0% found this document useful (0 votes)
17 views

Àºáaiàäpà Páaiàäð Áðºàpà C©Üaiàäavàgàgàä, Àiágàäpàméö C©Ü Àè Þ Aiéæãd É

The document discusses construction works related to drainage and road improvements at APMC Davangere. It provides details of excavation works required for construction of CC drains, culverts and roads at different locations within the market yard. Measurement details including length, breadth, depth of excavation works are provided block wise and location wise.

Uploaded by

pankaj kadkol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Àºáaiàäpà Páaiàäð Áðºàpà C©Üaiàäavàgàgàä, Àiágàäpàméö C©Ü Àè Þ Aiéæãd É

The document discusses construction works related to drainage and road improvements at APMC Davangere. It provides details of excavation works required for construction of CC drains, culverts and roads at different locations within the market yard. Measurement details including length, breadth, depth of excavation works are provided block wise and location wise.

Uploaded by

pankaj kadkol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 72

PÀ£ÁðlPÀ ¸ÀPÁðgÀ PÀȶ ªÀiÁgÁl E¯ÁSÉ

¸ÀºÁAiÀÄPÀ PÁAiÀÄð¤ªÁðºÀPÀ C©üAiÀÄAvÀgÀgÀÄ,


ªÀiÁgÀÄPÀmÉÖ
«±ÉõÀ vÁAwæPÀ C©üªÀÈ¢Þ
G¥À «¨sÁUÀ, zÁªÀtUÉgÉ,AiÉÆÃd£É,
(f¯Éè) J.¦.JA.¹ ¥ÁæAUÀt
zÁªÀtUÉgÉ.
Assistant Executive Engineer,M.D.P. Special Tech Sub-Division,DAVANAGERE.(Dist)
E-mail:- [email protected]
¸ÀASÉå: : ¸ÀPÁ¤C/ªÀiÁCAiÉÆÃ/«vÁG«/zÁ/ /2023-24 ¢£ÁAPÀ:- - - 2023
EªÀjUÉ
B PÁAiÀÄð¤ªÁðºÀPÀ
C©üAiÀÄAvÀgÀgÀÄ,
ªÀiÁgÀÄPÀmÉÖ C©üªÀÈ¢Þ AiÉÆÃd£É
«¨sÁUÀ,
¨ÉAUÀ¼ÀÆgÀÄ.

ªÀiÁ£À
ågÉÃ, «µÀAiÀ PÀȶ GvÀà£Àß ªÀiÁgÀÄPÀmÉÖ ¸À«Äw, zÁªÀtUÉgÉ
Ä B- ªÁåwÛAiÀÄ F PɼÀV£À C©üªÀÈ¢Ý PÁªÀÄUÁjUÀ¼À
2£Éà ºÁUÀÆ CAwªÀÄ ©®ÄèUÀ¼À£ÀÄß ¸À°è¸ÀĪÀ
G¯ÉèÃR J¸ï.n.E.J¸ï
§UÉÎ. PÀ£Àì¯ÉÖAmïì EArAiÀiÁ ¥ÉæöʪÉÃmï °«ÄmÉqï,
B- ºÀħâ½î EªÀgÀ ¥ÀvÀæzÀ ¢£ÁAPÀ : 16 -04-2023.
**********
ªÉÄîÌAqÀ «µÀAiÀÄPÉÌ ¸ÀA§A¢ü¹zÀAvÉ PÀȶ GvÀà£Àß ªÀiÁgÀÄPÀmÉÖ ¸À«Äw,
zÁªÀtUÉgÉ ªÁå¦üÛÛAiÀÄ F PɼÀV£À C©üªÀÈ¢Ý PÁªÀÄUÁjUÀ¼À°è ¥ÁåPÉÃeï -1 gÀ
C¼ÀvÉ ¥ÀĸÀÛPÀ, 2£Éà ºÁUÀÆ CAwªÀÄ ©®è£ÀÄß ¦.JA.¹ vÁAwæPÀ
¸ÀA¸ÉÜAiÀĪÀgÁzÀ J¸ï.n.E.J¸ï PÀ£Àì¯ÉÖAmïì EArAiÀiÁ ¥ÉæöʪÉÃmï °«ÄmÉqï,
ºÀħâ½î gÀªÀgÀÄ ¸À°è¹gÀĪÀÅzÀ£ÀÄß ¥Àj²Ã°¹ zÀÈrüÃPÀj¹ F ¥ÀvÀæzÉÆA¢UÉ
®UÀwÛ¹ ªÀÄÄA¢£À PÀæªÀÄPÁÌV ¸À°è¸À¯ÁVzÉ.
PÀÀæª
ÀÄ PÁªÀÄUÁjAiÀÄ ºÉ¸ÀgÀÄ JA.© £ÀA
¸ÀASÉå
Package -1 : 1)Construction of CC Drain for G-block 2£Éà ºÁUÀÆ CAwªÀÄ
Roads at Main Market Yard of APMC Davangere
2)Improvements of G-block Roads at main market yard ©®Äè
1 of ampc davangere. 3)Improvements of A1-Block Road JA.© £ÀA - 02
No 9 at Main Market Yard of AMPC Davangere Under
AAP 2022-23

vÀªÀÄä «±Áé¹,

¸ÀºÁAiÀÄPÀ PÁAiÀÄð¤ªÁðºÀPÀ
C©üAiÀÄAvÀgÀgÀÄ
ªÀiÁgÀÄPÀmÉÖ C©üªÀÈ¢Þ
AiÉÆÃd£É
«±ÉõÀ vÁAwæPÀ G¥À «¨sÁUÀ,
zÁªÀtUÉgÉ.
Name of the Work : Package -1 :
1)Construction of CC Drain for G-block Roads
at Main Market Yard of APMC Davangere
2)Improvements of G-block Roads at main
market yard of ampc davangere.
3)Improvements of A1-Block Road No 9 at
Main Market Yard of AMPC Davangere Under
AAP 2022-23

EMB No. - 02
Name of the Work : Package -1 : 1)Construction of CC
Drain for G-block Roads at Main Market Yard of APMC
Davangere 2)Improvements of G-block Roads at main
market yard of ampc davangere. 3)Improvements of A1-
Block Road No 9 at Main Market Yard of AMPC Davangere
Under AAP 2022-23

This is to Certify that this Measurement Book No.02 Contains


pages [From 01 to 36 pages] This has been counted
by me and found to be correct

Date :

Executive Engineer
MDP, Bangalore Division,
Bangalore.
MEASUREMENT BOOK CUM BILL

Name of the Agency : THIMMARAYI GOWDA


Class1 contractor, Chikkenahalli grama,
Belluru hobali,Nagamangala Tq,
Mandya - Dist

APMC/DVG/2139/2022-23,
Work Order No :
Dated: 19-01-2023

Date of Mark Out : Dated: 19-01-2023

Bill No. : 2nd and Final

Measurement Book
: 2
Number
Page No :
Pre mesurement Continued on :
Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
1 1 Earth work excavation for Foundation by mechanical means for all works & any depth , as per drawing and
technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius and lift including cost of labour, tools, usage of machinery & other appurtenaces required to
complete the work With all lead and lift etc complete as per specification & as per the direction of the engineer
incharge of the work.
CC Drain A1 Block
Drain R/s Cum 1 4.50 1.00 0.90 4.05
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 11.50 1.00 0.90 10.35
Culvert R/s 1 6.10 1.20 1.00 7.32
Drain R/s 1 4.00 1.00 0.90 3.60
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 8.10 1.00 0.90 7.29
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 5.90 1.00 0.90 5.31
Culvert R/s 1 6.00 1.20 1.00 7.20
Drain R/s 1 9.60 1.00 0.90 8.64
Culvert R/s 1 6.05 1.20 1.00 7.26
Drain R/s 1 15.90 1.00 0.90 14.31
At Entrance Culvert R/s 1 11.70 1.20 1.00 14.04
Vegitable Market
Culvert R/s 1 11.50 1.35 1.00 15.53
Drain R/s 1 30.00 1.00 0.90 27.00
1 30.00 1.00 0.90 27.00
1 20.30 1.00 0.90 18.27
Approach Drain 1 2.00 1.00 0.90 1.80
Culvert R/s 1 12.10 1.20 1.00 14.52
Drain R/s 1 30.00 1.00 0.90 27.00
1 21.50 1.00 0.90 19.35
G- Block Cross road L/s 1 4.00 1.00 0.90 3.60
F- Block 4th road Center Culvert 1 15.30 1.20 1.00 18.36
G- Block Road No 5 1 21.20 1.35 1.00 28.62
(chikkanahalli road L/s)
G- Block Road No 5 1 19.35 1.35 1.00 26.12
(chikkanahalli road R/s)
G- Block Road No 6 1 22.35 1.35 1.00 30.17
(chikkanahalli road L/s)
Total 368.49

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
Pre mesurement Continued on :
Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
2 10 Providing and laying in position plain cement concrete for levelling course for all works in foundation. The
granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine
mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead &
lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other
appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement &
formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse
aggregates With all lead and lift etc complete as per specification & as per the direction of the engineer incharge
of the work.
CC Drain A1 Block
Drain R/s Cum 1 4.50 1.00 0.075 0.34
Culvert R/s 1 6.05 1.10 0.075 0.50
Drain R/s 1 11.50 1.00 0.075 0.86
Culvert R/s 1 6.10 1.10 0.075 0.50
Drain R/s 1 4.00 1.00 0.075 0.30
Culvert R/s 1 6.05 1.10 0.075 0.50
Drain R/s 1 8.10 1.00 0.075 0.61
Culvert R/s 1 6.05 1.10 0.075 0.50
Drain R/s 1 5.90 1.00 0.075 0.44
Culvert R/s 1 6.00 1.10 0.075 0.50
Drain R/s 1 9.60 1.00 0.075 0.72
Culvert R/s 1 6.05 1.10 0.075 0.50
Drain R/s 1 15.90 1.00 0.075 1.19
At Entrance Culvert R/s 1 11.70 1.10 0.075 0.97
Vegitable Market
Culvert R/s 1 11.50 1.25 0.075 1.08
Culvert R/s 1 30.00 1.00 0.075 2.25
Drain R/s 1 30.00 1.00 0.075 2.25
1 20.30 1.00 0.075 1.52
Approach Drain 1 2.00 1.00 0.075 0.15
Culvert R/s 1 12.10 1.10 0.075 1.00
Drain R/s 1 30.00 1.00 0.075 2.25
1 21.50 1.00 0.075 1.61
G- Block Cross road L/s 1 4.00 1.00 0.075 0.30
F- Block 4th road Center Culvert 1 15.30 1.10 0.075 1.26
G- Block Road No 5
1 21.20 1.25 0.075 1.99
(chikkanahalli road L/s)
G- Block Road No 5
1 19.35 1.25 0.075 1.81
(chikkanahalli road R/s)
G- Block Road No 6
1 22.35 1.25 0.075 2.10
(chikkanahalli road L/s)
Total 27.99

Contractor Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

Pre mesurement Continued on :


Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
5 12 Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C.
work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent
members whereever necessary complete as per Design including cost of material, labour, usage
charges complete as per specifications. (The laps and wastages shall not be measured separately)With
all lead and lift etc complete as per specification & as per the direction of the engineer incharge of the
work.
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
CC Drain A1 Block
Drain R/s
MB 10mm Dia 34 2.10 71.40 0.62 44.27
DB 8 mm Dia 14 4.50 63.00 0.39 24.57
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
For Bottom Mat DB 10 mm Dia 9 6.05 54.45 0.62 33.76
Top Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
Top Mat DB 10mm Dia 9 6.05 54.45 0.62 33.76
For Chair
For Bottom Chair 10mm Dia 20 0.90 45.00 0.62 27.90
For side Wall
Vertical Bar out side12mm Dia 48 2.55 122.40 0.89 108.94
Vertical Bar in side12mm Dia 2x48 0.85 81.60 0.89 72.62
Horizantal Bar 8mm Dia 2 x 2x7 6.05 169.40 0.39 66.07
Drain R/s
MB 10mm Dia 77 2.10 161.00 0.62 99.82
DB 8 mm Dia 14 11.50 161.00 0.39 62.79
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 49 1.05 51.24 0.89 45.60
For Bottom Mat DB 10 mm Dia 8 6.10 51.24 0.62 31.77
Top Mat MB 12mm Dia 49 1.05 51.24 0.89 45.60
Top Mat DB 10 mm Dia 8 6.10 51.24 0.62 31.77
For Chair
For Bottom Chair 10mm Dia 20 0.90 27.00 0.62 16.74
For side Wall
Vertical Bar out side12mm Dia 48 2.55 122.40 0.89 108.94
Vertical Bar in side12mm Dia 2x48 0.85 81.60 0.89 72.62
Horizantal Bar 10mm Dia 2 x 2x7 6.10 170.80 0.62 105.90
Drain R/s
MB 10mm Dia 27 2.10 56.00 0.62 34.72
DB 8 mm Dia 14 4.00 56.00 0.39 21.84
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
For Bottom Mat DB 10 mm Dia 8 6.05 50.82 0.62 31.51
Top Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
Top Mat DB 10mm Dia 8 6.05 50.82 0.62 31.51
For Chair
For Bottom Chair 10mm Dia 20 0.90 27.00 0.62 16.74
For side Wall
Vertical Bar out side12mm Dia 48 2.55 122.40 0.89 108.94

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


Page No :
MDP Special Tech. Sub Division
Davangere
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
Vertical Bar in side12mm Dia 2x48 0.85 81.60 0.89 72.62
Horizantal Bar 8mm Dia 2 x 2x7 6.05 169.40 0.39 66.07
Drain R/s
MB 10mm Dia 54 2.10 113.40 0.62 70.31
DB 8 mm Dia 14 8.10 113.40 0.39 44.23
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
For Bottom Mat DB 10 mm Dia 8 6.05 50.82 0.62 31.51
Top Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
Top Mat DB 10mm Dia 8 6.05 50.82 0.62 31.51
For Chair
For Bottom Chair 10mm Dia 20 0.90 27.00 0.62 16.74
For side Wall
Vertical Bar out side12mm Dia 48 2.55 122.40 0.89 108.94
Vertical Bar in side12mm Dia 2x48 0.85 81.60 0.89 72.62
Horizantal Bar 8mm Dia 2 x 2x7 6.05 169.40 0.39 66.07
Drain R/s
MB 10mm Dia 39 2.10 82.60 0.62 51.21
DB 8 mm Dia 14 5.90 82.60 0.39 32.21
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 48 1.05 50.40 0.89 44.86
For Bottom Mat DB 10 mm Dia 8 6.00 50.40 0.62 31.25
Top Mat MB 12mm Dia 48 1.05 50.40 0.89 44.86
Top Mat DB 10mm Dia 8 6.00 50.40 0.62 31.25
For Chair
For Bottom Chair 10mm Dia 20 0.90 27.00 0.62 16.74
For side Wall
Vertical Bar out side12mm Dia 48 2.55 122.40 0.89 108.94
Vertical Bar in side12mm Dia 2x48 0.85 81.60 0.89 72.62
Horizantal Bar 8mm Dia 2 x 2x7 6.00 168.00 0.39 65.52
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
For Bottom Mat DB 10 mm Dia 8 6.05 50.82 0.62 31.51
Top Mat MB 12mm Dia 48 1.05 50.82 0.89 45.23
Top Mat DB 10mm Dia 8 6.05 50.82 0.62 31.51
For Chair
For Bottom Chair 10mm Dia 20 0.90 27.00 0.62 16.74
For side Wall
Vertical Bar out side12mm Dia 48 2.55 122.40 0.89 108.94
Vertical Bar in side12mm Dia 2x48 0.85 81.60 0.89 72.62
Horizantal Bar 8mm Dia 2 x 2x7 6.05 169.40 0.39 66.07
Drain R/s
MB 10mm Dia 106 2.10 222.60 0.62 138.01
DB 8 mm Dia 14 15.90 222.60 0.39 86.81
At entrence culvert
For Bottom
For Bottom Mat MB 12mm Dia 94 1.05 98.28 0.89 87.47
For Bottom Mat DB 10 mm Dia 8 11.70 98.28 0.62 60.93
Top Mat MB 12mm Dia 94 1.05 98.28 0.89 87.47
Top Mat DB 10 mm Dia 8 11.70 98.28 0.62 60.93
For Chair
For Bottom Chair 10mm Dia 39 0.90 27.00 0.62 16.74
Page No :

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
For side Wall
Vertical Bar out side12mm Dia 98 2.55 249.90 0.89 222.41
Vertical Bar in side12mm Dia 2x98 0.85 166.60 0.89 148.27
Horizantal Bar 8mm Dia 2 x 2x8 11.70 374.40 0.39 146.02
Vegitable Market
Culvert R/s
For Bottom
For Bottom Mat MB 12mm Dia 92 1.05 96.60 0.89 85.97
For Bottom Mat DB 10 mm Dia 8 11.50 96.60 0.62 59.89
Top Mat MB 12mm Dia 92 1.05 96.60 0.89 85.97
Top Mat DB 10 mm Dia 8 11.50 96.60 0.62 59.89
For Chair
For Bottom Chair 10mm Dia 38 0.90 54.00 0.62 33.48
For side Wall
Vertical Bar out side12mm Dia 88 2.55 224.40 0.89 199.72
Vertical Bar in side12mm Dia 2 x 88 0.85 149.60 0.89 133.14
Horizantal Bar 8mm Dia 2 x 2x 8 11.50 368.00 0.39 143.52
Drain R/s
MB 10mm Dia 535 2.80 1498.93 0.62 929.34
DB 8 mm Dia 19 80.30 1498.93 0.39 584.58
Approach Drain R/s
MB 10mm Dia 13 2.80 37.33 0.62 23.15
DB 8 mm Dia 19 2.00 37.33 0.39 14.56
Culvert R/s
For Bottom
For Bottom Mat MB 12mm Dia 97 1.05 101.64 0.89 90.46
For Bottom Mat DB 10 mm Dia 8 12.10 101.64 0.62 63.02
Top Mat MB 12mm Dia 97 1.05 101.64 0.89 90.46
Top Mat DB 10 mm Dia 8 12.10 101.64 0.62 63.02
For Chair
For Bottom Chair 10mm Dia 40 0.90 54.00 0.62 33.48
For side Wall
Vertical Bar out side12mm Dia 96 2.55 244.80 0.89 217.87
Vertical Bar in side12mm Dia 2 x 96 0.85 163.20 0.89 145.25
Horizantal Bar 8mm Dia 2 x 2x 8 12.10 387.20 0.39 151.01
Drain R/s
MB 10mm Dia 343 2.80 961.33 0.62 596.03
DB 8 mm Dia 22 51.50 1153.60 0.39 449.90
Road No 10 Culvert R/s
For Bottom
For Bottom Mat MB 12mm Dia 126 1.05 132.05 0.89 117.52
For Bottom Mat DB 10 mm Dia 8 15.72 132.05 0.62 81.87
Top Mat MB 12mm Dia 126 1.05 132.05 0.89 117.52
Top Mat DB 10 mm Dia 8 15.72 132.05 0.62 81.87
For Chair
For Bottom Chair 10mm Dia 52 0.90 94.32 0.62 58.48
For side Wall
Vertical Bar out side12mm Dia 126 2.55 320.69 0.89 285.41
Vertical Bar in side12mm Dia 2x120 0.85 213.79 0.89 190.27
Horizantal Bar 8mm Dia 2 x 2x8 15.72 503.04 0.39 196.19
G Block Cross Road Drain L/s
MB 10mm Dia 27 2.10 56.00 0.62 34.72
DB 8 mm Dia 17 4.00 67.20 0.39 26.21

