Àºáaiàäpà Páaiàäð Áðºàpà C©Üaiàäavàgàgàä, Àiágàäpàméö C©Ü Àè Þ Aiéæãd É
Àºáaiàäpà Páaiàäð Áðºàpà C©Üaiàäavàgàgàä, Àiágàäpàméö C©Ü Àè Þ Aiéæãd É
ªÀiÁ£À
ågÉÃ, «µÀAiÀ PÀȶ GvÀà£Àß ªÀiÁgÀÄPÀmÉÖ ¸À«Äw, zÁªÀtUÉgÉ
Ä B- ªÁåwÛAiÀÄ F PɼÀV£À C©üªÀÈ¢Ý PÁªÀÄUÁjUÀ¼À
2£Éà ºÁUÀÆ CAwªÀÄ ©®ÄèUÀ¼À£ÀÄß ¸À°è¸ÀĪÀ
G¯ÉèÃR J¸ï.n.E.J¸ï
§UÉÎ. PÀ£Àì¯ÉÖAmïì EArAiÀiÁ ¥ÉæöʪÉÃmï °«ÄmÉqï,
B- ºÀħâ½î EªÀgÀ ¥ÀvÀæzÀ ¢£ÁAPÀ : 16 -04-2023.
**********
ªÉÄîÌAqÀ «µÀAiÀÄPÉÌ ¸ÀA§A¢ü¹zÀAvÉ PÀȶ GvÀà£Àß ªÀiÁgÀÄPÀmÉÖ ¸À«Äw,
zÁªÀtUÉgÉ ªÁå¦üÛÛAiÀÄ F PɼÀV£À C©üªÀÈ¢Ý PÁªÀÄUÁjUÀ¼À°è ¥ÁåPÉÃeï -1 gÀ
C¼ÀvÉ ¥ÀĸÀÛPÀ, 2£Éà ºÁUÀÆ CAwªÀÄ ©®è£ÀÄß ¦.JA.¹ vÁAwæPÀ
¸ÀA¸ÉÜAiÀĪÀgÁzÀ J¸ï.n.E.J¸ï PÀ£Àì¯ÉÖAmïì EArAiÀiÁ ¥ÉæöʪÉÃmï °«ÄmÉqï,
ºÀħâ½î gÀªÀgÀÄ ¸À°è¹gÀĪÀÅzÀ£ÀÄß ¥Àj²Ã°¹ zÀÈrüÃPÀj¹ F ¥ÀvÀæzÉÆA¢UÉ
®UÀwÛ¹ ªÀÄÄA¢£À PÀæªÀÄPÁÌV ¸À°è¸À¯ÁVzÉ.
PÀÀæª
ÀÄ PÁªÀÄUÁjAiÀÄ ºÉ¸ÀgÀÄ JA.© £ÀA
¸ÀASÉå
Package -1 : 1)Construction of CC Drain for G-block 2£Éà ºÁUÀÆ CAwªÀÄ
Roads at Main Market Yard of APMC Davangere
2)Improvements of G-block Roads at main market yard ©®Äè
1 of ampc davangere. 3)Improvements of A1-Block Road JA.© £ÀA - 02
No 9 at Main Market Yard of AMPC Davangere Under
AAP 2022-23
vÀªÀÄä «±Áé¹,
¸ÀºÁAiÀÄPÀ PÁAiÀÄð¤ªÁðºÀPÀ
C©üAiÀÄAvÀgÀgÀÄ
ªÀiÁgÀÄPÀmÉÖ C©üªÀÈ¢Þ
AiÉÆÃd£É
«±ÉõÀ vÁAwæPÀ G¥À «¨sÁUÀ,
zÁªÀtUÉgÉ.
Name of the Work : Package -1 :
1)Construction of CC Drain for G-block Roads
at Main Market Yard of APMC Davangere
2)Improvements of G-block Roads at main
market yard of ampc davangere.
3)Improvements of A1-Block Road No 9 at
Main Market Yard of AMPC Davangere Under
AAP 2022-23
EMB No. - 02
Name of the Work : Package -1 : 1)Construction of CC
Drain for G-block Roads at Main Market Yard of APMC
Davangere 2)Improvements of G-block Roads at main
market yard of ampc davangere. 3)Improvements of A1-
Block Road No 9 at Main Market Yard of AMPC Davangere
Under AAP 2022-23
Date :
Executive Engineer
MDP, Bangalore Division,
Bangalore.
MEASUREMENT BOOK CUM BILL
APMC/DVG/2139/2022-23,
Work Order No :
Dated: 19-01-2023
Measurement Book
: 2
Number
Page No :
Pre mesurement Continued on :
Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
1 1 Earth work excavation for Foundation by mechanical means for all works & any depth , as per drawing and
technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius and lift including cost of labour, tools, usage of machinery & other appurtenaces required to
complete the work With all lead and lift etc complete as per specification & as per the direction of the engineer
incharge of the work.
