condition of plinth.
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
Yes No NoAnsw
________________________________________________________________________
Are H2S sensors and alarm adequate and in good working order?
quiz?
________________________________________________________________________
________________________________________________________________________
"Provision of fencing around the Site and security at the entrance (OMR:
2017, Regulation:130)?"
Whether updated phone number for nearest Fire Service and Police Station
displayed?
(OMR:2017, Regulation:102)?"
y(OMR:2017, Regulation:102)?"
Yes No NoAnsw
displayed?"
PROHIBITED"" displayed?"
ed?"
"Whether names of "" FIRE FIGHTING TRAINED EMPLOYEES "" displayed ?"
________________________________________________________________________
________________________________________________________________________
Is there any valve in between a pump and its safety pressure relief
valve?
"Are all High pressure lines ( pump delivery lines, kill lines etc)
________________________________________________________________________
PART -II TECHNICAL: MUD TANK & CHEMICAL STORAGE AREA (OMR 2017;
REGULATION 48)
Yes No NoAnsw
satisfactory?
(local language)?
38.1)"
________________________________________________________________________
Whether the controls of workable BOP accessible and the BOP control unit
is in charged condition?
________________________________________________________________________
"PART-II TECHNICAL: PIPE RACK AREA (OMR 2017: REGULATION 49.1,49.2 &
49.3)"
39.2)
Yes No NoAnsw
________________________________________________________________________
Is there provision of Toe boards around Derrick Floor and Engine Floor?
least 1m high.
DM-5)
Are the Guy Line anchored as per design?( Applicable for only DM-5)
Are the safety clamps fitted as per norms?( Applicable for only DM-5)
________________________________________________________________________
Yes No NoAnsw
Is the condition of clamps used on jerk line/ guy ropes/ cat line as per
safety rules?
satisfactory?
________________________________________________________________________
REGULATION:43)
________________________________________________________________________
Yes No NoAnsw
________________________________________________________________________
36)"
"Whether side rails of stairs, rig floor and Mud Tanks in position?"
________________________________________________________________________
________________________________________________________________________
"PART II TECHNICAL : HEALTH AND HYGIENE (MINES ACTS' 1952 CLAUSE 19 & 21
Is the first Aid Equipments are available and as prescribed in the Third
Yes No NoAnsw
be kept in it)
"Whether sets of Splints 1.40 mtrs, 0.90 mtrs and 0.30 mtrs with
Whether the First Aid Boxes or Cupboards are available in the ratio one
Does the First Aid Box have sufficient supply of large and small
Does the First Aid Box have sufficient supply of sterilized Cotton wool
Does the First Aid Box have sufficient supply of Tincture of Iodine or
Does the First Aid Box have sufficient supply of Roller Bandage?
Does the First Aid Box have Tourniquet Scissors and Safety Pins?
"Is Canteen facility available 15 mtrs away from Latrine, Urinal or any
________________________________________________________________________
REGULATION:128)
Yes No NoAnsw
materials?
________________________________________________________________________
the Installation?
the Installation?
Are Ear Muff and Ear Plugs being used as PPE by working persons in the
Installation?
Installation?
________________________________________________________________________
rEGULATION:110.3)
Is there provision of Battery boxes & Battery cut off switch/ earth
switch?
Yes No NoAnsw
________________________________________________________________________
119)"
pits satisfactory?
satisfactorally?
"Are the setting values of fuses, relays within prescribed limits?( Chec
Regulation:120)
________________________________________________________________________
Is consent obtained from PCBA under Air Act:1981 and Water Act:1974?
Yes No NoAnsw
(Record available)
________________________________________________________________________
"Are 1 Nos DCP, 10kg for each Engine placed in the Main Engine Area?"
"Is 1 No DCP, 10kg placed near the Electrical Motor/Pump used for water
"Is 1 No DCP, 10kg for each Mud gunning pump placed in the Mud gunning
Pump area?"
Are 1 No 6.8kg CO2 extinguisher and 1 No 10kg DCP for each unit placed
10kg sand bucket or 1/2 sand drum with spade placed in the Diesel
Storage Area?"
"Are 1 No DCP, 10kg and 1 No Sand bucket stand placed in Lube storage
area?"
Yes No NoAnsw
"Are 1 No Fire extinguisher / Shed with 3 Nos DCP, 10kg & 2 Nos Sand
No of water monitors?
________________________________________________________________________
No of Hydrants?
________________________________________________________________________
Is there a dedicated fire water ring main around the Drilling Rig?
________________________________________________________________________
Is there provision of Trailer Fire Pump for fire water ring Main?
________________________________________________________________________
"Is NDT of Tubular and Handling tools done? viz; slips, tongs, elevators
,links ."
Yes No NoAnsw
available?
29-S))available?
76(2)))available?
available?
available?
available?
fortnightly) available?
Yes No NoAnsw
available?
________________________________________________________________________
Summary #1
________________________________________________________________________
Summary #2
________________________________________________________________________
Summary #3
________________________________________________________________________
Summary #4
________________________________________________________________________
Summary #5
________________________________________________________________________
Summary #6
________________________________________________________________________
Summary #7
________________________________________________________________________
Summary #8
________________________________________________________________________
Summary #9
________________________________________________________________________
Summary #10
________________________________________________________________________