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
F Block 4th road Center Culvert
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 122 1.05 128.52 0.89 114.38
For Bottom Mat DB 10 mm Dia 8 15.30 128.52 0.62 79.68
Top Mat MB 12mm Dia 122 1.05 128.52 0.89 114.38
Top Mat DB 10 mm Dia 8 15.30 128.52 0.62 79.68
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
For Chair
For Bottom Chair 10mm Dia 51 0.90 91.80 0.62 56.92
For side Wall
Vertical Bar out side12mm Dia 112 2.55 285.60 0.89 254.18
Vertical Bar in side12mm Dia 2x112 0.85 190.40 0.89 169.46
Horizantal Bar 8mm Dia 2 x 2x7 15.30 428.40 0.39 167.08
G-Block 5th road Culvert (At Chikkanahalli Road) R/S
Culvert
For Bottom Mat MB 12mm Dia 170 1.05 178.08 0.89 158.49
For Bottom Mat DB 10 mm Dia 8 21.20 178.08 0.62 110.41
Top Mat MB 12mm Dia 170 1.05 178.08 0.89 158.49
Top Mat DB 10 mm Dia 8 21.20 178.08 0.62 110.41
For Chair
For Bottom Chair 10mm Dia 71 0.90 127.20 0.62 78.86
For side Wall
Vertical Bar out side12mm Dia 170 2.55 432.48 0.89 384.91
Vertical Bar in side12mm Dia 2x144 0.85 288.32 0.89 256.60
Horizantal Bar 8mm Dia 2 x 2x8 21.20 678.40 0.39 264.58
G-Block 5th road Culvert (At Chikkanahalli Road) L/S
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 155 1.05 162.54 0.89 144.66
For Bottom Mat DB 10 mm Dia 8 19.35 162.54 0.62 100.77
Top Mat MB 12mm Dia 155 1.05 162.54 0.89 144.66
Top Mat DB 10 mm Dia 8 19.35 162.54 0.62 100.77
For Chair
For Bottom Chair 10mm Dia 65 0.90 116.10 0.62 71.98
For side Wall
Vertical Bar out side12mm Dia 155 2.55 394.74 0.89 351.32
Vertical Bar in side12mm Dia 2x144 0.85 263.16 0.89 234.21
Horizantal Bar 8mm Dia 2 x 2x8 19.35 619.20 0.39 241.49
G-Block 6th road Culvert (At Chikkanahalli Road) L/S
Culvert
For Bottom
For Bottom Mat MB 12mm Dia 179 1.05 187.74 0.89 167.09
For Bottom Mat DB 10 mm Dia 8 22.35 187.74 0.62 116.40
Top Mat MB 12mm Dia 179 1.05 187.74 0.89 167.09
Top Mat DB 10 mm Dia 8 22.35 187.74 0.62 116.40
For Chair
For Bottom Chair 10mm Dia 75 0.90 134.10 0.62 83.14
For side Wall
Vertical Bar out side12mm Dia 179 2.55 455.94 0.89 405.79
Vertical Bar in side12mm Dia 2x144 0.85 303.96 0.89 270.52
Horizantal Bar 8mm Dia 2 x 2x8 22.35 715.20 0.39 278.93
Total up dated Qty Total 12470.44

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

Pre mesurement Continued on :


Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
6 15 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth,
compacting each deposited layer by ramming after watering with a lead and lift Including cost of
alllabourcomplete as per specifications With all lead and lift etc complete as per specification & as per
the direction of the engineer incharge of the work.
CC Drain A1 Block
Drain R/s Cum 1 4.50 0.20 1.00 0.90
Culvert R/s 1 6.05 0.20 1.20 1.45
Drain R/s 1 11.50 0.20 1.00 2.30
Culvert R/s 1 6.10 0.20 1.20 1.46
Drain R/s 1 4.00 0.20 1.00 0.80
Culvert R/s 1 6.05 0.20 1.20 1.45
Drain R/s 1 8.10 0.20 1.00 1.62
Culvert R/s 1 6.05 0.20 1.20 1.45
Drain R/s 1 5.90 0.20 1.00 1.18
Culvert R/s 1 6.00 0.20 1.20 1.44
Drain R/s 1 9.60 0.20 1.00 1.92
Culvert R/s 1 6.05 0.20 1.20 1.45
Drain R/s 1 15.90 0.20 1.00 3.18
At Entrance Culvert R/s 1 11.70 0.20 1.20 2.81
For Approach 1 80.00 4.20 0.30 100.80
Vegitable Market
Culvert R/s 2 11.50 0.20 1.20 5.52
Drain R/s 2 30.00 0.20 1.00 12.00
2 30.00 0.20 1.00 12.00
2 20.30 0.20 1.00 8.12
Approach Drain 2 2.00 0.20 1.00 0.80
Culvert R/s 2 12.10 0.20 1.20 5.81
Drain R/s 2 30.00 0.20 1.00 12.00
2 21.50 0.20 1.00 8.60
G- Block Cross road L/s 1 4.00 0.20 1.00 0.80
F- Block 4th Cross road Center
1 15.30 0.20 1.20 3.67
Culvert
G- Block Road No 5 1 21.20 0.20 1.20 5.09
(chikkanahalli road L/s)
G- Block Road No 5
1 19.35 0.20 1.20 4.64
(chikkanahalli road R/s)
G- Block Road No 6
1 22.35 0.20 1.20 5.36
(chikkanahalli road L/s)
Total 208.64

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

Pre mesurement Continued on :


Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
7 13 Demolishing cement concrete manually/ by mechanical means including disposal of
material to the appropriate disposal area as per direction of Engineer-in-charge

F Block 4th Cross Road Center


Culvert Exesting CC Road Cum 1 7.50 0.30 1.30 2.93

Vegitable Market Entrence


Exesting CC Road 1 11.50 0.30 1.30 4.49

Vegitable Market Center Culvert


1 12.10 0.30 1.30 4.72

Vegitable Market Old Slab 1 130.00 0.15 0.90 17.55

29.68

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

Pre mesurement Continued on :


Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
8 14 Providing and Filling in foundation with granite / trap broken metal 100mm . and
down size & with approved sand including hand packing , ramming , watering ,
including cost of all materials and labourWith all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the work.

G- Block Road No 5 (chikkanahalli


road L/s) For Culvert 1 21.20 0.15 1.25 3.97

G- Block Road No 5 (chikkanahalli


road R/s) For Culvert 1 19.35 0.15 1.20 3.48

G- Block Road No 6 (chikkanahalli


road L/s) For Culvert 1 22.35 0.15 1.25 4.19

11.65

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

Pre mesurement Continued on :


Sl ITEM PARTICULARS UNIT No. L B D/H QUANTITY
No. NO.
1 2 3 4 5 6 7 8
5 12 Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C.
work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent
members whereever necessary complete as per Design including cost of material, labour, usage
charges complete as per specifications. (The laps and wastages shall not be measured separately)With
all lead and lift etc complete as per specification & as per the direction of the engineer incharge of the
work.
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
A1 Block Drain R/s
Culvert Slab
For Bottom Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Bottom Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Top Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Top Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Chair 10mm Dia 1 20 1.30 26.22 0.62 16.25
Culvert Slab
For Bottom Mat MB 16mm Dia 1 61 1.30 79.30 1.58 125.29
For Bottom Mat DB 10mm Dia 2 10 6.10 126.88 0.62 78.67
For Top Mat MB 16mm Dia 1 61 1.30 79.30 1.58 125.29
For Top Mat DB 10mm Dia 2 10 6.10 126.88 0.62 78.67
For Chair 10mm Dia 1 20 1.30 26.43 0.62 16.39
Culvert Slab
For Bottom Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Bottom Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Top Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Top Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Chair 10mm Dia 1 20 1.30 26.22 0.62 16.25
Culvert Slab
For Bottom Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Bottom Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Top Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Top Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Chair 10mm Dia 1 20 1.30 26.22 0.62 16.25
Culvert Slab
For Bottom Mat MB 16mm Dia 1 60 1.30 78.00 1.58 123.24
For Bottom Mat DB 10mm Dia 2 10 6.00 124.80 0.62 77.38
For Top Mat MB 16mm Dia 1 60 1.30 78.00 1.58 123.24
For Top Mat DB 10mm Dia 2 10 6.00 124.80 0.62 77.38
For Chair 10mm Dia 1 20 1.30 26.00 0.62 16.12

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
Culvert Slab
For Bottom Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Bottom Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Top Mat MB 16mm Dia 1 60 1.30 78.65 1.58 124.27
For Top Mat DB 10mm Dia 2 10 6.05 125.84 0.62 78.02
For Chair 10mm Dia 1 20 1.30 26.22 0.62 16.25
At entrence culvert
For Bottom Mat MB 16mm Dia 1 117 1.30 152.10 1.58 240.32
For Bottom Mat DB 10mm Dia 2 10 11.70 243.36 0.62 150.88
For Top Mat MB 16mm Dia 1 117 1.30 152.10 1.58 240.32
For Top Mat DB 10mm Dia 2 10 11.70 243.36 0.62 150.88
For Chair 10mm Dia 1 49 1.30 63.38 0.62 39.29
Vegitable Market
Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 115 1.30 149.50 1.58 236.21
For Bottom Mat DB 10mm Dia 2 10 11.50 239.20 0.62 148.30
For Top Mat MB 16mm Dia 1 115 1.30 149.50 1.58 236.21
For Top Mat DB 10mm Dia 2 10 11.50 239.20 0.62 148.30
For Chair 10mm Dia 1 38 1.30 49.83 0.62 30.90
R/s Drain Slab
For Mat MB 12mm Dia 1 642 0.90 578.16 0.89 514.56
For Mat DB 10mm Dia 2 7 80.30 1156.32 0.62 716.92
Approach Drain R/s
For Top Slab
For Mat MB 12mm Dia 1 16 0.90 14.40 0.89 12.82
For Mat DB 10mm Dia 2 7 2.00 28.80 0.62 17.86
Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 121 1.30 157.30 1.58 248.53
For Bottom Mat DB 10mm Dia 2 10 12.10 251.68 0.62 156.04
For Top Mat MB 16mm Dia 1 121 1.30 157.30 1.58 248.53
For Top Mat DB 10mm Dia 2 10 12.10 251.68 0.62 156.04
For Chair 10mm Dia 1 40 1.30 52.43 0.62 32.51
Drain Top Slab R/s
For Mat MB 12mm Dia 1 412 0.90 370.80 0.89 330.01
For Mat DB 10mm Dia 2 7 51.50 741.60 0.62 459.79
Road No 10 Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 157 1.30 204.36 1.58 322.89
For Bottom Mat DB 10mm Dia 2 10 15.72 326.98 0.62 202.73
For Top Mat MB 16mm Dia 1 157 1.30 204.36 1.58 322.89
For Top Mat DB 10mm Dia 2 10 15.72 326.98 0.62 202.73
F Block 4th road Center Culvert Slab
For Bottom Mat MB 16mm Dia 1 153 1.30 198.90 1.58 314.26
For Bottom Mat DB 10mm Dia 2 10 15.30 318.24 0.62 197.31
For Top Mat MB 16mm Dia 1 153 1.30 198.90 1.58 314.26
For Top Mat DB 10mm Dia 2 10 15.30 318.24 0.62 197.31
For Chair 10mm Dia 1 51 1.30 66.30 0.62 41.11
Road No 11, Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 176 2.60 457.60 1.58 723.01
For Bottom Mat DB 10mm Dia 1 21 17.60 366.08 0.62 226.97
For Top Mat MB 16mm Dia 1 176 2.60 457.60 1.58 723.01
For Top Mat DB 10mm Dia 1 21 17.60 366.08 0.62 226.97
For Chair 10mm Dia 1 59 2.60 152.53 0.62 94.57

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
Parapet Wall
U Bars 12mm Dia 2 27 1.50 80.00 0.89 71.20
DB 10 mm Dia 2 12 2.00 48.00 0.62 29.76
For Haunch Bars 12mm Dia 2 141 0.90 253.80 0.89 225.88
Road No 11, Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 168 2.60 435.50 1.58 688.09
For Bottom Mat DB 10mm Dia 1 21 16.75 348.40 0.62 216.01
For Top Mat MB 16mm Dia 1 168 2.60 435.50 1.58 688.09
For Top Mat DB 10mm Dia 1 21 16.75 348.40 0.62 216.01
For Chair 10mm Dia 1 56 2.60 145.17 0.62 90.00
Parapet Wall
U Bars 12mm Dia 2 27 1.50 80.00 0.89 71.20
DB 10 mm Dia 2 12 2.00 48.00 0.62 29.76
For Haunch Bars 12mm Dia 2 168 0.90 301.50 0.89 268.34
Road No 11, Culvert Slab L/s
For Bottom Mat MB 16mm Dia 1 122 1.45 176.17 1.58 278.36
For Bottom Mat DB 10mm Dia 1 12 12.15 140.94 0.62 87.38
For Top Mat MB 16mm Dia 1 122 1.45 176.17 1.58 278.36
For Top Mat DB 10mm Dia 1 12 12.15 140.94 0.62 87.38
For Chair 10mm Dia 1 41 1.45 58.73 0.62 36.41
Parapet Wall
U Bars 12mm Dia 2 17 1.50 50.00 0.89 44.50
DB 10 mm Dia 2 12 1.25 30.00 0.62 18.60
Road No 11, Culvert Slab L/s
For Slab
For Bottom Mat MB 16mm Dia 1 147 1.45 212.42 1.58 335.63
For Bottom Mat DB 10mm Dia 1 14 14.65 212.42 0.62 131.70
For Top Mat MB 16mm Dia 1 147 1.45 212.42 1.58 335.63
For Top Mat DB 10mm Dia 1 14 14.65 212.42 0.62 131.70
For Chair 10mm Dia 1 49 1.45 70.81 0.62 43.90
Parapet Wall
U Bars 12mm Dia 2 17 1.50 50.00 0.89 44.50
DB 10 mm Dia 2 12 1.25 30.00 0.62 18.60
Road No 11, Culvert Slab L/s
For Slab
For Bottom Mat MB 16mm Dia 1 184 1.45 266.80 1.58 421.54
For Bottom Mat DB 10mm Dia 1 14 18.40 266.80 0.62 165.42
For Top Mat MB 16mm Dia 1 184 1.45 266.80 1.58 421.54
For Top Mat DB 10mm Dia 1 14 18.40 266.80 0.62 165.42
For Chair 10mm Dia 1 61 1.45 88.93 0.62 55.14
Parapet Wall
U Bars 12mm Dia 2 21 1.50 64.00 0.89 56.96
DB 10 mm Dia 2 12 1.60 38.40 0.62 23.81
G Block Cross Road Culvert Slab L/s
For Bottom Mat MB 16mm Dia 1 126 1.30 163.15 1.58 257.78
For Bottom Mat DB 10mm Dia 1 13 12.55 163.15 0.62 101.15
For Top Mat MB 16mm Dia 1 126 1.30 163.15 1.58 257.78
For Top Mat DB 10mm Dia 1 13 12.55 163.15 0.62 101.15
For Chair 10mm Dia 1 42 1.30 54.38 0.62 33.72
Road No 10 Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 181 1.30 235.95 1.58 372.80
For Bottom Mat DB 10mm Dia 1 13 18.15 235.95 0.62 146.29
For Top Mat MB 16mm Dia 1 181 1.30 235.95 1.58 372.80
For Top Mat DB 10mm Dia 1 13 18.15 235.95 0.62 146.29
For Chair 10mm Dia 1 61 1.30 78.65 0.62 48.76

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


Page No :
MDP Special Tech. Sub Division
Davangere
No of Rods Length Total Co-eff/ unit Total wt in kg
weight
Parapet Wall
U Bars 10mm Dia 2 15 1.50 44.00 0.62 27.28
DB 8 mm Dia 2 12 1.10 26.40 0.39 10.30
Road No 10 Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 157 1.30 204.36 1.58 322.89
For Bottom Mat DB 10mm Dia 1 13 15.72 204.36 0.62 126.70
For Top Mat MB 16mm Dia 1 157 1.30 204.36 1.58 322.89
For Top Mat DB 10mm Dia 1 13 15.72 204.36 0.62 126.70
For Chair 10mm Dia 1 52 1.30 68.12 0.62 42.23
Parapet Wall
U Bars 10mm Dia 2 15 1.50 44.00 0.62 27.28
DB 8 mm Dia 2 12 1.10 26.40 0.39 10.30
G-1 Block Road Culvert Slab R/s
For Bottom Mat MB 16mm Dia 1 132 1.30 171.60 1.58 271.13
For Bottom Mat DB 10mm Dia 1 13 13.20 171.60 0.62 106.39
For Top Mat MB 16mm Dia 1 132 1.30 171.60 1.58 271.13
For Top Mat DB 10mm Dia 1 13 13.20 171.60 0.62 106.39
For Chair 10mm Dia 1 44 1.30 57.20 0.62 35.46
Parapet Wall
U Bars 10mm Dia 2 15 1.50 44.00 0.62 27.28
DB 8 mm Dia 2 12 1.10 26.40 0.39 10.30
Road No 5 End Culvert Slab
For Bottom Mat MB 16mm Dia 1 105 1.30 136.50 1.58 215.67
For Bottom Mat DB 10mm Dia 1 13 10.50 136.50 0.62 84.63
For Top Mat MB 16mm Dia 1 105 1.30 136.50 1.58 215.67
For Top Mat DB 10mm Dia 1 13 10.50 136.50 0.62 84.63
For Chair 10mm Dia 1 35 1.30 45.50 0.62 28.21
2000MT Godown Cross road Culvert Slab L/s
For Bottom Mat MB 16mm Dia 1 98 1.30 128.05 1.58 202.32
For Bottom Mat DB 10mm Dia 1 13 9.85 128.05 0.62 79.39
For Top Mat MB 16mm Dia 1 98 1.30 128.05 1.58 202.32
For Top Mat DB 10mm Dia 1 13 9.85 128.05 0.62 79.39
For Chair 10mm Dia 1 33 1.30 42.68 0.62 26.46
G-Block 5th road Culvert Slab(At Chikkanahalli Road) R/S
For Bottom Mat MB 16mm Dia 1 212 1.30 275.60 1.58 435.45
For Bottom Mat DB 10mm Dia 2 13 21.20 551.20 0.62 341.74
For Top Mat MB 16mm Dia 1 212 1.30 275.60 1.58 435.45
For Top Mat DB 10mm Dia 2 13 21.20 551.20 0.62 341.74
G-Block 5th road Culvert Slab (At Chikkanahalli Road) L/S
For Bottom Mat MB 16mm Dia 1 194 1.30 251.55 1.58 397.45
For Bottom Mat DB 10mm Dia 2 10 19.35 402.48 0.62 249.54
For Top Mat MB 16mm Dia 1 194 1.30 251.55 1.58 397.45
For Top Mat DB 10mm Dia 2 10 19.35 402.48 0.62 249.54
G-Block 6th road Culvert Slab (At Chikkanahalli Road)L/S
For Bottom Mat MB 16mm Dia 1 224 1.30 290.55 1.58 459.07
For Bottom Mat DB 10mm Dia 2 10 22.35 464.88 0.62 288.23
For Top Mat MB 16mm Dia 1 224 1.30 290.55 1.58 459.07
For Top Mat DB 10mm Dia 2 10 22.35 464.88 0.62 288.23
Total up dated Qty Total 24067.70

