Final Esp of Talcher-Balram - 4.5.2024-Model
Final Esp of Talcher-Balram - 4.5.2024-Model
E
W
HS )
NO:17(L
CURVE '' S
HS) '50.232
NO:16(L Δ =15°4 3.98°)
CURVE '' m(
HS) ° 2 3'35.056 R =440 .789 m 142.345 CURVE NO:9 & 10(LHS)
NO:15(L Δ = 1 5
8°) 1 1 5
CL = .242 m Δ =11°7'49.6''
CURVE
CURVE NO:18(RHS) 100.05
CURVE NO:19(RHS) m(3.9m TL =58 mm
'58.187'' R =440 8 8 R =886.600 m(2°)
Δ =16°20'44.855'' Δ =16°20'55.171'' Δ =15°3 3.98°) CL =11.4 8.1 SE =35 ph
FL = 99.423M GTS
FL = 98.636M
m p h
TL =63.193 m TL =63.204 m TL =58 mm k
V=50 45 kmph S) TCL =202.201 m
SE =35 mm SE =35 mm SE =35 ph PSR= 2 ,1 3 &14 (LH CCL =142.201 m
V=50 k4m ,1
V=50 kmph V=50 kmph kmph NO:11
PSR=45 kmph PSR=45 kmph PSR= 5 CURVE '51.81'' SE =40 mm NOTE :
5 1. ALL CHAINAGES AND LEVELS ARE IN METER.
Δ =15°1 (3.98°) V=50 kmph 2. CSB OF TALCHER IS CONSIDERED AS 0.0M. TAKEOFF PT OF BYPASS LINE
1 AT C :-2099.382M F/CSB/TLHR
7.802M /CSB/TLHR
TPTC1 AT CH:-2360.380M F/CSB
CURVE NO:8(LHS)
/ TL H R
S BI
k CURVE NO:7 (LHS) AFTER JOINT SURVEY AS PER JPO NO JPO/01-2013 Dt
TO
V=50 45 kmph
TUM
SB
EN R
Δ =11°7'49.606''
1 AT C :-2069.382M F/CSB/TLHR
7.802M F/CSB/TLHR
= OAD
/TLHR
15.01.13.
W
PS R JAG Δ =11°7'39.939''
AR
TPCC1 AT CH:-2420.380M F/C
GA NNA
R =875m(2°) 4. DESIGN AXLE LOAD FORMATION IS 25 TONNE.
TH A R =875m(2°)
DS
F/CSB
REA 5. LOADING STD BRIDGES 25T-2008.
TL =100.301 m
X
TL =100.280 m
PC
LHR
X
X
F/CSB
C BO
CURVE NO:(LHS) 6. MINIMUM FORMATION WIDTH 7.85M.
/CSB
C BO
C BO
CURVE NO:(LHS) TRL=30M
Δ =38°30'9.89''
F
TRL=30M 7. TRACK CENTER SPACING MINIMUM 5.3M FOR DOUBLING.
Δ =16°5'51.688''
RO
SB/T
.345
0.572M
Δ =16°20'33.795'' 142 R =357.143m(4.9°) TCL =199.907 m TCL =199.948 m 8. TRACK STRUCTURE NEW WORK
AD
158.316
LHR
R =437.5 m(4°)
C
C
R =437.5 m(4°) TL =154.876m CCL =139.948 m
0.572M
R
CCL =139.907 m I) RAILS : MAIN LINE & LOOP LINE 60KG.
VIL
R
R
C
TL =86.901 m TCL =300.0m
)
TL =87.856 m SE =40 mm II) SLEEPER : MAIN LINE & LOOP LINE 60KG PSC 1660 NOS/KM.
LA
M
SE =40 mm
/
M)
T
2M
TPCC- AT CH:-208
CCL =180.0m
H:-209
TCL =172.919 m
GE
(WIDER BASE PSC SLEEPER TO BE PROVIDED)
/
TRL= 50M V=50 kmph
F
CH :
X 3.2 M X 3.72
V=50 kmph
8M
134.23
3. 72
SE =60 mm III) PT & CROSSING : 1 IN 12 TWS & 1 IN 8.5 CS.
