Copy of 围栏施工每日功效 - 01.05.2024
Copy of 围栏施工每日功效 - 01.05.2024
12/01/2024
beam painting
post shifting 96
beam shifting
12/01/2024 post installation 0
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 77
beam precast 50
post painting 0
beam painting
post shifting 0
beam shifting
13/01/2024 post installation 0
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 78
beam precast 0
post painting 40
beam painting
post shifting 34
beam shifting
14/01/2024 post installation 0
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 75
beam precast 0
post painting 0
beam painting
post shifting 55
beam shifting
15/01/2024 post installation 0
beam installation
back support post precast
15/01/2024
19/01/2024
post painting 80
beam painting 10
post shifting 48
beam shifting 21
19/01/2024 post installation 21
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 85
beam precast 50
post painting 40
beam painting 20
post shifting 30
beam shifting 0
20/01/2024 post installation 20
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 0
beam precast 0
post painting 40
beam painting 50
post shifting 55
beam shifting 0
21/01/2024 post installation 40
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 120
beam precast 50
post painting 40
beam painting 0
post shifting 140
beam shifting 0
22/01/2024 post installation 20
beam installation
22/01/2024
18/02/2024
post shifting 0
beam shifting 0
post installation 52
18/02/2024
beam installation 148
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 1600
Install top rail with Tension Wire 900
accessories installation for chain link for top rail 0
post precast 58
beam precast 48
post painting 0
beam painting 18
post shifting 0
beam shifting 0
post installation 26
19/02/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 900
Install top rail with Tension Wire 600
accessories installation for chain link and top rail 0
post precast 10
beam precast 50
post painting 0
beam painting 0
post shifting 30
beam shifting 0
post installation 26
20/02/2024
beam installation 50
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 1000
Install top rail with Tension Wire 450
accessories installation for chain link and top rail
post precast 9
beam precast 68
post painting 55
beam painting 166
post shifting 28
beam shifting 0
post installation 21
21/02/2024
21/02/2024
beam installation 120
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 98
post painting 0
beam painting 50
post shifting 0
beam shifting 0
post installation 25
24/02/2024
beam installation 80
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 30
beam painting 45
post shifting 0
beam shifting 60
post installation 10
25/02/2024
beam installation 50
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 70
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 101
beam precast 70
post painting 0
beam painting 55
post shifting 0
beam shifting 60
post installation 0
26/02/2024
beam installation 30
back support post precast 0
back support post painting 0
26/02/2024
05/03/2024
post painting 60
beam painting 40
post shifting 70
beam shifting 0
post installation 90
05/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 117
beam precast 0
post painting 50
beam painting 30
post shifting 70
beam shifting 70
post installation 100
06/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 100
beam precast 0
post painting 50
beam painting 30
post shifting 70
beam shifting 30
post installation 70
07/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 90
beam precast 0
post painting 30
beam painting 0
post shifting 0
09/03/2024
beam shifting 90
post installation 60
09/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 100