Contractor PMC Assistant Engineer 2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No:

PRE MEASUREMENTS
Name of the Work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC
Davangere 2)Improvements of G-block Roads at main market yard of ampc davangere. 3)Improvements of
A1-Block Road No 9 at Main Market Yard of AMPC Davangere Under AAP 2022-23

Authority : Vide SER No: 100,101& 104/2022-23, D: 28-10-2022,


Work Order No : APMC/DVG/2139/2022-23, Dated: 19-01-2023
Date of Mark Out:- 19-01-2023
Accepted tender Amount : Rs.49907301.11 TP = (+) 4.38 % As Per 2020-21 CSR
Name of the Agency: Thimmarayi gowda,Class1 contractor, Chikkenahalli grama,Belluru hobali,
Nagamangala Tq, Mandya - Dist
Stipulated date for Completion of the work : (165 Days)

OGL Sheet
AVG Ground Level Length in Width in
Sl.No. Chainage Ground Level in m in m m m
L C R
A1 Block Road No 9 MMY
From CH 160.00 m to 202.50 m

1 160.00 101.455 101.603 101.450 101.503 0.00 13.00

2 190.00 101.500 101.678 101.555 101.578 30.00 13.00

3 202.00 101.650 101.798 101.645 101.698 12.00 13.00

G Block Cross Road From CH 0.00 m to 45.00 m

1 0.00 100.370 100.515 100.360 100.415 0.00 13.00

2 30.00 100.375 100.520 100.365 100.420 30.00 13.00

3 15.00 100.380 100.525 100.365 100.423 15.00 13.00

Contractor PMC Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Page No :

Pre mesurement Continued on :


Loosening , leveling and Compacting original ground supporting embankment to facilitate placement of
first layer of embankment , scarified to a depth , mixed with water at OMC and then compacted by
rolling so as to achieve minimum dry density as given in Table 300-2 for embankment
5 2 construction .With all lead and lift etc complete as per specification & as per the direction of the
engineer incharge of the work.

Road No 4 Extention From CH 0.00 m to 37.50 m


0.00 to 30.00 1 30.00 (14.00+14.00)/2 0.100 42.00
30 .00 to 37.50 1 7.50 (14.00+14.00)/2 0.100 10.50
Betn Road No 3 to 4 (Cross road) From CH 0.00 m to 73.50 m
0.00 to 30.00 1 30.00 (13.20+13.20)/2 0.100 39.60
30 .00 to 60.00 1 30.00 (13.20+13.20)/2 0.100 39.60
60.00 to 70.00 1 10.00 (13.20+13.20)/2 0.100 13.20
70.00 to 73.50 1 3.50 (13.20+13.20)/2 0.100 4.62
Road No 11 From CH 0.00 m to 137.00 m
0.00 to 30.00 1 30.00 (10.85+11.60)/2 0.100 33.68
30 .00 to 60.00 1 30.00 (11.60+12.20)/2 0.100 35.70
60.00 to 90.00 1 30.00 (12.20+12.60)/2 0.100 37.20
90.00 to 120.00 1 30.00 (12.60+13.20)/2 0.100 38.70
120.00 to 137.00 1 17.00 (13.20+13.60)/2 0.100 22.78
A1 Block Road No 9 MMY
From CH 0.00 m to 202.50 m
0.00 to 30.00 1 30.00 (12.50+11.20)/2 0.100 35.55
30 .00 to 60.00 1 30.00 (11.20+10.20)/2 0.100 32.10
60.00 to 90.00 1 30.00 (10.20+09.20)/2 0.100 29.10
90.00 to 105.00 1 15.00 (13.50+13.70)/2 0.100 20.40
105.00 to 120.00 1 15.00 (13.70+13.40)/2 0.100 20.33
120.00 to 150.00 1 30.00 (13.40+12.20)/2 0.100 38.40
150.00 to 160.00 1 10.00 (12.20+12.20)/2 0.100 12.20
160.00 to 190.00 1 30.00 (12.20+12.20)/2 0.100 36.60
190.00 to 202.50 1 12.50 (12.20+14.40)/2 0.100 16.63
G Block Cross Road From CH 0.00 m to 45.00 m
0 .00 to 30.00 1 30.00 (10.00+10.00)/2 0.100 30.00
30.00 to 45.00 1 15.00 (10.00+10.00)/2 0.100 15.00
Vegitable Market Parking area 1 10.50 (9.0+8.3)/2 0.100 9.08
1 10.00 (18.6+10.1)/2 0.100 14.35
1 10.00 (10.1+6.2)/2 0.100 8.15
1 10.00 (6.2+3.3)/2 0.100 4.75
Vegitable Market Toilet area (7.8+8.6+9.2+7.5+6
1 30.50
)/5 0.100
23.85
1 16.50 2.30 0.100 3.80
1 16.50 6.30 0.100 5.20
Deduction
Cistran -1 1.80 1.80 0.100 -0.32
Toilet -1 5.30 1.80 0.100 -0.95
Deduction Chambers -28 0.60 0.60 0.075 -0.76
Total 671.77
Deduct Privious Paid Qty Above Roads Vide I No 2, E-MB 1,Page No.25 526.11
Total 145.66

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Page No :
Davangere
Page No :

Pre mesurement Continued on :


Earth work excavation for Foundation by mechanical means for all works & any depth , as per drawing and technical
specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated
surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius and
1 1 lift including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work With all
lead and lift etc complete as per specification & as per the direction of the engineer incharge of the work.

Earth work excavation Calcualtion Report


AVG
AVG OGL AVG
Sl.No. Chainage Excavation Level Excavation Depth in m Width in m Sec Area AVG Area Length in
Level Valume In
in m Level in Sqm In sqm m
in m Cum
in m
L C R

Road No 4 Extention From CH 0.00 m to 37.50 m

1 0.00 99.595 98.695 98.695 98.695 98.695 0.900 14.00 12.60 0.00 0.00 0.00

2 30.00 99.400 98.500 98.500 98.500 98.500 0.900 14.00 12.60 12.60 30.00 378.00

3 37.50 99.250 98.350 98.350 98.350 98.350 0.900 14.00 12.60 12.60 7.50 94.50

Betn Road No 3 to 4 (Cross road) From CH 0.00 m to 73.50 m

1 0.00 99.310 98.410 98.405 98.410 98.408 0.902 13.20 11.90 0.00 0.00 0.00

2 30.00 100.110 99.215 99.205 99.215 99.212 0.898 13.20 11.86 11.88 30.00 356.40

3 60.00 100.910 100.020 100.005 100.020 100.015 0.895 13.20 11.81 11.84 30.00 355.08

4 73.50 101.300 100.400 100.390 100.400 100.397 0.903 13.20 11.92 11.87 13.50 160.23

Road No 11 From CH 0.00 m to 137.00 m

1 0.00 99.765 98.870 98.860 98.870 98.867 0.898 11.23 10.08 0.00 0.00 0.00

2 30.00 99.445 98.545 98.540 98.545 98.543 0.902 11.23 10.12 10.10 30.00 303.07

3 60.00 99.125 98.230 98.220 98.230 98.227 0.898 11.90 10.69 10.41 30.00 312.17

4 90.00 98.805 97.910 97.900 97.910 97.907 0.898 12.40 11.14 10.91 30.00 327.44

5 120.00 98.485 97.585 97.575 97.585 97.582 0.903 12.90 11.65 11.40 30.00 341.89

6 137.00 98.285 97.390 97.380 97.390 97.387 0.898 13.40 12.04 11.85 17.00 201.37
A1 Block Road No 9 MMY
From CH 0.00 m to 202.50 m
1 0.00 99.900 99.005 98.985 99.005 98.998 0.902 11.85 11.85 0.00 0.00 0.00

2 30.00 100.180 99.285 99.270 99.285 99.280 0.900 10.70 10.70 11.27 30.00 338.25

3 60.00 100.460 99.610 99.565 99.610 99.595 0.865 9.70 9.70 10.20 30.00 306.00

4 90.00 100.740 99.845 99.825 99.845 99.838 0.902 13.60 13.60 11.65 30.00 349.50

5 120.00 101.020 100.125 100.110 100.125 100.120 0.900 13.55 13.55 13.58 30.00 407.25

6 150.00 101.300 100.405 100.395 100.405 100.402 0.898 12.80 12.80 13.18 30.00 395.25

7 160.00 101.400 100.505 100.490 100.505 100.500 0.900 12.20 12.20 12.50 10.00 125.00

8 190.00 101.578 100.586 100.764 100.641 100.664 0.914 12.20 12.20 12.20 30.00 366.00

9 202.50 101.698 100.760 100.908 100.755 100.808 0.890 13.30 13.30 12.75 12.00 153.00

Contractor PMC Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Page No :

AVG
AVG OGL AVG
Sl.No. Chainage Excavation Level Excavation Depth in m Width in m Sec Area AVG Area Length in
Level Valume In
in m Level in Sqm In sqm m
in m Cum
in m
L C R
Davanagere
Page No :

AVG
AVG OGL AVG
Sl.No. Chainage Excavation Level Excavation Depth in m Width in m Sec Area AVG Area Length in
Level Valume In
in m Level in Sqm In sqm m
in m Cum
in m
L C R
G Block Cross Road From CH 0.00 m to 45.00 m
1 0.00 100.415 99.461 99.606 99.451 99.506 0.909 10.00 10.00 11.65 12.00 139.80

2 30.00 100.420 99.475 99.620 99.465 99.520 0.900 10.00 10.00 10.00 12.00 120.00

3 15.00 100.423 99.472 99.617 99.457 99.515 0.908 10.00 10.00 10.00 12.00 120.00

Road No 11 For Main Drain Portion to Nala Cum 1 9.80 2.50 1.50 36.75
1 10.10 1.50 1.20 18.18
Road No 11 L/s Drain 1 9.90 1.00 1.00 9.90
Vegitable Market Parking area
1 10.50 (9.0+8.3)/2 0.15 13.62

1 10.00 (18.6+10.1) 0.15 21.53


/2
1 10.00 (10.1+6.2)/2 0.15 12.23

1 10.00 (6.2+3.3)/2 0.15 7.13


Vegitable Market Toilet area
(7.8+8.6+9.2
1 30.50 +7.5+6)/5 0.15 35.78

1 16.50 2.30 0.15 5.69

1 16.50 6.30 0.15 7.80


Deduction

Cistran -1 1.80 1.80 0.15 -0.49


Toilet -1 5.30 1.80 0.15 -1.43
Cum 5816.88
Deduct Privious Paid Qty Above Roads Vide I No 1, E-MB 1,Page No.25 4890.31
Total 926.57

Contractor PMC Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Page No :

Pre mesurement Continued on :


Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow
pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and
compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water, all
3 3 materials, usage& all other appurtenaces required to complete the work.With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the work.

Embankment Calcualtion Report


AVG AVG
Excavation Embankment Level Embankm Depth in AVG Sec Area AVG Length AVG
Sl.No. Chainage Width in m Width in Area In Valume In
Level in m ent Level m in Sqm in m
in m in m m sqm Cum

L C R
Road No 4 Extention From CH 0.00 m to 37.50 m

1 0.00 98.695 99.445 99.450 99.445 99.447 0.752 (14.00+14.00)/2 14.00 10.52 0.00 0.00 0.00

2 30.00 98.500 99.250 99.245 99.250 99.248 0.748 (14.00+14.00)/2 14.00 10.48 10.50 30.00 315.00

3 37.50 98.350 99.100 99.105 99.100 99.102 0.752 (14.00+14.00)/2 14.00 10.52 10.51 7.50 78.81

Btn Road No 3 to 4 (Cross road) From CH 0.00 m to 73.50 m

1 0.00 98.408 99.160 99.155 99.160 99.158 0.750 (13.20+13.20)/2 13.20 9.90 0.00 0.00 0.00

2 30.00 99.212 99.965 99.950 99.965 99.960 0.748 (13.20+13.20)/2 13.20 9.88 9.89 30.00 296.67

3 60.00 100.015 100.770 100.765 100.770 100.768 0.753 (13.20+12.20)/2 13.20 9.94 9.91 30.00 297.22

4 73.50 100.397 101.150 101.145 101.150 101.148 0.752 (12.20+11.10)/2 13.20 9.92 9.91 13.50 133.85

Road No 11 From CH 0.00 m to 137.00 m

1 0.00 98.867 99.620 99.605 99.620 99.615 0.748 10.85 11.50 8.12 0.00 0.00 0.00

2 30.00 98.543 99.295 99.295 99.295 99.295 0.752 (10.85+11.60)/2 11.23 8.44 8.28 30.00 248.35

3 60.00 98.227 98.980 98.975 98.980 98.978 0.752 (11.60+12.20)/2 11.90 8.94 8.50 30.00 255.02

4 90.00 97.907 98.660 98.650 98.660 98.657 0.750 (12.20+12.60)/2 12.40 9.30 8.89 30.00 266.82

5 120.00 97.582 98.335 98.325 98.335 98.332 0.750 (12.60+13.20)/2 12.90 9.67 9.31 30.00 279.20

6 137.00 97.387 98.140 98.135 98.140 98.138 0.752 (13.20+13.60)/2 13.40 10.07 9.29 17.00 157.86

A1 Block Road No 9 MMY From CH 0.00 m to 202.50 m


1 0.00 98.998 99.755 99.745 99.755 99.752 0.753 11.85 11.85 8.93 0.00 0.00 0.00

2 30.00 99.280 100.035 100.015 100.035 100.028 0.748 10.70 10.70 8.01 8.47 30.00 254.01

3 60.00 99.595 100.360 100.325 100.360 100.348 0.753 9.70 9.70 7.31 8.08 30.00 242.41

4 90.00 99.838 100.595 100.575 100.595 100.588 0.750 13.60 13.60 10.20 8.50 30.00 255.14

5 120.00 100.120 100.875 100.855 100.875 100.868 0.748 13.55 13.55 10.14 9.22 30.00 276.47

6 150.00 100.402 101.155 101.155 101.155 101.155 0.753 12.80 12.80 9.64 9.99 30.00 299.83

7 160.00 100.500 101.255 101.235 101.255 101.248 0.748 12.20 12.20 9.13 9.07 10.00 90.71
8 190.00 100.664 101.346 101.524 101.401 101.424 0.760 12.20 12.20 9.27 9.27 30.00 278.16
9 202.50 100.808 101.505 101.653 101.500 101.553 0.745 13.30 13.30 9.91 9.59 12.50 119.88

G Block Cross Road From CH 0.00 m to 45.00 m

1 0.00 99.506 99.911 100.056 99.901 99.956 0.450 10.00 10.00 4.50 0.00 0.00 0.00

2 30.00 99.520 99.925 100.070 99.915 99.970 0.450 10.00 10.00 4.50 4.50 30.00 135.00

3 45.00 99.515 99.922 100.067 99.907 99.965 0.450 10.00 10.00 4.50 4.50 15.00 67.50
Cum 4347.92
Deduct Privious Paid Qty Above Roads Vide I No 3, E-MB 1,Page No.25 Cum 4044.60
Total 303.32

Contractor PMC Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Page No :

Pre mesurement Continued on :


Construction of granular sub-base using crusher run spreading in uniform layers with motor
grader on prepared surface mixing by mix in place method with rotovator at OMC and
compacting with vibratory roller to achieve the desired density, complete per clause 401. With all
4 4 lead and lift etc complete as per specification & as per the direction of the engineer incharge of
the work.