AR
X 3.7
43M
TPTC- AT CH:-205
6 CCL =72.919 m
H:-206
B
TCL =174.790 m
FL = .0M F/C
158.31
shift=0.043 m shift=0.043 m
/TLHR
535.0
TR=60.0m
EA
6
F/CS
27 40
IV) BALLAST CUSHION: MAIN LINE 300MM CLEAN & LOOP LINE
H
CCL =74.79 m TRL=50M
/TLHR
1 AT C
shift=0.42m
X
1
250MM CLEAN.
HR
101.
H
.
SE =60 mm
M
DIVERTED ROAD
0
SE =60 mm V=50 kmph
M
9. RULING GRADIENT 1 IN 100.
1 AT C
DIVERTED ROAD
2
CH:3274.0M F/CSB TLHR
M
B/TL
ED A 1 X 3.25
377M B TLHR
F/CSB
3.25
V=50 kmph
-
:26
/TLHR
V=50 kmph 10. PRECAUTION TO BE TAKEN FOR EXISTING ELECTRICAL CABLES IF ANY
/TLHR
0
1
H
F/CSB
B
TPCC-
TPCC-
shift=.238m AND MODIFICATION/RELOCATION TO BE MADE IF REQUIRED.
C
9 CH
shift=.238m
600.
LOOP LINE-1 CAL-757.018 M (PT TO PT)
S
R
LHR
(1 X
/TLHR
FL=104.75M
C
11. ALL HT/LT OVERHEAD AND UNDER GROUND ELECTRICAL POWER LINE
AT
/TLH
TPTC-
TPTC-
6.3 6.3 6.3
32M
M F/
F/CSB
)
/
LOOP LINE-2 CAL-796.118M (FM TO FM)
F/CSB
1
NES CROSSING WILL BE MODIFIED AS PER REGULATION OF TRACK
MF
2
D AS
0
LL LI
(
N
TP-2
CSB/T
CH:-
.882M
S
-
CROSSING 1987, IF REQUIRED. APPROVAL OF DIVISION IS TO BE OBTAIN
OR A
CSB
A
O
/TLHR
LOOP LINE-3 CAL-1300.696M (FM TO FM)
875.4
0
(F
F/CSB
32.45
SP
/TLHR
N
BEFORE EXECUTION OF WORK.
/TLHR
E
.
AREA
LHR
2M
T
2660
F BR
12. NECESSARY SAFETY PRECAUTION TO BE TAKEN DURING EXECUTION
32M
M F/
/TLHR
ED
:-1855
TING
OHE498/11A(C)
A
OHE498/9A(C)
2M F/
G
END
5.3 6.5
LOG OHE498/13A(C) OHE498/7A(C)
CH:-1
TEN
OHE498/17A(C) OHE498/15A(C) OF WORK TO AVOID ANY DAMAGE TO THE EXISTING S&T CABLES.
F/CSB
6
ER
97.88
C2
WAT OHE498/19A(C)
F/CSB
/T
32M
TPTC
791.8
OHE498/5A(C) 13. IF ANY DIVERSION OF CABLE IS REQUIRED THEN IT SHOULD BE DONE
00
CH:-
(FOR ALL LINES
CL O
F/CSB
PIPE LINE
OHE498AT(C) OHE498/21A(C) OHE498/19(C)
:
OHE498/17(C)
CSB
TPC
)
S
T
TPTC
/TLHR
T CH
X
3
BEFORE EXECUTION OF WORK WITH PROPER SAFETY PRECAUTION
F/CSB
710.