beam precast 0
post painting 30
beam painting 0
post shifting 50
beam shifting 0
post installation 40
10/03/2024
beam installation 70
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 60
beam painting 0
post shifting 70
beam shifting 0
post installation 40
11/03/2024
beam installation 50
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 70
beam painting 50
post shifting 70
beam shifting 0
post installation 80
12/03/2024
beam installation 30
12/03/2024
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 70
beam painting 20
post shifting 80
beam shifting 0
post installation 80
13/03/2024
beam installation 80
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 70
beam painting 3
post shifting 60
beam shifting 80
post installation 80
14/03/2024
beam installation 50
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 50
post painting 70
beam painting 40
post shifting 60
beam shifting 120
post installation 50
16/03/2024
beam installation 100
back support post precast 0
back support post painting 0
back support post installation 0
16/03/2024
24/03/2024
beam painting 0
post shifting 0
beam shifting 0
post installation 20
24/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 25
beam precast 50
post painting 0
beam painting 0
post shifting 60
beam shifting 0
post installation 0
25/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 270
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 23
beam precast 0
post painting 32
beam painting 0
post shifting 0
beam shifting 0
post installation 35
26/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 20
beam painting 50
post shifting 0
beam shifting 0
27/03/2024
post installation 30
27/03/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 25
30/03/2024
beam installation 40
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 20
post painting 0
beam painting 0
post shifting 0
beam shifting 80
post installation 0
31/03/2024
beam installation 65
back support post precast 23
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 20
post painting 0
beam painting 0
post shifting 32
beam shifting 0
post installation 21
01/04/2024
beam installation 15
back support post precast 23
01/04/2024
21/04/2024
beam painting 0
post shifting 0
beam shifting 0
post installation 0
21/04/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 2700
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
22/04/2024 beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 2500
Concertina Installation 1000
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
23/04/2024 beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 400
Concertina Installation 1500
post precast 0
beam precast 0
post painting 0
beam painting 0
24/04/2024
post shifting 0
beam shifting 0
post installation 0
24/04/2024 beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 0
Concertina Installation 2500
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
beam installation 0
25/04/2024
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 0
Concertina Top Installation 1000
Concertina Installation Towards Outside 0
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
beam installation 0
27/04/2024
backstay support post precast 0
backstay support post painting 0
backstay support post installation 10
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 0
Concertina Top Installation 500
Concertina Installation Towards Outside 0
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
beam installation 0
28/04/2024
backstay support post precast 0
backstay support post painting 0
backstay support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 0
Concertina Top Installation 500
