1.3.1. Sanitation ............................................................................................................ 42
1.4. INSTALLATIONS ........................................................................................................... 42
1.4.1. WORKSHOP ......................................................................................................... 42
1.4.1.1. Warehouse .................................................................................................. 42
1.3.2.1. Changing room ............................................................................................ 43
1.3.2.2. Car park ....................................................................................................... 43
1.3.2.3. Car wash ...................................................................................................... 43
1.3.2.4. Central zone ................................................................................................ 43
1.4.2. Offices.................................................................................................................. 43
1.4.2.1. Hall............................................................................................................... 43
1.4.2.2. First floor ..................................................................................................... 43
1.4.2.2.1. Offices....................................................................................................... 43
1.4.2.2.2. Administrative office ................................................................................ 44
1.4.2.2.3. Bathroom.................................................................................................. 44
1.4.2.2.4. Waiting room............................................................................................ 44
2. DRAWINGS .......................................................................................................................... 45
2.1. 3D Structure ................................................................................................................ 46
2.2. Frame 1........................................................................................................................ 47
2.3. Frame 2........................................................................................................................ 48
2.4. Frame 3........................................................................................................................ 49
2.5. Foundation 1 ............................................................................................................... 50
2.6. Foundation 2 ............................................................................................................... 51
2.7. Foundation 3 ............................................................................................................... 52
2.8. Foundation 4 ............................................................................................................... 53
2.9. Foundation 5 ............................................................................................................... 54
2.10. Foundation 6 ........................................................................................................... 55
2.11. Foundation 7 ........................................................................................................... 56
2.12. One-line diagram ..................................................................................................... 57
2.13. One-line diagram scheme ....................................................................................... 58
2.14. Supply water............................................................................................................ 59
2.15. Drainage water ........................................................................................................ 60
2.16. Ground floor ............................................................................................................ 62
2.17. First floor ................................................................................................................. 63
3. SPECIFICATION SHEET ......................................................................................................... 64
3
3.1. SPECIFICATION SHEET DEFINITION ............................................................................. 64
3.2.1. Project’s documents ............................................................................................ 64
3.2.2. Description of sites .............................................................................................. 64
3.2.3. Performance and time scheduling ...................................................................... 65
3.2.4. Modification of sites............................................................................................ 65
3.2.5. Omitted or conflicting regulations ...................................................................... 65
3.3. MATERIAL AND EQUIPMENT CONDITIONS ................................................................. 65
3.3.1. Terms ................................................................................................................... 65
3.3.2. Steel ..................................................................................................................... 65
3.3.3. Cement ................................................................................................................ 66
3.3.4. Water................................................................................................................... 66
3.3.5. Aggregates ........................................................................................................... 66
3.3.6. Pipes .................................................................................................................... 66
3.4. EXECUTION CONDITIONS ............................................................................................ 66
3.4.1. Terms ................................................................................................................... 66
3.4.1.1. Construction works ..................................................................................... 66
3.2.1.1. Temporary works ........................................................................................ 66
3.2.1.2. Landfills........................................................................................................ 67
3.2.1.3. Construction conservation .......................................................................... 67
3.2.1.4. Deviation of servicies .................................................................................. 67
3.5. REPLAN ........................................................................................................................ 67
3.6. EARTH MOVING........................................................................................................... 67
3.7. LAYING FOUNDATIONS ............................................................................................... 68
3.8. STRUCTURES ................................................................................................................ 68
3.8.1. Metallic structures .............................................................................................. 68
3.2.1. Prefabricated elements ....................................................................................... 68
3.9. ECONOMIC CONDITIONS............................................................................................. 69
3.9.1. General criteria.................................................................................................... 69
3.9.2. Deposits ............................................................................................................... 69
3.9.3. Contradictory prices ............................................................................................ 69
3.9.4. Claims price increase ........................................................................................... 69
3.9.5. Revision of contract prices .................................................................................. 70
4. BUDGET ............................................................................................................................... 71
4.1. UNIT BUDGET .............................................................................................................. 71
4
4.1.1. Structure.............................................................................................................. 71
4.1.2. Lighting ................................................................................................................ 71
4.1.3. Electricity ............................................................................................................. 72
4.1.4. Sanitation ............................................................................................................ 72
4.1.5. Machinery............................................................................................................ 73
4.1.6. Offices supplies ................................................................................................... 73
4.1.7. Civil work ............................................................................................................. 73
4.2. GENERAL BUDGET ....................................................................................................... 74
5
1. REPORT
1.1 GENERAL DESCRIPTION
1.1.1. OBJECTIVES
The main objective of this project is designing and building an industrial bay, in which
exists the necessary machinery to modificate cars. Besides, it is important that this
garage has a place where the cars can be parked and another place dedicated to the
offices and the customer reception.
Once the project is done, it should be able to modify mechanical and electronic aspects
of any car engine. Thus, it is going to be possible to increase the horsepower and
specifications required by the client.
On the other hand, due to the big size of the industrial bay we can also offer a private
luxury parking lot for people who want to park their cars for example on holidays. In
this way, clients will feel more secure.