CC Drain A1 Block
Drain R/s Cum 1 4.50 1.00 0.90 4.05
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 11.50 1.00 0.90 10.35
Culvert R/s 1 6.10 1.20 1.00 7.32
Drain R/s 1 4.00 1.00 0.90 3.60
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 8.10 1.00 0.90 7.29
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 5.90 1.00 0.90 5.31
Culvert R/s 1 6.00 1.20 1.00 7.20
Drain R/s 1 9.60 1.00 0.90 8.64
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 15.90 1.00 0.90 14.31
At Entrance Culvert R/s 1 11.70 1.20 1.00 14.04
Vegitable Market
Culvert R/s 1 11.50 1.35 1.00 15.53
Drain R/s 1 30.00 1.00 0.90 27.00
1 30.00 1.00 0.90 27.00
1 20.30 1.00 0.90 18.27
Approach Drain 1 2.00 1.00 0.90 1.80
Culvert R/s 1 12.10 1.20 1.00 14.52
Drain R/s 1 30.00 1.00 0.90 27.00
1 21.50 1.00 0.90 19.35
G- Block Cross road L/s 1 4.00 1.00 0.90 3.60
F- Block 4th road Center Culvert 1 15.30 1.20 1.00 18.36
G- Block Road No 5 1 21.20 1.35 1.00 28.62
(chikkanahalli road L/s)
G- Block Road No 5 1 19.35 1.35 1.00 26.12
(chikkanahalli road R/s)
G- Block Road No 6 1 22.35 1.35 1.00 30.17
(chikkanahalli road L/s)
Total 368.49
29.68
11.65
PRE MEASUREMENTS
Name of the Work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC
Davangere 2)Improvements of G-block Roads at main market yard of ampc davangere. 3)Improvements of
A1-Block Road No 9 at Main Market Yard of AMPC Davangere Under AAP 2022-23
OGL Sheet
AVG Ground Level Length in Width in
Sl.No. Chainage Ground Level in m in m m m
L C R
A1 Block Road No 9 MMY
From CH 160.00 m to 202.50 m
1 0.00 99.595 98.695 98.695 98.695 98.695 0.900 14.00 12.60 0.00 0.00 0.00
2 30.00 99.400 98.500 98.500 98.500 98.500 0.900 14.00 12.60 12.60 30.00 378.00
3 37.50 99.250 98.350 98.350 98.350 98.350 0.900 14.00 12.60 12.60 7.50 94.50
1 0.00 99.310 98.410 98.405 98.410 98.408 0.902 13.20 11.90 0.00 0.00 0.00
2 30.00 100.110 99.215 99.205 99.215 99.212 0.898 13.20 11.86 11.88 30.00 356.40
3 60.00 100.910 100.020 100.005 100.020 100.015 0.895 13.20 11.81 11.84 30.00 355.08
4 73.50 101.300 100.400 100.390 100.400 100.397 0.903 13.20 11.92 11.87 13.50 160.23
1 0.00 99.765 98.870 98.860 98.870 98.867 0.898 11.23 10.08 0.00 0.00 0.00
2 30.00 99.445 98.545 98.540 98.545 98.543 0.902 11.23 10.12 10.10 30.00 303.07
3 60.00 99.125 98.230 98.220 98.230 98.227 0.898 11.90 10.69 10.41 30.00 312.17
4 90.00 98.805 97.910 97.900 97.910 97.907 0.898 12.40 11.14 10.91 30.00 327.44
5 120.00 98.485 97.585 97.575 97.585 97.582 0.903 12.90 11.65 11.40 30.00 341.89
6 137.00 98.285 97.390 97.380 97.390 97.387 0.898 13.40 12.04 11.85 17.00 201.37
A1 Block Road No 9 MMY
From CH 0.00 m to 202.50 m
1 0.00 99.900 99.005 98.985 99.005 98.998 0.902 11.85 11.85 0.00 0.00 0.00
2 30.00 100.180 99.285 99.270 99.285 99.280 0.900 10.70 10.70 11.27 30.00 338.25
3 60.00 100.460 99.610 99.565 99.610 99.595 0.865 9.70 9.70 10.20 30.00 306.00
4 90.00 100.740 99.845 99.825 99.845 99.838 0.902 13.60 13.60 11.65 30.00 349.50
5 120.00 101.020 100.125 100.110 100.125 100.120 0.900 13.55 13.55 13.58 30.00 407.25
6 150.00 101.300 100.405 100.395 100.405 100.402 0.898 12.80 12.80 13.18 30.00 395.25
7 160.00 101.400 100.505 100.490 100.505 100.500 0.900 12.20 12.20 12.50 10.00 125.00
8 190.00 101.578 100.586 100.764 100.641 100.664 0.914 12.20 12.20 12.20 30.00 366.00
9 202.50 101.698 100.760 100.908 100.755 100.808 0.890 13.30 13.30 12.75 12.00 153.00
AVG
AVG OGL AVG
Sl.No. Chainage Excavation Level Excavation Depth in m Width in m Sec Area AVG Area Length in
Level Valume In
in m Level in Sqm In sqm m
in m Cum
in m
L C R
Davanagere
Page No :
AVG
AVG OGL AVG
Sl.No. Chainage Excavation Level Excavation Depth in m Width in m Sec Area AVG Area Length in
Level Valume In
in m Level in Sqm In sqm m
in m Cum
in m
L C R
G Block Cross Road From CH 0.00 m to 45.00 m
1 0.00 100.415 99.461 99.606 99.451 99.506 0.909 10.00 10.00 11.65 12.00 139.80
2 30.00 100.420 99.475 99.620 99.465 99.520 0.900 10.00 10.00 10.00 12.00 120.00
3 15.00 100.423 99.472 99.617 99.457 99.515 0.908 10.00 10.00 10.00 12.00 120.00
Road No 11 For Main Drain Portion to Nala Cum 1 9.80 2.50 1.50 36.75
1 10.10 1.50 1.20 18.18
Road No 11 L/s Drain 1 9.90 1.00 1.00 9.90
Vegitable Market Parking area
1 10.50 (9.0+8.3)/2 0.15 13.62
L C R
Road No 4 Extention From CH 0.00 m to 37.50 m
1 0.00 98.695 99.445 99.450 99.445 99.447 0.752 (14.00+14.00)/2 14.00 10.52 0.00 0.00 0.00
2 30.00 98.500 99.250 99.245 99.250 99.248 0.748 (14.00+14.00)/2 14.00 10.48 10.50 30.00 315.00
3 37.50 98.350 99.100 99.105 99.100 99.102 0.752 (14.00+14.00)/2 14.00 10.52 10.51 7.50 78.81
1 0.00 98.408 99.160 99.155 99.160 99.158 0.750 (13.20+13.20)/2 13.20 9.90 0.00 0.00 0.00
2 30.00 99.212 99.965 99.950 99.965 99.960 0.748 (13.20+13.20)/2 13.20 9.88 9.89 30.00 296.67
3 60.00 100.015 100.770 100.765 100.770 100.768 0.753 (13.20+12.20)/2 13.20 9.94 9.91 30.00 297.22
