Water Calculation New
Water Calculation New
Total Water
Perso
S.No. Description Requirement
n
LPC LPD kl/da
1 Passenger Terminal Cum Admin
Building
1.1 Employees 50 45 2250 2.25
1.2 Visitors 5 15 75 0.08
1.3 Foreign Nationals 2000 15 30000 30.00
Total for Domestic use 32.33
2 Cargo Terminal Building
9 Jawan Barrack
9.1 Bed 200 135 27000 27.00
9.2 Visitors 5 15 75 0.08
9.3 Permanent Employees 20 135 2700 2.70
Total for Domestic use 29.78
10 Barrack for officer
10.1 Bed 16 135 2160 2.16
10.2 Visitors 5 15 75 0.08
10.3 Permanent Employees 5 135 675 0.68
Total for Domestic use 2.92
11 Barrack For Subordinate Officer
11.1 Bed 16 135 2160 2.16
11.2 Visitors 5 15 75 0.08
11.3 Permanent Employees 5 135 675 6.75
Total for Domestic use 8.99
12 Mahila Barrack
12.1 Bed 24 135 3240 3.24
12.2 Visitors 5 15 75 0.08
12.3 Permanent Employees 5 135 675 0.68
Total for Domestic use 3.99
13 LPAI & Stakeholder quarters 3 nos
13.1 Residence 20 135 2700 2.70
14 Toilet Block (Export) 4 nos 340 person each
block
Visitors 1500 45 67500 67.50
15 Toilet Block (Import) 1 nos 400 person each
block
Visitors 500 45 22500 22.50
16 Toilet Block with Restroom (Import)
Visitors 500 45 22500 22.50
Total 207.20
Total Water Requirement
S.No Description Person
2 Fresh 213
3 Waste Water Generated (80%) 170
4 STP Capacity Say 200 KLD
Water Balance Data (in KL/Day)
S. No. Description Round-off
A. Domestic Water
1 Domestic Water Requirement 213
2 Domestic water Requirement per day for Filter back wash (LS) 5
Total Domestic water 217
B. Recycled Water Reuse from STP
1 Gardening and Landscape @ 2 Liters per day per sqm for 40000 sqm. 80
2 Recycle water Requirement per day for Paved area- Mopping & washing 5
(LS)
TOTAL 85
Reclaimed Water from S.T.P @80% of Waste Water 135
Generated
Flow to external drain after treatment 50
Underground Storage
S.No. Description Capacity in
cum