Road No 4 Extention From CH 0.00 m to 37.50 m


0.00 to 30.00 1 30.00 (14.00+14.00)/2 0.15 63.00
30 .00 to 37.50 1 7.50 (14.00+14.00)/2 0.15 15.75
Betn Road No 3 to 4 (Cross road) From CH 0.00 m to 73.50 m
0.00 to 30.00 1 30.00 (13.20+13.20)/2 0.15 59.40
30.00 to 60.00 1 30.00 (13.20+13.20)/2 0.15 59.40
60.00 to 70.00 1 10.00 (13.20+13.20)/2 0.15 19.80
70.00 to 73.50 1 3.50 (13.20+13.20)/2 0.15 6.93
A1 Block Road No 9 MMY
From CH 0.00 m to 202.50 m
0.00 to 30.00 1 30.00 (12.50+11.20)/2 0.15 53.32
30 .00 to 60.00 1 30.00 (11.20+10.20)/2 0.15 48.15
60.00 to 90.00 1 30.00 (10.20+09.20)/2 0.15 43.65
90.00 to 105.00 1 15.00 (13.50+13.70)/2 0.15 30.60
105.00 to 120.00 1 15.00 (13.70+13.40)/2 0.15 30.49
120.00 to 150.00 1 30.00 (13.40+12.20)/2 0.15 57.60
150.00 to 160.00 1 10.00 (12.20+12.20)/2 0.15 18.30
160.00 to 190.00 1 30.00 (12.20+12.20)/2 0.15 54.90
190.00 to 202.50 1 12.00 (12.20+14.40)/2 0.15 23.94
A1 Block R/s Culvert Approaches
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.15 1.35
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.15 1.35
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.15 1.35
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.15 1.35
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.15 1.35
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.15 1.35
Culvert Slab 2 10.00 (0.5 x 1.50)=0.75 0.15 2.25
At Entrence Culvert Slab 2 12.20 (0.5 x 2.50)=1.25 0.15 4.57
Road No 11 From CH 0.00 m to 137.00 m
0.00 to 30.00 1 30.00 (10.85+11.60)/2 0.15 50.51
30 .00 to 60.00 1 30.00 (11.60+12.20)/2 0.15 53.55
60.00 to 90.00 1 30.00 (12.20+12.60)/2 0.15 55.80
90.00 to 120.00 1 30.00 (12.60+13.20)/2 0.15 58.05
120.00 to 137.00 1 17.00 (13.20+13.60)/2 0.15 34.17
G1 Block Cross Road , From CH 0.00 m to 45.00 m
0.00 to 30.00 1 30.00 (10.00+10.00)/2 0.15 45.00
30.00 to 45.00 1 15.00 (10.00+10.00)/2 0.15 22.50

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

Culvert Approachs
Road No 11 Culvert Slab 1 12.80 (0.5 x 7.00)=3.50 0.15
6.72
Road No 11, R/s Culvert Slab 2 17.90 (0.5 x 3.00)=1.50 0.15
8.06
2 16.60 (0.5 x 3.00)=1.50 0.15
7.47
Road No 11, L/s Culvert Slab 1 12.10 (0.5 x 4.00)=2.00 0.15
3.63
1 12.10 (0.5 x 2.00)=1.00 0.15
1.82
2 15.20 (0.5 x 2.00)=1.00 0.15
4.56
2 18.90 (0.5 x 3.50)=1.75 0.15
9.92
G Block Cross Road Culvert Slab 2 12.80 (0.5 x 2.00)=1.00 0.15
3.84
Road No 10 R/s Culvert Slab 2 19.50 (0.5 x 2.00)=1.00 0.15
5.85
2 15.90 (0.5 x 3.00)=1.50 0.15
7.15
G-1 Block Center Culvert Slab 2 13.20 (0.5 x 2.00)=1.00 0.15
3.96
2000MT Godown Cross road
R/s 2 10.00 (0.5 x 2.00)=1.00 0.15
Culvert Center Slab 3.00
2 9.00 (0.5 x 2.00)=1.00 0.15
2.70
Vegitable Market Parking area 1 10.50 (9+8.3)/2 0.15 13.62
1 10.00 (18.6+10.1)/2 0.15 21.53
1 10.00 (10.1+6.2)/2 0.15 12.23
1 10.00 (6.2+3.3)/2 0.15 7.13
Vegitable Market Toilet area (7.8+8.6+9.2+7.5+
1 30.50 6)/5 0.15 35.78
1 16.50 2.30 0.15 5.69
1 16.50 6.30 0.15 7.80
Deduction
Cistran -1 1.80 1.80 0.15 -0.49
Toilet -1 5.30 1.80 0.15 -1.43
Cum 1090.26
Deduct Privious Paid Qty Above Roads Vide I No 1, E-MB 1,Page No.25 533.85
Total 556.41

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

Pre mesurement Continued on :


Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone
screening/binding materials to fill- up the interstices of coarse aggregate, watering and compacting
to the required density grading 2 as per Technical Specification Clause 405. Grading-I 63 mm to 45
5 5 mm a.Using Screening Crushable type such as Moorum or Gravel With all lead and lift etc complete
as per specification & as per the direction of the engineer incharge of the work.

G- Block Roads
Privious Paid Qty Vide I No 5, E-MB 1,Page No.26 Cum 1045.84
Chainage Nos L B D Qty

Road No 4 Extention From CH 0.00 m to 37.50 m


0.00 to 30.00 1 30.00 (13.50+13.50)/2 0.075 30.38
30 .00 to 37.50 1 7.50 (13.50+13.50)/2 0.075 7.59
Betn Road No 3 to 4 (Cross road) From CH 0.00 m to 73.50 m
0.00 to 30.00 1 30.00 (13.20+13.20)/2 0.075 29.70
30 .00 to 60.00 1 30.00 (13.20+13.20)/2 0.075 29.70
60.00 to 70.00 1 10.00 (13.20+13.20)/2 0.075 9.90
70.00 to 73.50 1 3.50 (13.20+13.20)/2 0.075 3.46
2000 MT Godown Cross Road From CH 0.00 m to 49.00 m
0.00 to 30.00 1 30.00 (11.10+11.70)/2 0.075 25.65
30 .00 to 49.00 1 19.00 (11.70+12.30)/2 0.075 17.10
2000 MT Godown front Road No 4 From CH 0.00 m to 93.50 m
0.00 to 30.00 1 30.00 (8.00+8.00)/2 0.075 18.00
30 .00 to 60.00 1 30.00 (8.00+8.00)/2 0.075 18.00
60.00 to 90.00 1 30.00 (8.00+8.00)/2 0.075 18.00
90.00 to 93.50 1 3.50 (8.00+8.00)/2 0.075 2.10
Road No 11 From CH 0.00 m to 137.00 m
0.00 to 30.00 1 30.00 (10.85+11.60)/2 0.075 25.26
30 .00 to 60.00 1 30.00 (11.60+12.20)/2 0.075 26.77
60.00 to 90.00 1 30.00 (12.20+12.60)/2 0.075 27.90
90.00 to 120.00 1 30.00 (12.60+13.20)/2 0.075 29.02
120.00 to 137.00 1 17.00 (13.20+13.60)/2 0.075 17.08

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :

A1 Block Road No 9 MMY From CH 0.00 m to 202.50 m


0.00 to 30.00 1 30.00 (12.50+11.20)/2 0.075 27.00
30 .00 to 60.00 1 30.00 (11.20+10.20)/2 0.075 27.00
60.00 to 90.00 1 30.00 (10.20+09.20)/2 0.075 27.00
90.00 to 105.00 1 15.00 (13.50+13.70)/2 0.075 14.06
105.00 to 120.00 1 15.00 (13.70+13.40)/2 0.075 14.63
120.00 to 150.00 1 30.00 (13.40+12.20)/2 0.075 29.25
150.00 to 160.00 1 10.00 (12.20+12.20)/2 0.075 9.75
160.00 to 190.00 1 30.00 (12.20+12.20)/2 0.075 27.45
190.00 to 202.50 1 12.00 (12.20+14.40)/2 0.075 11.97
G Block Cross Road , From CH 0.00 m to 45.00 m
0.00 to 30.00 1 30.00 (10.00+10.00)/2 0.075 22.50
30.00 to 45.00 1 15.00 (10.00+10.00)/2 0.075 11.25
A1 Block R/s Culvert Approaches
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.075 0.67
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.075 0.67
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.075 0.67
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.075 0.67
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.075 0.67
Culvert Slab 2 6.00 (0.5 x 1.50)=0.75 0.075 0.67
Culvert Slab 2 10.00 (0.5 x 1.50)=0.75 0.075 1.13
At Entrence Culvert Slab 2 12.20 (0.5 x 2.50)=1.25 0.075 2.29
Road No 11, R/s
Culvert Slab 2 17.90 (0.5 x 2.50)=1.25 0.075 3.36
Culvert Slab 2 16.60 (0.5 x 2.50)=1.25 0.075 3.11
Road No 11, L/s
Culvert Slab 2 12.10 (0.5 x 2.00)=1.00 0.075 1.82
Culvert Slab 2 15.20 (0.5 x 2.00)=1.00 0.075 2.28
Culvert Slab 2 18.90 (0.5 x 2.00)=1.00 0.075 2.83
G Block Cross Road
Culvert Slab 2 12.80 (0.5 x 2.00)=1.00 0.075 1.92
Road No 10 R/s
Culvert Slab 2 19.50 (0.5 x 2.00)=1.00 0.075 2.93
Culvert Slab 2 15.90 (0.5 x 2.00)=1.00 0.075 2.39

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


Page No :
MDP Special Tech. Sub Division
Davangere

G-1 Block Center


Culvert Slab 2 13.20 (0.5 x 2.00)=1.00 0.075 1.98
2000MT Godown Cross road R/s
Culvert Center Slab 2 11.00 (0.5 x 2.00)=1.00 0.075 1.65
Culvert Slab 2 10.00 (0.5 x 2.00)=1.00 0.075 1.50
Vegitable Market Parking area 1 10.55 (9+8.3)/2 0.075 6.84
1 10.00 (18.6+10.1)/2 0.075 10.76
1 10.00 (10.1+6.2)/2 0.075 6.11
1 10.00 (6.2+3.3)/2 0.075 3.56
Vegitable Market Toilet area (7.8+8.6+9.2+7.5+
1 30.50 6)/5 0.075 17.89

1 16.50 2.30 0.075 2.85


1 16.50 6.30 0.075 3.90
Deduction 0.075
Cistran -1 1.80 1.80 0.075 -0.24
Toilet -1 5.30 1.80 0.075 -0.72
Deduction Chambers -28 0.60 0.60 0.075 -0.76
Total 640.90

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with 3
wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming
requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering
6 6 and compacting to the required density.Grading-II 53 mm to 22.4 mm (a)Using Screening Crushable
type such as Moorum or GravelWith all lead and lift etc complete as per specification & as per the
direction of the engineer incharge of the work.

G- Block Roads
Fruit Market L/S Road From CH 0.00 m to 59.00 m
Chainage Nos L B D Qty
0.00 to 30.00 1 30.00 (13.50+13.50)/2 0.075 30.38
30.00 to 59.00 1 29.00 (13.50+13.50)/2 0.075 29.36
G- Block L/S Cross Road From CH 0.00 m to 59.50 m
0.00 to 30.00 1 30.00 (13.5+12.40)/2 0.075 29.14
30.00 to 59.5 1 29.50 (12.40+12.50)/2 0.075 27.55
Road No- 10 From CH 0.00 m to 132.40 m
0.00 to 30.00 1 30.00 (13.0+12.50)/2 0.075 28.69
30 .00 to 60.00 1 30.00 (12.50+12.50)/2 0.075 28.13
60.00 to 90.00 1 30.00 (12.50+12.50)/2 0.075 28.13
90.00 to 120.00 1 30.00 (12.50+12.50)/2 0.075 28.13
120.00 to 132.40 1 12.40 (12.50+12.00)/2 0.075 11.39
G-1 Block Road From CH 0.00 m to 77.90 m
Rd - A - Bell Mouth 0.50 9.70 (13.20+13.20)/2 0.075 4.80
1 18.90 (13.20+13.20)/2 0.075 18.71
Rd - B 1 34.80 (13.20+13.20)/2 0.075 34.45
Bell Mouth 0.50 14.50 (13.20+13.20)/2 0.075 7.18
G1 Block Cross Road , From CH 0.00 m to 45.00 m
0.00 to 30.00 1 30.00 (10.00+10.00)/2 0.125 37.50
30.00 to 45.00 1 15.00 (10.00+10.00)/2 0.125 18.75
Road No -5 From CH 0.00 m to 389.00 m
0.00 to 30.00 1 30.00 (16.20+16.20)/2 0.075 36.45
30 .00 to 60.00 1 30.00 (16.20+16.40)/2 0.075 36.67
60.00 to 90.00 1 30.00 (16.40+16.50)/2 0.075 37.01
90.00 to 120.00 1 30.00 (16.5+16.70)/2 0.075 37.35
120.00 to 150.00 1 30.00 (16.70+17.00)/2 0.075 37.91
150.00 to 180.00 1 30.00 (17.00+10.80)/2 0.075 31.28
180.00 to 195.00 1 15.00 (10.80+8.00)/2 0.075 10.58
Bell Mouth 0.50 16.20 18.20 0.075 11.06
222.00 to 252.00 1 30.00 (16.70+16.60)/2 0.075 37.46
252.00 to 282.00 1 30.00 (16.60+16.60)/2 0.075 37.35
282.00 to 312.00 1 30.00 (16.60+14.40)/2 0.075 34.87
312.00 to 342.00 1 30.00 (14.40+14.900)/2 0.075 32.96
342.00 to 372.00 1 30.00 (14.90+11.40)/2 0.075 29.59
372.00 to 389.00 1 17.00 (11.40+11.25)/2 0.075 14.44

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
Road No -6 From CH 0.00 m to 260.00 m
0.00 to 30.00 1 30.00 (16.60+16.40)/2 0.075 36.67
30 .00 to 60.00 1 30.00 (16.40+16.20)/2 0.075 36.45
60.00 to 90.00 1 30.00 (16.20+16.20)/2 0.075 36.45
90.00 to 120.00 1 30.00 (16.20+16.00)/2 0.075 36.00
120.00 to 150.00 1 30.00 (16.00+16.00)/2 0.075 35.89
150.00 to 180.00 1 30.00 (16.00+15.90)/2 0.075 35.66
180.00 to 210.00 1 30.00 (15.90+15.80)/2 0.075 35.66
210.00 to 240.00 1 30.00 (15.80+15.90)/2 0.075 35.78
240.00 to 260.00 1 20.00 (15.90+15.90)/2 0.075 23.85
Btn Road No 3 to 4 (Cross road) From CH 0.00 m to 73.50 m
0.00 to 30.00 1 30.00 (13.20+13.20)/2 0.075 29.70
30 .00 to 60.00 1 30.00 (13.20+13.20)/2 0.075 29.70
60.00 to 70.00 1 10.00 (13.20+13.20)/2 0.075 9.90
70.00 to 73.50 1 3.50 (13.20+13.20)/2 0.075 3.46
2000 MT Godown Cross Road From CH 0.00 m to 49.00 m
0.00 to 30.00 1 30.00 (11.10+11.70)/2 0.075 25.65
30 .00 to 49.00 1 19.00 (11.70+12.30)/2 0.075 17.10
2000 MT Godown front Road No 4 From CH 0.00 m to 93.50 m
0.00 to 30.00 1 30.00 (8.00+8.00)/2 0.075 18.00
30 .00 to 60.00 1 30.00 (8.00+8.00)/2 0.075 18.00
60.00 to 90.00 1 30.00 (8.00+8.00)/2 0.075 18.00
90.00 to 93.50 1 3.50 (8.00+8.00)/2 0.075 2.10
Road No 4 Extention From CH 0.00 m to 37.50 m
0.00 to 30.00 1 30.00 (13.20+13.20)/2 0.075 29.70
30 .00 to 37.50 1 7.50 (13.20+13.20)/2 0.075 7.42
Road No 11 From CH 0.00 m to 137.00 m
0.00 to 30.00 1 30.00 (10.85+11.60)/2 0.075 25.26
30 .00 to 60.00 1 30.00 (11.60+12.20)/2 0.075 26.77
60.00 to 90.00 1 30.00 (12.20+12.60)/2 0.075 27.90
90.00 to 120.00 1 30.00 (12.60+13.20)/2 0.075 29.02
120.00 to 137.00 1 17.00 (13.20+13.60)/2 0.075 17.08
A1 Block Road No 9 MMY From CH 0.00 m to 202.50 m
0.00 to 30.00 1 30.00 (12.50+11.20)/2 0.075 27.00
30 .00 to 60.00 1 30.00 (11.20+10.20)/2 0.075 27.00
60.00 to 90.00 1 30.00 (10.20+09.20)/2 0.075 27.00
90.00 to 105.00 1 15.00 (13.50+13.70)/2 0.075 14.06
105.00 to 120.00 1 15.00 (13.70+13.40)/2 0.075 14.63
120.00 to 150.00 1 30.00 (13.40+12.20)/2 0.075 29.25
150.00 to 160.00 1 10.00 (12.20+12.20)/2 0.075 9.75
160.00 to 190.00 1 30.00 (12.20+12.20)/2 0.075 27.45
190.00 to 202.50 1 12.50 (12.20+14.40)/2 0.075 12.47
Vegitable Market Parking area 1 10.55 (9+8.3)/2 0.075 6.84
1 10.00 (18.6+10.1)/2 0.075 10.76

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


Page No :
MDP Special Tech. Sub Division
Davangere
1 10.00 (10.1+6.2)/2 0.075 6.11
1 10.00 (6.2+3.3)/2 0.075 3.56
Vegitable Market Toilet area 1 30.50 (7.8+8.6+9.2+7.5+6)/5 0.075 17.89
1 16.50 2.30 0.075 2.85
1 16.50 6.30 0.075 3.90
Deduction
Cistran -1 1.80 1.80 0.075 -0.24
Toilet -1 5.30 1.80 0.075 -0.72
Culvert Approachs
G-Block 5th Cross road Culvert (At
Chikkanahalli Road) L/S 1 20.00 (0.5 x 2.00)=1.00 0.15 3.00

1 20.00 (0.5 x 1.00)=0.50 0.075 0.75


G-Block 5th Cross road Culvert (At
Chikkanahalli Road) R/S 1 19.00 (0.5 x 2.00)=1.00 0.15 2.85

1 19.00 (0.5 x 1.00)=0.50 0.075 0.71


G-Block 6th Cross road Culvert (At
Chikkanahalli Road) L/S 1 21.00 (0.5 x 2.00)=1.00 0.15 3.15

1 21.00 (0.5 x 1.00)=0.50 0.075 0.79


Deduction Chambers -28 0.60 0.60 0.075 -0.76
Schedule - B. Qty : 1689.93 Cum Qty Now to be Pay 1684.50
Tender Rate : 2200.00

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
MEASUREMENT SHEET
Name of the Work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC
Davangere 2)Improvements of G-block Roads at main market yard of ampc davangere. 3)Improvements of
A1-Block Road No 9 at Main Market Yard of AMPC Davangere Under AAP 2022-23

Authority : Vide SER No: 100,101& 104/2022-23, D: 28-10-2022,


Work Order No : APMC/DVG/2139/2022-23, Dated: 19-01-2023
Date of Mark Out :- 19-01-2023
Accepted tender Amount : Rs.49907301.11 TP = (+) 4.38 % As Per 2020-21 CSR
Name of the Agency: Thimmarayi gowda,Class1 contractor, Chikkenahalli grama,
Belluru hobali, Nagamangala Tq, Mandya - Dist
Stipulated date for Completion of the work : (165 Days)
Measurement recorded on :
Sl No I No. PARTICULARS Unit No L B D Qty
1 1 Earth work excavation for Foundation by mechanical means for all works & any depth , as
per drawing and technical specifications, including setting out, shoring, strutting,
barricading, caution lights, including dressing of excavated surfaces, disposing off or
levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius
and lift including cost of labour, tools, usage of machinery & other appurtenaces required
to complete the work With all lead and lift etc complete as per specification & as per the
direction of the engineer incharge of the work.

Privious Paid Qty Vide I No 1, E-MB 1,Page No.25 Cum 21408.85


Quantity Vide I no 1, Page No. 2 to 3 In this MB 926.57
Quantity Vide I no 1, Page No. 6 In this MB 368.49
Total updated Qty 22703.91
Deduct Privious Paid Qty Vide I No 1, E-MB 1,Page No.25 21408.85
Schedule - B. Qty : 22711.66 Cum Qty Now to be Pay 1295.06
###
Tender Rate : 80.00
2 2 Loosening , leveling and Compacting original ground supporting embankment to facilitate
placement of first layer of embankment , scarified to a depth , mixed with water at OMC
and then compacted by rolling so as to achieve minimum dry density as given in Table
300-2 for embankment construction .With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the work.

