CH 6
CH 6
Rate (Rs.)
Item TVC & PGT MAS, SA, Cement
Description of Item Unit
No. Division TPJ & MDU Qty.(qtl.)
Division
061011 Cement mortar 1:3 (1 cement : 3 fine sand) cum 2588.62 1768.73 1.680
061012 Cement mortar 1:4 (1 cement : 4 fine sand) cum 2588.62 1768.73 1.250
061013 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 2810.01 1843.70 0.830
061014 Cement mortar 1:6 (1 cement : 6 fine sand) cum 2609.93 1790.03 0.830
061015 Lime mortar 1:1:1 (1 lime putty : 1 surkhi : 1 fine sand) cum 3198.01 2434.57
061016 Cement Lime mortar 1:1:6 (1 cement : 1 lime : 6 fine cum 2888.86 2025.31 0.775
sand)
061020 Extra for random rubble masonry with hard stone in cum 466.80 466.80
superstructure above plinth level up to floor two level,
including levelling up with concrete as per specifications,
at window sills, ceiling level and the like
062016 Cement Lime mortar 1:1:6 (1 cement : 1 lime : 6 fine cum 3231.79 2376.85 0.705
sand)
062020 Coursed rubble masonry (2nd sort) with hard stone in
foundation and plinth with :
062021 Cement mortar 1:3 (1 cement : 3 fine sand) cum 2777.43 1987.72 1.530
062022 Cement mortar 1:4 (1 cement : 4 fine sand) cum 2777.43 1987.72 1.130
062023 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 2965.05 2042.24 0.750
062024 Cement mortar 1:6 (1 cement : 6 fine sand) cum 2777.43 1987.72 0.750
062025 Lime mortar 1:1:1 (1 lime putty : 1 surkhi : 1 fine sand) cum 3312.05 2573.67
062026 Cement Lime mortar 1:1:6 (1 cement : 1 lime : 6 sand cum 3050.37 2220.97 0.705
ordinary)
062030 Extra for coursed rubble masonry with hard stone (first cum 398.72 398.72
or second sort) in superstructure above plinth level
upto floor two level
Page 33
1 of 7 : Chapter - 6
SR's Unified Standard Schedule of Rates 2011 Chapter - 6 : Stone Work
Rate (Rs.)
Item TVC & PGT MAS, SA, Cement
Description of Item Unit
No. Division TPJ & MDU Qty.(qtl.)
Division
062040 Extra for coursed rubble masonry with hard stone (first cum 225.33 225.33
or second sort) in superstructure above floor two level
for every floor or part thereof
062050 Extra for coursed rubble masonry with hard stone (first
or second sort) in :
062051 Square or rectangular pillars cum 232.04 232.04
062052 Circular pillars cum 765.78 691.44
062060 Extra for coursed rubble masonry (first or second sort) cum 293.19 267.63
with hard stone curved on plan for a mean radius not
exceeding 6m
LATERITE MASONRY
063010 Laterite Masonry in foundation and plinth with :
063011 Cement mortar 1:3 (1 cement : 3 fine sand) cum 2652.69 1751.44 1.530
063012 Cement mortar 1:4 (1 cement : 4 fine sand) cum 2652.69 1751.44 1.130
063013 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 2761.83 1780.71 0.750
063014 Cement mortar 1:6 (1 cement : 6 fine sand) cum 2652.69 1751.44 0.750
063015 Lime mortar 1:1:1 (1 lime putty : 1 surkhi : 1 fine sand) cum 2973.46 2103.00
063016 Cement Lime mortar 1:1:6 (1 cement : 1 lime : 6 sand cum 2816.46 1891.39 0.705
ordinary)
