0% found this document useful (0 votes)
20 views

Final Esp of Talcher-Balram - 4.5.2024-Model

Uploaded by

rachita1.odra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Final Esp of Talcher-Balram - 4.5.2024-Model

Uploaded by

rachita1.odra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

N

E
W
HS )
NO:17(L
CURVE '' S
HS) '50.232
NO:16(L Δ =15°4 3.98°)
CURVE '' m(
HS) ° 2 3'35.056 R =440 .789 m 142.345 CURVE NO:9 & 10(LHS)
NO:15(L Δ = 1 5
8°) 1 1 5
CL = .242 m Δ =11°7'49.6''
CURVE
CURVE NO:18(RHS) 100.05
CURVE NO:19(RHS) m(3.9m TL =58 mm
'58.187'' R =440 8 8 R =886.600 m(2°)
Δ =16°20'44.855'' Δ =16°20'55.171'' Δ =15°3 3.98°) CL =11.4 8.1 SE =35 ph

CH : 2462.00M F/CSB TLHR


m( m 63 m TL =101.431 m
R =440 m(3.98°) R =440 m(3.98°) R =440 5 .678 TL = 5 9
m m V=50 k4m kmph
CL =125.503 m CL =125.525 m 1
CL =1 .186 m SE =3 5 PSR= 5 TRL=30M

FL = 99.423M GTS
FL = 98.636M
m p h
TL =63.193 m TL =63.204 m TL =58 mm k
V=50 45 kmph S) TCL =202.201 m
SE =35 mm SE =35 mm SE =35 ph PSR= 2 ,1 3 &14 (LH CCL =142.201 m
V=50 k4m ,1
V=50 kmph V=50 kmph kmph NO:11
PSR=45 kmph PSR=45 kmph PSR= 5 CURVE '51.81'' SE =40 mm NOTE :
5 1. ALL CHAINAGES AND LEVELS ARE IN METER.
Δ =15°1 (3.98°) V=50 kmph 2. CSB OF TALCHER IS CONSIDERED AS 0.0M. TAKEOFF PT OF BYPASS LINE

TPCC-2 AT CH:-2220.479M F/CSB/TLHR

TPCC-2 AT CH:-2240.003M F/CSB/TLHR


TPTC-2 AT CH:-2269.768M F/CSB/TLHR

TPCC-2 AT CH:-2239.768M F/CSB/TLHR


TPTC-2 AT CH:-2270.003M F/CSB/TLHR
m

TPTC-2 AT CH:-2250.479M F/CSB/TLHR


R =4401 7 .2 m shift=0.043 m IS AT PT 2357.946M F/TLHR CSB. TAKEOFF PT OF BHARATPUR -
1
CL = .960 m JAGANNATH LINE IS AT PT 18736.749M F/ANGL CSB.
TL =585 mm TO W 3. S&T GOOMTY/SERVICE BUILDINGS ARE TO BE DECIDED
SE =3 mph

TP-1 AT CH:-2417.88M F/CSB/TLHR


ARD

1 AT C :-2099.382M F/CSB/TLHR
7.802M /CSB/TLHR
TPTC1 AT CH:-2360.380M F/CSB
CURVE NO:8(LHS)

/ TL H R
S BI
k CURVE NO:7 (LHS) AFTER JOINT SURVEY AS PER JPO NO JPO/01-2013 Dt

TO
V=50 45 kmph
TUM

SB
EN R
Δ =11°7'49.606''

1 AT C :-2069.382M F/CSB/TLHR
7.802M F/CSB/TLHR
= OAD

/TLHR
15.01.13.

W
PS R JAG Δ =11°7'39.939''

AR
TPCC1 AT CH:-2420.380M F/C
GA NNA
R =875m(2°) 4. DESIGN AXLE LOAD FORMATION IS 25 TONNE.
TH A R =875m(2°)

DS

F/CSB
REA 5. LOADING STD BRIDGES 25T-2008.
TL =100.301 m

X
TL =100.280 m

PC
LHR
X
X

F/CSB
C BO
CURVE NO:(LHS) 6. MINIMUM FORMATION WIDTH 7.85M.