Concertina Installation Towards Outside 800
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
beam installation 0
29/04/2024
backstay support post precast 0
backstay support post painting 0
backstay support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 0
Concertina Top Installation 0
Concertina Installation Towards Outside 500
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
beam installation 0
30/04/2024
backstay support post precast 0
backstay support post painting 0
backstay support post installation 20
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 0
Concertina Top Installation 0
Concertina Installation Towards Outside 1000
post precast 0
beam precast 0
post painting 0
beam painting 0
post shifting 0
beam shifting 0
post installation 0
beam installation 0
01/05/2024
backstay support post precast 0
backstay support post painting 0
backstay support post installation 72
Chain Link mesh installation 0
Install top rail with Tension Wire 0
Barbed Wire Installation 0
Concertina Top Installation 0
Concertina Installation Towards Outside 500
ress report
Total complete number Total number complete rate
524 2940 17.8%
410 2940 13.9%
95 2940 3.2%
2940
24 2940 0.8%
2940
0 2940 0.0%
2940
980
980
980
2940
2940
601 2940 20.4%
460 2940 15.6%
145 2940 4.9%
2940
24 2940 0.8%
2940
16 2940 0.5%
2940
980
980
980
2940
2940
631 2940 21.5%
460 2940 15.6%
175 2940 6.0%
2940
36 2940 1.2%
2940
16 2940 0.5%
2940
980
980
980
2940
2940
705 2940 24.0%
460 2940 15.6%
205 2940 7.0%
2940
48 2940 1.6%
2940
16 2940 0.5%
2940
980
980
980
2940
2940
705 2940 24.0%
460 2940 15.6%
205 2940 7.0%
2940
144 2940 4.9%
2940
16 2940 0.5%
2940
980
980
980
2940
2940
782 2940 26.6%
510 2940 17.3%
205 2940 7.0%
2940
144 2940 4.9%
2940
16 2940 0.5%
2940
980
980
980
2940
2940
860 2940 29.3%
510 2940 17.3%
245 2940 8.3%
2940
176 2940 6.0%
2940
16 2940 0.5%
2940
980
980
980
2940
2940
935 2940 31.8%
510 2940 17.3%
245 2940 8.3%
2940
231 2940 7.9%
2940
32 2940 1.1%
2940
980
980
980
2940
2940
1011 2940 34.4%
510 2940 17.3%
325 2940 11.1%
2940
321 2940 10.9%
2940
56 2940 1.9%
2940
980
980
980
2940
2940
1011 2940 34.4%
510 2940 17.3%
368 2940 12.5%
55 2940 1.9%
354 2940 12.0%
25 2940 0.9%
79 2940 2.7%
2940
980
980
980
2940
2940
1011 2940 34.4%
510 2940 17.3%
448 2940 15.2%
65 2940 2.2%
402 2940 13.7%
46 2940 1.6%
100 2940 3.4%
2940
980
980
980
2940
2940
1096 2940 37.3%
560 2940 19.0%
488 2940 16.6%
85 2940 2.9%
432 2940 14.7%
46 2940 1.6%
120 2940 4.1%
2940
980
980
980
2940
2940
1096 2940 37.3%
560 2940 19.0%
528 2940 18.0%
135 2940 4.6%
487 2940 16.6%
46 2940 1.6%
160 2940 5.4%
2940
980
980
980
2940
2940
1216 2940 41.4%
610 2940 20.7%
568 2940 19.3%
135 2940 4.6%
627 2940 21.3%
46 2940 1.6%
180 2940 6.1%
2940
980
980
980
2940
2940
1326 2940 45.1%
610 2940 20.7%
603 2940 20.5%
135 2940 4.6%
759 2940 25.8%
46 2940 1.6%
219 2940 7.4%
2940
980
980
980
2940
2940
1326 2940 45.1%
660 2940 22.4%
633 2940 21.5%
135 2940 4.6%
887 2940 30.2%
69 2940 2.3%
259 2940 8.8%
45 2940
980
980
980
2940
2940
1421 2940 48.3%
660 2940 22.4%
703 2940 23.9%
175 2940 6.0%
887 2940 30.2%
109 2940 3.7%
329 2940 11.2%
85 2940
980
980
980
2940
2940
1421 2940 48.3%
660 2940 22.4%
703 2940 23.9%
175 2940 6.0%
887 2940 30.2%
140 2940 4.8%
329 2940 11.2%
140 2940
980
980
980
2940
2940
1459 2940 49.6%
710 2940 24.1%
758 2940 25.8%
220 2940 7.5%
937 2940 31.9%
190 2940 6.5%
369 2940 12.6%
180 2940
980
980
980
2940
2940
1533 2940 52.1% PVC围栏杆预制结束
710 2940 24.1%
793 2940 27.0%
250 2940 8.5%
972 2940 33.1%
230 2940 7.8%
402 2940 13.7%
213 2940 7.2%
980
980
980
2940
2940
1533 2940 52.1%
760 2940 25.9%
853 2940 29.0%
300 2940 10.2%
1032 2940 35.1%
280 2940 9.5%
434 2940 14.8%