4 73.50 100.397 101.150 101.145 101.150 101.148 0.752 (12.20+11.10)/2 13.20 9.92 9.91 13.50 133.85
1 0.00 98.867 99.620 99.605 99.620 99.615 0.748 10.85 11.50 8.12 0.00 0.00 0.00
2 30.00 98.543 99.295 99.295 99.295 99.295 0.752 (10.85+11.60)/2 11.23 8.44 8.28 30.00 248.35
3 60.00 98.227 98.980 98.975 98.980 98.978 0.752 (11.60+12.20)/2 11.90 8.94 8.50 30.00 255.02
4 90.00 97.907 98.660 98.650 98.660 98.657 0.750 (12.20+12.60)/2 12.40 9.30 8.89 30.00 266.82
5 120.00 97.582 98.335 98.325 98.335 98.332 0.750 (12.60+13.20)/2 12.90 9.67 9.31 30.00 279.20
6 137.00 97.387 98.140 98.135 98.140 98.138 0.752 (13.20+13.60)/2 13.40 10.07 9.29 17.00 157.86
2 30.00 99.280 100.035 100.015 100.035 100.028 0.748 10.70 10.70 8.01 8.47 30.00 254.01
3 60.00 99.595 100.360 100.325 100.360 100.348 0.753 9.70 9.70 7.31 8.08 30.00 242.41
4 90.00 99.838 100.595 100.575 100.595 100.588 0.750 13.60 13.60 10.20 8.50 30.00 255.14
5 120.00 100.120 100.875 100.855 100.875 100.868 0.748 13.55 13.55 10.14 9.22 30.00 276.47
6 150.00 100.402 101.155 101.155 101.155 101.155 0.753 12.80 12.80 9.64 9.99 30.00 299.83
7 160.00 100.500 101.255 101.235 101.255 101.248 0.748 12.20 12.20 9.13 9.07 10.00 90.71
8 190.00 100.664 101.346 101.524 101.401 101.424 0.760 12.20 12.20 9.27 9.27 30.00 278.16
9 202.50 100.808 101.505 101.653 101.500 101.553 0.745 13.30 13.30 9.91 9.59 12.50 119.88
1 0.00 99.506 99.911 100.056 99.901 99.956 0.450 10.00 10.00 4.50 0.00 0.00 0.00
2 30.00 99.520 99.925 100.070 99.915 99.970 0.450 10.00 10.00 4.50 4.50 30.00 135.00
3 45.00 99.515 99.922 100.067 99.907 99.965 0.450 10.00 10.00 4.50 4.50 15.00 67.50
Cum 4347.92
Deduct Privious Paid Qty Above Roads Vide I No 3, E-MB 1,Page No.25 Cum 4044.60
Total 303.32
Culvert Approachs
Road No 11 Culvert Slab 1 12.80 (0.5 x 7.00)=3.50 0.15
6.72
Road No 11, R/s Culvert Slab 2 17.90 (0.5 x 3.00)=1.50 0.15
8.06
2 16.60 (0.5 x 3.00)=1.50 0.15
7.47
Road No 11, L/s Culvert Slab 1 12.10 (0.5 x 4.00)=2.00 0.15
3.63
1 12.10 (0.5 x 2.00)=1.00 0.15
1.82
2 15.20 (0.5 x 2.00)=1.00 0.15
4.56
2 18.90 (0.5 x 3.50)=1.75 0.15
9.92
G Block Cross Road Culvert Slab 2 12.80 (0.5 x 2.00)=1.00 0.15
3.84
Road No 10 R/s Culvert Slab 2 19.50 (0.5 x 2.00)=1.00 0.15
5.85
2 15.90 (0.5 x 3.00)=1.50 0.15
7.15
G-1 Block Center Culvert Slab 2 13.20 (0.5 x 2.00)=1.00 0.15
3.96
2000MT Godown Cross road
R/s 2 10.00 (0.5 x 2.00)=1.00 0.15
Culvert Center Slab 3.00
2 9.00 (0.5 x 2.00)=1.00 0.15
2.70
Vegitable Market Parking area 1 10.50 (9+8.3)/2 0.15 13.62
1 10.00 (18.6+10.1)/2 0.15 21.53
1 10.00 (10.1+6.2)/2 0.15 12.23
1 10.00 (6.2+3.3)/2 0.15 7.13
Vegitable Market Toilet area (7.8+8.6+9.2+7.5+
1 30.50 6)/5 0.15 35.78
1 16.50 2.30 0.15 5.69
1 16.50 6.30 0.15 7.80
Deduction
Cistran -1 1.80 1.80 0.15 -0.49
Toilet -1 5.30 1.80 0.15 -1.43
Cum 1090.26
Deduct Privious Paid Qty Above Roads Vide I No 1, E-MB 1,Page No.25 533.85
Total 556.41
G- Block Roads
Privious Paid Qty Vide I No 5, E-MB 1,Page No.26 Cum 1045.84
Chainage Nos L B D Qty
G- Block Roads
Fruit Market L/S Road From CH 0.00 m to 59.00 m
Chainage Nos L B D Qty
0.00 to 30.00 1 30.00 (13.50+13.50)/2 0.075 30.38
30.00 to 59.00 1 29.00 (13.50+13.50)/2 0.075 29.36
G- Block L/S Cross Road From CH 0.00 m to 59.50 m
0.00 to 30.00 1 30.00 (13.5+12.40)/2 0.075 29.14
30.00 to 59.5 1 29.50 (12.40+12.50)/2 0.075 27.55
Road No- 10 From CH 0.00 m to 132.40 m
0.00 to 30.00 1 30.00 (13.0+12.50)/2 0.075 28.69
30 .00 to 60.00 1 30.00 (12.50+12.50)/2 0.075 28.13
60.00 to 90.00 1 30.00 (12.50+12.50)/2 0.075 28.13
90.00 to 120.00 1 30.00 (12.50+12.50)/2 0.075 28.13
120.00 to 132.40 1 12.40 (12.50+12.00)/2 0.075 11.39
G-1 Block Road From CH 0.00 m to 77.90 m
Rd - A - Bell Mouth 0.50 9.70 (13.20+13.20)/2 0.075 4.80
1 18.90 (13.20+13.20)/2 0.075 18.71
Rd - B 1 34.80 (13.20+13.20)/2 0.075 34.45
Bell Mouth 0.50 14.50 (13.20+13.20)/2 0.075 7.18
G1 Block Cross Road , From CH 0.00 m to 45.00 m
0.00 to 30.00 1 30.00 (10.00+10.00)/2 0.125 37.50
30.00 to 45.00 1 15.00 (10.00+10.00)/2 0.125 18.75
Road No -5 From CH 0.00 m to 389.00 m
0.00 to 30.00 1 30.00 (16.20+16.20)/2 0.075 36.45
30 .00 to 60.00 1 30.00 (16.20+16.40)/2 0.075 36.67
60.00 to 90.00 1 30.00 (16.40+16.50)/2 0.075 37.01
90.00 to 120.00 1 30.00 (16.5+16.70)/2 0.075 37.35
120.00 to 150.00 1 30.00 (16.70+17.00)/2 0.075 37.91
150.00 to 180.00 1 30.00 (17.00+10.80)/2 0.075 31.28
180.00 to 195.00 1 15.00 (10.80+8.00)/2 0.075 10.58
Bell Mouth 0.50 16.20 18.20 0.075 11.06
222.00 to 252.00 1 30.00 (16.70+16.60)/2 0.075 37.46
252.00 to 282.00 1 30.00 (16.60+16.60)/2 0.075 37.35
282.00 to 312.00 1 30.00 (16.60+14.40)/2 0.075 34.87
312.00 to 342.00 1 30.00 (14.40+14.900)/2 0.075 32.96
342.00 to 372.00 1 30.00 (14.90+11.40)/2 0.075 29.59
372.00 to 389.00 1 17.00 (11.40+11.25)/2 0.075 14.44
Privious Paid Qty Vide I No 10, E-MB 1,Page No.27 Cum 269.53