/CSB
C BO
C BO
CURVE NO:(LHS) TRL=30M
Δ =38°30'9.89''

F
TRL=30M 7. TRACK CENTER SPACING MINIMUM 5.3M FOR DOUBLING.
Δ =16°5'51.688''

RO
SB/T
.345

0.572M
Δ =16°20'33.795'' 142 R =357.143m(4.9°) TCL =199.907 m TCL =199.948 m 8. TRACK STRUCTURE NEW WORK

AD
158.316

LHR
R =437.5 m(4°)

C
C
R =437.5 m(4°) TL =154.876m CCL =139.948 m

0.572M
R
CCL =139.907 m I) RAILS : MAIN LINE & LOOP LINE 60KG.

VIL
R
R

C
TL =86.901 m TCL =300.0m

)
TL =87.856 m SE =40 mm II) SLEEPER : MAIN LINE & LOOP LINE 60KG PSC 1660 NOS/KM.

LA
M
SE =40 mm

/
M)
T
2M

TPCC- AT CH:-208
CCL =180.0m

H:-209
TCL =172.919 m

GE
(WIDER BASE PSC SLEEPER TO BE PROVIDED)

/
TRL= 50M V=50 kmph

F
CH :

X 3.2 M X 3.72
V=50 kmph

8M
134.23

3. 72
SE =60 mm III) PT & CROSSING : 1 IN 12 TWS & 1 IN 8.5 CS.

AR
X 3.7
43M

TPTC- AT CH:-205
6 CCL =72.919 m

H:-206
B
TCL =174.790 m

FL = .0M F/C
158.31
shift=0.043 m shift=0.043 m

/TLHR
535.0
TR=60.0m

EA
6

F/CS
27 40
IV) BALLAST CUSHION: MAIN LINE 300MM CLEAN & LOOP LINE

H
CCL =74.79 m TRL=50M

/TLHR
1 AT C
shift=0.42m

X
1
250MM CLEAN.

HR
101.

H
.
SE =60 mm

M
DIVERTED ROAD

0
SE =60 mm V=50 kmph

M
9. RULING GRADIENT 1 IN 100.

1 AT C
DIVERTED ROAD

2
CH:3274.0M F/CSB TLHR

M
B/TL
ED A 1 X 3.25
377M B TLHR

F/CSB
3.25
V=50 kmph

-
:26

/TLHR
V=50 kmph 10. PRECAUTION TO BE TAKEN FOR EXISTING ELECTRICAL CABLES IF ANY

/TLHR
0

1
H

F/CSB
B

TPCC-

TPCC-
shift=.238m AND MODIFICATION/RELOCATION TO BE MADE IF REQUIRED.

C
9 CH
shift=.238m

600.
LOOP LINE-1 CAL-757.018 M (PT TO PT)

S
R

LHR
(1 X

/TLHR
FL=104.75M

C
11. ALL HT/LT OVERHEAD AND UNDER GROUND ELECTRICAL POWER LINE

AT
/TLH

TPTC-

TPTC-
6.3 6.3 6.3

32M
M F/

F/CSB
)

/
LOOP LINE-2 CAL-796.118M (FM TO FM)

F/CSB
1
NES CROSSING WILL BE MODIFIED AS PER REGULATION OF TRACK

MF

2
D AS
0
LL LI

(
N

TP-2

CSB/T
CH:-

.882M
S
-
CROSSING 1987, IF REQUIRED. APPROVAL OF DIVISION IS TO BE OBTAIN
OR A

CSB

A
O

/TLHR
LOOP LINE-3 CAL-1300.696M (FM TO FM)

875.4
0
(F

F/CSB
32.45
SP

/TLHR
N
BEFORE EXECUTION OF WORK.

/TLHR
E
.
AREA

LHR

2M
T
2660
F BR
12. NECESSARY SAFETY PRECAUTION TO BE TAKEN DURING EXECUTION

32M
M F/

/TLHR
ED

:-1855
TING
OHE498/11A(C)

A
OHE498/9A(C)

2M F/
G

END

5.3 6.5
LOG OHE498/13A(C) OHE498/7A(C)

CH:-1
TEN
OHE498/17A(C) OHE498/15A(C) OF WORK TO AVOID ANY DAMAGE TO THE EXISTING S&T CABLES.

F/CSB
6
ER

97.88
C2
WAT OHE498/19A(C)

F/CSB
/T

32M
TPTC

791.8
OHE498/5A(C) 13. IF ANY DIVERSION OF CABLE IS REQUIRED THEN IT SHOULD BE DONE

00

CH:-
(FOR ALL LINES

CL O

F/CSB
PIPE LINE
OHE498AT(C) OHE498/21A(C) OHE498/19(C)

:
OHE498/17(C)

CSB

TPC
)

S
T
TPTC

/TLHR
T CH
X

3
BEFORE EXECUTION OF WORK WITH PROPER SAFETY PRECAUTION

F/CSB
710.