263 2940 8.9%
980
980
980
2940
2940
1533 2940 52.1%
810 2940 27.6%
913 2940 31.1%
360 2940 12.2%
1087 2940 37.0%
330 2940 11.2%
473 2940 16.1%
323 2940 11.0%
980
980
980
2940
2940
1533 2940 52.1%
810 2940 27.6%
973 2940 33.1%
420 2940 14.3%
1147 2940 39.0%
375 2940 12.8%
539 2940 18.3%
368 2940 12.5%
980
980
980
2940
2940
1533 2940 52.1%
810 2940 27.6%
1143 2940 38.9%
570 2940 19.4%
1227 2940 41.7%
415 2940 14.1%
602 2940 20.5%
413 2940 14.0%
980
980
980
2940
2940
1533 2940 52.1%
908 2940 30.9%
1268 2940 43.1%
670 2940 22.8%
1292 2940 43.9%
565 2940 19.2%
677 2940 23.0%
491 2940 16.7%
980
980
980
2940
2940
1533 2940 52.1%
983 2940 33.4%
1268 2940 43.1%
760 2940 25.9%
1370 2940 46.6%
665 2940 22.6%
755 2940 25.7%
566 2940 19.3%
980
980
980
2940
2940
1533 2940 52.1%
1081 2940 36.8%
1268 2940 43.1%
865 2940 29.4%
1370 2940 46.6%
766 2940 26.1%
851 2940 28.9%
566 2940 19.3%
980
980
980
2940
2940
1533 2940 52.1%
1131 2940 38.5%
1283 2940 43.6%
1045 2940 35.5%
1390 2940 47.3%
919 2940 31.3%
959 2940 32.6%
596 2940 20.3%
980
980
980
2940
2940
1533 2940 52.1%
1229 2940 41.8%
1343 2940 45.7%
1147 2940 39.0%
1435 2940 48.8%
949 2940 32.3%
1031 2940 35.1%
636 2940 21.6%
980
980
980
2940
2940
1543 2940 52.5%
1327 2940 45.1%
1397 2940 47.5%
1297 2940 44.1%
1450 2940 49.3%
979 2940 33.3%
1146 2940 39.0%
671 2940 22.8%
980
980
980
2940
2940
1543 2940 52.5%
1377 2940 46.8%
1397 2940 47.5%
1367 2940 46.5%
1475 2940 50.2%
1009 2940 34.3%
1222 2940 41.6%
764 2940 26.0%
0 980 0.0%
0 980 0.0%
0 980 0.0%
0 2940 0.0%
300 1470 20.4%
0 2940 0.0%
1640 2940 55.8%
1425 2940 48.5%
1397 2940 47.5%
1469 2940 50.0%
1485 2940 50.5%
1167 2940 39.7%
1304 2940 44.4%
764 2940 26.0%
0 980 0.0%
0 980 0.0%
0 980 0.0%
0 2940 0.0%
300 1470 20.4%
0 2940 0.0%
1640 2940 55.8%
1475 2940 50.2%
1397 2940 47.5%
1579 2940 53.7%
1541 2940 52.4%
1327 2940 45.1%
1360 2940 46.3%
764 2940 26.0%
0 980 0.0%
0 980 0.0%
0 980 0.0%
0 2940 0.0%
300 1470 20.4%
0 2940 0.0%
1737 2940 59.1%
1523 2940 51.8%
1477 2940 50.2%
1674 2940 56.9%
1591 2940 54.1%
1472 2940 50.1%
1392 2940 47.3%
869 2940 29.6%
0 980 0.0%
0 980 0.0%
0 980 0.0%
90 8820 1.0% LM
1800 8820 20.4% LM
900 8820 10.2% LM
1737 2940 59.1%
1573 2940 53.5%
1567 2940 53.3%
1779 2940 60.5%
1667 2940 56.7%
1562 2940 53.1%
1409 2940 47.9%
967 2940 32.9%
0 980 0.0%
0 980 0.0%
0 980 0.0%
90 8820 1.0% LM
1800 8820 20.4% LM
900 8820 10.2% LM
1737 2940 59.1%
1641 2940 55.8%
1617 2940 55.0%
1889 2940 64.3%
1707 2940 58.1%
1612 2940 54.8%
1441 2940 49.0%
1069 2940 36.4%
0 980 0.0%
0 980 0.0%
0 980 0.0%
90 8820 1.0% LM
1800 8820 20.4% LM
900 8820 10.2% LM
1737 2940 59.1%
1739 2940 59.1%
1617 2940 55.0%
2009 2940 68.3%
1707 2940 58.1%
1672 2940 56.9%
1474 2940 50.1%
1203 2940 40.9%
0 980 0.0%
0 980 0.0%
0 980 0.0%
900 8820 10.2% LM-LINEAR METER
1800 8820 20.4% LM
900 8820 10.2% LM
1737 2940 59.1%
1818 2940 61.8%
1617 2940 55.0%
1800 2940 61.2%
1707 2940 58.1% LM-LINEAR METER
1672 2940 56.9% LM
1526 2940 51.9% LM
1351 2940 46.0%
0 980 0.0%
0 980 0.0%
0 980 0.0%
2500 8820 28.3%
2700 8820 30.6%
900 8820 10.2%
1795 2940 61.1%
1866 2940 63.5%
1617 2940 55.0%
1818 2940 61.8%
1707 2940 58.1% LM-LINEAR METER
1672 2940 56.9% LM
1552 2940 52.8% LM
1351 2940 46.0%
0 980 0.0%
0 980 0.0%
0 980 0.0%
3400 8820 38.5%
3300 8820 37.4%
900 8820 10.2%
1805 2940 61.4%
1916 2940 65.2%
1617 2940 55.0%
1818 2940 61.8%
1737 2940 59.1% LM-LINEAR METER
1672 2940 56.9% LM
1578 2940 53.7% LM
1401 2940 47.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4400 8820 49.9%
3750 8820 42.5%
900 8820 10.2%
1814 2940 61.7%
1984 2940 67.5%
1672 2940 56.9%
1984 2940 67.5%
1765 2940 60.0% LM-LINEAR METER
1672 2940 56.9% LM
1599 2940 54.4% LM