1.1.2. LIMITATIONS
The garage is only going to be prepared to provide the services which are considered in
product specification, any exterior or interior aesthetic modifications are going to be
making in it. It isn’t going to be able to offer the service of a conventional garage.
1.1.3. LOCALIZATION
The localization for the facility would be the city of Valencia, located on the east coast
of Spain. We have chosen this city because in this city there isn´t any factory like this,
besides in Valencia there are many people who can be interested in our products, due to
it is an area where there is a great motor culture thanks to the different events that take
place in Chest circuit and the urban circuit in which hosts the Formula 1 Grand Prix of
Europe.
These sport events make this city has an important market in luxury and high quality
cars that belong to residents in Valencia and tourists attracted to there.
One aspect that we have to be into account is that Valencia is a growing city and the
third city in Spain related to the number of residents and to the urban area. In addition,
Valencia is the center of the Mediterranean economy because it has an influential
industry, high deposits and it is an important source of foreign currency and national
investment.
6
On the other hand, the site into the city of Valencia for the facility would be placed in
industrial estate, near the port. The area of the land that we would need is 6300 square
metres.
7
We have selected this area because there are some advantages for our project.
One advantage of locating the facility in this land is that it is very well communicated
with the V-15 and V-30 highways and CV-500 road.
Another advantage is that we have the possibility of maritime transport so we can offer
our products to clients of other countries.
Related to the economical aspects, the location is well due to we are next to marina,
nautical club etc and the people who belong to this types of club usually have a high
purchasing power.
8
This is the Gantt diagram that we have got:
1.1.5. LEGISLATION
In order to make this project we have to take into account some different laws and rules.
- Basic Documents.
- RITE 2007: Heating, air conditioning and ventilation.
- Thermal insulation.
- Water instalation: Plumbing and sanitation.
- Facility construction.
9
EHE: Structural Concrete Instruction
- Laying foundations.
Other lays
- Electricity:
o RBT-2002: Reglamento electrotécnico de baja tensión e Instrucciones
técnicas complementarias.
o UNE 20-460-94 Parte 5-523: Intensidades admisibles en los cables y
conductores aislados.
o UNE 20-434-90: Sistema de designación de cables.
o UNE 20-435-90 Parte 2: Cables de transporte de energía aislados con
dieléctricos secos extruidos para tensiones de 1 a 30kV.
o UNE 20-460-90 Parte 4-43: Instalaciones eléctricas en edificios.
Protección contra las sobreintensidades.
o UNE 20-460-90 Parte 5-54: Instalaciones eléctricas en edificios. Puesta a
tierra y conductores de protección.
o UNE-EN 60947-2: Aparamenta de baja tensión. Interruptores
automáticos.
o Anexo B: Interruptores automáticos con protección incorporada por
intensidad diferencial residual.
o UNE-EN 60947-3: Aparamenta de baja tensión. Interruptores,
seccionadores, interruptores-seccionadores y combinados fusibles.
o UNE-EN 60269-1: Fusibles de baja tensión.
o UNE-EN 60898: Interruptores automáticos para instalaciones domésticas
y análogas para la protección contra sobreintensidades.
- Directiva 2010/31/UE : Certify energy consumption.
- Real decreto RD 346/2011 : Telecommunications.
- Some city hall’s permits and licenses.
1.2.1. CONSTRUCTION
The facility of the Project is going to be located in a plot of 6300 m2. The facility is
going to be built with ridged roofs. The built-up area will take up a surface of 3000 m2,
which is 47,62 % of the plot. The rest of the surface will be part of the access to the
facility.
10
1.2.1.2. Foundation
The foundation will be made with reinforced concrete isolated footings which will be
connected by tie beam. The arrangement and the dimension of each footing can be seen
in the drawings.
The building will have the corresponding manhole to evacuate the rain and fecal water,
and the supply corresponding to the General Drainage Network.
In the front of the facility there is a second floor of 300 m2, where the offices will be
installed.
All the structure will be made with steal S-275, which has yield strength of 275 N/mm2.
1.2.1.4. Enclosure
The curlings rest over the frames, which it has just been described. The cross-section
that has been used for the upper and lateral curlings is ZF which are separated ad
distance of 2,5 meters.
X-bracings, with a circular cross-section, have been used to brace the structure.
1.2.1.5. Measurements
The next tables show the details of the material resources necessary to carry out the
building of the facility. They are divided in structure, joining and foundations.