T CH
OHE(D)

R
OHE498/3A(C)

X
I
TPTC1

/TLHR
E
OHE498/21(C)

5.3

771.8
X

7
PT AT

755.4
R
OHE498/23A(C)

B/TLH
E
L AND PRIOR INTIMATION TO CONCERNED SSE(SIG) AND SSE(TELE) IN

FM AT CH:-2988.478M F/CSB/TLHR
AL

CH:-1
E

32M
T
OHE(C)

CH:-1
PT AT CH:-2968.928M F/CSB/TLHR
RD W

1
H
PT AT CH:-3046.478M F/CSB/TLHR

M F/
HUTS

PT AT CH:-3052.978M F/CSB/TLHR

5.5

32M
DE AT CH:-316 2.978M F/CSB/TLHR

E
FM AT CH:-3072.528M F/CSB/TLHR

A
GUA

TPCC1 AT

:-2
CHARGE.

TO B
PT A
SB/TL
OHE498/1A(C)

AT C
1
OHE498/18(C)

6.3

.782M
OHE498/23(C)

TPCC1 AT

FM A
B
PT AT CH:-3130.528M F/CSB/TLHR

/CSB
OHE498/20(C)
DE AT CH:-3088.928F/CSB/TLHR

2
TPCC1 AT

CH:-1
14. DRAWING IS PREPARED BASED ON SITE DATA.

T CH
AT C

713.8
CH:-1

382M

F/CSB
.S

TPTC

TO
.45
OHE498/22(C)
.5 C
OHE498/25A(C)

F/CS
F/CSB

707.3
AT CH:-
OHE(C) OHE497/37A(C) 15. VERTICAL CURVES SHALL BE PROVIDED IN THE FIELD DURING
8

PT AT
PT AT
1 IN 120.0

H:-27
FM M ORL

2M F
M F/C
OHE498/24(C) CONSTRUCTION ONLY ON THOSE POINTS OF CHANGE OF GRADE

.3

:-1686
TP-2 AT CH:-2948.928M F/CSB/TLHR

HR
PT A
H:-28

:-275
LINE(N

6.3 6

CH:-1

.
T

:-1671
TPCC2 AT CH:-2922.585M F/C

T
O STA WHERE THE ALGEBRIC DIFFERENCE BETWEEN THE GRADES IS EQUAL

TPTC2 AT CH:-2972.585M F/CSB

M
CH:-1
OHE497/35A(C)

TPCC2 AT CH:-2925.165M F/C

.332M
FM A
G) FM

TPTC2 AT CH:-2975.165M F/CSB


FM

BOX
BLING

DE A
TPCC2 AT CH:-292

/CSB/TL
TPTC2 AT CH:-2971.365M F/CSB

SB
BLIN

99.66
OHE498/27A(C)

PT AT CH:-2388.000M

9.782
CH:-2849.6
TO OR MORE THAN 4MM WITH MINIMUM RADIUS OF VERTICAL CURVE

29.78
)

2
STA

FLOW
CH:-2850.3

H
23.425

00.37

LHR

T CH
796.986
CH:-2846.9

.3 6.3
1 IN 8 2500M.

.00M F/C
O

SB
C
( N

PT AT
INE .5 C.S

T CH
CL OF B SPAN(1 X 1.2MX2MX3.5M) RCC
OHE497/33A(C)

PT AT
16. DESIGN SPEED IS 50 KMPH.
RL L

:-1587
T
6M F
120.0

:-160
.00M F/C

6
HR
O

F/CSB/T
DE A

6.09 5
0M M ORL 17. GRADE CONDONATION FOR ALL EXISTING AS WELL AS PROPOSED

CH:-1
FM A
5M F
120. .S 1 IN 8

F
F/CSB
LINE(N

R
OHE498/29A(C)
8.5 C

HR

45.925M TOP)
.5 C.S F

B/TL

DE A
OHE497/31A (C) CUR PT-XINGS TO BE TAKEN BELOW 1 IN 400 GRADE BY GSU.
O STA

/TLH
N

M F/CS

/CSB
I ALL M VE

T CH
-
1 BLIN

T CH
RD W Δ =8° NO:6(LH

:
66M F/CSB
G)