1521 2940 51.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4400 8820 49.9%
3750 8820 42.5%
900 8820 10.2%
1814 2940 61.7%
2082 2940 70.8%
1672 2940 56.9%
2034 2940 69.2%
1765 2940 60.0% LM-LINEAR METER
1672 2940 56.9% LM
1624 2940 55.2% LM
1601 2940 54.5%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4400 8820 49.9%
3750 8820 42.5%
900 8820 10.2%
1814 2940 61.7%
2082 2940 70.8%
1702 2940 57.9%
2079 2940 70.7%
1765 2940 60.0% LM-LINEAR METER
1732 2940 58.9% LM
1634 2940 55.6% LM
1651 2940 56.2%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4470 8820 50.7%
3750 8820 42.5%
900 8820 10.2%
1915 2940 65.1%
2152 2940 73.2%
1702 2940 57.9%
2134 2940 72.6%
1765 2940 60.0% LM-LINEAR METER
1792 2940 61.0% LM
1634 2940 55.6% LM
1681 2940 57.2%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4470 8820 50.7%
3750 8820 42.5%
900 8820 10.2%
1936 2940 65.9%
2152 2940 73.2%
1702 2940 57.9%
2110 2940 71.8%
1795 2940 61.1% LM-LINEAR METER
1872 2940 63.7% LM
1662 2940 56.5% LM
1599 2940 54.4%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4470 8820 50.7% Beam 1662
3750 8820 42.5% 63
900 8820 10.2% 1599
2036 2940 69.3%
2202 2940 74.9%
1702 2940 57.9%
2121 2940 72.1%
1825 2940 62.1% LM-LINEAR METER
1872 2940 63.7% LM
1692 2940 57.6% LM
1599 2940 54.4%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4470 8820 50.7% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2066 2940 70.3%
2250 2940 76.5%
1702 2940 57.9%
2171 2940 73.8%
1825 2940 62.1% LM-LINEAR METER
1872 2940 63.7% LM
1692 2940 57.6% LM
1599 2940 54.4%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4540 8820 51.5% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2161 2940 73.5%
2318 2940 78.8%
1772 2940 60.3%
2201 2940 74.9%
1925 2940 65.5% LM-LINEAR METER
1872 2940 63.7% LM
1692 2940 57.6% LM
1599 2940 54.4%
0 980 0.0%
0 980 0.0%
0 980 0.0%
4540 8820 51.5% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2201 2940 74.9%
2346 2940 79.8%
1822 2940 62.0%
2241 2940 76.2%
1965 2940 66.8% LM-LINEAR METER
1872 2940 63.7% LM
1752 2940 59.6% LM
1726 2940 58.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2307 2940 78.5%
2396 2940 81.5%
1892 2940 64.4%
2271 2940 77.2%
2035 2940 69.2% LM-LINEAR METER
1872 2940 63.7% LM
1807 2940 61.5% LM
1726 2940 58.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2387 2940 81.2%
2444 2940 83.1%
1952 2940 66.4%
2311 2940 78.6%
2105 2940 71.6% LM-LINEAR METER
1872 2940 63.7% LM
1897 2940 64.5% LM
1726 2940 58.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2504 2940 85.2%
2444 2940 83.1%
2002 2940 68.1%
2341 2940 79.6%
2175 2940 74.0% LM-LINEAR METER
1942 2940 66.1% LM
1997 2940 67.9% LM
1726 2940 58.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2604 2940 88.6%
2444 2940 83.1%
2052 2940 69.8%
2371 2940 80.6%
2245 2940 76.4% LM-LINEAR METER
1972 2940 67.1% LM
2067 2940 70.3% LM
1726 2940 58.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2694 2940 91.6%
2444 2940 83.1%
2082 2940 70.8%
2371 2940 80.6%
2245 2940 76.4% LM-LINEAR METER
2062 2940 70.1% LM
2127 2940 72.3% LM
1726 2940 58.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2794 2940 95.0%
2444 2940 83.1%
2112 2940 71.8%
2371 2940 80.6%
2295 2940 78.1% LM-LINEAR METER
2062 2940 70.1% LM
2167 2940 73.7% LM
1796 2940 61.1%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2794 2940 95.0%
2444 2940 83.1%
2172 2940 73.9%
2371 2940 80.6%
2365 2940 80.4% LM-LINEAR METER
2062 2940 70.1% LM
2207 2940 75.1% LM
1846 2940 62.8%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2794 2940 95.0%
2444 2940 83.1%
2242 2940 76.3%
2421 2940 82.3%
2435 2940 82.8% LM-LINEAR METER
2062 2940 70.1% LM
2287 2940 77.8% LM