T CH
OHE(D)
R
OHE498/3A(C)
X
I
TPTC1
/TLHR
E
OHE498/21(C)
5.3
771.8
X
7
PT AT
755.4
R
OHE498/23A(C)
B/TLH
E
L AND PRIOR INTIMATION TO CONCERNED SSE(SIG) AND SSE(TELE) IN
FM AT CH:-2988.478M F/CSB/TLHR
AL
CH:-1
E
32M
T
OHE(C)
CH:-1
PT AT CH:-2968.928M F/CSB/TLHR
RD W
1
H
PT AT CH:-3046.478M F/CSB/TLHR
M F/
HUTS
PT AT CH:-3052.978M F/CSB/TLHR
5.5
32M
DE AT CH:-316 2.978M F/CSB/TLHR
E
FM AT CH:-3072.528M F/CSB/TLHR
A
GUA
TPCC1 AT
:-2
CHARGE.
TO B
PT A
SB/TL
OHE498/1A(C)
AT C
1
OHE498/18(C)
6.3
.782M
OHE498/23(C)
TPCC1 AT
FM A
B
PT AT CH:-3130.528M F/CSB/TLHR
/CSB
OHE498/20(C)
DE AT CH:-3088.928F/CSB/TLHR
2
TPCC1 AT
CH:-1
14. DRAWING IS PREPARED BASED ON SITE DATA.
T CH
AT C
713.8
CH:-1
382M
F/CSB
.S
TPTC
TO
.45
OHE498/22(C)
.5 C
OHE498/25A(C)
F/CS
F/CSB
707.3
AT CH:-
OHE(C) OHE497/37A(C) 15. VERTICAL CURVES SHALL BE PROVIDED IN THE FIELD DURING
8
PT AT
PT AT
1 IN 120.0
H:-27
FM M ORL
2M F
M F/C
OHE498/24(C) CONSTRUCTION ONLY ON THOSE POINTS OF CHANGE OF GRADE
.3
:-1686
TP-2 AT CH:-2948.928M F/CSB/TLHR
HR
PT A
H:-28
:-275
LINE(N
6.3 6
CH:-1
.
T
:-1671
TPCC2 AT CH:-2922.585M F/C
T
O STA WHERE THE ALGEBRIC DIFFERENCE BETWEEN THE GRADES IS EQUAL
M
CH:-1
OHE497/35A(C)
.332M
FM A
G) FM
BOX
BLING
DE A
TPCC2 AT CH:-292
/CSB/TL
TPTC2 AT CH:-2971.365M F/CSB
SB
BLIN
99.66
OHE498/27A(C)
PT AT CH:-2388.000M
9.782
CH:-2849.6
TO OR MORE THAN 4MM WITH MINIMUM RADIUS OF VERTICAL CURVE
29.78
)
2
STA
FLOW
CH:-2850.3
H
23.425
00.37
LHR
T CH
796.986
CH:-2846.9
.3 6.3
1 IN 8 2500M.
.00M F/C
O
SB
C
( N
PT AT
INE .5 C.S
T CH
CL OF B SPAN(1 X 1.2MX2MX3.5M) RCC
OHE497/33A(C)
PT AT
16. DESIGN SPEED IS 50 KMPH.
RL L
:-1587
T
6M F
120.0
:-160
.00M F/C
6
HR
O
F/CSB/T
DE A
6.09 5
0M M ORL 17. GRADE CONDONATION FOR ALL EXISTING AS WELL AS PROPOSED
CH:-1
FM A
5M F
120. .S 1 IN 8
F
F/CSB
LINE(N
R
OHE498/29A(C)
8.5 C
HR
45.925M TOP)
.5 C.S F
B/TL
DE A
OHE497/31A (C) CUR PT-XINGS TO BE TAKEN BELOW 1 IN 400 GRADE BY GSU.
O STA
/TLH
N
M F/CS
/CSB
I ALL M VE
T CH
-
1 BLIN
T CH
RD W Δ =8° NO:6(LH
:
66M F/CSB
G)
B/TL
8
5.26
6.3
/CSB
0
GUA
75M F/CSB
4
44'16
PT AT
S)
0
S
C
86M F/CSB
1 IN 8.
4
OHE497/29A(C)
FLAT
R= .60
/CSB
6.6
438.0
6
C
5 C.S CL =700 m(2.5 3''
6.3
A
T
DE A
/CS
LL
:-
D WA
TP-1 A
4M F
4
120.0 TL = 106.734 °)
TP-2
B
6
R
CH
GUA
2
MO
6.3
OHE498/31A(C)
