SATIP-S-060-07 Rev 7 Neutralization Tank and Apparatuses

This document provides a typical inspection plan for a neutralization tank and associated piping and apparatuses. It outlines inspection responsibilities and quality procedures for various project phases and tasks, including material receiving, installation, pre-commissioning, and general notes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views2 pages

SATIP-S-060-07 Rev 7 Neutralization Tank and Apparatuses

This document provides a typical inspection plan for a neutralization tank and associated piping and apparatuses. It outlines inspection responsibilities and quality procedures for various project phases and tasks, including material receiving, installation, pre-commissioning, and general notes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Neutralization Tank and Apparatuses SATIP-S-060-07 30-Apr-13 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Qualification of RTR & Thermoplastic See See


1.1 See SATIP S-070-03 Thermoplastic and RTR Piping
Installers Remarks Remarks

See SATIP-Q-001-02 Cast-In Place Portland Cement


See See Concrete and
1.2 Concrete Mix Design
Remarks Remarks SATIP-Q-001-04 Structural Pre-Cast Concrete
as applicable

2.0 MATERIAL RECEIVING

SAIC SAIC
2.1 Neutralization Tank Receiving
S-4044 S-4044 W W

Neutralization Tank SAIC SAIC


2.2
Handling, Storage, and Preservation S-4044 S-4044 W S Weekly Inspection by Contractor QA/QC

See See
2.3 Thermoplastic and RTR Piping See SATIP S-070-03 Thermoplastic and RTR Piping
Remarks Remarks

3.0 INSTALLATION

See See See SATIP S-070-01 Excavation and Backfill for


3.1 Trench Inspection
Remarks Remarks Underground Utilities

See See
3.2 Thermoplastic and RTR Piping See SATIP S-070-03 Thermoplastic and RTR Piping
Remarks Remarks

Also See SATIP Q-001-02 Cast-In-Place Portland Cement


Neutralization Tank and its piping SAIC SAIC Concrete and
3.3
Inspection S-4045 S-4045 H W SATIP-Q-001-04 Structural Pre-Cast Concrete
as applicable

See See
3.4 Valves See SATIP-L-108-01 Valves
Remarks Remarks

Piping SATR SATR


3.5
Gravity Hydrostatic Testing S-4001 S-4001 H H

See See See SATIP S-070-01 Excavation and Backfill for


3.6 Backfilling and Compaction
Remarks Remarks Underground Utilities

Watertightness Test of the Neutralization SATR SATR


3.7
Tank S-4002 S-4002 H H

Page 1 of 2
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Neutralization Tank and Apparatuses SATIP-S-060-07 30-Apr-13 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

4.0 PRE-COMMISSIONING

Final inspection of the Neutralization SAIC SAIC


4.1
System S-4046 S-4046 RH R

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative
3 is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
4
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Page 2 of 2