0% found this document useful (0 votes)
28 views8 pages

Steam Turbine Sequence

The document outlines the turbine start up sequence control steps. It details the commands, expected feedbacks, and bypass conditions for each step of the turbine start up process.

Uploaded by

Shivam Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views8 pages

Steam Turbine Sequence

The document outlines the turbine start up sequence control steps. It details the commands, expected feedbacks, and bypass conditions for each step of the turbine start up process.

Uploaded by

Shivam Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 8

Turbine start up sequence control

CMD ON Turbine Sequence SGC

Step 101

Command: SGC Control oil supply on


Feedback: 1) SGC Control oil pumps on & EHA oil
SP
2) SLC all ESV's & Control valves ON &
OL VLV ON
Step bypass: ESV open/TSLLE>56%

Step 102

Command: No command
Feedback: 1) Condenser pre.<0.6 kg/cm2
2) IPBP trip not operated
3) CEP-1/2 dish. Pre >17 kg/cm2
4) CW pressure > 4 kg/cm2

Step 103

Command: 1) LPBP Control ON


2) ASM ON

Feedback: 1) LPBP Control ON


2) ASM ON
3) Water injection control ON

Step bypass: 1) HRH pr > 15 kg/cm2


2) Turbine speed > 49.5 S-1
Step 104

Command: 1) SLC drains ON


2) SLC warm up drains ON
3) HP exhaust temp. control Auto &
ON
Feedback: 1) SLC WARM UP drains ON
2) SLC drains ON
3) HP exhaust temp. control Auto ON
4) HP exhaust temp. control ON.

Step bypass: 1) HRH pr > 15 kg/cm2


2) Turbine speed > 49.5 S-1

Step 105

Command: No command
Feedback: 1) All ESV closed
2) All CVs closed
3) CRH NRV 1 & 2 closed

Step bypass: 1) ESV open/TSLLE>56%


2) TSLLE>56%/Position setpoint
Turbine>0%
3) Generator load >10%

Step 106

Command: No command
Feedback: 1) Turbine trip system A&B no trip
2) One OVEF ON
3) Lube oil cooler outlet temp>35 deg c
4) SLC drains NO FAULT

Step 107

Command: 1) SLC warm up control off


2) Drain before HP CV-1 closed.
3) Drain before HP CV-2 closed.

Feedback: 1) SLC warm up control off & drain


before HPCV-1 & 2 closed

Step bypass: 1) ESV open


Step 108

Command: No command
Feedback: 1) L.steam flow >10% & steam before
HPBP>30 K
2) Steam before IPBP > 30 K
3) DT >X1, < X2 & > X3
4) Drain before ESV open
5) Drain before HPCV -1 & 2 not closed.
6) Condenser pre. < 0.5 kg/cm2
7) Turbine speed > 0.25 S-1
8) Step 5 completed
9) Step 6 completed
Step bypass: 1) Wall temp. HPCV-1 & 2 <100 deg C
2) ESV open/TSLLE >56%.
3) Turbine speed > 690 rpm

Step 109

Command: TSLLE raised


Feedback: TSLLE position >56%

Step 110

Command: No command
Feedback: 1) HPESV-1 opened
2) HPESV-2 opened
3) IPESV-1 opened
4) IPESV-2 opened
5) LPESV-1 opened
6) LPESV-2 opened

Step 111

Command: No command
Feedback: 1) Gland steam pressure control auto
2) Gland steam pressure < 1.06 kg/cm2
& > 1.04 kg/cm2
3) One OVEF ON
4) SLC Drain no fault
Step 112

Command: No command

Step 113

Command: SLC Warmup control ON


Feedback: 1) HPC temp > 450 deg C, LSTM FL>15 &
Bypass LS
2) DT >X4,
3) DT >X5,
4) DT >X6,
5) Drain before HPCV -1 & 2 > 2% &
Bypass
6) Turbine speed >15 rpm
7) Steam before LPBP SH >30 K
8) Step-11 permit fulfilled
9) HP casing DT top bottom not high
10) Condenser pressure trip not operate
11) Load setpoint >10 %
12) Steam purity < 0.5 us/cm
13) Drain before HPCV -1 & 2 not closed
14) One OVEF ON

Step bypass: Turbine speed >11.5 S-1

Step 114

Command: Turbine speed setpoint raised


Feedback: Turbine speed reference > 690 rpm

Step 115

Command: Tno coomand


Feedback: Turbine speed> 630 rpm

Step 116

Command: No command
Feedback: CRH X7 satisfied & casing flange
temp. 60 degc & DT HPS
surface/mean <12 deg c & upper
margin > 30 k

Step bypass: 1) Wall temp. HP casing >250 deg C


2)Turbine speed > 2994 rpm
temp. 60 degc & DT HPS
surface/mean <12 deg c & upper
margin > 30 k

Step bypass: 1) Wall temp. HP casing >250 deg C


2)Turbine speed > 2994 rpm
Step 117

Command: 1) Turbine speed set point raised


2) SLC warm up control off
3) Drain before HPCV -1 & 2 closed
Feedback: Turbine speed SP>3015 RPM

Step 118

Command: No command
Feedback: Turbine speed > 2940 rpm
Step bypass: Generator breaker ON

Step 119

Command: AVR auto


Feedback: AVR auto

Step 120

Command: Excitation field breaker closed


Feedback: Generator voltage >95% & excitation
brkr closed & AVR auto.

Step bypass: Generator breaker ON

Step 121

Command: No command
Feedback: 1) CRH X8 checked
2) Upper margin > min
3) Synchroniser on AUTO

Step 122

Command: synchronise on
Feedback: Generator breaker ON

Step 123

Command: TSLLE raised


Feedback: TSLLE >100 %
Command: TSLLE raised
Feedback: TSLLE >100 %

Step 124

Command: Power setpoint raised


Feedback: Step 24 waiting time finished
Step bypass: Generator load >10%

Step 125

Command: Start up check back


Feedback: 1) Generator breaker ON
2) Step 25 activated.
3) Turbine speed > 2970 rpm.
Step-101

Command SGC Control oil supply on


Feedback 1) SGC Control oil pumps on & EHA oil SP
2) SLC all ESV's & Control valves ON & OL VLV ON
Step bypass ESV open/TSLLE>56%

Step-102

Command No command
1) Condenser pre.<0.6 kg/cm2
2) IPBP trip not operated
Feedback 3)CEP-1/2 dish. Pre >17 kg/cm2
4) CW pressure > 4 kg/cm2

Step-103

1)LPBP Control ON
Command
2) ASM ON
1) Condenser pre.<0.6 kg/cm2
2) IPBP trip not operated
Feedback 3)CEP-1/2 dish. Pre >17 kg/cm2
4) CW pressure > 4 kg/cm2