Sdi Simple Silt Density Index Tester Operating Manual
Sdi Simple Silt Density Index Tester Operating Manual
Operators Manual
Manufactured by:
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 1727-4427
www.appliedmembranes.com [email protected]
simple SDI:auto
Table of Contents
Topic Page
Introduction............................................................................................................... 3
Getting to know simple SDI: Overview...................................................................... 4
Setting up simple SDI:
Getting Started..................................................................................................... 5
Prefilter Installation and supply water connection................................................ 6
Drain line connection.......................................................................................... 7
Start-up and test procedure.................................................................................. 8
Test Procedure..................................................................................................... 9-11
Operating simple SDI:
End of test clean-up and routine maintenance...................................................... 12
Controller Operation............................................................................................ 13-15
Troubleshooting................................................................................................... 16
Battery care and Charging.................................................................................... 17
How to use our Quick-connect fittings................................................................. 18
Specifications............................................................................................................ 19
Parts Drawings........................................................................................................... 20 & 21
Declaration of Conformity, CE................................................................................... 22
Warranty................................................................................................................... 23
2
simple SDI:auto
Introduction
Thank you for purchasing simple SDI. We hope you’ll find simple SDI to be an indespen-
sible tool.
We designed simple SDI with feedback from experts familiar with other automated SDI
measurement systems as well as those who’d performed more manual tests than they care
to remember. We incorporated as many of their suggestions as we could. For example:
As good as simple SDI is, there’s always room for improvement. If you have an experi-
ence, idea or input either positive or negative we’d love to hear from you.
Again, thanks for your purchase. Welcome to the community of simple SDI users.
David Spears
Distributed By:
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
3
simple SDI:auto
Getting to know simple SDI: Overview
Controller Enclosure
LCD Display
Enter Switch
Down Switch
UP Switch
Power Switch
Power In (9VDC)
Pressure Gauge
Pressure Regulator
Inlet Valve
Water Inlet (.25”OD)
! WARNING! Do not blow air through the inlet or outlet of the meter or the
flow sensor will be damaged.
4
Distributed By:
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
simple SDI:auto
Setting up simple SDI: Getting Started
Remove the vinyl plug from the water Inlet fitting Remove the vinyl cap from the outlet fitting on
and place it in the Power In jack. the right side of the meter.
Note: Replace the vinyl caps after testing to protect the internal components from foreign
particles and to retain the collets on the fittings.
NOTE! simpleSDI is a precision instrument and should be used accordingly. Do not drop
! or otherwise physically shock the meter. Do not submerge or spray with water. Do not
leave in direct sunlight or other unprotected environment.
The minimum prefiltration requirement is the 50 For many water supplies, the optional 5 micron
micron prefilter. This filter should be used on every prefilter is also required. Use the 5 micron filter
test. The filter is too large to affect the SDI results on unfiltered water supplies or on water supplies
but small enough to protect the internal compo- where the SDI results are high (e.g. SDI-15 greater
nents of simple SDI from damage. than 5) or whenever you receive an “OVER-
RANGE” error message indicating that the plug-
Distributed By:
ging factor is 90% or greater.
5
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
simple SDI:auto
Setting up simple SDI: Prefilter installation and Supply Water Connection
The illustrations below show how to connect the prefilters. Please note the direction of the flow arrows on
the filters and connect them in the proper orientation. Use the blue 1/4” OD Polyethylene tubing supplied.
There are two short pieces for interconnecting the filters and connecting to simple SDI. There’s one long
piece for connecting to the water supply.
Note: These instructions assume familiarity with the Quick-Connect type fittings that we use. If you
haven’t used these fittings before, please see the appendix for a tutorial on how to use them.
.25” OD
Polyethylene Tubing
(or equiv.)
50 micron
Prefilter
Water Source
.25” OD
50 micron Polyethylene Tubing
Prefilter (or equiv.)
5 micron
Prefilter
6
simple SDI:auto
Setting up simple SDI: Filter Holder and Drain Line Connection
To Drain
Connections Complete
From To Drain
Water
Supply
Close the Inlet Valve on simple SDI. Slowly open the Inlet Valve on simple SDI by
Open the valve at the water source. turning the handle counterclockwise. Water will
flow through simple SDI.
No bubbles
Tapping on the pressure regulator and/or turning Allow the water to run for 15 seconds or so or
the knob helps to dislodge air bubbles. until you see a clear bubble-free stream of water
flowing through the clear blue tubing. Close the
Distributed By: Inlet Valve.
8
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
simple SDI:auto
Setting up simple SDI: Test Procedure
The next step is to install the membrane filter. As simple as this sounds there are at least two distinct ways
and perhaps a number of hybrid methods for doing this. We’re going to explain two methods. You chose
the method that works best for you.