Privious Paid Qty Vide I No 2, E-MB 1,Page No.25 Cum 2053.87


Quantity Vide I no 2, Page No. 4 In this MB 145.66
Total updated Qty 2199.53
Deduct Privious Paid Qty Vide I No 2, E-MB 1,Page No.25 2053.87
Schedule - B. Qty : 2253.24 Cum Qty Now to be Pay 145.66
###
Tender Rate : 99.00

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
3 3 Construction of Embankment by excavating the available approved Gravel/Murrum
deposited at a place or borrow pits during or prior excavation with all lifts and lead,
transportation to site, spreading, grading to required slope and compacting to meet the
requirement complete as per specifications, including cost of labour, rolling, water, all
materials, usage& all other appurtenaces required to complete the work.With all lead and
lift etc complete as per specification & as per the direction of the engineer incharge of the
work.

Privious Paid Qty Vide I No 3, E-MB 1,Page No.25 Cum 15507.46


Quantity Vide I no 3, Page No. 13 In this MB 303.32
Total updated Qty 15810.78
Deduct Privious Paid Qty Vide I No 3, E-MB 1,Page No.25 15507.46
Schedule - B. Qty : 15816.90 Cum Qty Now to be Pay 303.32
###
Tender Rate : 435.00
4 4 Construction of granular sub-base using crusher run spreading in uniform layers with
motor grader on prepared surface mixing by mix in place method with rotovator at OMC
and compacting with vibratory roller to achieve the desired density, complete per clause
401. With all lead and lift etc complete as per specification & as per the direction of the
engineer incharge of the work.

Privious Paid Qty Vide I No 4, E-MB 1,Page No.25 Cum 2823.24


Quantity Vide I no 4, Page No. 14 to 15 In this MB 556.41
Total updated Qty 3379.65
Deduct Privious Paid Qty Vide I No 4, E-MB 1,Page No.25 2823.24
Schedule - B. Qty : 3379.86 Cum Qty Now to be Pay 556.41
###
Tender Rate : 2500.00
5 5 Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill- up the interstices of
coarse aggregate, watering and compacting to the required density grading 2 as per
Technical Specification Clause 405. Grading-I 63 mm to 45 mm a.Using Screening
Crushable type such as Moorum or Gravel With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the work.

Privious Paid Qty Vide I No 5, E-MB 1,Page No.26 Cum 1045.84


Quantity Vide I no 5, Page No. 16 to 18 In this MB 640.90
Total updated Qty 1686.74
Deduct Privious Paid Qty Vide I No 5, E-MB 1,Page No.26 1045.84
Schedule - B. Qty : 1689.93 Cum Qty Now to be Pay 640.90
###
Tender Rate : 2300.00

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
7 7 Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class
conforming to IS:458-1988 with latest amentments using ordinary portland cement, for
sanitary works and conveying to work site, rolling and lowering into trenches, laying
true to line and level including loading and unloading at both destinations and jointing of
pipes and specials, perfect linking of joints with jack to correct position including cost of
jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all
leads and lifts as directed and giving necessary hydraulic test as per ISS to the required
pressure and commissioning etc. complete. (Contractor will make his own arrangements
for procuring water for testing). Before the execution of the work, the contractor shall
carry out the survey.RCC NP3 Class pipe of 300 mm dia.With all lead and lift etc complete
as per specification & as per the direction of the engineer incharge of the work.

For G-Block Fruit Market road Mtr 1 10.00 10.00


G Block Cross Road 1 12.50 12.50
G1 Block Road 2 10.00 20.00
Road No 11 2 10.00 20.00
1 12.50 12.50
G-Block Road No 10 2 10.00 20.00
G-Block Road No 5 3 15.00 45.00
G-Block Road No 6 2 15.00 30.00
Schedule - B. Qty : 170.00 Mtr Qty Now to be Pay 170.00
###
Tender Rate : 1200.00
8 8 Constructing brick masonry chamber of internal dimension 600x600mm and depth of
600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed
concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC
1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and
cover.. T130BWith all lead and lift etc complete as per specification & as per the direction
of the engineer incharge of the work.

For G-Block Fruit Market road


2 1 2.00
G Block Cross Road 2 1 2.00
G1 Block Road 2 2 4.00
Road No 11 2 2 4.00
2 1 2.00
G-Block Road No 10 2 2 4.00
G-Block Road No 5 2 3 6.00
G-Block Road No 6 2 2 4.00
Schedule - B. Qty : 30 Each Qty Now to be Pay 28.00
###
Tender Rate : 5500

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
Davangere
9 9 Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the
Engineer incharge of work(With all need and left, loading and unloading and as directed
by engineer in charge of work)

Privious Paid Qty Vide I No 9, E-MB 1,Page No.27 Cum 21408.85


Quantity Vide I no 1, Page No. In this MB 368.49
Quantity Vide I no 1, Page No. In this MB 926.57
Total updated Qty 22703.91
Limit to Tender Qty 22507.47
Deduct Privious Paid Qty Vide I No 9, E-MB 1,Page No.27 21408.85
Schedule - B. Qty : 22507.47 Cum Qty Now to be Pay 1098.62
###
Tender Rate : 35.00
10 10 Providing and laying in position plain cement concrete for levelling course for all works
in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine
aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm
thickness, well compacted using plate vibrators, including all lead & lifts, cost of all
materials of quality, labour, Usage charges of machineries, curing, and all the other
appurtenances required to complete the work as per technical specifications. (The cost of
steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm
nominal size graded crushed coarse aggregates With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the work.

Privious Paid Qty Vide I No 10, E-MB 1,Page No.27 Cum 269.53
Quantity Vide I no 10, Page No. 8 In this MB 27.99
Total updated Qty 297.52
Limit to Tender Qty 288.91
###
Deduct Privious Paid Qty Vide I No 10, E-MB 1,Page No.27 269.53
Schedule - B. Qty : 288.91 Cum Qty Now to be Pay 19.38
###
Tender Rate : 6200.00

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
11 11 Providing and laying in position Reinforced cement concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works & other parallel
works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with super
plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes
wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to
the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all
other appurtenances required to complete the work as per techni�al specifications. (The
cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20
mm nominal size graded crushed coarse aggregates (With all lead and lift etc complete as
per specification & as per the direction of the engineer incharge of the work.)

Privious Paid Qty Vide I No 10, E-MB 1,Page No.32 Cum 941.87
CC Drain Avg Avg
A1 Block Drain R/s Raft Cum 1 4.50 0.90 0.15 0.61
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 11.50 0.90 0.15 1.55
Culvert Raft 1 6.10 1.10 0.25 1.68
Drain R/s Raft 1 4.00 0.90 0.15 0.54
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 8.10 0.90 0.15 1.09
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 5.90 0.90 0.15 0.80
Culvert Raft 1 6.00 1.10 0.25 1.65
Drain R/s Raft 1 9.60 0.90 0.15 1.30
Culvert Raft 1 6.05 1.10 0.25 1.66
Drain R/s Raft 1 15.90 0.90 0.15 2.15
At Entrence Culvert Raft 1 11.70 1.10 0.25 3.22
A1 Block Drain R/s Wall Cum 2 4.50 0.15 0.60 0.81
Culvert Wall 2 6.05 0.25 0.60 1.82
Drain R/s wall 2 11.50 0.15 0.60 2.07
Culvert Wall 2 6.10 0.25 0.60 1.83
Drain R/s wall 2 4.00 0.15 0.60 0.72
Culvert Wall 2 6.50 0.25 0.60 1.95
Drain R/s wall 2 8.10 0.15 0.60 1.46
Culvert Wall 2 6.05 0.25 0.60 1.82
Drain R/s wall 2 5.90 0.15 0.60 1.06

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
Davangere
Culvert Wall 2 6.00 0.25 0.60 1.80
Drain R/s wall 2 9.60 0.15 0.60 1.73
Culvert Wall 2 6.00 0.25 0.60 1.80
Drain R/s Wall 2 15.90 0.15 0.60 2.86
At Entrence Culvert Wall 2 11.70 0.25 0.60 3.51
A1 Block R/s
Culvert Slab 1 6.05 1.10 0.25 1.66
Culvert Slab 1 6.10 1.10 0.25 1.68
Culvert Slab 1 6.05 1.10 0.25 1.66
Culvert Slab 1 6.05 1.10 0.25 1.66
Culvert Slab 1 6.00 1.10 0.25 1.65
Culvert Slab 1 6.05 1.10 0.25 1.66
At Entrence Culvert Slab 1 11.70 1.10 0.25 3.22
Vegitable Market
Culvert Raft 1 11.50 1.10 0.25 3.16
Drain R/s Raft 1 30.00 0.90 0.15 4.05
Drain R/s Raft 1 30.00 0.90 0.15 4.05
Drain R/s Raft 1 20.30 0.90 0.15 2.74
Culvert Raft 1 12.10 1.10 0.25 3.33
Drain R/s Raft 1 30.00 0.90 0.15 4.05
Drain R/s Raft 1 21.50 0.90 0.15 2.90
Approach 1 2.00 0.90 0.15 0.27
Culvert Wall 2 11.50 0.25 0.90 5.18
Drain R/s Wall 2 30.00 0.15 0.90 8.10
Drain R/s Wall 2 30.00 0.15 0.90 8.10
Drain R/s Wall 2 20.30 0.15 0.90 5.48
Culvert Wall 2 12.10 0.25 0.90 5.45
Drain R/s Wall 2 30.00 0.15 0.90 8.10
Drain R/s Wall 2 21.50 0.15 0.90 5.81
Approach 2 2.00 0.15 0.75 0.45
Culvert Slab 1 11.50 1.25 0.30 4.31
Drain R/s Top Slab 1 30.00 0.90 0.15 4.05
Drain R/s Top Slab 1 30.00 0.90 0.15 4.05
Drain R/s Top Slab 1 20.30 0.90 0.15 2.74

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
Davangere
Culvert Slab 1 12.10 1.10 0.30 3.99
Drain R/s Top Slab 1 30.00 0.90 0.15 4.05
Drain R/s Top Slab 1 21.50 0.90 0.15 2.90
G Block Cross Road L/s
Drain Raft 1 4.00 0.90 0.15 0.54
Drain Wall 2 4.00 0.15 0.60 0.72
F Block 4 th Cross Road R/s
Culvert Raft 1 15.30 1.10 0.25 4.21
Culvert Wall 2 15.30 0.25 0.60 4.59
Culvert Slab 1 15.30 1.10 0.25 4.21
Road No 11, R/s
Parapet wall for 4th Main Drain 1 1.90 0.25 0.60 0.29
Road No 11, R/s
Culvert Slab 1 17.60 2.30 0.30 12.14
For Hanch Slab Both 0.50 2 17.60 0.20 0.20 0.70
Parapet wall 2 2.00 0.25 0.55 0.55
Road No 11, R/s
Culvert Slab 1 16.75 2.30 0.30 11.56
For Hanch Slab Both 0.50 2 16.75 0.20 0.20 0.67
Parapet wall 2 2.00 0.25 0.55 0.55
Road No 11, L/s
Culvert Slab 1 12.15 1.25 0.25 3.80
Parapet wall 2 1.25 0.25 0.60 0.38
Road No 11, L/s
Culvert Slab 1 14.65 1.25 0.25 4.58
Parapet wall 2 1.25 0.25 0.60 0.38
Road No 11, L/s
Culvert Slab 1 18.15 1.25 0.25 5.67
Parapet wall 2 1.70 0.25 0.55 0.47
G Block Cross Road
Culvert Slab 1 12.55 1.10 0.25 3.45
G- Block Road No 5 (At Chikkanahalli Road) L/s & R/s
Culvert Raft L/s 1 21.20 1.25 0.25 6.63
Culvert Raft R/s 1 19.35 1.25 0.25 6.05
Culvert Wall 2 21.20 0.25 0.90 9.54

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
MDP Special Tech. Sub Division
Davangere
Culvert Wall 2 19.35 0.25 0.90 8.71
Culvert Slab 1 21.20 1.20 0.30 7.63
Culvert Slab 1 19.35 1.20 0.30 6.97
G- Block Road No 6 (At Chikkanahalli Road) L/s
Culvert Raft 1 22.35 1.20 0.25 6.71
Culvert Wall 2 22.35 0.25 0.90 10.06
Culvert Slab 1 22.35 1.20 0.30 8.05
Road No 10 R/s
Culvert Slab 1 18.15 1.10 0.25 4.99
Parapet wall 2 1.10 0.25 0.50 0.28
Culvert Slab 1 15.72 1.10 0.25 4.32
Parapet wall 2 1.15 0.25 0.55 0.32
G-1 Block Center
Culvert Slab 1 13.20 1.10 0.25 3.63
Parapet wall 2 1.20 0.25 0.55 0.33
Road no 5 End Culvert
Culvert Center Slab 1 10.50 1.10 0.25 2.89
2000MT Godown Cross road R/s
Culvert Slab 1 9.85 1.10 0.25 2.71
306.20
Total updated Qty 1248.07
Deduct Privious Paid Qty Vide I No 11, E-MB 1,Page No.32 941.87
###
Schedule - B. Qty : 1249.94 Cum Qty Now to be Pay 306.20
Tender Rate : 8950.00
12 12 Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel
reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position, binding and anchoring to adjacent members whereever necessary complete as
per Design including cost of material, labour, usage charges complete as per
specifications. (The laps and wastages shall not be measured separately)With all lead and
lift etc complete as per specification & as per the direction of the engineer incharge of the
work.

Privious Paid Qty Vide I No 12, E-MB 1,Page No.32 Kg 53176.62


Quantity Vide I no 12, Page No. 9 to 12 In this MB 12470.44
Quantity Vide I no 12, Page No. 19 t 22 In this MB 24067.70
Total updated Qty 89714.76
Deduct Privious Paid Qty Vide I No 12, E-MB 1,Page No.32 53176.62
###
Schedule - B. Qty : 89881.12 Kg Qty Now to be Pay 36538.14
Tender Rate : 105.00

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
MDP Special Tech. Sub Division
Davangere
13 13 Demolishing cement concrete manually/ by mechanical means including disposal of
material to the appropriate disposal area as per direction of Engineer-in-charge
Quantity Vide I no 13, Page No. 5 In this MB Cum 29.68
Schedule - B. Qty : 29.93 Cum Qty Now to be Pay 29.68
###
Tender Rate : 1400
14 14 Providing and Filling in foundation with granite / trap broken metal 100mm . and down
size & with approved sand including hand packing , ramming , watering , including cost of
all materials and labourWith all lead and lift etc complete as per specification & as per the
direction of the engineer incharge of the work.

Privious Paid Qty Vide I No 14, E-MB 1,Page No.32 Cum 43.17
Quantity Vide I no 14, Page No. 7 In this MB 11.65
Total updated Qty 54.82
Deduct Privious Paid Qty Vide I No 14, E-MB 1,Page No.32 43.17
Schedule - B. Qty : 54.84 Cum Qty Now to be Pay 11.65
###
Tender Rate : 2700.00
15 15 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms
in depth, compacting each deposited layer by ramming after watering with a lead and lift
Including cost of alllabourcomplete as per specifications With all lead and lift etc
complete as per specification & as per the direction of the engineer incharge of the work.

Privious Paid Qty Vide I No 12, E-MB 1,Page No.32 Cum 213.61
Quantity Vide I no 15, Page No. 23 In this MB 208.64
Total updated Qty 422.25
Deduct Privious Paid Qty Vide I No 12, E-MB 1,Page No.32 213.61

Schedule - B. Qty : 433.90 Cum Qty Now to be Pay 208.64


###
Tender Rate : 130.00

16 16 Providing and laying flooring with burnt stone slabs 10 cms thick, rough chistle dressed
on sand bed 7.5 cms to 8 cms thick and pointed with cement mortar 1:3, , including cost
of materials, sand, labour, curing complete as per specifications.With all lead and lift etc
complete as per specification & as per the direction of the engineer incharge of the work.

Vegitable Market Parking area Sqm 1 10.55 (9+8.3)/2 91.26

1 10.00 (18.6+10.1 143.50


)/2

1 10.00 (10.1+6.2)/ 81.50


2
Page No :
Sl No I No. PARTICULARS Unit No L B D Qty
Contractor PMC Assistant Engineer -2 Assistant Executive Engineer
MDP Special Tech. Sub Division
Davangere
1 10.00 (6.2+3.3)/2 47.50
Vegitable Market Toilet area
1 30.50 (7.8+8.6+9. 238.51
2+7.5+6)/5

1 16.50 2.30 37.95


0.5 16.50 6.30 51.98
At Building side
1 45.00 (8.2+7.8+2.8)
/3 282.00

1 2.70 2.70 7.29

1 3.80 3.50 13.30

1 5.20 6.80 35.36

1 5.65 4.80 27.12

1 19.80 1.30 25.74

1 11.00 (5.5+4.6)/2 55.55


Deduction
Cistran -1 1.80 1.80 -3.24
Toilet -1 5.30 1.80 -9.54
Tree -1 1.50 1.50 -2.25
Schedule - B. Qty : 1125 Sqm Qty Now to be Pay 1123.52
###
Tender Rate : 990.00

Contractor PMC Assistant Engineer -2 Assistant Executive Engineer


MDP Special Tech. Sub Division
Davangere
WORK COMPLETION REPORT
FORM PWG 46
(See Paragraph 234)
Sl No. Particulars Details

Package -1 : 1)Construction of CC Drain for G-


block Roads at Main Market Yard of APMC
1 Name Of Work Davangere 2)Improvements of G-block Roads
at main market yard of ampc davangere.
3)Improvements of A1-Block Road No 9 at
Main Market Yard of AMPC Davangere Under
AAP 2022-23

2 Estimate Cost. Rs : 568.15 Lakhs


SER : SER No: 100,101& 104/2022-23, D:
3 Sanctioned No. 28-10-2022,
4 Head of Account 2022-23 AAP Scheme.