B/TL

8
5.26

6.3
/CSB

0
GUA

75M F/CSB

4
44'16

PT AT
S)

0
S
C
86M F/CSB
1 IN 8.

4
OHE497/29A(C)

FLAT
R= .60

/CSB
6.6
438.0
6
C
5 C.S CL =700 m(2.5 3''

6.3

A
T

DE A
/CS
LL

:-
D WA

TP-1 A

4M F

4
120.0 TL = 106.734 °)

TP-2
B

6
R

CH
GUA

2
MO

6.3
OHE498/31A(C)

4
1.685M F/CSB
1 IN 8.
5 C.S F RL LINE(NO SE = 53.481 m m

MF
:-
0MF
FLOW

T CH:-2
.9
OHE497/27A(C)

1
M 3
S V=50 5 mm

6.3

TP1 AT
TABLI

2459
555.4

EXISTIN XTENDED AS (
R

FM AT C

8
NG)

4
kmph

/TLH

3.04
5.2

:2
1 IN 8.

4
OHE498/33A(C)
5

H
HUT OHE497/25A(C) C.S

AT CH:-
H:-2
6.3

TPTC1 A
C
5

0
SB
SB

58

:-15
SB

R NO -8
120.0 M ORL LINE(NO STABLING)

AT C
M F/C
OHE498/35A(C)

CH:-2
1 IN 8.5 C.S

H
PIER ND WAL
L OHE497/23A(C)

AT C
U OHE498/37A(C)
COMPO

TPCC1
65 M SHUNTING NECK 1 IN 8.5 C.S
10.32 FM DRAIN

G
2
2
COMPOUND WALL

E
DRAIN

AT

C
OHESB01/5A(C) FM DRAIN OHE498/39A(C)

5
4M OHE1/3A(C) UC DRAIN
OHESB01/01A(C)

TPT
6

E
OHE498/41A(C)

TP-1
5.8

2
1 IN 8.5 C.S

TO B
2
CH:-

TPTC
6.44

HR
6.44 5.7

S)

B/TL
:1(LH
6.5
6.41

T
N O 4 ' '
.02

FM A
VE
CUR15°17'34.0°)

S
3KM

Δ = 440 m(4m

C
TP-2 AT CH:-2947.938M F/CSB/TLHR
TOWARDS

HR
12.76 M

/
R = 74.083 40 m

MF
10
0.0
JAGANNATH YARD T = =147.4 0 m

/TL
5
CL OF BRIDGE CH:3138.332M F/TLHR/CSB
PROP. ROB NO-1 SPAN 1 X 36.0 COMPOSITE GIRDER

TCL = 87.44

2.413
13

CSB
CCL =30 mm
1

LHR
' TRL=80 m h

CH FL =
3 ' CUR

2
21 ) VE

/
Se 50 kmp

F
Δ =12 NO:4 &

: 12
.

CSB/T
TPTC2 AT CH:-2978.6M F/CSB/TLHR

0 3°
:2(RHS)

2
V = 0.085m

M
5

HR
2 OHE49715A(C) °
' . 148.343 R =4 1'44.605' (RHS)

-
O

00 6.022
E N 59 m(6 m m

H:
V BYPAS

3.08
CUR 20'45.324'' ° S= 4 0 '

.
4 0 94 28 S LINE CL = m(3.9 CUR

/TL

0
AT C
Δ =16° .00m(4.0°)

8
5 VE N

0
= 8 .7 .7 100 102 TL =492.359 m 8°)

MF M
M F/
Δ =2 60 98 .107 48 Δ O:3(R
R =440 4m

79
= 1

TPCC2 AT CH:-2918.6M F/CSB


1.73 6.
SE = 359 m 1° H
R =1 =2 R =4 40'8.127' S)

/CS
T =93.2 TP NE

H:-2
PL LI 35 m
4'23.51'' CUR

TP-1
CL = 40 m(3.9 '

CH:978.152 M F/CSB
T CL OHE497/13A(C) V=50 m

853.08
2A
Δs =3°5 5.52m R GC
M VE N

B
TC T 3 PSR= kmph 8 9 8 Δ O
° 1°39' :2(RHS)

CH:692.0 M F/CSB
0 .