Structure
Resumen de medición
Material Longitud Volumen Peso
Materi
Designació Serie Perfil Perfil Serie Material Perfil Serie Perfil Serie Material
Tipo al
n (m) (m) (m) (m³) (m³) (kg) (kg) (kg)
(m³)
HE 220 B , Simple con 148.00 10932.4
1.623
cartelas 0 6
HE 240 B , Simple con
64.000 0.899 5614.10
cartelas
HE 260 B , Simple con
32.000 0.488 3116.68
cartelas
HE 200 B , Simple con 136.00
1.117 8408.86
cartelas 0
HE 180 B , Simple con
8.000 0.067 429.95
cartelas
HE 300 B 128.00 14981.5
1.908
0 7
HE 180 B 64.000 0.418 3280.67
HEB 580.000 6.520 46764.29
IPE 330 297.74 14631.5
1.864
6 6
IPE 160 13.124 0.026 207.08
IPE 600, Simple con 550.00 14.58 77133.5
cartelas 0 8 1
IPE 270 52.498 0.241 1891.57
S275 IPE IPE 450 8.000 0.079 620.46
11
Resumen de medición
Material Longitud Volumen Peso
Materi
Designació Serie Perfil Perfil Serie Material Perfil Serie Perfil Serie Material
Tipo al
n (m) (m) (m) (m³) (m³) (kg) (kg) (kg)
(m³)
IPE 300 328.11 13857.0
1.765
0 7
IPE 550 48.000 0.643 5049.12
IPE 500 52.498 0.609 4780.43
IPE 360 52.498 0.382 2996.01
1402.47 20.19 121166.8
4 8 2
L 150 x 150 x 18 85.638 0.437 3428.51
L 150 x 150 x 14 542.37 17158.2
2.186
3 3
L 628.010 2.623 20586.73
Ø18 159.20
0.041 318.02
0
Ø20 59.400 0.019 146.49
Ø14 47.835 0.007 57.80
Ø10 63.780 0.005 39.32
Ø12 15.945 0.002 14.16
Joining
Soldaduras
fu Espesor de garganta Longitud de cordones
Ejecución Tipo
(kp/cm²) (mm) (mm)
4 89924
En ángulo 5 22768
6 67350
4 2860
A tope en bisel
8 4920
simple
En taller 10 13740
6 1985
12
Chapas
Dimensiones Peso
Material Tipo Cantidad
(mm) (kg)
8 206x205x12 31.82
262x255x12
16 94.67
(36+190+36x111+144x12)
4 170x170x12 10.89
2 152x155x12 4.44
Rigidizadores
2 152x85x12 2.43
4 170x95x12 6.09
2 188x105x12 3.72
2 188x185x12 6.55
16 152x155x14 41.43
1 185x306x8 3.56
S275 4 205x306x8 15.78
2 170x306x8 6.54
8 155x304x8 23.71
1 155x306x8 2.98
8 255x306x9 44.17
Chapas
3 190x450x14 28.19
5 180x360x14 35.61
16 190x415x14 138.65
28 190x360x14 210.48
2 190x405x15 18.12
8 190x360x15 64.43
Total 794.29
Angulares
Descripción Longitud Peso
Material Tipo
(mm) (mm) (kg)
L45x4.5 1430 3.86
L60x8 1020 7.17
Anclajes de tirantes L70x8 960 7.96
S275
L70x10 2960 30.21
L80x10 1620 19.08
Total 68.28
Elementos de tornillería
Tipo Material Cantidad Descripción
100 ISO 4014-M16x65
Tornillos Clase 8.8 136 ISO 4017-M16x55
24 ISO 4017-M20x60
13
Elementos de tornillería
Tipo Material Cantidad Descripción
8 ISO 4032-M12
24 ISO 4032-M14
Clase 5 8 ISO 4032-M16
Tuercas 64 ISO 4032-M18
24 ISO 4032-M20
236 ISO 4032-M16
Clase 8
24 ISO 4032-M20
4 ISO 7089-12
12 ISO 7089-14
Arandelas Dureza 200 HV 476 ISO 7089-16
32 ISO 7089-18
60 ISO 7089-20
Placas de anclaje
Dimensiones Peso
Material Elementos Cantidad
(mm) (kg)
9 300x300x15 95.38
2 350x350x15 28.85
7 450x450x18 200.29
16 500x500x20 628.00
Placa base 8 450x450x20 254.34
4 550x550x20 189.97
S275 4 400x400x22 110.53
1 350x600x22 36.27
6 400x750x25 353.25
8 400/220x100/0x5 9.73
4 350/210x100/30x5 4.73
Rigidizadores pasantes
12 450/250x100/0x7 23.08
32 500/300x150/55x7 115.18
14
Placas de anclaje
Dimensiones Peso
Material Elementos Cantidad
(mm) (kg)
12 750/550x150/55x7 67.92
8 550/260x150/0x8 30.52