Thimmarayi gowda,Class1 contractor,


5 Name of the Tenderer Chikkenahalli grama,
Belluru hobali, Nagamangala Tq,
Mandya - Dist
WORK_Order No : APMC/DVG/2139/2022-
23,
6 Tender Agreement Number Dated: 19-01-2023
7 Date of Commencement 19-01-2023
8 Target Date of Completion 02-07-2023
9 Acutal Date of Completion
10 Extension of time if any -----------

Acutal Expenditure incurred


11 Since commencement Rs = 58797790.50

12 Tender Premium (+) 4.38 % As Per 2020-21 CSR


Net amount- excess over the
13 Tender Amount -----------
14 Net Percentage of excess ----------
Sri Rudresha J.B, AEE
15 Name of the officer in charge Sri H Venkata naik, AE-2

Assistant Engineer-2 Assistant Executive Engineer,


M.D.P. Special Tech Sub-Division.,
Davanagere
P.W.G ORIGINAL/DUPLICATE/TRIPLICATE
CONTRACT CERTIFICATE
(For Other Works)
Bill No.: II & Final Sub-Division: Davanagere Reference paras to
Division Banglore P.W. Account Code
Bill Received No. Date:- Date _________________
Scheduled Docket No. Cash Book Vr. No. ________________
Date : _________________
Name of work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC Davangere
2)Improvements of G-block Roads at main market yard of ampc davangere. 3)Improvements of A1-Block Road No 9
at Main Market Yard of AMPC Davangere Under AAP 2022-23

Estimate Cost :- Rs : 568.15 Lakhs


Name of the Contractor : Thimmarayi gowda,Class1 contractor, Chikkenahalli grama,Belluru hobali, Nagamangala
Tq, Mandya - Dist
Work order No. APMC/DVG/2139/2022-23, Dated: 19-01-2023
Certified that the measurements were checked taken by me on _______________ and recorded on pages 01 to
of Measurement E- Mesurment Book No.02 and that the work is satisfactorily executed.

Contractor Officer in charge of the work


Certified that the measurements were checked by me on……………………and found correct.
The work is satisfactorily executed.
Certified that the quantities of materials shown in column 3 of account I have been actually brought to site of the work and the contractor
has not previously received any advance of this security. These materials are of an inpershable nature and are all required by the contractor
for immediate use on the work in connection with items for which rates for finished work have been agreed upon. A formal agreement signed
and executed by the contractor is recorded in Division Office

Asst. Executive Engineer,


M.D.P. Special Tech Sub-Division., Davanagere
II MEMORANDUM OF PAYMENT
1) Total value of work done or supplies made as per Account with in
2) Deduct amount to be held in reserve …………… Present Rs. ………………
3) ………………………………………………………Balance Rs………………
4) Deduct Payments :
a) Amount of previous payment as in Divisional/Sub-Divisional
Cash Book Vr. No. ………….. Date ………………… S.D. No.
Payment
now made } A) Amount of adjusted towards cash advances recovery of cost of store or other
materials supplied
Recovery of amount creditable to this other work
Amount paid on this bill by cheque/cash.
TOTAL

5) Balance being unpaid value of work done hold in reserve


6) Deduct Cash advance made on Division/Sub-Divisional Cash Book Vr No.
Date ………………….. Less adjustments
7) Net amount due or from Contractor
UNADJUSTED ITEMS
8) Advance to Contractor for materials brought to site (as detailed within)
9) Value if Government material supplied
TOTAL AMOUNT UNADJUSTED

Contractor's Signature.
For use in the Executive Engineer Office.
Received Rs. …………………in words……………………………….……………………
……………………………………………………..……………………………. by cash and adjustment of
payment as per memorandum

(in final settlement of all demands)


Witness
1
2
Dated Signature of Contractor
Paid by me Cheque No. ……………………….. dated ………………………...

Cash Rs. …………………………………………………………………………..

Date: Initials of Officer making payment Date: Executive Engineer.


Page 47

2nd & Final Bill


Name of the Work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC Davangere 2)Improvements of G-block Roads at main market yard of ampc davangere.
3)Improvements of A1-Block Road No 9 at Main Market Yard of AMPC Davangere Under AAP 2022-23

Sl. Schedule - B Item of work Previous Measurement Present Measurement Total up – to date
Unit Rate
NO. Qty Qnty Amount Qnty Amount Qnty Amount
Earth work excavation for Foundation by mechanical means for all works & any depth ,
as per drawing and technical specifications, including setting out, shoring, strutting,
barricading, caution lights, including dressing of excavated surfaces, disposing off or
1 levelling the excavated earth or sorting & stacking the selected earth for reuse in a
22711.66 radius and lift including cost of labour, tools, usage of machinery & other appurtenaces
Cum 80.00 21408.85 1712708.00 1274.19 101935.20 22683.04 1814643.20
required to complete the work With all lead and lift etc complete as per specification &
as per the direction of the engineer incharge of the work.

Loosening , leveling and Compacting original ground supporting embankment to


facilitate placement of first layer of embankment , scarified to a depth , mixed with
water at OMC and then compacted by rolling so as to achieve minimum dry density as
2 2253.24 given in Table 300-2 for embankment construction .With all lead and lift etc complete
as per specification & as per the direction of the engineer incharge of the work. Cum 99.00 2053.87 203333.13 145.66 14420.34 2199.53 217753.47

Construction of Embankment by excavating the available approved Gravel/Murrum


deposited at a place or borrow pits during or prior excavation with all lifts and lead,
transportation to site, spreading, grading to required slope and compacting to meet the
requirement complete as per specifications, including cost of labour, rolling, water, all
3 15816.90 materials, usage& all other appurtenaces required to complete the work.With all lead Cum 435.00 15507.46 6745745.10 303.32 131944.20 15810.78 6877689.30
and lift etc complete as per specification & as per the direction of the engineer incharge
of the work.

Construction of granular sub-base using crusher run spreading in uniform layers with
motor grader on prepared surface mixing by mix in place method with rotovator at
OMC and compacting with vibratory roller to achieve the desired density, complete per
4 3379.86 clause 401. With all lead and lift etc complete as per specification & as per the direction Cum 2500.00 2823.24 7058100.00 556.41 1391025.00 3379.65 8449125.00
of the engineer incharge of the work.

Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill- up the interstices of
coarse aggregate, watering and compacting to the required density grading 2 as per
5 1689.93 Technical Specification Clause 405. Grading-I 63 mm to 45 mm a.Using Screening
Crushable type such as Moorum or Gravel With all lead and lift etc complete as per Cum 2300.00 1045.84 2405432.00 640.90 1474070.00 1686.74 3879502.00
specification & as per the direction of the engineer incharge of the work.

Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber,
applying and brooming requisite type of screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and compacting to the required
6 1689.93 density.Grading-II 53 mm to 22.4 mm (a)Using Screening Crushable type such as
Moorum or GravelWith all lead and lift etc complete as per specification & as per the Cum 2200.00 0.00 0.00 1684.50 3705900.00 1684.50 3705900.00
direction of the engineer incharge of the work.
Page 48

Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class
conforming to IS:458-1988 with latest amentments using ordinary portland cement,
for sanitary works and conveying to work site, rolling and lowering into trenches,
laying true to line and level including loading and unloading at both destinations and
jointing of pipes and specials, perfect linking of joints with jack to correct position
including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S
RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per
ISS to the required pressure and commissioning etc. complete. (Contractor will make
7 170.00 his own arrangements for procuring water for testing). Before the execution of the Mtr 1200.00 0.00 0.00 170.00 204000.00 170.00 204000.00
work, the contractor shall carry out the survey.RCC NP3 Class pipe of 300 mm dia.With
all lead and lift etc complete as per specification & as per the direction of the engineer
incharge of the work.

Constructing brick masonry chamber of internal dimension 600x600mm and depth of


600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed
concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC
1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame
8 30.00 and cover.. T130BWith all lead and lift etc complete as per specification & as per the each 5500.00 0.00 0.00 28.00 154000.00 28.00 154000.00
direction of the engineer incharge of the work.

Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the
9 22507.47 Engineer incharge of work(With all need and left, loading and unloading and as directed
by engineer in charge of work)
Cum 35.00 21408.85 749309.75 1098.62 38451.70 22507.47 787761.45

Providing and laying in position plain cement concrete for levelling course for all works
in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine
aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150
mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all
materials of quality, labour, Usage charges of machineries, curing, and all the other
appurtenances required to complete the work as per technical specifications. (The cost
10 288.91 of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 Cum 6200.00 269.53 1671086.00 19.38 120156.00 288.91 1791242.00
mm nominal size graded crushed coarse aggregates With all lead and lift etc complete
as per specification & as per the direction of the engineer incharge of the work.

Providing and laying in position Reinforced cement concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works & other parallel
works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with super
plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes
wherever necesary, including all lead & lifts, cost of all materials of quality, confirming
to the requirements of relevant IS codes, labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per techni �al
11 1249.94 specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Cum 8950.00 941.87 8429736.50 306.20 2740490.00 1248.07 11170226.50
Design Mix Using 20 mm nominal size graded crushed coarse aggregates (With all lead
and lift etc complete as per specification & as per the direction of the engineer incharge
of the work.)
Page 49

Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel


reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position, binding and anchoring to adjacent members whereever necessary complete
as per Design including cost of material, labour, usage charges complete as per
12 89881.12 specifications. (The laps and wastages shall not be measured separately)With all lead Kg 105.00 53176.62 5583545.10 36538.14 3836504.70 89714.76 9420049.80
and lift etc complete as per specification & as per the direction of the engineer incharge
of the work.

Demolishing cement concrete manually/ by mechanical means including disposal of


13 29.93 material to the appropriate disposal area as per direction of Engineer-in-charge Cum 1400.00 0.00 0.00 29.68 41552.00 29.68 41552.00

Providing and Filling in foundation with granite / trap broken metal 100mm . and down
size & with approved sand including hand packing , ramming , watering , including cost
of all materials and labourWith all lead and lift etc complete as per specification & as
14 54.84 per the direction of the engineer incharge of the work. Cum 2700.00 43.17 116559.00 11.65 31455.00 54.82 148014.00

Refilling available earth around trenches/pipelines, cables in layers not exceeding 20


cms in depth, compacting each deposited layer by ramming after watering with a lead
and lift Including cost of alllabourcomplete as per specifications With all lead and lift etc
15 433.90 complete as per specification & as per the direction of the engineer incharge of the Cum 130.00 213.61 27769.30 208.64 27123.20 422.25 54892.50
work.

Providing and laying flooring with burnt stone slabs 10 cms thick, rough chistle dressed
on sand bed 7.5 cms to 8 cms thick and pointed with cement mortar 1:3, , including
cost of materials, sand, labour, curing complete as per specifications.With all lead and
16 1125.00 lift etc complete as per specification & as per the direction of the engineer incharge of Sqm 990.00 0.00 1123.52 1112284.80 1123.52 1112284.80
the work.

Grand total 34703323.88 15125312.14 49828636.02

18% Gst 6246598.30 2722556.19 8969154.48

Grand total 40949922.18 17847868.33 58797790.50

Contractor Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Name of the Work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC Davangere 2)Improvements of G-block Roads at main
market yard of ampc davangere. 3)Improvements of A1-Block Road No 9 at Main Market Yard of AMPC Davangere Under AAP 2022-23
Royalty Recovery Statement
Sand Metal Bricks Gravel
Sl No. Item No. Disscription of Work Unit Qty
Constant Qty in Cum Constant Qty in Cum Constant Qty in Nos Constant Qty in Cum
1 3 Construction of Embankment by excavating the
available approved Gravel/Murrum deposited at Cum 15810.78 1.25 19763.48
a place or borrow pits during or prior excavation
2 4 Construction
with all lifts ofand
granular
lead, sub-base using crusher
transportation to site,
run spreading in uniform layers with motor Cum 3379.65 1.33 4494.93
grader on prepared surface mixing by mix in
3 5 Providing,
place method laying, spreading
with rotovatorandat compacting
OMC and
stone aggregates of specific sizes to water Cum 1686.74 1.30 2192.76
bound macadam specification including
4 6 Providing,
spreading inlaying,
uniformspreading andhand
thickness, compacting
packing,
stone aggregates of specific sizes to water Cum 1684.50 1.25 2105.63
bound macadam specification including
5 10 Providing
spreading and laying in
in uniform position hand
thickness, plain packing,
cement
concrete for levelling course for all works in Cum 288.91 0.465 134.34 0.89 257.71
foundation. The granite/trap/basalt crushed
6 11 Providing and aggregates
graded coarse laying in position
and fine Reinforced
aggregates
cement concrete for all Sub structures of Cum 1248.07 0.430 536.67 0.69 861.17
building, Irrigation works, Sub structure works
7 14 Providing and Filling
of bridges, Drain works &inother
foundation with
parallel works
granite / trap broken metal 100mm . and down Cum 54.82 0.50 27.41 1.00 54.82
size & with approved sand including hand
8 16 Providing and laying
packing , ramming flooring ,with
, watering burntcost
including stone
of
slabs 10 cms thick, rough chistle dressed on Cum 1123.52 1.07 1202.17
sand bed 7.5 cms to 8 cms thick and pointed
with cement mortar 1:3, , including Total Quantity
cost of 1900.59 9967.02 0.00 19763.48
Rate/Unit 138.00 126.00 90.00 60.00
Royalty 262281.00 1255844.00 0.00 1185809.00
Total Royalty Proposed for recovery in this bill 2703934.00
Total Upto Date Royalty Charges
Say Rs Total Upto date Royalty Charges 2703934.00
Deducted in Previous RA Bill No 1 1686841.00
Now tobe Deducted in this Bill 1017093.00

Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Page 51

Name of work : Package -1 : 1)Construction of CC Drain for G-block Roads at Main Market Yard of APMC Davangere
2)Improvements of G-block Roads at main market yard of ampc davangere. 3)Improvements of A1-Block Road No 9 at Main
Market Yard of AMPC Davangere Under AAP 2022-23
Comparative Statement
Sl. As per Sanctioned Schedule - B Work Done Savingas Excess
Particulars Unit
No. Qty Rate Amount Qty Amount
1 2 3 4 5 6 7 8 9 10
1 Earth work excavation for Foundation by mechanical means
for all works & any depth , as per drawing and technical
specifications, including setting out, shoring, strutting,
barricading, caution lights, including dressing of excavated
surfaces, disposing off or levelling the excavated earth or
sorting & stacking the selected earth for reuse in a radius and
lift including cost of labour, tools, usage of machinery & other Cum 22711.66 80.00 1816932.80 22683.04 1814643.20 2289.60 0.00
appurtenaces required to complete the work With all lead and
lift etc complete as per specification & as per the direction of
the engineer incharge of the work.

2 Loosening , leveling and Compacting original ground


supporting embankment to facilitate placement of first layer
of embankment , scarified to a depth , mixed with water at
OMC and then compacted by rolling so as to achieve
minimum dry density as given in Table 300-2 for
embankment construction .With all lead and lift etc complete Cum 2253.24 99.00 223070.76 2199.53 217753.47 5317.29 0.00
as per specification & as per the direction of the engineer
incharge of the work.

3 Construction of Embankment by excavating the available


approved Gravel/Murrum deposited at a place or borrow pits
during or prior excavation with all lifts and lead,
transportation to site, spreading, grading to required slope
and compacting to meet the requirement complete as per
specifications, including cost of labour, rolling, water, all
materials, usage& all other appurtenaces required to
complete the work.With all lead and lift etc complete as per Cum 15816.90 435.00 6880351.50 15810.78 6877689.30 2662.20 0.00
specification & as per the direction of the engineer incharge
of the work.
Page 52

4 Construction of granular sub-base using crusher run


spreading in uniform layers with motor grader on prepared
surface mixing by mix in place method with rotovator at OMC
and compacting with vibratory roller to achieve the desired
density, complete per clause 401. With all lead and lift etc
complete as per specification & as per the direction of the Cum 3379.86 2500.00 8449650.00 3379.65 8449125.00 525.00 0.00
engineer incharge of the work.

5 Providing, laying, spreading and compacting stone aggregates


of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to
proper grade and camber, applying and brooming, stone
screening/binding materials to fill- up the interstices of
coarse aggregate, watering and compacting to the required
density grading 2 as per Technical Specification Clause 405.
Grading-I 63 mm to 45 mm a.Using Screening Crushable type Cum 1689.93 2300.00 3886839.00 1686.74 3879502.00 7337.00 0.00
such as Moorum or Gravel With all lead and lift etc complete
as per specification & as per the direction of the engineer
incharge of the work.

6 Providing, laying, spreading and compacting stone aggregates


of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel/ vibratory roller in stages to
proper grade and camber, applying and brooming requisite
type of screening/ binding Materials to fill up the interstices
of coarse aggregate, watering and compacting to the
required density.Grading-II 53 mm to 22.4 mm (a)Using
Screening Crushable type such as Moorum or GravelWith all Cum 1689.93 2200.00 3717846.00 1684.50 3705900.00 11946.00 0.00
lead and lift etc complete as per specification & as per the
direction of the engineer incharge of the work.
Page 53

7 Supplying S&S RCC SPUN / VIBRATED CAST PIPES


(REINFORCED) pipes NP-3 Class conforming to IS:458-1988
with latest amentments using ordinary portland cement, for
sanitary works and conveying to work site, rolling and
lowering into trenches, laying true to line and level including
loading and unloading at both destinations and jointing of
pipes and specials, perfect linking of joints with jack to
correct position including cost of jointing materials, i.e,
rubber rings conforming to IS: 5382 for S&S RCC pipes, with
all leads and lifts as directed and giving necessary hydraulic
test as per ISS to the required pressure and commissioning
etc. complete. (Contractor will make his own arrangements
for procuring water for testing). Before the execution of the Mtr 170.00 1200.00 204000.00 170.00 204000.00 0.00 0.00
work, the contractor shall carry out the survey.RCC NP3 Class
pipe of 300 mm dia.With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge
of the work.

8 Constructing brick masonry chamber of internal dimension


600x600mm and depth of 600mm (inner dimensions) with
modular bricks of CD 75 in cement mortar 1:6, bed concrete
150mm thick with 1:3:6, plastering 12 mm thick with
cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI
cover & frame etc. excluding the cost of CI frame and cover..
T130BWith all lead and lift etc complete as per specification each 30.00 5500.00 165000.00 28.00 154000.00 11000.00 0.00
& as per the direction of the engineer incharge of the work.

9 Removal of Unserviceable Soil with Disposal upto a suitable


distance as directed by the Engineer incharge of work(With
all need and left, loading and unloading and as directed by Cum 22507.47 35.00 787761.45 22507.47 787761.45 0.00 0.00
engineer in charge of work)
Page 54

10 Providing and laying in position plain cement concrete for


levelling course for all works in foundation. The
granite/trap/basalt crushed graded coarse aggregates and
fine aggregates as per relevant IS Codes machine mixed, laid
in layers not exceeding 150 mm thickness, well compacted
using plate vibrators, including all lead & lifts, cost of all
materials of quality, labour, Usage charges of machineries,
curing, and all the other appurtenances required to complete
the work as per technical specifications. (The cost of steel
reinforcement & formwork shall be paid separately) Mix
1:3:6 (M10) Using 40 mm nominal size graded crushed coarse Cum 288.91 6200.00 1791242.00 288.91 1791242.00 0.00 0.00
aggregates With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge
of the work.