063020 Extra for Laterite Masonry in superstructure above plinth cum 237.70 237.70
level upto floor two level
063030 Extra for Laterite Masonry in superstructure above floor cum 241.70 241.70
two level for every floor or part thereof
063040 Extra for Laterite masonry in :
063041 Square or rectangular pillars cum 130.00 130.00
063042 Circular pillars cum 534.20 365.78
063050 Extra for Laterite masonry curved on plan for a mean cum 258.09 200.01
radius not exceeding 6m
ASHLAR MASONRY :
064010 Stone work plain ashlar in superstructure upto floor two
level in cement mortar 1:6 (1 cement : 6 coarse sand)
including pointing with cement mortar 1:2 (1 white
cement : 2 stone dust) with an admixture of pigment
matching the stone shade
064011 Red Sand Stone cum 20167.65 19789.53 0.490
064012 White Sand Stone cum 20921.19 20543.07 0.490
064020 Stone work plain ashlar in superstructure upto floor two
level in cement mortar 1:4 (1 cement : 4 coarse sand)
including pointing with cement mortar 1:2 (1 white
cement : 2 stone dust) with an admixture of pigment
matching the stone shade
064021 Red Sand Stone cum 19707.70 19329.57 0.690
064022 White Sand Stone cum 20618.74 20240.61 0.690
064030 Stone work plain ashlar in arches in cement mortar 1:3
(1 cement : 3 coarse sand) including centring, shuttering
and pointing with white cement mortar 1:2 (1 white
cement : 2 stone dust) with an admixture of pigment
matching the stone shade
064031 Red Sand Stone cum 22336.18 21957.99 1.070
064032 White Sand Stone cum 23427.71 23049.53 1.070
Page 34
2 of 7 : Chapter - 6
SR's Unified Standard Schedule of Rates 2011 Chapter - 6 : Stone Work
Rate (Rs.)
Item TVC & PGT MAS, SA, Cement
Description of Item Unit
No. Division TPJ & MDU Qty.(qtl.)
Division
064090 Extra over Item 064030 for additional cost of centring for Sqm 912.91 460.94
arches exceeding 6m span including all strutting, bolting,
wedging etc. and removal (area of soffit to be measured)
065011 Red Sand Stone, 70mm thick Sqm 1927.73 1887.69 0.045
065012 Red Sand Stone, 60mm thick Sqm 1829.49 1789.45 0.045
065013 Red Sand Stone, 50mm thick Sqm 1731.48 1691.43 0.045
065014 Red Sand Stone, 40mm thick Sqm 1632.94 1592.90 0.045
065015 Red Sand Stone, 30mm thick Sqm 1534.70 1494.66 0.045
065020 Stone work (White Sand Stone) for wall lining etc.
(veneer work) over 12mm thick bed of cement lime
mortar 1:1:6 (1 cement : 1 lime putty : 6 fine sand)
including pointing in white cement mortar 1:2 (1 white
cement : 2 stone dust) with an admixture of pigment
matching the stone shade. (To be secured to the backing
by means of cramps this shall be paid for separately)
065021 White Sand Stone, 70mm thick Sqm 2004.16 1964.11 0.045
065022 White Sand Stone, 60mm thick Sqm 1895.00 1854.96 0.045
065023 White Sand Stone, 50mm thick Sqm 1786.09 1746.05 0.045
Page 35
3 of 7 : Chapter - 6
SR's Unified Standard Schedule of Rates 2011 Chapter - 6 : Stone Work
Rate (Rs.)
Item TVC & PGT MAS, SA, Cement
Description of Item Unit
No. Division TPJ & MDU Qty.(qtl.)
