1 A Block to I Block spike arrester fixing -3 nos
2 All Panel rooms panel sticker marking each flat
3 Transformer and grid substation AB switch repair and greasing 4 Swimming pool internal lighting 5 Over head tank repair and New tank fixing A-1,E-1,F-1,H-1,J-1,M-1,U-1 6 T block road Parer work 7 External Cracks and Holes each block and club house 8 Plumbing duct long grass cleaning 9 48 nos flat meter fixing 10 Each block stair case , corridor, and basement tubelight checking 11 Swimming pool motor-1 nos 12 U block 2 nos chamber cover 13 Basement chamber cleaning 14 STP cleaning 15 H block storage water tank repair 16 Terrrace greading 17 S block parking Demarktation 18 Main gate humps making 19 External paint to all blocks 20 Explanation joint repair J block driveway, H-I,A-B,C-D and E-F driveway. 21 Lift door paint & repair 22 Lift ventilator on roof top to be fixing-24 nos 23 320 KVA DG , 160 KVA DG, 100KVA DG servicing 24 Villa swimming pool cleaning 25 Villa basement cleaning 26 Villa basement rain water pipes connection 27 1 no chamber cover near Villa-34 28 Boundry wall to be hight near villa no 33 side 29 Each block basement store room grill to be fixed 30 Ampitheater repair and painting 31 Q block fire pump room baricute 32 Fire motor gland branch replace block-C, E, & l 33 L block sprinker line broken 34 1 no sprinker new fixing 35 Alaram mcp break glass broken-60pc 36 Villa to K block boundry wall repair near visitor parking