4
1.685M F/CSB
1 IN 8.
5 C.S F RL LINE(NO SE = 53.481 m m
MF
:-
0MF
FLOW
T CH:-2
.9
OHE497/27A(C)
1
M 3
S V=50 5 mm
6.3
TP1 AT
TABLI
2459
555.4
EXISTIN XTENDED AS (
R
FM AT C
8
NG)
4
kmph
/TLH
3.04
5.2
:2
1 IN 8.
4
OHE498/33A(C)
5
H
HUT OHE497/25A(C) C.S
AT CH:-
H:-2
6.3
TPTC1 A
C
5
0
SB
SB
58
:-15
SB
R NO -8
120.0 M ORL LINE(NO STABLING)
AT C
M F/C
OHE498/35A(C)
CH:-2
1 IN 8.5 C.S
H
PIER ND WAL
L OHE497/23A(C)
AT C
U OHE498/37A(C)
COMPO
TPCC1
65 M SHUNTING NECK 1 IN 8.5 C.S
10.32 FM DRAIN
G
2
2
COMPOUND WALL
E
DRAIN
AT
C
OHESB01/5A(C) FM DRAIN OHE498/39A(C)
5
4M OHE1/3A(C) UC DRAIN
OHESB01/01A(C)
TPT
6
E
OHE498/41A(C)
TP-1
5.8
2
1 IN 8.5 C.S
TO B
2
CH:-
TPTC
6.44
HR
6.44 5.7
S)
B/TL
:1(LH
6.5
6.41
T
N O 4 ' '
.02
FM A
VE
CUR15°17'34.0°)
S
3KM
Δ = 440 m(4m
C
TP-2 AT CH:-2947.938M F/CSB/TLHR
TOWARDS
HR
12.76 M
/
R = 74.083 40 m
MF
10
0.0
JAGANNATH YARD T = =147.4 0 m
/TL
5
CL OF BRIDGE CH:3138.332M F/TLHR/CSB
PROP. ROB NO-1 SPAN 1 X 36.0 COMPOSITE GIRDER
TCL = 87.44
2.413
13
CSB
CCL =30 mm
1
LHR
' TRL=80 m h
CH FL =
3 ' CUR
2
21 ) VE
/
Se 50 kmp
F
Δ =12 NO:4 &
: 12
.
CSB/T
TPTC2 AT CH:-2978.6M F/CSB/TLHR
0 3°
:2(RHS)
2
V = 0.085m
M
5
HR
2 OHE49715A(C) °
' . 148.343 R =4 1'44.605' (RHS)
-
O
00 6.022
E N 59 m(6 m m
H:
V BYPAS
3.08
CUR 20'45.324'' ° S= 4 0 '
.
4 0 94 28 S LINE CL = m(3.9 CUR
/TL
0
AT C
Δ =16° .00m(4.0°)
8
5 VE N
0
= 8 .7 .7 100 102 TL =492.359 m 8°)
MF M
M F/
Δ =2 60 98 .107 48 Δ O:3(R
R =440 4m
79
= 1
/CS
T =93.2 TP NE
H:-2
PL LI 35 m
4'23.51'' CUR
TP-1
CL = 40 m(3.9 '
CH:978.152 M F/CSB
T CL OHE497/13A(C) V=50 m
853.08
2A
Δs =3°5 5.52m R GC
M VE N
B
TC T 3 PSR= kmph 8 9 8 Δ O
° 1°39' :2(RHS)
CH:692.0 M F/CSB
0 .