18 450/250x100/0x8 39.56
8 85/0x100/0x5 1.33
Rigidizadores no pasantes 18 60/5x100/45x5 3.17
32 97/0x100/0x6 7.31
Total 2199.41
36 Ø 14 - L = 335 + 136 20.49
4 Ø 16 - L = 435 + 155 3.73
4 Ø 16 - L = 335 + 155 3.10
32 Ø 20 - L = 442 + 194 50.21
64 Ø 20 - L = 440 + 194 100.11
Pernos de anclaje
B 400 S, Ys = 1.15 (corrugado) 192 Ø 20 - L = 540 + 194 347.67
28 Ø 20 - L = 538 + 194 50.56
4 Ø 20 - L = 542 + 194 7.26
16 Ø 25 - L = 490 + 243 45.18
24 Ø 25 - L = 695 + 243 86.73
Total 715.03
Foundation
15
B 400 S, Ys=1.15 (kg) Hormigón (m³)
Elemento Ø12 HA-25, Yc=1.5 Limpieza
Referencias: N123 y N99 2x204.12 2x6.09 2x0.81
Referencia: N27 152.37 4.37 0.73
Referencia: N3 70.31 2.21 0.44
Referencia: N1 85.93 2.65 0.53
Referencia: N25 133.98 3.90 0.65
Referencias: N49, N73 y N145 3x124.43 3x3.58 3x0.65
Referencias: N97 y N121 2x129.49 2x3.86 2x0.70
Referencia: N193 37.05 1.05 0.21
Referencia: N217 34.67 0.91 0.18
Referencia: N241 25.39 0.78 0.20
Referencias: N266, N268 y N270 3x62.92 3x1.54 3x0.26
Referencias: N281 y N282 2x16.76 2x0.68 2x0.17
Referencias: N297, N298 y N299 3x9.61 3x0.48 3x0.12
Referencia: N283 12.98 0.58 0.14
Referencia: N272 66.40 1.94 0.32
Referencia: N284 12.98 0.58 0.14
Referencia: N300 9.31 0.40 0.10
Totales 6377.14 190.01 31.39
16
B 400 S, Hormigó
Ys=1.15 (kg) n (m³)
Elemento Ø8 Ø12 Tota HA-25, Limp
l Yc=1.5 ieza
Referencias: C [N14-N38], C [N38-N62], C [N62- 30x7 30x2 963. 30x0.57 30x0.
N86], C [N86-N110], .50 4.62 60 14
C [N110-N134], C [N134-N158], C [N158-N182],
C [N182-N206],
C [N206-N230], C [N230-N254], C [N241-N217],
C [N217-N193],
C [N193-N169], C [N169-N145], C [N145-N121],
C [N121-N97],
C [N97-N73], C [N73-N49], C [N49-N25], C
[N25-N1], C [N3-N27],
C [N27-N51], C [N51-N75], C [N75-N99], C
[N99-N123], C [N123-N147],
C [N147-N171], C [N171-N195], C [N195-N219]
y C [N219-N243]
Referencias: C [N254-N280], C [N280-N278], C 30x5 30x2 776. 30x0.38 30x0.
[N278-N276], .19 0.70 70 09
C [N276-N274], C [N274-N243], C [N243-N272],
C [N272-N270],
C [N270-N268], C [N268-N266], C [N266-N241],
C [N1-N265],
C [N265-N267], C [N267-N269], C [N269-N271],
C [N271-N3], C [N3-N273],
C [N273-N275], C [N275-N277], C [N277-N279],
C [N279-N14],
C [N219-N284], C [N284-N283], C [N283-N282],
C [N282-N281],
C [N281-N217], C [N195-N300], C [N300-N299],
C [N299-N298],
C [N298-N297] y C [N297-N193]
Totales 380. 1359. 1740 28.44 7.11
70 60 .30
17
1.2.2. LIGHTING
1.2.2.1. Introduction
Lighting is one of the most important surroundings requirements indoor. An appropriate
visibility is very important in order to do any type of task in a comfortable and safe
way.
In order to calculate the luminaries that are necessary to obtain a determined level of
light we have used the lumen method
1.2.2.2. Luminaries
Selecting an adequate type of luminaire is very important to ensure a good visibility in
all the areas of the facility. Three types of luminaries have been chosen for the indoor
and outdoor lighting, and an additional luminaire for the emergency lighting.
18
19
20
21
22
1.2.2.3. Indoor lighting
As the iluminance required isn’t the same in each area, we have to use the lumen
method for each one.