Quantity Vide I no 10, Page No. 8 In this MB 27.99
Total updated Qty 297.52
Limit to Tender Qty 288.91
###
Deduct Privious Paid Qty Vide I No 10, E-MB 1,Page No.27 269.53
Schedule - B. Qty : 288.91 Cum Qty Now to be Pay 19.38
###
Tender Rate : 6200.00
Privious Paid Qty Vide I No 10, E-MB 1,Page No.32 Cum 941.87
CC Drain Avg Avg
A1 Block Drain R/s Raft Cum 1 4.50 0.90 0.15 0.61
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 11.50 0.90 0.15 1.55
Culvert Raft 1 6.10 1.10 0.25 1.68
Drain R/s Raft 1 4.00 0.90 0.15 0.54
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 8.10 0.90 0.15 1.09
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 5.90 0.90 0.15 0.80
Culvert Raft 1 6.00 1.10 0.25 1.65
Drain R/s Raft 1 9.60 0.90 0.15 1.30
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 15.90 0.90 0.15 2.15
At Entrence Culvert Raft 1 11.70 1.10 0.25 3.22
A1 Block Drain R/s Wall Cum 2 4.50 0.15 0.60 0.81
Culvert Wall 2 6.05 0.25 0.60 1.82
Drain R/s wall 2 11.50 0.15 0.60 2.07
Culvert Wall 2 6.10 0.25 0.60 1.83
Drain R/s wall 2 4.00 0.15 0.60 0.72
Culvert Wall 2 6.50 0.25 0.60 1.95
Drain R/s wall 2 8.10 0.15 0.60 1.46
Culvert Wall 2 6.05 0.25 0.60 1.82
Drain R/s wall 2 5.90 0.15 0.60 1.06
Privious Paid Qty Vide I No 14, E-MB 1,Page No.32 Cum 43.17
Quantity Vide I no 14, Page No. 7 In this MB 11.65
Total updated Qty 54.82
Deduct Privious Paid Qty Vide I No 14, E-MB 1,Page No.32 43.17
Schedule - B. Qty : 54.84 Cum Qty Now to be Pay 11.65
###
Tender Rate : 2700.00
15 15 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms
in depth, compacting each deposited layer by ramming after watering with a lead and lift
Including cost of alllabourcomplete as per specifications With all lead and lift etc
complete as per specification & as per the direction of the engineer incharge of the work.
Privious Paid Qty Vide I No 12, E-MB 1,Page No.32 Cum 213.61
Quantity Vide I no 15, Page No. 23 In this MB 208.64
Total updated Qty 422.25
Deduct Privious Paid Qty Vide I No 12, E-MB 1,Page No.32 213.61
16 16 Providing and laying flooring with burnt stone slabs 10 cms thick, rough chistle dressed
on sand bed 7.5 cms to 8 cms thick and pointed with cement mortar 1:3, , including cost
of materials, sand, labour, curing complete as per specifications.With all lead and lift etc
complete as per specification & as per the direction of the engineer incharge of the work.
Contractor's Signature.
For use in the Executive Engineer Office.
Received Rs. …………………in words……………………………….……………………
……………………………………………………..……………………………. by cash and adjustment of
payment as per memorandum
Sl. Schedule - B Item of work Previous Measurement Present Measurement Total up – to date
Unit Rate
NO. Qty Qnty Amount Qnty Amount Qnty Amount
Earth work excavation for Foundation by mechanical means for all works & any depth ,
as per drawing and technical specifications, including setting out, shoring, strutting,
barricading, caution lights, including dressing of excavated surfaces, disposing off or
1 levelling the excavated earth or sorting & stacking the selected earth for reuse in a
22711.66 radius and lift including cost of labour, tools, usage of machinery & other appurtenaces
Cum 80.00 21408.85 1712708.00 1274.19 101935.20 22683.04 1814643.20
required to complete the work With all lead and lift etc complete as per specification &
as per the direction of the engineer incharge of the work.
Construction of granular sub-base using crusher run spreading in uniform layers with
motor grader on prepared surface mixing by mix in place method with rotovator at
OMC and compacting with vibratory roller to achieve the desired density, complete per
4 3379.86 clause 401. With all lead and lift etc complete as per specification & as per the direction Cum 2500.00 2823.24 7058100.00 556.41 1391025.00 3379.65 8449125.00
of the engineer incharge of the work.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill- up the interstices of
coarse aggregate, watering and compacting to the required density grading 2 as per
5 1689.93 Technical Specification Clause 405. Grading-I 63 mm to 45 mm a.Using Screening
Crushable type such as Moorum or Gravel With all lead and lift etc complete as per Cum 2300.00 1045.84 2405432.00 640.90 1474070.00 1686.74 3879502.00
specification & as per the direction of the engineer incharge of the work.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber,
applying and brooming requisite type of screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and compacting to the required
6 1689.93 density.Grading-II 53 mm to 22.4 mm (a)Using Screening Crushable type such as
Moorum or GravelWith all lead and lift etc complete as per specification & as per the Cum 2200.00 0.00 0.00 1684.50 3705900.00 1684.50 3705900.00
direction of the engineer incharge of the work.