TLH
T 5 ) =
TCL =185.52 m . 3 L 9 1
C
101 4
CH:1200 M F/CSB
FL=99.539M GTS
45 km =44.9 m
CH:2462 M F/CSB
H: ph S E =3 61 m R 4 4.6
CCL =660 m
T
=
CL =440 m(3.9 84''
R
-2
V=50 5 mm
C1 A
74
H:-2
TRL = 0mm 6.7 PSR= kmph TL =489.544 m 8°)
FL=83.364M
Se =8 kmph
FL=83.958M
2 45 km SE = 4.936 m
FL=86.13M
FL=98.75M
8M OHE497/11A(C)
AT C
TPT
V =50 41 m ph 3
V=50 5 mm
HR
F/C
S=0.3
6/4 SB ED
SB PSR= kmph
B/TL
/TLH
45 km
03
CL OF EXIST.BR.(ROB)AT
N)
-49 F/C ANN
CH:3087.966M F/TLHR/CSB
PCC1
ph
(TO BE DISMENTALED)
1.3
6(D
)
F/CS
/CSB
ON
04
M
10
OHE497/9A(C)
4-4
FL FL=
5.4
5.3
T
YPH
P) 73.0 SS
R
CH =10 101
B/TLHR
FOR SIDING (GCMPL)LINE
8M F
SB/TLH
3(U H:7 LA
M
KM M
(KM
DS
19
:26 1.8 .02
5-4 .C L C
.428
INE
91 09 0M
3.2
LHR
PL
F/CSB
.85 M
AG
131
R
34.54
FL
EL
6/4 -83 SP
8M GT
11
=
SB/TLH
CM
455.19
DAM
OHE497/7A(C)
2
FL 10 F/C S
S
PIP
/C
:-104
=
CH 102 1.87
F/CSB/T
S)
.49 .CT NG
54M F/C
SG
F/CSB
0R
SB
.884M F
H:-10
E N :27 .66 8M
F/CSB
V DETA
8.152 M
2''
KM NO L-XI
CUR '50.89
10
FL 89 7M IL
& CO S FOR UP
IN
H
RD
6 ° 1 9 .0M G CUR
FL = 83.857M
FL =10 VE
74M F/C
Δ =1 (4°)
AT C
/CSB
L)L
OMO Δ =18 NO:1(R
7.5 m F/C TS N LIN ,DN
AT C
L.C OF
WA
SB
CH =10 4.27
OHE497/5A(C)
4 3 H
1.288M
= Δ =26 °
R =2 30'12.172 S)
.9
R
E
.295 M
R m
7.809
3.864M
CH:-952
:30 5.0 8M SB R =38 °48'52.03
CM
.62
.47 F/C
L
TO
CH:-944
TL =8
CH:-87
5
CL = 0 m(7 '
.
'
.00M F
29 67M
C/
TP-2
TL=9 4.615m " TL =480.721m°)
TP-2
50
7
.00
(G
TRL= 74.699 m
14
M GTS CL =11.679M
H:-860.5
OHE497/03A(C)
1 SE = 0.723 m 45
CH:-84
NG
CH:-821
TCL = m F/C 80.0M 3 5.1
CH:-85
OHE497/3(C)
4.699 V=50 5 mm
H:-791
SB 9
CH:820
7
FM AT
=
TP-1 AT
DI
CC L OHE497/01A(C)
kmph
TP-1 AT
0 mm PSR=
SI
SE =5 ph 35 km 40
HR
OHE497/01(C) OHE496/55A(C) 0
PT AT C
ph
CH
km
TP AT
OHE497/4(C)
V=50
C
FO
TP AT
TP-1 AT
/TL
:
.238m
OHE496/55(C) OHE496/53A(C)
FL .0M
69
FM AT
shift=
PT AT
2
CSB
SB
= 8 F/C
OHE497/02(C)
SB
OHE496/53(A)
2.1
OHE496/51A(C)
3
F/C
1 IN 8.5
.36 SB T
F/C
120.
F/CS
.57 CSB
B
OHE496/56(C) OHE496/51(A) CS
0 F/
OHEGBL0/8(C) 0M
PI L
4M LH
OHE496/49A(C)
/CS
7.0
OHE496/54B(C) OVE
C
R RU ER
4M
OHE496/49(A)
47M
OHEGBL0/7(C) OHE496/54A(C) OHE496/52A(C) GA
/
0.38
H:- 00 F
82 F
5.3 OHE496/47A(C) N LI
.943M
OHE496/54(A) OHE496/52(A) OHE496/47(C) NE TE
R
22.