Filter installation:Technique #1
1 2
Open the membrane filter housing. Using the Put the top back on the membrane filter housing
tweezers provided, place a membrane on the but do not fully tighten it. Leave it loose enough
face of the filter housing. (Note that the mem- so that water can freely escape, about 1/2 turn
branes are white and are separated by light less than fully tight.
blue pieces of paper. Make sure that you have a
membrane and only a membrane.)
3 4
No bubbles
Open the inlet valve-just enough for water to flow. When you see clear bubble-free water in the
Allow water to dribble out of the housing. clear blue tubing, tighten the housing and close
the Inlet Valve. With the inlet valve closed,
tighten the housing further if necessary. (Go to
Distributed By:
Page 10.)
9
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
simple SDI:auto
Setting up simple SDI: Test Procedure
Filter installation:Technique #2
1 2
Open the membrane filter housing. Hold the inlet Using the tweezers provided, place a membrane
half of the filter housing in one hand. Tilt the on the face of the filter housing. (Note that the
filter housing UP so that the face of the housing membranes are white and are separated by
is up and parallel to the ground. Open the inlet light blue pieces of paper. Make sure that you
valve very slightly so that water spills out of the have a membrane and only a membrane.) The
housing. Close the valve while keeping the filter “shiny” side of the membrane should be placed
housing face up and parallel to the ground. “UP”.
3 4
Next, wet the membrane thoroughly. An eye- Once the membrane has been wetted thoroughly,
dropper or small bottle with a spout are helpful put the top back on the membrane filter housing
in doing this. and tighten fully. (Go to Page 10.)
Distributed By:
10
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
simple SDI:auto
Setting up simple SDI: Test Procedure
With the system purged of air bubbles and the membrane filter installed, the only things
left are to adjust the pressure and start the test.
Adjust to 30 psi
Open the Inlet Valve and as quickly as possible As soon as you reach 30 psi, close the inlet valve.
adjust the pressure to 30 psi. (Turning the knob This procedure is only necessary on the first test
on the pressure regulator clockwise increases the on a given water supply. On subsequent tests the
pressure, turning it counter-clockwise reduces the pressure can be adjusted, if necessary, during the
pressure.) first few seconds of the test.
ENTER
POWER
Turn the Power ON. After the Welcome screen Monitor the meter as the test begins. As the mem-
comes up, Press ENTER to begin the test. OPEN brane fouls, the pressure will increase. For opti-
the inlet valve. As soon as the water starts flowing, mum accuracy re-adjust the presssure to 30 psi.
the test will begin automatically. After the first 4 to 5 minutes the pressure will
stabilize. The test will take approximately 20 min-
utes to complete. 11
simple SDI:auto
Operating simple SDI: End of test clean-up and routine maintenance
WARNING!
! WARNING! Do not blow air through the inlet or outlet of the meter or
the flow sensor will be damaged.
When you are finished testing, close the valve at Place the vinyl cap into the outlet fitting on the
the supply source. Disconnect simple SDI from right side of the meter.
the source. Disconnect the prefilters and drain
line. Drain as much of the water from the tubing
and filters as possible.
Remove the plug from the Power Inlet fitting and Close the case and stand the meter vertically so
put it into the inlet fitting. that the handle is up. This will allow any water
inside the bottom part of the meter to drain out.
NOTE! simpleSDI is a precision instrument-use with care. Do not drop or physically shock the meter. Do
12 ! not submerge or spray with water. Do not leave in direct sunlight or other unprotected environment.
simple SDI:auto
Operating simple SDI: Controller Operation
The controller is the heart of simple SDI. It performs all of the control, measurement
and calculation functions necessary to conduct a SDI test. Below is a close-up view
of the controller with call-outs explaining the primary control elements.
Display
Shows current information relative to the status of the
meter. Shows status of tests in process and the final
results of tests when they’re completed.
si mple SDI
UP DOWN
POWER ENTER
s p e a r s d e s i g n . n e t
Distributed By:
13
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
simple SDI:auto
Operating simple SDI: Controller Operation
Shown below and on the next page are representative displays from different points
during the course of an SDI 15 test.
Welcome to simpleSDI
Start-up screen Press:
ENTER to begin test
Display during
inital flow First 100ML 13.1 sec
measurement. First 500ML 33.2 sec
Values update in Run Time 33:2 Total Elapsed time since
real-time Flow 943 ml/min starting the test.
Distributed By:
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
14
simple SDI:auto
Operating simple SDI: Controller Operation
15
simple SDI:auto
Operating simple SDI: Troubleshooting
There are three error conditions that the controller reports. Two conditions are related to
low flow, the other to an increase in flow.
Cause: This message is displayed whenever the flow rate increases relative to the initial flow rate.