1.2.2.3.1. Garage
General lighting
Local index:
h= 5 m
a1= 48 m
b1= 44 m
a2= 24 m
b2= 6 m
a3= 6 m
b2= 19 m
Reflection coefficients:
Utilization factor:
Fu = 0,642
Maintenance factor:
Fm = 0,7
23
Average level of lighting:
Em = 750 lx
Emergency lighting
Power: 0,55 W
Em = 2 lx
1.2.2.3.2. Warehouse
General lighting
Local index:
h= 5 m
a= 30 m
b= 6 m
24
Reflection coefficients:
Utilization factor:
Fu = 0,35
Maintenance factor:
Fm = 0,6
Em = 300 lx
15 luminaries
Emergency lighting
Power: 0,55 W
Em = 2 lx
25
1.2.2.3.3. Changing room
General lighting
Local index
h= 3 m
a= 25 m
b= 6 m
Power: 4x24 W = 96 W
Reflection coefficients:
Utilization factor:
Fu = 0,564
Maintenance factor:
Fm = 0,8
Em = 200 lx
12 luminaries
26
Emergency lighting
Power: 0,55 W
Em = 2 lx
1.2.2.3.4. Reception
General lighting
Local index:
h= 3 m
a= 25 m
b= 12 m
Power: 3x24 W = 72 W
Reflection coefficients:
27
Utilization factor:
Fu = 0,686
Maintenance factor:
Fm = 0,7
Em = 150 lx
18 luminaries
Emergency lighting
Power: 0,55 W
Em = 2 lx
1.2.2.3.5. Offices
General lighting
Local index:
h= 3 m
a= 25 m
b= 12 m
28
Type of luminarie: Philips TBS 260 4xTL5-24W/840 HFS C6 PI
Power: 4x24 W = 96 W
Reflection coefficients:
Utilization factor:
Fu = 0,686
Maintenance factor:
Fm = 0,7
Em = 600 lx
Emergency lighting
Power: 0,55 W
Em = 2 lx
29
Total power = 0,00495 kW
Power: 150 W
Em = 20 lx
Utilization factor:
30
Maintenance factor:
14 m
14 luminaries
Arrangement: unilateral
Reception zone:
Power: 150 W
Em = 20 lx
Utilization factor:
31
a2/h = 0,12 a1/h = 2
Maintenance factor:
10 luminaries
Arrangement: bilateral
Its composition is reflected in the one-line diagram, with the following protection
devices:
32
Machinery garage Installed power (kW)
Wheel aligner 2
Exhaust-gas analiser 0,16
Wheel changers 4,4
Wheel balancing machine 1
Car lift 8,8
Power outlets 12
Air conditioning 79,794
Total 108,154
Garage lighting Installed power (kW)
Lighting 65,92
Emergency lighting 0,035
Total 65,955
Outdoor lighting Installed power (kW)
Lighting 8
Changing room Installed power (kW)
Lighting 1,152
Emergency lighting 0,0033
Power outlets 2
Air conditioning 4,95
Total 8,1053
Offices Installed power (kW)
Lighting 6,48
Emergency lighting 0,01
Power outlets 5
Air conditioning 19,8
Total 31,29
Warehouse Installed power (kW)
Lighting 4,8
Emergency lighting 0,011
Air conditioning 5,94
Total 10,751
33
1.2.3.3. Measurements
The following table shows the characteristic of each section and its length:
Material Longitud
(m)
RZ1 0,6/1 kV Cobre Flexible, 400 mm². Unipolar 148.0
RZ1 0,6/1 kV Cobre Flexible, 35 mm². Tripolar 20.5
RZ1 0,6/1 kV Cobre Flexible, 35 mm². Unipolar 262.5
RZ1 0,6/1 kV Cobre Flexible, 16 mm². Unipolar 386.0
RZ1 0,6/1 kV Cobre Flexible, 6 mm². Unipolar 242.5
RZ1 0,6/1 kV Cobre Flexible, 25 mm². Unipolar 2.5
RZ1 0,6/1 kV Cobre Flexible, 150 mm². Tripolar 0.5
RZ1 0,6/1 kV Cobre Flexible, 150 mm². Unipolar 1.0
RZ1 0,6/1 kV Cobre Flexible, 70 mm². Unipolar 602.5
RZ1 0,6/1 kV Cobre Flexible, 95 mm². Tripolar 40.5
RZ1 0,6/1 kV Cobre Flexible, 95 mm². Unipolar 81.0
RZ1 0,6/1 kV Cobre Flexible, 240 mm². Tripolar 83.0
RZ1 0,6/1 kV Cobre Flexible, 120 mm². Tripolar 1.0
RZ1 0,6/1 kV Cobre Flexible, 120 mm². Unipolar 2.0
The following table shows the characteristic of each protection devices and its amount:
Magnetotérmicos Cantidad
Legrand Lexic DPX 1600 1
In: 1600 A; Un: 240 ÷ 690 V; Icu: 20 ÷ 60 kA; Curva I - t (Ptos.)
Tripolar
ABB S260 Curva C 1
In: 50 A; Un: 240 / 415 V; Icu: 6 kA; Tipo C; Categoría 3
Tripolar
ABB S260 Curva C 3
In: 10 A; Un: 240 / 415 V; Icu: 6 kA; Tipo C; Categoría 3
Tripolar
ABB S260 Curva C 4
In: 0.5 A; Un: 400 V; Icu: 10 kA; Curva I - t (Ptos.)
Tripolar
ABB S260 Curva C 6
In: 8 A; Un: 400 V; Icu: 10 kA; Curva I - t (Ptos.)
Tripolar
34
Magnetotérmicos Cantidad
ABB S260 Curva C 2
In: 4 A; Un: 400 V; Icu: 10 kA; Curva I - t (Ptos.)
Tripolar
ABB S260 Curva C 1
In: 32 A; Un: 240 / 415 V; Icu: 6 kA; Tipo C; Categoría 3
Tripolar
ABB S260 Curva C 3
In: 16 A; Un: 240 / 415 V; Icu: 6 kA; Tipo C; Categoría 3
Tripolar
Legrand Lexic DPX 400 1
In: 400 A; Un: 240 ÷ 690 V; Icu: 16 ÷ 60 kA; Curva I - t (Ptos.)