Page 48
Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class
conforming to IS:458-1988 with latest amentments using ordinary portland cement,
for sanitary works and conveying to work site, rolling and lowering into trenches,
laying true to line and level including loading and unloading at both destinations and
jointing of pipes and specials, perfect linking of joints with jack to correct position
including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S
RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per
ISS to the required pressure and commissioning etc. complete. (Contractor will make
7 170.00 his own arrangements for procuring water for testing). Before the execution of the Mtr 1200.00 0.00 0.00 170.00 204000.00 170.00 204000.00
work, the contractor shall carry out the survey.RCC NP3 Class pipe of 300 mm dia.With
all lead and lift etc complete as per specification & as per the direction of the engineer
incharge of the work.
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the
9 22507.47 Engineer incharge of work(With all need and left, loading and unloading and as directed
by engineer in charge of work)
Cum 35.00 21408.85 749309.75 1098.62 38451.70 22507.47 787761.45
Providing and laying in position plain cement concrete for levelling course for all works
in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine
aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150
mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all
materials of quality, labour, Usage charges of machineries, curing, and all the other
appurtenances required to complete the work as per technical specifications. (The cost
10 288.91 of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 Cum 6200.00 269.53 1671086.00 19.38 120156.00 288.91 1791242.00
mm nominal size graded crushed coarse aggregates With all lead and lift etc complete
as per specification & as per the direction of the engineer incharge of the work.
Providing and laying in position Reinforced cement concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works & other parallel
works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with super
plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes
wherever necesary, including all lead & lifts, cost of all materials of quality, confirming
to the requirements of relevant IS codes, labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per techni �al
11 1249.94 specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Cum 8950.00 941.87 8429736.50 306.20 2740490.00 1248.07 11170226.50
Design Mix Using 20 mm nominal size graded crushed coarse aggregates (With all lead
and lift etc complete as per specification & as per the direction of the engineer incharge
of the work.)
Page 49
Providing and Filling in foundation with granite / trap broken metal 100mm . and down
size & with approved sand including hand packing , ramming , watering , including cost
of all materials and labourWith all lead and lift etc complete as per specification & as
14 54.84 per the direction of the engineer incharge of the work. Cum 2700.00 43.17 116559.00 11.65 31455.00 54.82 148014.00
Providing and laying flooring with burnt stone slabs 10 cms thick, rough chistle dressed
on sand bed 7.5 cms to 8 cms thick and pointed with cement mortar 1:3, , including
cost of materials, sand, labour, curing complete as per specifications.With all lead and
16 1125.00 lift etc complete as per specification & as per the direction of the engineer incharge of Sqm 990.00 0.00 1123.52 1112284.80 1123.52 1112284.80
the work.
Name of work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC Davangere
2)Improvements of G-block Roads at main market yard of ampc davangere. 3)Improvements of A1-Block Road No 9 at Main
Market Yard of AMPC Davangere Under AAP 2022-23
Comparative Statement
Sl. As per Sanctioned Schedule - B Work Done Savingas Excess
Particulars Unit
No. Qty Rate Amount Qty Amount
1 2 3 4 5 6 7 8 9 10
1 Earth work excavation for Foundation by mechanical means
for all works & any depth , as per drawing and technical
specifications, including setting out, shoring, strutting,
barricading, caution lights, including dressing of excavated
surfaces, disposing off or levelling the excavated earth or
sorting & stacking the selected earth for reuse in a radius and
lift including cost of labour, tools, usage of machinery & other Cum 22711.66 80.00 1816932.80 22683.04 1814643.20 2289.60 0.00
appurtenaces required to complete the work With all lead and
lift etc complete as per specification & as per the direction of
the engineer incharge of the work.
AVG
AVG GSB AVG AVG
Embankme GSB Level Depth in Sec Area Length in
Sl.No. Chainage Level Width in m Area In Valume In
nt Level in m m in Sqm m
in m sqm Cum
in m
L C R
Fruit Market Road From CH 0.00 m to 59.00 m
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.70 1.90 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.70 1.90 1.90 30.00 57.15
3 59.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.70 1.90 1.90 29.00 55.25
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40
3 59.50 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 29.50 58.41
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.50 1.88 1.91 30.00 57.38
3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.50 1.88 1.88 30.00 56.25
4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.50 1.88 1.88 30.00 56.25