TLH
T 5 ) =
TCL =185.52 m . 3 L 9 1

C
101 4

CH:1200 M F/CSB
FL=99.539M GTS
45 km =44.9 m

CH:2462 M F/CSB
H: ph S E =3 61 m R 4 4.6
CCL =660 m

T
=
CL =440 m(3.9 84''

R
-2
V=50 5 mm

C1 A
74

H:-2
TRL = 0mm 6.7 PSR= kmph TL =489.544 m 8°)

FL=83.364M
Se =8 kmph

FL=83.958M
2 45 km SE = 4.936 m

FL=86.13M
FL=98.75M
8M OHE497/11A(C)

AT C

TPT
V =50 41 m ph 3
V=50 5 mm

HR
F/C
S=0.3

6/4 SB ED
SB PSR= kmph

B/TL

/TLH
45 km

03
CL OF EXIST.BR.(ROB)AT

N)
-49 F/C ANN
CH:3087.966M F/TLHR/CSB

PCC1
ph
(TO BE DISMENTALED)

1.3

6(D
)

F/CS

/CSB
ON
04

M
10
OHE497/9A(C)

4-4
FL FL=

5.4

5.3
T

YPH

P) 73.0 SS
R
CH =10 101

B/TLHR
FOR SIDING (GCMPL)LINE

8M F

SB/TLH

3(U H:7 LA
M

KM M
(KM

DS
19
:26 1.8 .02

5-4 .C L C
.428
INE
91 09 0M

3.2

LHR
PL

F/CSB
.85 M

AG
131

R
34.54
FL

EL

6/4 -83 SP
8M GT

11
=

SB/TLH
CM
455.19

DAM
OHE497/7A(C)

2
FL 10 F/C S

S
PIP

/C
:-104
=
CH 102 1.87

F/CSB/T
S)

.49 .CT NG
54M F/C

CH : 916.412M F/CSB TLHR


O:(LH

SG

F/CSB
0R
SB

.884M F
H:-10
E N :27 .66 8M

F/CSB
V DETA

8.152 M
2''

KM NO L-XI
CUR '50.89

10
FL 89 7M IL
& CO S FOR UP

IN

H
RD
6 ° 1 9 .0M G CUR

FL = 83.857M
FL =10 VE

74M F/C
Δ =1 (4°)

AT C

/CSB
L)L
OMO Δ =18 NO:1(R
7.5 m F/C TS N LIN ,DN

AT C

L.C OF
WA

SB
CH =10 4.27
OHE497/5A(C)
4 3 H

1.288M
= Δ =26 °
R =2 30'12.172 S)

.9
R
E

.295 M
R m
7.809

3.864M
CH:-952
:30 5.0 8M SB R =38 °48'52.03

CM
.62

.47 F/C

L
TO

CH:-944
TL =8

CH:-87
5
CL = 0 m(7 '

.
'

.00M F
29 67M

C/
TP-2
TL=9 4.615m " TL =480.721m°)

TP-2
50

7
.00

(G
TRL= 74.699 m

14
M GTS CL =11.679M

H:-860.5
OHE497/03A(C)
1 SE = 0.723 m 45

CH:-84
NG

CH:-821
TCL = m F/C 80.0M 3 5.1

CH:-85
OHE497/3(C)
4.699 V=50 5 mm

H:-791
SB 9

CH:820
7

FM AT
=

TP-1 AT
DI
CC L OHE497/01A(C)
kmph

TP-1 AT
0 mm PSR=

SI
SE =5 ph 35 km 40

HR
OHE497/01(C) OHE496/55A(C) 0

PT AT C
ph

CH
km

TP AT
OHE497/4(C)
V=50

C
FO

TP AT

TP-1 AT

/TL

:
.238m
OHE496/55(C) OHE496/53A(C)

FL .0M
69
FM AT
shift=

PT AT

2
CSB

SB
= 8 F/C
OHE497/02(C)

SB
OHE496/53(A)

2.1
OHE496/51A(C)

3
F/C
1 IN 8.5

.36 SB T
F/C
120.