Tripolar
Merlin Gerin NSA125/NSA160 E 1
In: 160 A; Un: 240 ÷ 440 V; Icu: 10 ÷ 25 kA; Curva I - t (Ptos.)
Tripolar
ABB S260 Curva C 2
In: 2 A; Un: 400 V; Icu: 10 kA; Curva I - t (Ptos.)
Tripolar
ABB S260 Curva C 1
In: 20 A; Un: 240 / 415 V; Icu: 6 kA; Tipo C; Categoría 3
Tripolar
EN60898 3KA Curva C 1
In: 100 A; Un: 240 / 415 V; Icu: 3 kA; Tipo C; Categoría 3
Unipolar
Siemens 3VF3reg 1
In: 100 A; Un: 240 ÷ 415 V; Icu: 25 ÷ 40 kA; Curva I - t (Ptos.)
Tripolar
ABB S260 Curva C 1
In: 1 A; Un: 400 V; Icu: 10 kA; Curva I - t (Ptos.)
Tripolar
EN60898 6kA Curva C 1
In: 125 A; Un: 240 / 415 V; Icu: 6 kA; Tipo C; Categoría 3
Tripolar
Legrand Lexic DPX 1600 1
In: 1250 A; Un: 240 ÷ 690 V; Icu: 20 ÷ 60 kA; Curva I - t (Ptos.)
Tripolar
Legrand Lexic DPX 160 1
In: 160 A; Un: 240 ÷ 690 V; Icu: 15 ÷ 50 kA; Curva I - t (Ptos.)
Tripolar
35
Magnetotérmicos Cantidad
Siemens 3VF3reg 1
In: 160 A; Un: 240 ÷ 415 V; Icu: 25 ÷ 40 kA; Curva I - t (Ptos.)
Tripolar
ABB S260 Curva C 1
In: 3 A; Un: 400 V; Icu: 10 kA; Curva I - t (Ptos.)
Unipolar
ABB S260 Curva C 1
In: 8 A; Un: 400 V; Icu: 10 kA; Curva I - t (Ptos.)
Unipolar
Diferenciales Cantidad
M-G Vigirex RH248E (R)Toro A 1
In: 10000 A; Un: 415 V; Id: 10000 mA; (R)
Tripolar-Tetrapolar
Legrand bloque DPX125/1600(I) 1
In: 1600 A; Un: 500 V; Id: 30 mA; (I)
Tripolar-Tetrapolar
Legrand bloque DPX125/1600(I) 1
In: 160 A; Un: 500 V; Id: 30 mA; (I)
Tripolar-Tetrapolar
In the facility there are four main consumptions, which are detail in the next table:
Consumption
Area Flow
point
1 Car washing 2,8 l/s
2 Garage basins 1,2 l/s
3 W.C. Offices 1,2 l/s
4 Changing room 2,4 l/s
To manage those supplies we will install a number of discrete sections as the drawings
show. The next table shows the characteristic of each section, its flow, its velocity ant
its low pressure drops.
36
Inicio Final Longitud Diámetros Caudal Pérdid. Velocidad Coment.
m mm l/s m.c.a. m/s
The material that has been used for the drainage water is fiber cement. The velocity in
each section should be higher than the minimum limit value in order to avoid
sedimentation, incrustations and blockages, to avoid erosion problems.
In the drainage water there is two different flows: rainwater and sewage. To calculate
the sewage flow you only have to look the consumption that we had in the supply.
While to calculate the rainwater flow, it’s necessary to divide the plot in different areas
and calculate the flow for each area.
In that way, the land has been divided in 8 parts, each of them has a different suface.
The different parts and its surface can be seen in the next picture:
37
So, with those areas we can obtain the rainwater flow in each point.
Firstly, we calculate the total concentration time from the next equation:
As the value of the total concentration time is smaller than 10 min, we take a value for
that parameter of 10.
From the next map, we obtain the average rainfall water intensity for an hour. So that
value is Ih = 65 mm/h.
38
With that value we can calculate the average rainfall intensity for a time of TC. So that
value is equal to 130 l/s·Ha.
I = 130 l/s·Ha
The next table shows the sewage and rainwater flows for each collect point:
39
The next table shows the length and the diameter of each section:
Descripción Longitud
m
DN350 25.10
DN600 70.48
DN700 25.10
DN900 25.10
DN1000 25.10
DN1500 20.17
DN1700 25.10
1.3. EQUIPMENT
In this section are indicated only the main elements of the work area, which have:
Power supply: 2 kW
Maximum rim diameter: 1100mm
Maximum rim width: 330mm
Maximum wheel weight: 65kg
40
4. Spring suspension workbench SAM brand model 734-CR-PA.
41
9. Electric welder zehen brand model Zsw-29 with characteristics:
1.3.1. Sanitation
The bathrooms of the workshop have low-tank toilets, pedestal sinks and modular metal
lockers.
The faucet will be mixer taps, which have a single tap to regulate the flow, quantity and
temperature of the water.