5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 1.84 30.00 55.13
6 132.40 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 1.80 12.40 22.32
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 2.43 30.00 72.90
3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.40 2.46 2.44 30.00 73.35
4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.50 2.48 2.47 30.00 74.02
5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.70 2.51 2.49 30.00 74.70
6 150.00 #REF! #REF! #REF! #REF! #REF! 0.150 17.00 2.55 2.53 30.00 75.82
7 180.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.40 1.86 2.21 30.00 66.15
8 195.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.53 15.00 22.95
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.70 2.51 0.00 0.00 0.00
2 237.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.70 2.51 2.51 30.00 75.15
3 267.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.60 2.49 2.50 30.00 74.93
4 297.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.40 2.46 2.47 30.00 74.25
5 327.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.65 2.35 2.40 30.00 72.11
AVG
AVG GSB AVG AVG
Embankme GSB Level Depth in Sec Area Length in
Sl.No. Chainage Level Width in m Area In Valume In
nt Level in m m in Sqm m
in m sqm Cum
in m
L C R
6 357.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.16 1.97 2.16 30.00 64.82
7 374.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.25 1.69 1.83 17.00 31.12
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.60 2.49 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.40 2.46 2.47 30.00 74.25
3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 2.44 30.00 73.35
4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 2.43 30.00 72.90
5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.00 2.40 2.42 30.00 72.45
6 150.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.00 2.40 2.40 30.00 72.00
7 180.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.90 2.39 2.43 30.00 72.84
8 210.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.80 2.37 2.41 30.00 72.32
9 240.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.90 2.39 2.40 30.00 72.00
10 261.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.90 2.39 2.39 21.00 50.26
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.10 1.66 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.80 1.77 1.72 30.00 51.52
3 49.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.30 1.85 1.81 20.00 36.15
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 30.00 36.00
3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 30.00 36.00
4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 30.00 36.00
5 93.50 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 3.50 4.20
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40
3 45.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 15.00 29.70
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40
3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40
4 75.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 15.00 29.70
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.50 1.72 0.00 0.00 0.00
2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.60 1.74 1.73 0.00
3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.40 1.86 1.77 0.00
4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.80 1.92 1.84 0.00
5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.30 2.00 1.93 0.00
6 137.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.30 2.00 1.90 0.00
1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 0.00 0.00 0.00
2 30.00 101.424 101.496 101.674 101.551 101.574 0.150 12.00 1.80 1.80 30.00 54.00
3 60.00 101.553 101.655 101.803 101.650 101.703 0.150 12.00 1.80 1.80 30.00 54.00
AVG
AVG GSB AVG AVG
Embankme GSB Level Depth in Sec Area Length in
Sl.No. Chainage Level Width in m Area In Valume In
nt Level in m m in Sqm m
in m sqm Cum
in m
L C R
4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 1.80 30.00 54.00
5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 1.85 30.00 55.50
6 150.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 1.90 30.00 57.00
7 160.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 1.88 10.00 18.75
L C R
Fruit Market Road From CH 0.00 m to 59.00 m
1 0.00 100.193 100.221 100.368 100.216 100.268 0.0750 12.70 0.95 0.00 0.00 0.00
2 30.00 100.472 100.500 100.648 100.495 100.548 0.0755 12.70 0.96 0.96 30.00 28.67
3 59.00 100.563 100.590 100.738 100.585 100.638 0.0745 12.70 0.95 0.95 29.00 27.62
1 0.00 99.764 99.791 99.938 99.786 99.838 0.0745 13.20 0.98 0.00 0.00 0.00
2 30.00 99.560 99.591 99.736 99.581 99.636 0.0750 13.20 0.99 0.99 30.00 29.60
3 59.50 99.465 99.495 99.641 99.486 99.541 0.0755 13.20 1.00 0.99 29.50 29.30
1 0.00 100.183 100.160 100.358 100.255 100.258 0.0745 12.70 0.95 0.00 0.00 0.00
2 30.00 100.193 100.220 100.368 100.215 100.268 0.0750 12.70 0.95 0.95 30.00 28.48
3 60.00 100.202 100.230 100.378 100.225 100.277 0.0755 12.70 0.96 0.96 30.00 28.67
4 90.00 100.270 100.300 100.445 100.290 100.345 0.0750 12.70 0.95 0.96 30.00 28.67
5 120.00 100.309 100.340 100.485 100.330 100.385 0.0755 12.70 0.96 0.96 30.00 28.67
6 132.40 100.341 100.370 100.515 100.360 100.415 0.0745 12.70 0.95 0.95 12.40 11.81
1 0.00 99.723 99.745 99.898 99.750 99.798 0.0750 16.20 1.22 0.00 0.00 0.00
2 30.00 99.545 99.865 99.720 99.275 99.620 0.0750 16.20 1.22 1.22 30.00 36.45
3 60.00 99.944 99.971 100.118 99.966 100.018 0.0745 16.40 1.22 1.22 30.00 36.55