1876 2940 63.8%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2794 2940 95.0%
2444 2940 83.1%
2312 2940 78.6%
2441 2940 83.0%
2515 2940 85.5% LM-LINEAR METER
2062 2940 70.1% LM
2367 2940 80.5% LM
1956 2940 66.5%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2794 2940 95.0%
2444 2940 83.1%
2382 2940 81.0%
2444 2940 83.1%
2575 2940 87.6% LM-LINEAR METER
2142 2940 72.9% LM
2447 2940 83.2% LM
2006 2940 68.2%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2794 2940 95.0%
2494 2940 84.8%
2452 2940 83.4%
2484 2940 84.5%
2635 2940 89.6% LM-LINEAR METER
2262 2940 76.9% LM
2497 2940 84.9% LM
2106 2940 71.6%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2800 2940 95.2%
2570 2940 87.4%
2452 2940 83.4%
2484 2940 84.5%
2635 2940 89.6% LM-LINEAR METER
2262 2940 76.9% LM
2537 2940 86.3% LM
2146 2940 73.0%
0 980 0.0%
0 980 0.0%
0 980 0.0%
5240 8820 59.4% Beam 1662
4350 8820 49.3% 63
900 8820 10.2% 1599
2800 2940 95.2%
2570 2940 87.4%
2452 2940 83.4%
2564 2940 87.2%
2635 2940 89.6% LM-LINEAR METER
2262 2940 76.9% LM
2577 2940 87.7% LM
2246 2940 76.4%
0 980 0.0%
0 980 0.0%
0 980 0.0%
6230 8820 70.6% Beam 1662
5340 8820 60.5% 63
900 8820 10.2% 1599
2800 2940 95.2%
2570 2940 87.4%
2452 2940 83.4%
2564 2940 87.2%
2635 2940 89.6% LM-LINEAR METER
2312 2940 78.6% LM
2597 2940 88.3% LM
2346 2940 79.8%
0 980 0.0%
0 980 0.0%
0 980 0.0%
6230 8820 70.6% Beam 1662
5340 8820 60.5% 63
900 8820 10.2% 1599
2800 2940 95.2%
2570 2940 87.4%
2452 2940 83.4%
2564 2940 87.2%
2635 2940 89.6% LM-LINEAR METER
2312 2940 78.6% LM
2597 2940 88.3% LM
2446 2940 83.2%
0 980 0.0%
0 980 0.0%
0 980 0.0%
6230 8820 70.6% Beam 1662
6740 8820 76.4% 63
900 8820 10.2% 1599
2800 2940 95.2%
2570 2940 87.4%
2452 2940 83.4%
2564 2940 87.2%
2635 2940 89.6% LM-LINEAR METER
2312 2940 78.6% LM
2597 2940 88.3% LM
2446 2940 83.2%
0 980 0.0%
0 980 0.0%
0 980 0.0%
7330 8820 83.1% Beam 1662
7340 8820 83.2% 63
900 8820 10.2% 1599
2800 2940 95.2%
2570 2940 87.4%
2542 2940 86.5%
2564 2940 87.2%
2635 2940 89.6% LM-LINEAR METER
2312 2940 78.6% LM
2612 2940 88.8% LM
2461 2940 83.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
7330 8820 83.1% Beam 1662
7340 8820 83.2% 63
900 8820 10.2% 1599
2800 2940 95.2%
2570 2940 87.4%
2602 2940 88.5%
2564 2940 87.2%
2635 2940 89.6% LM-LINEAR METER
2312 2940 78.6% LM
2632 2940 89.5% LM
2461 2940 83.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
7330 8820 83.1% Beam 1662
7340 8820 83.2% 63
900 8820 10.2% 1599
2825 2940 96.1%
2620 2940 89.1%
2602 2940 88.5%
2564 2940 87.2%
2695 2940 91.7% LM-LINEAR METER
2312 2940 78.6% LM
2632 2940 89.5% LM
2461 2940 83.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
7600 8820 86.2% Beam 1662
7340 8820 83.2% 63
900 8820 10.2% 1599
2848 2940 96.9%
2620 2940 89.1%
2634 2940 89.6%
2564 2940 87.2%
2695 2940 91.7% LM-LINEAR METER
2312 2940 78.6% LM
2667 2940 90.7% LM
2461 2940 83.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
7600 8820 86.2%
7340 8820 83.2%
900 8820 10.2%
2848 2940 96.9%
2620 2940 89.1%
2654 2940 90.3%
2614 2940 88.9%
2695 2940 91.7% LM-LINEAR METER
2312 2940 78.6% LM
2697 2940 91.7% LM
2461 2940 83.7%
0 980 0.0%
0 980 0.0%
0 980 0.0%
7600 8820 86.2%
7340 8820 83.2%
900 8820 10.2%
2848 2848 100.0%
2620 2848 92.0%
2654 2848 93.2%
2614 2848 91.8%
2695 2848 94.6% LM-LINEAR METER
2312 2848 81.2% LM
2722 2848 95.6% LM
2501 2848 87.8%
0 980 0.0%
0 980 0.0%
0 980 0.0%
7600 8820 86.2%
7340 8820 83.2%
900 8820 10.2%
2848 2848 100.0%
2640 2848 92.7%
2654 2848 93.2%
2614 2848 91.8%
2695 2848 94.6% LM-LINEAR METER
2392 2848 84.0% LM
2722 2848 95.6% LM
2566 2848 90.1%
23 284 8.1%
0 284 0.0%
0 284 0.0%
7600 8820 86.2%
7340 8820 83.2%
900 8820 10.2%