An increase in flow usually indicates an air-bubble on the surface of the membrane at the begin-
ning of the test that subsequently cleared and allowed an increase in membrane surface area with
a corresponding increase in flow. It can also indicate a torn membrane or an error in setting the
initial pressure. (e.g. test was started at less than 30 psi and then manually adjusted up to 30 psi
after the test had begun.
Correction: Purge the air from the system and begin a new test.
Replace the torn membrane and begin a new test.
16 Carefully adjust the pressure when starting a new test.
simple SDI:auto
Operating simple SDI: Battery charging and care.
!
NOTE:
Charge the battery at the end of
each day’s use. Failure to keep a
charge on the battery or allowing
the battery to fully discharge will
shorten the battery life.
!
WARNING!
To charge the battery simply plug the supplied Do not blow air through the
charger /power adapter into the appropriate elec-
trical supply (110 VAC or 220 VAC). Plug the
inlet or outlet of the meter or
other end of the supplied charger into the Power the flow sensor will be damaged.
In plug on simple SDI.
Battery Info
Battery Type: 6 Volt, 1.3 AH Sealed Lead Acid (SLA)
Battery Life: At least 5 years of typical usage.
Battery Capacity: Approximately 13 hours of testing. Power consumption is highest during active
testing. To conserve the battery, simpleSDI shifts into a “sleep” mode when testing
is complete.
Charge Rate:
Charge Frequency: Charging at the end of each day’s use is recommended. This practice will ensure that
you always have a fully charge battery when you need it. Unlike NiCad batteries, the
SLA battery used in simple SDI can be charged after every use without diminishing
the batteries capacity or useful life. Failure to keep a charge on the battery or allow-
ing the battery to fully discharge will shorten battery life.
NOTE! simpleSDI is a precision instrument-use with care. Do not drop or physically shock
! the meter. Do not submerge or spray with water. Do not leave in direct sunlight or other
unprotected environment.
17
simple SDI:auto
Operating
How to usesimple SDI: How to use
our Quick-Connect our quick-connect fittings
fittings.
To Attach Tubing:
Cutaway view of fitting and tubing
To ease insertion, moisten Note: Resistance will be felt Keep pushing until the
end of tubing with fresh when the tubing meets the resistance is overcome and the
water or 3% hydrogen O ring. tubing rests against the stop.
peroxide solution.
Tube Stop
O-Ring
To Remove Tubing:
Electrical
Battery Type: 6 Volt, 1.3 AH Sealed Lead Acid (SLA)
Battery Life: At least 5 years of typical usage.
Battery Capacity: Approximately 13 hours of testing.
Power Supply: 110VAC-9VDC 500 ma (U.S.)
220VAC-9VDC 500 ma (Int’l)
Tests Performed
SDI5 100 ml and 500 ml sample volumes
SDI10 100 ml and 500 ml sample volumes
SDI15 100 ml and 500 ml sample volumes
Distributed By:
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
19
Isometric View with insert and case hidden.
simple SDI:auto
Part Number Date Serial Number Note: These drawings reflects changes
to the flow transducer and pressure
182-10005 02/27/2007 7B-280-0204
regulator that occured on the respective Perspective Reference
185-10006 04/04/2007 XX-283-0011 models and dates as shown in this table.
182-10025 02/27/2007 XX-281-0099
182-10026 02/27/2007 XX-284-0006
530-90298 04/01/2010 0C-###-####
530-90250 04/01/2010 0C-###-####
1
2 14
20
3 11
12
5 10
19
16
13
18 6
6
15
21
15
17
7
19 18
17
7
15
6 16
15
16b
3 23
21 22
23 5
2 9 6
13
1
4
24
25
21
simple SDI:auto
EC Declaration of Conformity
| Electromagnetic Compliance 2004/108/EC
| Low Voltage 2006/95/EC
The devices defined below have been developed, constructed and manufactured according to the above
mentioned EC directives. The applied harmonized standards are noted below.
Product Description
Product Name: simpleSDI
Product Type: Portable, battery powered silt density index testing tool.
Manufacturer: SDI Solutions
Product Environment:
This product is intended for use in commercial and light-industrial environments.
Applicable Directives
Emission: EN 61000-6-3:2007
Immunity: EN 61000-6-1:2007
SDI Solutions
David Spears
Technical Director
Distributed By:
® 2450 Business Park Dr. Vista, CA 92081 (760) 727-3711 (760) 727-4427
www.appliedmembranes.com [email protected]
22
simple SDI:auto
simple SDI: Limited Warranty
Exclusion of damages:
Procam’s liability is limited to the cost of repair or replacement of the product. Procam shall not be
liable for:
1. Damage to other property caused by any defects in the product, damages based upon inconve-
nience, loss of use of the product, loss of time, loss of profits, loss of business opportunity, loss of
goodwill, interference with business relationships or other commercial loss, even if advised of the
possibility or such damages.
2. Any other damages, whether incidental, consequential or otherwise.