4 90.00 100.057 100.085 100.233 100.080 100.133 0.0755 16.50 1.25 1.23 30.00 37.01
5 120.00 100.179 100.206 100.353 100.201 100.253 0.0745 16.70 1.24 1.24 30.00 37.35
6 150.00 100.202 100.225 100.378 100.230 100.277 0.0750 17.00 1.28 1.26 30.00 37.79
7 180.00 100.244 100.270 100.420 100.270 100.320 0.0755 12.40 0.94 1.11 30.00 33.17
8 195.00 100.265 100.290 100.440 100.290 100.340 0.0750 8.00 0.60 0.77 15.00 11.52
1 0.00 98.903 98.925 99.078 98.930 98.978 0.0750 16.70 1.25 0.00 0.00 0.00
2 237.00 98.802 98.825 98.978 98.830 98.878 0.0755 16.70 1.26 1.26 30.00 37.70
3 267.00 98.702 98.730 98.878 98.725 98.777 0.0750 16.60 1.25 1.25 30.00 37.59
AVG GSB AVG WBM AVG AVG
WBM G-I Level Depth in Sec Area Length in
Sl.No. Chainage Level G-I Level Width in m Area In Valume In
in m m in Sqm m
in m in m sqm Cum
L C R
4 297.00 98.591 98.620 98.766 98.611 98.666 0.0745 16.40 1.22 1.23 30.00 37.00
5 327.00 98.503 98.575 98.678 98.480 98.578 0.0750 15.65 1.17 1.20 30.00 35.93
6 357.00 98.450 98.480 98.625 98.471 98.525 0.0745 13.16 0.98 1.08 30.00 32.31
7 374.00 98.310 98.330 98.485 98.340 98.385 0.0750 11.25 0.84 0.91 17.00 15.51
1 0.00 98.890 98.920 99.065 98.910 98.965 0.0750 16.60 1.25 0.00 0.00 0.00
2 30.00 98.980 99.000 99.155 99.010 99.055 0.0750 16.40 1.23 1.24 30.00 37.13
3 60.00 99.073 99.100 99.248 99.095 99.148 0.0745 16.20 1.21 1.22 30.00 36.55
4 90.00 99.160 99.191 99.336 99.181 99.236 0.0755 16.20 1.22 1.22 30.00 36.45
5 120.00 99.248 99.276 99.423 99.270 99.323 0.0750 16.00 1.20 1.21 30.00 36.35
6 150.00 99.341 99.370 99.516 99.361 99.416 0.0745 16.00 1.19 1.20 30.00 35.88
7 180.00 99.430 99.460 99.605 99.450 99.505 0.0750 15.90 1.19 1.21 30.00 36.38
8 210.00 99.489 99.520 99.665 99.510 99.565 0.0755 15.80 1.19 1.21 30.00 36.16
9 240.00 99.549 99.581 99.723 99.566 99.623 0.0745 15.90 1.18 1.20 30.00 35.97
10 261.00 99.617 99.640 99.793 99.645 99.693 0.0750 15.90 1.19 1.20 10.00 11.97
1 0.00 98.950 98.975 99.125 98.975 99.025 0.0750 11.10 0.83 0.00 0.00 0.00
2 30.00 98.800 98.825 98.975 98.825 98.875 0.0750 11.80 0.89 0.86 30.00 25.76
3 49.00 98.856 98.881 99.031 98.881 98.931 0.0745 12.30 0.92 0.90 20.00 18.01
1 0.00 99.196 99.221 99.371 99.221 99.271 0.0745 8.00 0.60 0.00 0.00 0.00
2 30.00 99.213 99.235 99.388 99.240 99.288 0.0750 8.00 0.60 0.60 30.00 17.94
3 60.00 99.364 99.390 99.540 99.390 99.440 0.0755 8.00 0.60 0.60 30.00 18.00
4 90.00 99.411 99.436 99.586 99.436 99.486 0.0745 8.00 0.60 0.60 30.00 18.00
5 93.50 99.406 99.431 99.581 99.431 99.481 0.0745 8.00 0.60 0.60 3.50 2.10
L C R
Fruit Market Road From CH 0.00 m to 59.00 m
1 0.00 100.268 100.295 100.443 100.290 100.343 0.0745 12.70 0.95 0.00 0.00 0.00
2 30.00 100.548 100.575 100.723 100.570 100.623 0.0750 12.70 0.95 0.95 30.00 28.48
3 59.00 100.637 100.665 100.813 100.660 100.712 0.0750 12.70 0.95 0.95 29.00 27.62
1 0.00 99.838 99.865 100.013 99.860 99.913 0.0745 13.20 0.98 0.00 0.00 0.00
2 30.00 99.636 99.665 99.810 99.655 99.710 0.0745 13.20 0.98 0.98 30.00 29.50
3 59.50 99.541 99.570 99.715 99.560 99.615 0.0745 13.20 0.98 0.98 29.50 29.01
1 0.00 100.258 100.235 100.433 100.330 100.333 0.0750 12.70 0.95 0.00 0.00 0.00
2 30.00 100.268 100.295 100.443 100.290 100.343 0.0750 12.70 0.95 0.95 30.00 28.58
3 60.00 100.278 100.305 100.453 100.300 100.353 0.0750 12.70 0.95 0.95 30.00 28.58
4 90.00 100.345 100.375 100.520 100.365 100.420 0.0750 12.70 0.95 0.95 30.00 28.58
5 120.00 100.385 100.415 100.560 100.405 100.460 0.0750 12.70 0.95 0.95 30.00 28.58
6 132.40 100.415 100.445 100.590 100.435 100.490 0.0750 12.70 0.95 0.95 12.40 11.81
1 0.00 99.798 99.820 99.973 99.825 99.873 0.0750 16.20 1.22 0.00 0.00 0.00
2 30.00 99.620 99.940 99.795 99.350 99.695 0.0750 16.20 1.22 1.22 30.00 36.45
3 60.00 100.018 100.045 100.193 100.040 100.093 0.0745 16.40 1.22 1.22 30.00 36.55
4 90.00 100.133 100.160 100.308 100.155 100.208 0.0750 16.50 1.24 1.23 30.00 36.89
5 120.00 100.253 100.280 100.428 100.275 100.328 0.0745 16.70 1.24 1.24 30.00 37.22
6 150.00 100.278 100.300 100.453 100.305 100.353 0.0750 17.00 1.28 1.26 30.00 37.79
7 180.00 100.320 100.345 100.495 100.345 100.395 0.0750 12.40 0.93 1.10 30.00 33.08
8 195.00 100.340 100.365 100.515 100.365 100.415 0.0750 8.00 0.60 0.77 15.00 11.48
1 0.00 98.978 99.000 99.153 99.005 99.053 0.0750 16.70 1.25 0.00 0.00 0.00
2 237.00 98.878 98.900 99.053 98.905 98.953 0.0750 16.70 1.25 1.25 30.00 37.58
3 267.00 98.778 98.805 98.953 98.800 98.853 0.0750 16.60 1.25 1.25 30.00 37.46
4 297.00 98.666 98.695 98.840 98.685 98.740 0.0745 16.40 1.22 1.23 30.00 37.00
AVG WBM AVG WBM AVG AVG
WBM G-II Level Depth in Sec Area Length in
Sl.No. Chainage G-I Level G-II Level Width in m Area In Valume In
in m m in Sqm m
in m in m sqm Cum
L C R
5 327.00 98.578 98.650 98.753 98.555 98.653 0.0750 15.65 1.17 1.20 30.00 35.93
6 357.00 98.525 98.554 98.700 98.545 98.599 0.0745 13.16 0.98 1.08 30.00 32.31
7 374.00 98.385 98.405 98.560 98.415 98.460 0.0750 11.25 0.84 0.91 17.00 15.51
1 0.00 98.965 98.995 99.140 98.985 99.040 0.0750 16.60 1.25 0.00 0.00 0.00
2 30.00 99.055 99.075 99.230 99.085 99.130 0.0750 16.40 1.23 1.24 30.00 37.13
3 60.00 99.148 99.175 99.323 99.170 99.223 0.0750 16.20 1.22 1.22 30.00 36.68
4 90.00 99.236 99.265 99.410 99.255 99.310 0.0745 16.20 1.21 1.21 30.00 36.33
5 120.00 99.323 99.351 99.498 99.345 99.398 0.0750 16.00 1.20 1.20 30.00 36.10
6 150.00 99.416 99.445 99.590 99.435 99.490 0.0745 16.00 1.19 1.20 30.00 35.88