Division
065024 White Sand Stone, 40mm thick Sqm 1676.37 1636.32 0.045
065025 White Sand Stone, 30mm thick Sqm 1567.46 1527.42 0.045
065030 Extra for stone work (veneer work) curved on plan with a cum 1041.87 1041.87
mean radius not exceeding 6m
065040 Providing and fixing gun metal cramps of required shape
for anchoring stone wall lining to the backing or securing
adjacent stones in stone wall lining in cement mortar 1:2
(1 cement : 2 fine sand) including making the necessary
chases
065041 25mmx6mm – 30cm long Each 55.71 54.13 0.030
065042 15mmx6mm – 16.5cm long Each 26.44 24.86 0.020
065050 Providing and fixing stone dowels 10cmx5cmx2.5cm cut Each 19.16 17.58 0.007
to double wedge shape as per design in cement mortar
1:2 (1 cement : 2 fine sand) including making the
necessary chases
065060 Providing and fixing copper pins 7.5cm long 6mm dia. for Each 7.42 5.83 0.007
securing adjacent stones in stone wall lining in cement
mortar 1:2 (1 cement : 2 fine sand) including making the
necessary chases
065070 Providing and fixing sloping chajja of stone 40mm thick
and upto 80cm wide beyond the wall as measured along
the slope, exposed surface well dressed on both sides, in
cement mortar 1:4 (1 cement : 4 coarse sand) with
12mm diameter anchoring steel bar 45cm long fixed in
each stone and supported on and including with bricks
cove of class designation 7.5 in cement mortar 1:4 (1
cement : 4 coarse sand) including pointing in cement
mortar 1:2 (1 white cement : 2 stone dust) with an
admixture of pigment matching the stone shade
065100 Providing and fixing red sand stone brackets Each 1798.20 1798.20 0.030
55cmx22.5cmx45cm sunk and moulded including
providing and fixing with 4 nos. gun metal cramp
25x6mm, 30cm long and dowel bars 7.5cm long 6mm
dia. as per design
Page 36
4 of 7 : Chapter - 6
SR's Unified Standard Schedule of Rates 2011 Chapter - 6 : Stone Work
Rate (Rs.)
Item TVC & PGT MAS, SA, Cement
Description of Item Unit
No. Division TPJ & MDU Qty.(qtl.)
Division
065170 Extra for laying stone work in or under foul position cum 101.26 101.26
Page 37
5 of 7 : Chapter - 6
SR's Unified Standard Schedule of Rates 2011 Chapter - 6 : Stone Work
Rate (Rs.)
Item TVC & PGT MAS, SA, Cement
Description of Item Unit
No. Division TPJ & MDU Qty.(qtl.)
Division
065180 Wall lining butch work upto 10m height with Dholpur Sqm 1994.72 1910.18 0.155
stone 40mm thick rough facing on the exposed surface
with stone strips of minimum length 230mm and
required width including embedding every tenth layer
and bottom most layer in masonry or concrete after
making necessary chases of size 75mmx75mm and by
providing layer of 75mm thick strips including 12mm
thick bed of cement mortar 1:3 (1 cement : 3 coarse
sand) including ruled pointing in cement mortar 1:2 (1
white cement : 2 stone dust) with an admixture of
pigment to match the shade of stone complete as per
direction of the Engineer-in-Charge
065190 Stone work for wall lining upto 10m height etc. (veneer Sqm 1389.19 1357.16 0.137
work) over 12mm thick bed of cement mortar 1:3 (1
cement : 3 coarse sand) and jointed with grey cement
slurry @ 3.30kg/sqm including rubbing and polishing
complete. (to be secured to the backing by means of
cramps which shall be paid for separately) Kota Stone
slabs rough chiseled, 25mm thick
065200 Stone tile work for wall lining upto 10m height with
special adhesive like araldite or equivalent over 12mm
thick bed of cement mortar 1:3 (1 cement : 3 coarse
sand) including pointing in white cement with an
admixture of pigment to match the stone shade
065201 8mm thick (mirror polishing and machine cut edge) Sqm 1061.40 1030.25 0.077
Granite Black Stone
065202 8mm thick (mirror polishing and machine cut edge) Sqm 1324.73 1293.59 0.077
Granite Brown Ruby Red Stone
065203 8mm thick (mirror polishing and machine cut edge) Raj Sqm 1099.84 1068.70 0.077
Nagar White Stone
065210 Extra for stone work for wall lining on exterior walls of Sqm 61.46 61.46
height more than 10m from ground level for every
additional height of 3m or part thereof
065220 Dry rubble masonry in retaining walls, toe walls etc. cum 1609.07 1376.77
Page 38
6 of 7 : Chapter - 6
SR's Unified Standard Schedule of Rates 2011 Chapter - 6 : Stone Work
Rate (Rs.)
Item TVC & PGT MAS, SA, Cement
Description of Item Unit
No. Division TPJ & MDU Qty.(qtl.)
Division
Page 39
7 of 7 : Chapter - 6