11 Providing and laying in position Reinforced cement concrete


for all Sub structures of building, Irrigation works, Sub
structure works of bridges, Drain works & other parallel
works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per
relevant IS Codes machine mixed with super plasticisers, laid
in layers, well compacted using needle vibrators, providing
weep holes wherever necesary, including all lead & lifts, cost
of all materials of quality, confirming to the requirements of
relevant IS codes, labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work
as per techni�al specifications. (The cost of steel
reinforcement & formwork to be paid separately) M20 Cum 1249.94 8950.00 11186963.00 1248.07 11170226.50 16736.50 0.00
Design Mix Using 20 mm nominal size graded crushed coarse
aggregates (With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge
of the work.)
Page 55

12 Providing Thermo-Mechanically Treated bars of grade Fe-


500D or more Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position, binding
and anchoring to adjacent members whereever necessary
complete as per Design including cost of material, labour,
usage charges complete as per specifications. (The laps and
wastages shall not be measured separately)With all lead and Kg 89881.12 105.00 9437517.60 89714.76 9420049.80 17467.80 0.00
lift etc complete as per specification & as per the direction of
the engineer incharge of the work.

13 Demolishing cement concrete manually/ by mechanical


means including disposal of material to the appropriate
disposal area as per direction of Engineer-in-charge Cum 29.93 1400.00 41902.00 29.68 41552.00 350.00 0.00

14 Providing and Filling in foundation with granite / trap broken


metal 100mm . and down size & with approved sand
including hand packing , ramming , watering , including cost
of all materials and labourWith all lead and lift etc complete
as per specification & as per the direction of the engineer Cum 54.84 2700.00 148068.00 54.82 148014.00 54.00 0.00
incharge of the work.

15 Refilling available earth around trenches/pipelines, cables in


layers not exceeding 20 cms in depth, compacting each
deposited layer by ramming after watering with a lead and
lift Including cost of alllabourcomplete as per specifications
With all lead and lift etc complete as per specification & as Cum 433.90 130.00 56407.00 422.25 54892.50 1514.50 0.00
per the direction of the engineer incharge of the work.

16 Providing and laying flooring with burnt stone slabs 10 cms


thick, rough chistle dressed on sand bed 7.5 cms to 8 cms
thick and pointed with cement mortar 1:3, , including cost of
materials, sand, labour, curing complete as per
specifications.With all lead and lift etc complete as per Sqm 1125.00 990.00 1113750.00 1123.52 1112284.80 1465.20 0.00
specification & as per the direction of the engineer incharge
of the work.

Total 49907301.11 49828636.02 78665.09 0.00


18% Gst 8983314.20 8969154.48 14159.72 0.00
Grand Total 58890615.31 58797790.50 92824.81 0.00

Assistant Engineer-2 Assistant Executive Engineer


MDP Davangere M.D.P. Special Tech Sub-Division.,
Davangere
Construction of granular sub-base using crusher run spreading in uniform layers with motor grader on prepared
surface mixing by mix in place method with rotovator at OMC and compacting with vibratory roller to achieve the
4 4 desired density, complete per clause 401. With all lead and lift etc complete as per specification & as per the
direction of the engineer incharge of the work.

GSB Calcualtion Report

AVG
AVG GSB AVG AVG
Embankme GSB Level Depth in Sec Area Length in
Sl.No. Chainage Level Width in m Area In Valume In
nt Level in m m in Sqm m
in m sqm Cum
in m

L C R
Fruit Market Road From CH 0.00 m to 59.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.70 1.90 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.70 1.90 1.90 30.00 57.15

3 59.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.70 1.90 1.90 29.00 55.25

G- Block Cross Road From CH 0.00 m to 59.50 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40

3 59.50 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 29.50 58.41

Road No- 10 From CH 0.00 m to 132.40 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.50 1.88 1.91 30.00 57.38

3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.50 1.88 1.88 30.00 56.25

4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.50 1.88 1.88 30.00 56.25

5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 1.84 30.00 55.13

6 132.40 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 1.80 12.40 22.32

G-1 Block Road From CH 0.00 m to 78.80 m

1 Bell Mouth 0.50 9.700 13.200 0.150 9.60

2 For Road 1.00 18.900 13.200 0.150 37.42

3 1.00 34.800 13.200 0.150 68.90

4 Bell Mouth 0.50 15.400 13.200 0.150 15.25

Road No -5 From CH 0.00 m to 207.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 2.43 30.00 72.90

3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.40 2.46 2.44 30.00 73.35

4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.50 2.48 2.47 30.00 74.02

5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.70 2.51 2.49 30.00 74.70

6 150.00 #REF! #REF! #REF! #REF! #REF! 0.150 17.00 2.55 2.53 30.00 75.82

7 180.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.40 1.86 2.21 30.00 66.15

8 195.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.53 15.00 22.95

9 Bell Mouth 0.50 12.000 16.200 0.150 14.58

Road No -5 From CH 220.00 m to 374.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.70 2.51 0.00 0.00 0.00

2 237.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.70 2.51 2.51 30.00 75.15

3 267.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.60 2.49 2.50 30.00 74.93

4 297.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.40 2.46 2.47 30.00 74.25

5 327.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.65 2.35 2.40 30.00 72.11
AVG
AVG GSB AVG AVG
Embankme GSB Level Depth in Sec Area Length in
Sl.No. Chainage Level Width in m Area In Valume In
nt Level in m m in Sqm m
in m sqm Cum
in m

L C R
6 357.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.16 1.97 2.16 30.00 64.82

7 374.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.25 1.69 1.83 17.00 31.12

Road No -6 From CH 0.00 m to 261.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.60 2.49 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.40 2.46 2.47 30.00 74.25

3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 2.44 30.00 73.35

4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.20 2.43 2.43 30.00 72.90

5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.00 2.40 2.42 30.00 72.45

6 150.00 #REF! #REF! #REF! #REF! #REF! 0.150 16.00 2.40 2.40 30.00 72.00

7 180.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.90 2.39 2.43 30.00 72.84

8 210.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.80 2.37 2.41 30.00 72.32

9 240.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.90 2.39 2.40 30.00 72.00

10 261.00 #REF! #REF! #REF! #REF! #REF! 0.150 15.90 2.39 2.39 21.00 50.26

2000 MT Godown Cross Road From CH 0.00 m to 49.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.10 1.66 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.80 1.77 1.72 30.00 51.52

3 49.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.30 1.85 1.81 20.00 36.15

Road No 4 From CH 0.00 m to 93.50 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 30.00 36.00

3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 30.00 36.00

4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 30.00 36.00

5 93.50 #REF! #REF! #REF! #REF! #REF! 0.150 8.00 1.20 1.20 3.50 4.20

Road No 4 Extanction From CH 0.00 m to 45.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40

3 45.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 15.00 29.70

Btn Road No 3 to 4 (Cross road) From CH 0.00 m to 75.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40

3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 30.00 59.40

4 75.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.20 1.98 1.98 15.00 29.70

Road No 11 From CH 0.00 m to 137.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.50 1.72 0.00 0.00 0.00

2 30.00 #REF! #REF! #REF! #REF! #REF! 0.150 11.60 1.74 1.73 0.00

3 60.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.40 1.86 1.77 0.00

4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.80 1.92 1.84 0.00

5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.30 2.00 1.93 0.00

6 137.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.30 2.00 1.90 0.00

A1 Block From CH 0.00 m to 160.00 m

1 0.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 0.00 0.00 0.00

2 30.00 101.424 101.496 101.674 101.551 101.574 0.150 12.00 1.80 1.80 30.00 54.00

3 60.00 101.553 101.655 101.803 101.650 101.703 0.150 12.00 1.80 1.80 30.00 54.00
AVG
AVG GSB AVG AVG
Embankme GSB Level Depth in Sec Area Length in
Sl.No. Chainage Level Width in m Area In Valume In
nt Level in m m in Sqm m
in m sqm Cum
in m

L C R
4 90.00 #REF! #REF! #REF! #REF! #REF! 0.150 12.00 1.80 1.80 30.00 54.00

5 120.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 1.85 30.00 55.50

6 150.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 1.90 30.00 57.00

7 160.00 #REF! #REF! #REF! #REF! #REF! 0.150 13.00 1.95 1.88 10.00 18.75

Cum Total 2838.66

Contractor Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in
stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill- up the
interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical
5 5 Specification Clause 405. Grading-I 63 mm to 45 mm a.Using Screening Crushable type such as Moorum or Gravel
With all lead and lift etc complete as per specification & as per the direction of the engineer incharge of the work.

WBM G-I Calcualtion Report

AVG GSB AVG WBM AVG AVG


WBM G-I Level Depth in Sec Area Length in
Sl.No. Chainage Level G-I Level Width in m Area In Valume In
in m m in Sqm m
in m in m sqm Cum

L C R
Fruit Market Road From CH 0.00 m to 59.00 m

1 0.00 100.193 100.221 100.368 100.216 100.268 0.0750 12.70 0.95 0.00 0.00 0.00

2 30.00 100.472 100.500 100.648 100.495 100.548 0.0755 12.70 0.96 0.96 30.00 28.67

3 59.00 100.563 100.590 100.738 100.585 100.638 0.0745 12.70 0.95 0.95 29.00 27.62

G- Block Cross Road From CH 0.00 m to 59.50 m

1 0.00 99.764 99.791 99.938 99.786 99.838 0.0745 13.20 0.98 0.00 0.00 0.00

2 30.00 99.560 99.591 99.736 99.581 99.636 0.0750 13.20 0.99 0.99 30.00 29.60

3 59.50 99.465 99.495 99.641 99.486 99.541 0.0755 13.20 1.00 0.99 29.50 29.30

Road No- 10 From CH 0.00 m to 132.40 m

1 0.00 100.183 100.160 100.358 100.255 100.258 0.0745 12.70 0.95 0.00 0.00 0.00

2 30.00 100.193 100.220 100.368 100.215 100.268 0.0750 12.70 0.95 0.95 30.00 28.48

3 60.00 100.202 100.230 100.378 100.225 100.277 0.0755 12.70 0.96 0.96 30.00 28.67

4 90.00 100.270 100.300 100.445 100.290 100.345 0.0750 12.70 0.95 0.96 30.00 28.67

5 120.00 100.309 100.340 100.485 100.330 100.385 0.0755 12.70 0.96 0.96 30.00 28.67

6 132.40 100.341 100.370 100.515 100.360 100.415 0.0745 12.70 0.95 0.95 12.40 11.81

G-1 Block Road From CH 0.00 m to 80.00 m

1 Bell Mouth 0.50 17.500 13.200 0.0750 8.66

2 For Road 1.00 18.900 13.200 0.0750 18.71

3 1.00 34.800 13.200 0.0750 34.45

4 Bell Mouth 0.50 27.900 13.200 0.0750 13.81

Road No -5 From CH 0.00 m to 205.00 m

1 0.00 99.723 99.745 99.898 99.750 99.798 0.0750 16.20 1.22 0.00 0.00 0.00

2 30.00 99.545 99.865 99.720 99.275 99.620 0.0750 16.20 1.22 1.22 30.00 36.45

3 60.00 99.944 99.971 100.118 99.966 100.018 0.0745 16.40 1.22 1.22 30.00 36.55

4 90.00 100.057 100.085 100.233 100.080 100.133 0.0755 16.50 1.25 1.23 30.00 37.01

5 120.00 100.179 100.206 100.353 100.201 100.253 0.0745 16.70 1.24 1.24 30.00 37.35

6 150.00 100.202 100.225 100.378 100.230 100.277 0.0750 17.00 1.28 1.26 30.00 37.79

7 180.00 100.244 100.270 100.420 100.270 100.320 0.0755 12.40 0.94 1.11 30.00 33.17

8 195.00 100.265 100.290 100.440 100.290 100.340 0.0750 8.00 0.60 0.77 15.00 11.52

9 Bell Mouth 0.50 12.000 16.200 0.0750 7.29

Road No -5 From CH 220.00 m to 374.00 m

1 0.00 98.903 98.925 99.078 98.930 98.978 0.0750 16.70 1.25 0.00 0.00 0.00

2 237.00 98.802 98.825 98.978 98.830 98.878 0.0755 16.70 1.26 1.26 30.00 37.70

3 267.00 98.702 98.730 98.878 98.725 98.777 0.0750 16.60 1.25 1.25 30.00 37.59
AVG GSB AVG WBM AVG AVG
WBM G-I Level Depth in Sec Area Length in
Sl.No. Chainage Level G-I Level Width in m Area In Valume In
in m m in Sqm m
in m in m sqm Cum

L C R
4 297.00 98.591 98.620 98.766 98.611 98.666 0.0745 16.40 1.22 1.23 30.00 37.00

5 327.00 98.503 98.575 98.678 98.480 98.578 0.0750 15.65 1.17 1.20 30.00 35.93

6 357.00 98.450 98.480 98.625 98.471 98.525 0.0745 13.16 0.98 1.08 30.00 32.31

7 374.00 98.310 98.330 98.485 98.340 98.385 0.0750 11.25 0.84 0.91 17.00 15.51

Road No -6 From CH 0.00 m to 261.00 m

1 0.00 98.890 98.920 99.065 98.910 98.965 0.0750 16.60 1.25 0.00 0.00 0.00

2 30.00 98.980 99.000 99.155 99.010 99.055 0.0750 16.40 1.23 1.24 30.00 37.13

3 60.00 99.073 99.100 99.248 99.095 99.148 0.0745 16.20 1.21 1.22 30.00 36.55

4 90.00 99.160 99.191 99.336 99.181 99.236 0.0755 16.20 1.22 1.22 30.00 36.45

5 120.00 99.248 99.276 99.423 99.270 99.323 0.0750 16.00 1.20 1.21 30.00 36.35

6 150.00 99.341 99.370 99.516 99.361 99.416 0.0745 16.00 1.19 1.20 30.00 35.88

7 180.00 99.430 99.460 99.605 99.450 99.505 0.0750 15.90 1.19 1.21 30.00 36.38

8 210.00 99.489 99.520 99.665 99.510 99.565 0.0755 15.80 1.19 1.21 30.00 36.16

9 240.00 99.549 99.581 99.723 99.566 99.623 0.0745 15.90 1.18 1.20 30.00 35.97

10 261.00 99.617 99.640 99.793 99.645 99.693 0.0750 15.90 1.19 1.20 10.00 11.97

2000 MT Godown Cross Road From CH 0.00 m to 49.00 m

1 0.00 98.950 98.975 99.125 98.975 99.025 0.0750 11.10 0.83 0.00 0.00 0.00

2 30.00 98.800 98.825 98.975 98.825 98.875 0.0750 11.80 0.89 0.86 30.00 25.76

3 49.00 98.856 98.881 99.031 98.881 98.931 0.0745 12.30 0.92 0.90 20.00 18.01

2000 MT Godown Road From CH 0.00 m to 93.50 m

1 0.00 99.196 99.221 99.371 99.221 99.271 0.0745 8.00 0.60 0.00 0.00 0.00

2 30.00 99.213 99.235 99.388 99.240 99.288 0.0750 8.00 0.60 0.60 30.00 17.94

3 60.00 99.364 99.390 99.540 99.390 99.440 0.0755 8.00 0.60 0.60 30.00 18.00

4 90.00 99.411 99.436 99.586 99.436 99.486 0.0745 8.00 0.60 0.60 30.00 18.00

5 93.50 99.406 99.431 99.581 99.431 99.481 0.0745 8.00 0.60 0.60 3.50 2.10

Cum Total 1152.95

Contractor Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller
in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill
6 6 up the interstices of coarse aggregate, watering and compacting to the required density.Grading-II 53 mm to 22.4
mm (a)Using Screening Crushable type such as Moorum or GravelWith all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the work.

WBM G-II Calcualtion Report

AVG WBM AVG WBM AVG AVG


WBM G-II Level Depth in Sec Area Length in
Sl.No. Chainage G-I Level G-II Level Width in m Area In Valume In
in m m in Sqm m
in m in m sqm Cum

L C R
Fruit Market Road From CH 0.00 m to 59.00 m

1 0.00 100.268 100.295 100.443 100.290 100.343 0.0745 12.70 0.95 0.00 0.00 0.00

2 30.00 100.548 100.575 100.723 100.570 100.623 0.0750 12.70 0.95 0.95 30.00 28.48

3 59.00 100.637 100.665 100.813 100.660 100.712 0.0750 12.70 0.95 0.95 29.00 27.62

G- Block Cross Road From CH 0.00 m to 59.50 m

1 0.00 99.838 99.865 100.013 99.860 99.913 0.0745 13.20 0.98 0.00 0.00 0.00

2 30.00 99.636 99.665 99.810 99.655 99.710 0.0745 13.20 0.98 0.98 30.00 29.50

3 59.50 99.541 99.570 99.715 99.560 99.615 0.0745 13.20 0.98 0.98 29.50 29.01

Road No- 10 From CH 0.00 m to 132.40 m

1 0.00 100.258 100.235 100.433 100.330 100.333 0.0750 12.70 0.95 0.00 0.00 0.00

2 30.00 100.268 100.295 100.443 100.290 100.343 0.0750 12.70 0.95 0.95 30.00 28.58

3 60.00 100.278 100.305 100.453 100.300 100.353 0.0750 12.70 0.95 0.95 30.00 28.58

4 90.00 100.345 100.375 100.520 100.365 100.420 0.0750 12.70 0.95 0.95 30.00 28.58

5 120.00 100.385 100.415 100.560 100.405 100.460 0.0750 12.70 0.95 0.95 30.00 28.58

6 132.40 100.415 100.445 100.590 100.435 100.490 0.0750 12.70 0.95 0.95 12.40 11.81

G-1 Block Road From CH 0.00 m to 80.00 m

1 Bell Mouth 0.50 17.500 13.200 0.0750 8.66

2 For Road 1.00 18.900 13.200 0.0750 18.71

3 1.00 34.800 13.200 0.0750 34.45

4 Bell Mouth 0.50 27.900 13.200 0.0750 13.81

Road No -5 From CH 0.00 m to 205.00 m

1 0.00 99.798 99.820 99.973 99.825 99.873 0.0750 16.20 1.22 0.00 0.00 0.00

2 30.00 99.620 99.940 99.795 99.350 99.695 0.0750 16.20 1.22 1.22 30.00 36.45

3 60.00 100.018 100.045 100.193 100.040 100.093 0.0745 16.40 1.22 1.22 30.00 36.55

4 90.00 100.133 100.160 100.308 100.155 100.208 0.0750 16.50 1.24 1.23 30.00 36.89

5 120.00 100.253 100.280 100.428 100.275 100.328 0.0745 16.70 1.24 1.24 30.00 37.22

6 150.00 100.278 100.300 100.453 100.305 100.353 0.0750 17.00 1.28 1.26 30.00 37.79

7 180.00 100.320 100.345 100.495 100.345 100.395 0.0750 12.40 0.93 1.10 30.00 33.08

8 195.00 100.340 100.365 100.515 100.365 100.415 0.0750 8.00 0.60 0.77 15.00 11.48