2848 2848 100.0%
2660 2848 93.4%
2654 2848 93.2%
2614 2848 91.8%
2727 2848 95.8% LM-LINEAR METER
2392 2848 84.0% LM
2743 2848 96.3% LM
2581 2848 90.6%
46 284 16.2%
0 284 0.0%
0 284 0.0%
7600 8820 86.2%
7340 8820 83.2%
900 8820 10.2%
2848 2848 100.0%
2660 2848 93.4%
2654 2848 93.2%
2614 2848 91.8%
2747 2848 96.5% LM-LINEAR METER
2392 2848 84.0% LM
2773 2848 97.4% LM
2601 2848 91.3%
69 284 24.3%
0 284 0.0%
0 284 0.0%
7600 8820 86.2%
7340 8820 83.2%
900 8820 10.2%
2848 2848 100.0%
2660 2848 93.4%
2654 2848 93.2%
2614 2848 91.8%
2747 2848 96.5% LM-LINEAR METER
2392 2848 84.0% LM
2790 2848 98.0% LM
2621 2848 92.0%
92 284 32.4%
0 284 0.0%
0 284 0.0%
7600 8820 86.2%
7840 8820 88.9%
900 8820 10.2%
2848 2848 100.0%
2710 2848 95.2%
2654 2848 93.2%
2614 2848 91.8%
2747 2848 96.5% LM-LINEAR METER
2392 2848 84.0% LM
2790 2848 98.0% LM
2691 2848 94.5%
92 284 32.4%
0 284 0.0%
0 284 0.0%
8050 8820 91.3%
8090 8820 91.7%
900 8820 10.2%
2848 2848 100.0%
2710 2848 95.2%
2654 2848 93.2%
2614 2848 91.8%
2747 2848 96.5% LM-LINEAR METER
2427 2848 85.2% LM
2790 2848 98.0% LM
2691 2848 94.5%
122 284 43.0%
0 284 0.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
900 8820 10.2%
2848 2848 100.0%
2760 2848 96.9%
2751 2848 96.6%
2731 2848 95.9%
2747 2848 96.5% LM-LINEAR METER
2627 2848 92.2% LM
2790 2848 98.0% LM
2732 2848 95.9%
152 284 53.5%
0 284 0.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
900 8820 10.2%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
188 284 66.2%
0 284 0.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
900 8820 10.2%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
230 284 81.0%
50 284 17.6%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
900 8820 10.2%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
284 284 100.0%
50 284 17.6%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
900 8820 10.2%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
900 8820 10.2%
2000 8456 23.7% 8456 LM
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
4700 8464 55.5% 8456 LM
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
7200 8464 85.1% 8456 LM
1000 8464 11.8%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8% 8456 LM
2500 8464 29.5%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8% 8456 LM
5000 8464 59.1%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5% LM-LINEAR METER
2747 2848 96.5% LM
2790 2848 98.0% LM
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
0 284 0.0%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8% 8456 LM
6000 8464 70.9%
0 8464 0.0%
2848 2848 100.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5%
2747 2848 96.5% LM-LINEAR METER
2790 2848 98.0% LM
2790 2848 98.0% LM
284 2848 10.0%
284 284 100.0%
284 284 100.0%
10 284 3.5%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8% 8456 LM
6500 8464 76.8%
0 8464 0.0%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5%
2747 2848 96.5%
2790 2848 98.0%
2790 2848 98.0%
284 2848 10.0%
284 2848 10.0%
284 284 100.0%
284 284 100.0%
10 284 3.5%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8%
7000 8464 82.7%
800 8464 9.5%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5%
2747 2848 96.5%
2790 2848 98.0%
2790 2848 98.0%
2790 2848 98.0%
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
10 284 3.5%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8%
7000 8464 82.7%
1300 8464 15.4%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5%
2747 2848 96.5%
2790 2848 98.0%
2790 2848 98.0%
2790 2848 98.0%
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
30 284 10.6%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8%
7000 8464 82.7%
2300 8464 27.2%
2848 2848 100.0%
2848 2848 100.0%
