Technical Specification For Modular Ot
Technical Specification For Modular Ot
SPECIFICATIONS:- Control panel should have all the controls within the theatre will
be located on a membrane type control panel mounted in the theatre wall. The panel
will incorporate all the necessary controls for the correct operation and monitoring of
the equipment and services within the operating theatre. The time elapsed digital
clock and real time digital clocks shall have high brightness characters, The medical
gas alarm will indicate High and Low gas pressure for each gas service present in the
operating theatre and will have an audible buzzer with mute facility. The medical gas
alarms will be connected to local pressure switches located downstream of the last
isolation valves. Each control panel will be of 6tile and will have display for Time
elapse clock, Standard Clock, Temperature and Humidity, Clean room luminaries,
Telephone, Medical Gas Alarms.
Distribution Board outside OT Electrical Distribution Board will have all high voltage
equipment should be installed in a separate enclosure. The remote cabinet should
house the operating transformers, light control relays, electrical distribution
equipment and circuit protection equipment for all circuits within the operating
theatre. All internal wiring should terminate in connectors with screw mounted, on
a DIN rail. Individual miniature circuit breakers will protect all internal circuits.
5. DISTRIBUTION BOARD:
All high voltage equipment should be installed in a separate enclosure. The remote cabinet
should house the operating lamp transformers, mains failure relays, electrical distribution
equipment & circuit protection equipment for all circuits within the operating theatre. All
internal wiring should terminate in connectors with screw & clamp spring connections of the
clip- on type mounted, on a DIN rail & labeled with clear proprietary labels. Individual fees or
miniature circuit breakers should protect all internal circuits.
9. Storage Unit : The storage unit should be made with 1.50 mm thick EGP Zinc coated steel
panels. The storage unit should be divided 2 equal parts and each part should have individual
glass doors with high quality locking system. Each part will be provided with glass racks.
11. Hatch Box : A Hatch should be provided in each operation theatre to remove waste materials
from the operation theatre to Dirty linen area just adjacent to Operation Theatre. Each Hatch
should be equipped with two doors and the door should be operated electronically. The Hatch
should be designed in such a way that only one door should be opened at one time. The UV
lights should be so installed that it is kept on while both the doors are closed. This UV light
has to be automatically turned off in case of opening of either of the doors. There shall be
indicators on both side of the OT so that door open/close status can be monitored from both
ends.
12. SCRUB STATION:
Compact surgical scrub sink should be designed for use in OT complex providing Surgeons
with a convenient sink for pre – OT scrub up. Each fixture should be fabricated from heavy
gauge type 304 stainless steel and should be seamless welded construction, polished to a
stain finish. The scrub sink should be provided with a front access panel which should be
easily removed for access to the water controlled value, waste connections, stoppers and
strainers. Hands free operation should include infra red sensors with built-in range of
adjustment. Thermostatic mixing, valve control should be located behind the access panel
and maintain constant water temperature. User defined setting of 1 to 3 min are available.
This timing should be adjustable to meet individual application requirements. Provided with
infrared sensors, thermostatic control taps with fail safe temperature controls. All units
should have reduced anti- splash fronts. Knee operated switch should be there.
Aluminium Ducting ( 22 gauge ) with curves & bends where indicated for easy flow of
air tight by applying silicon sealant after fabrication. Hangers will be provided to ducts
& will be suspended be means of G.I. coated rod & these will not be more than 2.5 mtrs
apart. Thermal insulation with 9mm XPE with aluminium foil for supply & return air
ducts. Joints will be lapped with Nitrile tape for better insulation. (Laminar to AHU &
Return air in all four corners) AHU to be placed near OT, not more than 6 meter.