F/CS

.57 CSB
B
OHE496/56(C) OHE496/51(A) CS

0 F/
OHEGBL0/8(C) 0M
PI L

4M LH
OHE496/49A(C)

/CS

7.0
OHE496/54B(C) OVE
C
R RU ER

4M
OHE496/49(A)

47M
OHEGBL0/7(C) OHE496/54A(C) OHE496/52A(C) GA

/
0.38

H:- 00 F
82 F
5.3 OHE496/47A(C) N LI

.943M
OHE496/54(A) OHE496/52(A) OHE496/47(C) NE TE

R
22.
GC FM OHE496/45(B)
PI

F/CSB
-112

740
T C 00.
FM 120

06.1
Δ =2 ML LIN ER

/CSB

H:7
OHEGBL0/5(C) .0 M

:-996
FM

-2 A H:-7
R = 6°48 E ORL OHE496/43(B)

CH:

T C
:-17
TL= 229.31'52.03" 120OHEGBL0/4(C) LIN

CSB
.0 M ORL E

/CSB
.584M F
(NO

68.868M
LINE(NO

C
CL 54.66 0m

T CH
STABLIN STA

T CH
Δ

A
100.00R =10 M

DE E AT
G) BLIN

/
TP A

.868M /S GCMPL
102.107R R =44

8.152 F
7.31

PT
G)

8.868 F
T =2 °0

Y
4M

E
CLL=1 92.0 1'00

MT

/TP
SIDIN FL=86.1 /CSB

TP A

D
F/CSB
L)LIN

CH:-950
TP-2
=2 17.6 0 m "

SB
F/CSB
T CH:-9

O
CMP M

GO
24 0M

CH:-92
3

.00M F/C
52 F/CS
MF
.00

CH:-89

M
M

B
836.00M

F/CS
00.00

PT AT OFF POINT
DE/TP A

TP-1 AT
G (G
L

PT AT
C

H:-808.1
FM AT
CU

CH:-797
2

.00M
GA

CH:848
CH:1
TE RV

AT CH:-
Δ
R =27 E N

8
T =2 °1 O-

:-75
CLL=6 80.0 9'21 1L

DE AT C
TAKE
FOR

TP2 AT
=1 8.05 m( .60

T CH
TPTC2
33 6M 6.2 "
100.00R 126 .52 5°
.71R 3M )

C2 A
FOR SID
ALL L =86.095M SB
TO

T
(GCM EXCEP
INE
W

/C
AR

TPC
0M F
D

PL) L

CH:978
S
TA

IN
200.0
LC

INE

G
C H
Δ URV

EXCE FOR LA=83.857SB


FL=83.9 /CSB
(
ER

GCMPL 8M

.152
R =4 E

45
(k

CH:1
TL =32 5°9' NO

CH:
m

5.3
C = 0. 50 :1 5.

PT G LL LIN M
M
CCL =2133 00m .812

1R
02

9
FOR

1
F
2

5
T L 5 .0 (5 ''

)LINE

(F
)
SeRL = = 1 2.2486m .5°)

F
.
C

412M

OR
M
V = 7 74 4
S= =50 108 8.00 .24 m

AL
488.40R 102.107R
0.7 km .00 0 m

SIDINS

F/C
92 ph 0m m

L
481.73R
m

48

EX
m

8.
G

CE
4
126.71 R
455.31R

PT
(F
455.19 R

GC MP
OR

MP L L
GC

L L INE
IN
E)
NE)

)
I

48 SB
L

28
M
L

3.5 /C
MP

6R
=8 F
FL3.0M
G C
R

:75
(FO
FL

CH
=8 CH

3R
:69 3.3
2.0 64

1.7
M M
F/C

48
SB

0R
40
TOWARDS TALCHER (km 5.022 )

ZONE : EAST COAST RAILWAY


DIVISION : SECTION :
KHURDA ROAD DIVISION TALCHER-TLSB
PROJECT : MCL DEPOSIT WORK

REMODELING OF TALCHER TO TLSB SECTION

SCALE : REVISION:
1:1000 1MM:1METER
LEGEND
8 4 0 10 20 30 METRES
EXISTING WORK
ISSUED DATE: 04.05.2023
10 6 2
EXISTING DISMANTLED WORK
PREPARED BY:-
TALCHER NEW WORK
ODRA ASSOCIATES PVT LTD
COMPOUND WALL
Coporate Office : 4th Floor NSIC Building, Dharmapada
GUARD WALL Bhawan, Mancheswar Railway station Rd,
WATER LOGGED AREA Block D, Sector A, Macheswar Indusrial
DRAIN Estate, Bhubaneswar, Odisha-751007
PIPE LINE A s s o c i a t e s P v t. L t d Tel : 0674-2952715
OHE MAST
DRAWN BY: CHECKED BY: SHEET NO: 01
PIER
HUTS RACHITA JEEVAN