GC FM OHE496/45(B)
PI
F/CSB
-112
740
T C 00.
FM 120
06.1
Δ =2 ML LIN ER
/CSB
H:7
OHEGBL0/5(C) .0 M
:-996
FM
-2 A H:-7
R = 6°48 E ORL OHE496/43(B)
CH:
T C
:-17
TL= 229.31'52.03" 120OHEGBL0/4(C) LIN
CSB
.0 M ORL E
/CSB
.584M F
(NO
68.868M
LINE(NO
C
CL 54.66 0m
T CH
STABLIN STA
T CH
Δ
A
100.00R =10 M
DE E AT
G) BLIN
/
TP A
.868M /S GCMPL
102.107R R =44
8.152 F
7.31
PT
G)
8.868 F
T =2 °0
Y
4M
E
CLL=1 92.0 1'00
MT
/TP
SIDIN FL=86.1 /CSB
TP A
D
F/CSB
L)LIN
CH:-950
TP-2
=2 17.6 0 m "
SB
F/CSB
T CH:-9
O
CMP M
GO
24 0M
CH:-92
3
.00M F/C
52 F/CS
MF
.00
CH:-89
M
M
B
836.00M
F/CS
00.00
PT AT OFF POINT
DE/TP A
TP-1 AT
G (G
L
PT AT
C
H:-808.1
FM AT
CU
CH:-797
2
.00M
GA
CH:848
CH:1
TE RV
AT CH:-
Δ
R =27 E N
8
T =2 °1 O-
:-75
CLL=6 80.0 9'21 1L
DE AT C
TAKE
FOR
TP2 AT
=1 8.05 m( .60
T CH
TPTC2
33 6M 6.2 "
100.00R 126 .52 5°
.71R 3M )
C2 A
FOR SID
ALL L =86.095M SB
TO
T
(GCM EXCEP
INE
W
/C
AR
TPC
0M F
D
PL) L
CH:978
S
TA
IN
200.0
LC
INE
G
C H
Δ URV
GCMPL 8M
.152
R =4 E
45
(k
CH:1
TL =32 5°9' NO
CH:
m
5.3
C = 0. 50 :1 5.
PT G LL LIN M
M
CCL =2133 00m .812
1R
02
9
FOR
1
F
2
5
T L 5 .0 (5 ''
)LINE
(F
)
SeRL = = 1 2.2486m .5°)
F
.
C
412M
OR
M
V = 7 74 4
S= =50 108 8.00 .24 m
AL
488.40R 102.107R
0.7 km .00 0 m
SIDINS
F/C
92 ph 0m m
L
481.73R
m
48
EX
m
8.
G
CE
4
126.71 R
455.31R
PT
(F
455.19 R
GC MP
OR
MP L L
GC
L L INE
IN
E)
NE)
)
I
48 SB
L
28
M
L
3.5 /C
MP
6R
=8 F
FL3.0M
G C
R
:75
(FO
FL
CH
=8 CH
3R
:69 3.3
2.0 64
1.7
M M
F/C
48
SB
0R
40
TOWARDS TALCHER (km 5.022 )
SCALE : REVISION:
1:1000 1MM:1METER
LEGEND
8 4 0 10 20 30 METRES
EXISTING WORK
ISSUED DATE: 04.05.2023
10 6 2
EXISTING DISMANTLED WORK
PREPARED BY:-
TALCHER NEW WORK
ODRA ASSOCIATES PVT LTD
COMPOUND WALL
Coporate Office : 4th Floor NSIC Building, Dharmapada
GUARD WALL Bhawan, Mancheswar Railway station Rd,
WATER LOGGED AREA Block D, Sector A, Macheswar Indusrial
DRAIN Estate, Bhubaneswar, Odisha-751007
PIPE LINE A s s o c i a t e s P v t. L t d Tel : 0674-2952715
OHE MAST
DRAWN BY: CHECKED BY: SHEET NO: 01
PIER
HUTS RACHITA JEEVAN