The toilets and showers are equipped with liquid soap dispensers, frameless mirrors,
lavatory roll holder, trash disposal and hot air electrical hand of stainless steel with
electronic sensor.
There are ladies toilets and gents toilets. Both services have two independent toilets
through walls and doors, and a sink in a common area of the two toilets.
Services will also have the changing room area, so have a large area. These have metal
modular lockers with key lock for employees to leave the clothing change and personal
without the risk of lost or theft, it have also two showers in each service, and the will be
shower trays, closed for curtains and conventional shower heads hand with mixer tap.
Also, there will be a fully equipped first aid kit as specified in the “Ordenanza General
de Seguridad e Higiene en el Trabajo”.
1.4. INSTALLATIONS
1.4.1. WORKSHOP
1.4.1.1. Warehouse
It has an area of one hundred eighty square meters. It is a reserved space to store all
kind of merchandise of any size due to the large volume of available.
It consists of two main passages separated by a central shelf. There are also some
shelves on both sides of the central shelf and last on the bottom of warehouse.
42
1.3.2.1. Changing room
It has a total space of one hundred fifty square meters, it is connected directly with the
workshop area and it will be differentiated in a male staff area and another area for
female staff.
Each of two changing rooms will be consist of eight individual showers, six toilets and
six urinals. In case of men´s changing room, three of these six urinals are wall urinals.
The central zone of each changing room is made up of a row of benches where workers
will be able to change their clothes and a locker for each worker where they can store
their personal belongings.
1.4.2. Offices
1.4.2.1. Hall
It has an area of three hundred square meters it will harbor the customer receipt and also
a varied exhibition of modified cars by the firm in order to the customers can check the
excellent work done with cars.
In the hall there are stairs that connect directly to the office area.
1.4.2.2.1. Offices
These are the components of the offices:
- Desks.
- Chairs for administrative.
- Customers chairs.
- Computers.
43
- Lamps.
- Wastepaper basket.
- Small filing cabinet.
1.4.2.2.3. Bathroom
44
2. DRAWINGS
45
2.1. 3D Structure
46
2.2. Frame 1
47
2.3. Frame 2
48
2.4. Frame 3
49
2.5. Foundation 1
50
2.6. Foundation 2
51
2.7. Foundation 3
52
2.8. Foundation 4
53
2.9. Foundation 5
54
2.10. Foundation 6
55
2.11. Foundation 7
56
2.12. One-line diagram
57
2.13. One-line diagram scheme
58
2.14. Supply water
59
2.15. Drainage water 1
60
2.16. Drainage water 2
61
2.17. Ground floor
62
2.18. First floor
63
3. SPECIFICATION SHEET
This specification sheet aims to define the material and equipment characteristics used
in the construction, and control and implementation techniques to follow for the proper
performance of the project.
Drawings, specification sheet, price list and total budget are contractually binding,
therefore are mandatory and only authorized modifications by technical management
are introduced.
The other project’s documents or data are informative and are constituted by the report
and partial budgets. These documents represent only an informed opinion, and the data
collected has to be a complement for the contractor, who has to get his own information
directly and with his own means.
Only contractual documents form the basis of the contract, so the contractor can not
modify any contract condition on the basis of informative documents, unless these data
appear in a contractual document.
In case of any discrepancy between the drawings and the specification sheet, the
specification sheet will prevail.
What be indicated in the drawings and omitted in the specification or vice versa sheet
must be executed as if mentions in both.
The sites are localized in Valencia, near the port, with a total land of 6.300 m2 which is
the necessary for the execution of this project.
The sites are described in the report and drawings, which specifies all the characteristics
of each element involved in:
64
1. Realization of foundations.
2. Execution of civil works regarding projected facility.
3. Continued civil works. Floor, officies, changing room, warehouse.
4. Sanitation and plumbing installatin.
5. Prefabricated fed hud.
6. Low voltage electrical installation.
7. Fenced plot outside the facility with concrete building blocks, and metal
enclosure galvanized of hollow sections, spaced 3 m, and mesh galvanized to
give a total height of 3 m.
8. Installation of fire protection equipment.
9. Installing the necessary machinery for carrying out the activity projected.
The schedule for the completion of works and facilities, including auxiliary equipment
necessary, shall be agreed with the contractor.
3.3.2. Steel
The steel will comply all the mechanical characteristics (yield strength, tensile strength,
elongation, bending), included in the rule UNE-EN 10020:2001, and chemical
characteristics (limit in carbon, phosphorus and sulfur), established in the rule EA-95.
65
3.3.3. Cement
The cement will be chosen by the contractor, but it should comply with the rule RC-08
(“Instrucción para la Recepción de Cementos” and the norm EN 197.
3.3.4. Water
The water will come from the existing mains water on the sites and will be used for
mixing the concrete and concrete curing. Its mineralization will not be excessive. In
general, any potable water may be used without preliminary experiments.
3.3.5. Aggregates
The sands have to be of siliceous nature, from rivers or quarries.