7 180.00 99.505 99.535 99.680 99.525 99.580 0.0750 15.90 1.19 1.21 30.00 36.35
8 210.00 99.565 99.595 99.740 99.585 99.640 0.0750 15.80 1.19 1.20 30.00 36.09
9 240.00 99.623 99.655 99.798 99.640 99.698 0.0745 15.90 1.18 1.20 30.00 35.90
10 261.00 99.693 99.715 99.868 99.720 99.768 0.0750 15.90 1.19 1.19 10.00 11.93
1 0.00 99.025 99.050 99.200 99.050 99.100 0.0750 11.10 0.83 0.00 0.00 0.00
2 30.00 98.875 98.900 99.050 98.900 98.950 0.0750 11.80 0.89 0.86 30.00 25.76
3 49.00 98.931 98.955 99.105 98.955 99.005 0.0745 12.30 0.92 0.90 20.00 18.01
1 0.00 99.271 99.295 99.445 99.295 99.345 0.0745 8.00 0.60 0.00 0.00 0.00
2 30.00 99.288 99.310 99.463 99.315 99.363 0.0750 8.00 0.60 0.60 30.00 17.94
3 60.00 99.440 99.465 99.615 99.465 99.515 0.0750 8.00 0.60 0.60 30.00 17.96
4 90.00 99.486 99.510 99.660 99.510 99.560 0.0745 8.00 0.60 0.60 30.00 17.96
5 93.50 99.480 99.505 99.655 99.505 99.555 0.0745 8.00 0.60 0.60 3.50 2.09
1 0.00 99.594 99.670 99.670 99.670 99.670 0.0755 15.20 1.15 0.00 0.00 0.00
2 30.00 99.400 99.475 99.475 99.475 99.475 0.0745 15.20 1.13 1.14 30.00 34.20
3 45.00 99.250 99.325 99.325 99.325 99.325 0.0745 15.20 1.13 1.13 15.00 16.99
1 0.00 99.309 99.385 99.380 99.385 99.383 0.0745 15.20 1.13 0.00 0.00 0.00
2 30.00 100.111 100.190 100.180 100.190 100.187 0.0755 15.20 1.15 1.14 30.00 34.20
3 60.00 100.915 100.995 100.980 100.995 100.990 0.0750 15.20 1.14 1.14 30.00 34.31
4 75.00 101.297 101.375 101.365 101.375 101.372 0.0745 15.20 1.13 1.14 15.00 17.04
1 0.00 99.767 99.845 99.835 99.845 99.842 0.0745 11.50 0.86 0.00 0.00 0.00
2 30.00 99.443 99.520 99.515 99.520 99.518 0.0755 11.60 0.88 0.87 30.00 25.99
3 60.00 99.127 99.205 99.195 99.205 99.202 0.0750 12.40 0.93 0.90 30.00 27.09
4 90.00 98.807 98.885 98.875 98.885 98.882 0.0750 12.80 0.96 0.95 30.00 28.35
5 120.00 98.482 98.560 98.550 98.560 98.557 0.0750 13.30 1.00 0.98 30.00 29.36
6 137.00 98.287 98.365 98.355 98.365 98.362 0.0745 13.30 0.99 0.99 17.00 16.90
L C R
From CH 0.00 m to 160.00 m
1 0.00 99.899 99.980 99.960 99.980 99.973 0.0745 11.50 0.86 0.00 0.00 0.00
2 30.00 100.180 100.260 100.245 100.260 100.255 0.0750 11.60 0.87 0.86 30.00 25.90
3 60.00 100.495 100.585 100.540 100.585 100.570 0.0750 12.40 0.93 0.90 30.00 27.00
4 90.00 100.738 100.820 100.800 100.820 100.813 0.0750 12.80 0.96 0.95 30.00 28.35
5 120.00 101.019 101.100 101.085 101.100 101.095 0.0755 13.30 1.00 0.98 30.00 29.46
6 150.00 101.302 101.380 101.370 101.380 101.377 0.0745 13.30 0.99 1.00 30.00 29.93
7 160.00 101.400 101.480 101.465 101.480 101.475 0.0750 13.30 1.00 0.99 10.00 9.94
Tender Qty 1689.93 Cum Present Payable Qty Cum Total 1566.02
Tender Rate 2200.00 Rs
Providing and laying in position Reinforced cement concrete for all Sub
structures of building, Irrigation works, Sub structure works of bridges,
Drain works & other parallel works from 0.50m to 3.50 m height. The
granite/trap/basalt crushed graded coarse aggregates and fine
aggregates as per relevant IS Codes machine mixed with super
plasticisers, laid in layers, well compacted using needle vibrators,
providing weep holes wherever necesary, including all lead & lifts, cost
of all materials of quality, confirming to the requirements of relevant IS
codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per techni�al
11 specifications. (The cost of steel reinforcement & formwork to be paid Cum 1249.94 8950.00 11186963.00 1248.07 11170226.50 16736.50 0.00
separately) M20 Design Mix Using 20 mm nominal size graded crushed
coarse aggregates (With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the
work.)
Providing and laying flooring with burnt stone slabs 10 cms thick, rough
chistle dressed on sand bed 7.5 cms to 8 cms thick and pointed with
cement mortar 1:3, , including cost of materials, sand, labour, curing
complete as per specifications.With all lead and lift etc complete as per
16 specification & as per the direction of the engineer incharge of the Sqm 1125.00 990.00 1113750.00 1123.52 1112284.80 1465.20 0.00
work.
Date
Item No
E1,1,7,8,10,11,12,10
2,13
All mesurments
OGL
1,2,1,14
10,12
3
4,15
All mesurments
Name Of Work : Package -3 : Construction of Link Road and Wire Fencing around the Layout of Hamalas Residential Houses in H
Giriyapura Sy.No.6.1 at Boragondanahalli Village of APMC Davanagere Limit Under AAP 2022-23.
Item No Item description Recording Date Qty Date of Sampling Daaaate of testing
Loosening , leveling and
1 Compacting original ground 1/28/2023 465.15
supporting embankment to
facilitate placement of first
Construction of Embankment
2 by excavating the available 2/6/2023 1285.80
approved Gravel/Murrum
deposited at a place or
Construction of granular sub-
3 base using crusher run 2/13/2023 438.61
spreading in uniform layers
with motor grader on
Grading-I 63 mm to 45 mm
4 (a)Using Screening Crushable 2/21/2023 219.30
type such as Moorum or
Gravel With all lead and lift
Grading-II 53 mm to 22.4 mm
5 (a)Using Screening Crushable 3/9/2023 228.49
type such as Moorum or
Gravel With all lead and lift
Mix 1:4:8( M5) Using 40 mm
8 nominal size For CD 1/28/2023 1.57
Providing Thermo-
10 Mechanically Treated bars of 1/28/2023 7811.04
grade Fe-500D or more Steel
reinforcement for R.C.C. work
1:4:8( M5) Using 40 mm
12 nominal size For All round 1/28/2023 28.41
Fensing Column
M20 Design Mix Using 20
13 mm nominal size For All 2/6/2023 32.48
round Fensing Footing
M20 Design Mix Using 20
14 mm nominal size For All 3/9/2023 35.69
round Fensing Column