2747 2848 96.5%
2747 2848 96.5%
2790 2848 98.0%
2790 2848 98.0%
2790 2848 98.0%
2790 2848 98.0%
284 284 100.0%
284 284 100.0%
102 284 35.9%
8130 8820 92.2%
8130 8820 92.2%
7600 8464 89.8%
7000 8464 82.7%
2800 8464 33.1%
2800
2494 2570
76
2800
2494 2570
76
2800
2494 2570
76
2800
2494 2570
76
2800
2494 2570
76
2800
2494 2570
76
2800
2494 2570
76
2800
2494 2570
76
150
150
8464 7200 1264
12/01/2024
beam painting
post shifting 96
beam shifting
12/01/2024 post installation 0
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 77
beam precast 50
post painting 0
beam painting
post shifting 0
beam shifting
13/01/2024 post installation 0
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 78
beam precast 0
post painting 40
beam painting
post shifting 34
beam shifting
14/01/2024 post installation 0
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 75
beam precast 0
post painting 0
beam painting
post shifting 55
beam shifting
15/01/2024 post installation 0
beam installation
back support post precast
15/01/2024
19/01/2024
post painting 80
beam painting 10
post shifting 48
beam shifting 21
19/01/2024 post installation 21
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 85
beam precast 50
post painting 40
beam painting 20
post shifting 30
beam shifting 0
20/01/2024 post installation 20
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 0
beam precast 0
post painting 40
beam painting 50
post shifting 55
beam shifting 0
21/01/2024 post installation 40
beam installation
back support post precast
back support post painting
back support post installation
mesh installation
accessories installation
post precast 120
beam precast 50
post painting 40
beam painting 0
post shifting 140
beam shifting 0
22/01/2024 post installation 20
beam installation
22/01/2024
18/02/2024
post shifting 0
beam shifting 0
post installation 52
18/02/2024
beam installation 148
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 1600
Install top rail with Tension Wire 900
accessories installation for chain link for top rail 0
post precast 58
beam precast 48
post painting 0
beam painting 18
post shifting 0
beam shifting 0
post installation 26
19/02/2024
beam installation 0
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 900
Install top rail with Tension Wire 600
accessories installation for chain link and top rail 0
post precast 10
beam precast 50
post painting 0
beam painting 0
post shifting 30
beam shifting 0
post installation 26
20/02/2024
beam installation 50
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 1000
Install top rail with Tension Wire 450
accessories installation for chain link and top rail
post precast 9
beam precast 68
post painting 55
beam painting 166
post shifting 28
beam shifting 0
post installation 21
21/02/2024
21/02/2024
beam installation 120
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 98
post painting 0
beam painting 50
post shifting 0
beam shifting 0
post installation 25
24/02/2024
beam installation 80
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 0
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 0
beam precast 0
post painting 30
beam painting 45
post shifting 0
beam shifting 60
post installation 10
25/02/2024
beam installation 50
back support post precast 0
back support post painting 0
back support post installation 0
Chain Link mesh installation 70
Install top rail with Tension Wire 0
accessories installation for chain link and top rail 0
post precast 101
beam precast 70
post painting 0
beam painting 55
post shifting 0
beam shifting 60
post installation 0
26/02/2024
beam installation 30
back support post precast 0
back support post painting 0
26/02/2024