9 Bell Mouth 0.50 12.000 16.200 0.0750 7.29

Road No -5 From CH 220.00 m to 374.00 m

1 0.00 98.978 99.000 99.153 99.005 99.053 0.0750 16.70 1.25 0.00 0.00 0.00

2 237.00 98.878 98.900 99.053 98.905 98.953 0.0750 16.70 1.25 1.25 30.00 37.58

3 267.00 98.778 98.805 98.953 98.800 98.853 0.0750 16.60 1.25 1.25 30.00 37.46

4 297.00 98.666 98.695 98.840 98.685 98.740 0.0745 16.40 1.22 1.23 30.00 37.00
AVG WBM AVG WBM AVG AVG
WBM G-II Level Depth in Sec Area Length in
Sl.No. Chainage G-I Level G-II Level Width in m Area In Valume In
in m m in Sqm m
in m in m sqm Cum

L C R
5 327.00 98.578 98.650 98.753 98.555 98.653 0.0750 15.65 1.17 1.20 30.00 35.93

6 357.00 98.525 98.554 98.700 98.545 98.599 0.0745 13.16 0.98 1.08 30.00 32.31

7 374.00 98.385 98.405 98.560 98.415 98.460 0.0750 11.25 0.84 0.91 17.00 15.51

Road No -6 From CH 0.00 m to 261.00 m

1 0.00 98.965 98.995 99.140 98.985 99.040 0.0750 16.60 1.25 0.00 0.00 0.00

2 30.00 99.055 99.075 99.230 99.085 99.130 0.0750 16.40 1.23 1.24 30.00 37.13

3 60.00 99.148 99.175 99.323 99.170 99.223 0.0750 16.20 1.22 1.22 30.00 36.68

4 90.00 99.236 99.265 99.410 99.255 99.310 0.0745 16.20 1.21 1.21 30.00 36.33

5 120.00 99.323 99.351 99.498 99.345 99.398 0.0750 16.00 1.20 1.20 30.00 36.10

6 150.00 99.416 99.445 99.590 99.435 99.490 0.0745 16.00 1.19 1.20 30.00 35.88

7 180.00 99.505 99.535 99.680 99.525 99.580 0.0750 15.90 1.19 1.21 30.00 36.35

8 210.00 99.565 99.595 99.740 99.585 99.640 0.0750 15.80 1.19 1.20 30.00 36.09

9 240.00 99.623 99.655 99.798 99.640 99.698 0.0745 15.90 1.18 1.20 30.00 35.90

10 261.00 99.693 99.715 99.868 99.720 99.768 0.0750 15.90 1.19 1.19 10.00 11.93

2000 MT Godown Cross Road From CH 0.00 m to 49.00 m

1 0.00 99.025 99.050 99.200 99.050 99.100 0.0750 11.10 0.83 0.00 0.00 0.00

2 30.00 98.875 98.900 99.050 98.900 98.950 0.0750 11.80 0.89 0.86 30.00 25.76

3 49.00 98.931 98.955 99.105 98.955 99.005 0.0745 12.30 0.92 0.90 20.00 18.01

2000 MT Godown Road From CH 0.00 m to 93.50 m

1 0.00 99.271 99.295 99.445 99.295 99.345 0.0745 8.00 0.60 0.00 0.00 0.00

2 30.00 99.288 99.310 99.463 99.315 99.363 0.0750 8.00 0.60 0.60 30.00 17.94

3 60.00 99.440 99.465 99.615 99.465 99.515 0.0750 8.00 0.60 0.60 30.00 17.96

4 90.00 99.486 99.510 99.660 99.510 99.560 0.0745 8.00 0.60 0.60 30.00 17.96

5 93.50 99.480 99.505 99.655 99.505 99.555 0.0745 8.00 0.60 0.60 3.50 2.09

Road No 4 Extention From CH 0.00 m to 45.00 m

1 0.00 99.594 99.670 99.670 99.670 99.670 0.0755 15.20 1.15 0.00 0.00 0.00

2 30.00 99.400 99.475 99.475 99.475 99.475 0.0745 15.20 1.13 1.14 30.00 34.20

3 45.00 99.250 99.325 99.325 99.325 99.325 0.0745 15.20 1.13 1.13 15.00 16.99

Btn Road No 3 to 4 (Cross road) From CH 0.00 m to 75.00 m

1 0.00 99.309 99.385 99.380 99.385 99.383 0.0745 15.20 1.13 0.00 0.00 0.00

2 30.00 100.111 100.190 100.180 100.190 100.187 0.0755 15.20 1.15 1.14 30.00 34.20

3 60.00 100.915 100.995 100.980 100.995 100.990 0.0750 15.20 1.14 1.14 30.00 34.31

4 75.00 101.297 101.375 101.365 101.375 101.372 0.0745 15.20 1.13 1.14 15.00 17.04

Road No 11 From CH 0.00 m to 137.00 m

1 0.00 99.767 99.845 99.835 99.845 99.842 0.0745 11.50 0.86 0.00 0.00 0.00

2 30.00 99.443 99.520 99.515 99.520 99.518 0.0755 11.60 0.88 0.87 30.00 25.99

3 60.00 99.127 99.205 99.195 99.205 99.202 0.0750 12.40 0.93 0.90 30.00 27.09

4 90.00 98.807 98.885 98.875 98.885 98.882 0.0750 12.80 0.96 0.95 30.00 28.35

5 120.00 98.482 98.560 98.550 98.560 98.557 0.0750 13.30 1.00 0.98 30.00 29.36

6 137.00 98.287 98.365 98.355 98.365 98.362 0.0745 13.30 0.99 0.99 17.00 16.90

A1 Block Road No 9 MMY


AVG WBM AVG WBM AVG AVG
WBM G-II Level Depth in Sec Area Length in
Sl.No. Chainage G-I Level G-II Level Width in m Area In Valume In
in m m in Sqm m
in m in m sqm Cum

L C R
From CH 0.00 m to 160.00 m

1 0.00 99.899 99.980 99.960 99.980 99.973 0.0745 11.50 0.86 0.00 0.00 0.00

2 30.00 100.180 100.260 100.245 100.260 100.255 0.0750 11.60 0.87 0.86 30.00 25.90

3 60.00 100.495 100.585 100.540 100.585 100.570 0.0750 12.40 0.93 0.90 30.00 27.00

4 90.00 100.738 100.820 100.800 100.820 100.813 0.0750 12.80 0.96 0.95 30.00 28.35

5 120.00 101.019 101.100 101.085 101.100 101.095 0.0755 13.30 1.00 0.98 30.00 29.46

6 150.00 101.302 101.380 101.370 101.380 101.377 0.0745 13.30 0.99 1.00 30.00 29.93

7 160.00 101.400 101.480 101.465 101.480 101.475 0.0750 13.30 1.00 0.99 10.00 9.94

Tender Qty 1689.93 Cum Present Payable Qty Cum Total 1566.02
Tender Rate 2200.00 Rs

Contractor Assistant Engineer-2 Assistant Executive Engineer


M.D.P. Special Tech Sub-Division.,
Davanagere
Name of the Work : 1)Construction of CC Road, Toilet, Watersupply, compound wall and Entrance Gate at Santebennur SMY of apmc channagiri, 2) Widening of First Main
& Second Cross CC Road and Construction of Drain at MMY of apmc channagiri , 3)Renovation of Administrative Office, APJ and NGRG Godowns at MMY of APMC
Channagiri Under AAP 2021-22
Comparative Statement
As per Sanctioned Tenderd Schedule - B Work Done Savingas Excess
Sl. No. Particulars Unit
Qty Rate Amount Qty Amount
1 2 3 4 5 6 7 8 9 10
Earth work excavation for Foundation by mechanical means for all works
& any depth , as per drawing and technical specifications, including
setting out, shoring, strutting, barricading, caution lights, including
dressing of excavated surfaces, disposing off or levelling the excavated
earth or sorting & stacking the selected earth for reuse in a radius and
1
lift including cost of labour, tools, usage of machinery & other
Cum 22711.66 80.00 1816932.80 22683.04 1814643.20 2289.60 0.00
appurtenaces required to complete the work With all lead and lift etc
complete as per specification & as per the direction of the engineer
incharge of the work.

Loosening , leveling and Compacting original ground supporting


embankment to facilitate placement of first layer of embankment ,
scarified to a depth , mixed with water at OMC and then compacted by
rolling so as to achieve minimum dry density as given in Table 300-2 for
2 embankment construction .With all lead and lift etc complete as per Cum 2253.24 99.00 223070.76 2199.53 217753.47 5317.29 0.00
specification & as per the direction of the engineer incharge of the
work.

Construction of Embankment by excavating the available approved


Gravel/Murrum deposited at a place or borrow pits during or prior
excavation with all lifts and lead, transportation to site, spreading,
grading to required slope and compacting to meet the requirement
complete as per specifications, including cost of labour, rolling, water,
all materials, usage& all other appurtenaces required to complete the
3
work.With all lead and lift etc complete as per specification & as per the Cum 15816.90 435.00 6880351.50 15810.78 6877689.30 2662.20 0.00
direction of the engineer incharge of the work.

Construction of granular sub-base using crusher run spreading in


uniform layers with motor grader on prepared surface mixing by mix in
place method with rotovator at OMC and compacting with vibratory
roller to achieve the desired density, complete per clause 401. With all
4 lead and lift etc complete as per specification & as per the direction of Cum 3379.86 2500.00 8449650.00 3379.65 8449125.00 525.00 0.00
the engineer incharge of the work.
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber, applying
and brooming, stone screening/binding materials to fill- up the
interstices of coarse aggregate, watering and compacting to the
required density grading 2 as per Technical Specification Clause 405.
5 Grading-I 63 mm to 45 mm a.Using Screening Crushable type such as Cum 1689.93 2300.00 3886839.00 1686.74 3879502.00 7337.00 0.00
Moorum or Gravel With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the
work.

Providing, laying, spreading and compacting stone aggregates of


specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3 wheeled
steel/ vibratory roller in stages to proper grade and camber, applying
and brooming requisite type of screening/ binding Materials to fill up
the interstices of coarse aggregate, watering and compacting to the
required density.Grading-II 53 mm to 22.4 mm (a)Using Screening
6 Crushable type such as Moorum or GravelWith all lead and lift etc Cum 1689.93 2200.00 3717846.00 1684.50 3705900.00 11946.00 0.00
complete as per specification & as per the direction of the engineer
incharge of the work.

Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes


NP-3 Class conforming to IS:458-1988 with latest amentments using
ordinary portland cement, for sanitary works and conveying to work
site, rolling and lowering into trenches, laying true to line and level
including loading and unloading at both destinations and jointing of
pipes and specials, perfect linking of joints with jack to correct position
including cost of jointing materials, i.e, rubber rings conforming to IS:
5382 for S&S RCC pipes, with all leads and lifts as directed and giving
necessary hydraulic test as per ISS to the required pressure and
commissioning etc. complete. (Contractor will make his own
7 arrangements for procuring water for testing). Before the execution of Mtr 170.00 1200.00 204000.00 170.00 204000.00 0.00 0.00
the work, the contractor shall carry out the survey.RCC NP3 Class pipe
of 300 mm dia.With all lead and lift etc complete as per specification &
as per the direction of the engineer incharge of the work.

Constructing brick masonry chamber of internal dimension 600x600mm


and depth of 600mm (inner dimensions) with modular bricks of CD 75
in cement mortar 1:6, bed concrete 150mm thick with 1:3:6,
plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm
thk for fixing CI cover & frame etc. excluding the cost of CI frame and
8 cover.. T130BWith all lead and lift etc complete as per specification & each 30.00 5500.00 165000.00 28.00 154000.00 11000.00 0.00
as per the direction of the engineer incharge of the work.
Removal of Unserviceable Soil with Disposal upto a suitable distance as
directed by the Engineer incharge of work(With all need and left,
9 loading and unloading and as directed by engineer in charge of work) Cum 22507.47 35.00 787761.45 22507.47 787761.45 0.00 0.00

Providing and laying in position plain cement concrete for levelling


course for all works in foundation. The granite/trap/basalt crushed
graded coarse aggregates and fine aggregates as per relevant IS Codes
machine mixed, laid in layers not exceeding 150 mm thickness, well
compacted using plate vibrators, including all lead & lifts, cost of all
materials of quality, labour, Usage charges of machineries, curing, and
all the other appurtenances required to complete the work as per
technical specifications. (The cost of steel reinforcement & formwork
10 shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size Cum 288.91 6200.00 1791242.00 288.91 1791242.00 0.00 0.00
graded crushed coarse aggregates With all lead and lift etc complete as
per specification & as per the direction of the engineer incharge of the
work.

Providing and laying in position Reinforced cement concrete for all Sub
structures of building, Irrigation works, Sub structure works of bridges,
Drain works & other parallel works from 0.50m to 3.50 m height. The
granite/trap/basalt crushed graded coarse aggregates and fine
aggregates as per relevant IS Codes machine mixed with super
plasticisers, laid in layers, well compacted using needle vibrators,
providing weep holes wherever necesary, including all lead & lifts, cost
of all materials of quality, confirming to the requirements of relevant IS
codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per techni�al
11 specifications. (The cost of steel reinforcement & formwork to be paid Cum 1249.94 8950.00 11186963.00 1248.07 11170226.50 16736.50 0.00
separately) M20 Design Mix Using 20 mm nominal size graded crushed
coarse aggregates (With all lead and lift etc complete as per
specification & as per the direction of the engineer incharge of the
work.)

Providing Thermo-Mechanically Treated bars of grade Fe-500D or more


Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position, binding and anchoring to adjacent
members whereever necessary complete as per Design including cost
of material, labour, usage charges complete as per specifications. (The
laps and wastages shall not be measured separately)With all lead and
12
lift etc complete as per specification & as per the direction of the Kg 89881.12 105.00 9437517.60 89714.76 9420049.80 17467.80 0.00
engineer incharge of the work.

Demolishing cement concrete manually/ by mechanical means


including disposal of material to the appropriate disposal area as per
13
direction of Engineer-in-charge Cum 29.93 1400.00 41902.00 29.68 41552.00 350.00 0.00
Providing and Filling in foundation with granite / trap broken metal
100mm . and down size & with approved sand including hand packing ,
ramming , watering , including cost of all materials and labourWith all
lead and lift etc complete as per specification & as per the direction of
14
the engineer incharge of the work. Cum 54.84 2700.00 148068.00 54.82 148014.00 54.00 0.00

Refilling available earth around trenches/pipelines, cables in layers not


exceeding 20 cms in depth, compacting each deposited layer by
ramming after watering with a lead and lift Including cost of
alllabourcomplete as per specifications With all lead and lift etc
15
complete as per specification & as per the direction of the engineer Cum 433.90 130.00 56407.00 422.25 54892.50 1514.50 0.00
incharge of the work.

Providing and laying flooring with burnt stone slabs 10 cms thick, rough
chistle dressed on sand bed 7.5 cms to 8 cms thick and pointed with
cement mortar 1:3, , including cost of materials, sand, labour, curing
complete as per specifications.With all lead and lift etc complete as per
16 specification & as per the direction of the engineer incharge of the Sqm 1125.00 990.00 1113750.00 1123.52 1112284.80 1465.20 0.00
work.

Total 49907301.11 49828636.02 78665.09 0.00


GST 18% 8983314.20 8969154.48 14159.72 0.00
Grand Total 58890615.31 58797790.50 92824.81 0.00

Assistant Engineer-2 Assistant Executive Engineer


MDP Davangere M.D.P. Special Tech Sub-Division.,
Davangere
Name Of Work : Package -3 : Construction of Link Road and Wire Fencing
around the Layout of Hamalas Residential Houses in H Giriyapura Sy.No.6.1 at
Boragondanahalli Village of APMC Davanagere Limit Under AAP 2022-23.

Date

Work order Date 1/19/2023

Work Complition Date 4/18/2023

1st PMR Date : 1/28/2023

2nd PMR Date : 2/6/2023

3rd PMR Date : 2/13/2023

4th PMR Date : 2/21/2023

Date Of Recording 3/9/2023

Name Of Work : Package -1 : 1)Construction of CC Drain for G-block Roads at


Main Market Yard of APMC Davangere 2)Improvements of G-block Roads at
main market yard of ampc davangere. 3)Improvements of A1-Block Road No 9 at
Main Market Yard of AMPC Davangere Under AAP 2022-23
Date

Work order Date 1/19/2023

Work Complition Date 4/18/2023

1st PMR Date : 1/20/2023

2nd PMR Date : 1/30/2023

3rd PMR Date : 2/14/2023

4th PMR Date : 2/25/2023


5th PMR Date : 3/1/2023

Date Of Recording 9-03.2023


on of Link Road and Wire Fencing
Houses in H Giriyapura Sy.No.6.1 at
nagere Limit Under AAP 2022-23.

Item No

E1,1,7,8,10,11,12,10

2,13

All mesurments

n of CC Drain for G-block Roads at


mprovements of G-block Roads at
provements of A1-Block Road No 9 at
er AAP 2022-23
Item No

OGL

1,2,1,14

10,12

3
4,15

All mesurments
Name Of Work : Package -3 : Construction of Link Road and Wire Fencing around the Layout of Hamalas Residential Houses in H
Giriyapura Sy.No.6.1 at Boragondanahalli Village of APMC Davanagere Limit Under AAP 2022-23.
Item No Item description Recording Date Qty Date of Sampling Daaaate of testing
Loosening , leveling and
1 Compacting original ground 1/28/2023 465.15
supporting embankment to
facilitate placement of first
Construction of Embankment
2 by excavating the available 2/6/2023 1285.80
approved Gravel/Murrum
deposited at a place or
Construction of granular sub-
3 base using crusher run 2/13/2023 438.61
spreading in uniform layers
with motor grader on
Grading-I 63 mm to 45 mm
4 (a)Using Screening Crushable 2/21/2023 219.30
type such as Moorum or
Gravel With all lead and lift
Grading-II 53 mm to 22.4 mm
5 (a)Using Screening Crushable 3/9/2023 228.49
type such as Moorum or
Gravel With all lead and lift
Mix 1:4:8( M5) Using 40 mm
8 nominal size For CD 1/28/2023 1.57

M20 Design Mix Using 20


9 mm nominal size For CD 3/9/2023 14.56

Providing Thermo-
10 Mechanically Treated bars of 1/28/2023 7811.04
grade Fe-500D or more Steel
reinforcement for R.C.C. work
1:4:8( M5) Using 40 mm
12 nominal size For All round 1/28/2023 28.41
Fensing Column
M20 Design Mix Using 20
13 mm nominal size For All 2/6/2023 32.48
round Fensing Footing
M20 Design Mix Using 20
14 mm nominal size For All 3/9/2023 35.69
round Fensing Column