The contractor must test sand for mortars to know if increase or decrease the dosage of
the mixture. With these results and prior the start of the sites, the site manager will set
the mixing proportion and size to be used in the whole construction.
3.3.6. Pipes
There are two types of pipes in the facility, ones are used to supply water and the others
for the drainage of water.
Supply pipes are PEAD and drainage pipes are made of fiber cement.
The pipes must accomplish the terms established in the norm UNE-EN 10255, and the
checks and tests collected in “Pliego de Prescipciones Técnicas Generales para Tuberías
de Abastecimiento de Agua” will be obligatory.
66
The materials and construction units needed in those temporary works shall comply
with all requirements of these specifications, as if they were definitive works.
Only necessary temporary works will be paid, if project management believes that they
are not strictly necessary will not be paid.
3.2.1.2. Landfills
The contractor shall locate landfills to use and pay the usage costs.
The different materials need to be removed would not increase the price because they
are included in the contract.
The project manager may authorize areas inside the sites as landfills.
All of the above is included in the contract, so the contractor can not claim more money.
If the project manager accept the changes, he will communicate them to the appropriate
company. The changes will be paid by receipt.
3.5. REPLAN
Prior the start of the construction, the project manager will check the modifications
proposed by the contractor. After completing the checks, the charter will be done and
the construction can begin.
67
embankments, excavation of trenches and pits , land transport to landfill and final
replant.
The clearance works includes the excavation and removal of the materials to be
clearing. All this will be made in accordance with these specifications.
The explanation includes cut or fill operations needed to level the areas where buildings
will settle.
If during excavations springs or filtrations appear by any cause, the project management
will establish what to do and what works should be done. These operations would be
included in excavation prices, as well as the transport.
All excavations will be done in accordance with the drawings and data obtained from
the replant.
El contratista cargará y transportará hasta el vertedero todas las tierras y materiales que
la dirección facultativa declare inutilizables.
The contractor will charge and transport to the landfill every land and materials that
project management declare unusable.
The steel to be used will comply with the requirements in the Structural Concrete
(EHE).
3.8. STRUCTURES
3.8.1. Metallic structures
The shape and dimensions of the structure will be defined in the drawings, as well as the
type of steel.
Unions, whatever their type, are made in accordance with the directions of the project,
the project management or rules in force.
Before installation of the structure will be cleaned at least the parts must remain hidden.
68
The assembly of the various components will be in accordance with the directions of the
manufacturer and the project management, by trained personnel capable of perform the
work.
Special care will be taken with the anchor and plumbing elements, as well as the perfect
sealing of joints
3.9.2. Deposits
The Contractor will provide a deposit within deadline. The amount will be 10% of the
final budgeted amount in order to avoid last minute dropouts.
If the contractor refuses to carry out the agreed work, the project manager may hire
another company to perform these services, losing the previous contractor the full
amount of the deposit.
The price will be determined between the project manager and the contractor before
starting the execution of the works and the period determined by the specifications. If
no agreement is reached, the price would be determined by analogy with one of the
work within the framework of the project price.
69
3.9.5. Revision of contract prices
The review of the contracted prices is admissible if the project management decided to
implement substantial changes in any material or service used in construction. This
review shall be made between the project management and contractor.
70
4. BUDGET
4.1.2. Lighting
71
4.1.3. Electricity
Amount
Description Unit Price (€/m) Total Price
(m)
RZ1 0,6/1 kV Cobre Flexible, 400 mm². Unipolar 148,0 1,27 187,96
RZ1 0,6/1 kV Cobre Flexible, 35 mm². Tripolar 20,5 26,27 538,535
RZ1 0,6/1 kV Cobre Flexible, 35 mm². Unipolar 262,5 0,61 160,125
RZ1 0,6/1 kV Cobre Flexible, 16 mm². Unipolar 386,0 0,39 150,54
RZ1 0,6/1 kV Cobre Flexible, 6 mm². Unipolar 242,5 0,24 58,2
RZ1 0,6/1 kV Cobre Flexible, 25 mm². Unipolar 2,5 0,39 0,975
RZ1 0,6/1 kV Cobre Flexible, 70 mm². Unipolar 602,5 0,81 488,025
RZ1 0,6/1 kV Cobre Flexible, 95 mm². Tripolar 40,5 26,27 551,67
RZ1 0,6/1 kV Cobre Flexible, 95 mm². Unipolar 81,0 0,86 36,12
RZ1 0,6/1 kV Cobre Flexible, 240 mm². Tripolar 83,0 35,7 2963,1
RZ1 0,6/1 kV Cobre Flexible, 120 mm². Tripolar 1,0 26,27 26,27
RZ1 0,6/1 kV Cobre Flexible, 120 mm². Unipolar 2,0 0,86 1,72
Total 5163,24
4.1.4. Sanitation
72
4.1.5. Machinery
73
4.2. GENERAL BUDGET
Description Price
Structure 271.150,63
Lighting 215.459,90
Electricity 5163,24
Sanitation 23130,60
Machinery 52027
Offices supply 19439,10
Civil work 26199,42
Total 591.675,79
74