0% found this document useful (0 votes)
20 views

NCR Format

Uploaded by

Daniel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

NCR Format

Uploaded by

Daniel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

NON-CONFORMANCE REPORT

No.: MEIDP/NCR/SSCM-1/0001 DATE:


CONTRACT TITLE: INTEGRATED HOSPITALITY & SPORTS COMPLEX - MEIDP, SHILLONG.

AGREEMENT NO: SSCM/CE/TB-145/2021-22/81


SUBJECT:
TO: Project Manager of Contractor FROM: CSC-MEIDP

DESCRIPTION OF THE NON-CONFORMANCE

Non-Compliance with: (Specs. No., Shop Drawing No., Method Statement No., etc.)

Action Required by: _______________________ Date:___________________ ACTION : Immediate

Issued by:(QC/FE CSC Representative) Received by: (Contractor's Representative)

Signature: Date: Signature: Date:

Contractor's Comments: Agree Disagree

Corrective Action Proposed:


Preventive Action Recommended:

Name: Signature: Date:

Engineer's Decision on the Proposed Corrective Action:

Accept Repair Rework Reject Ongoing

Comments:

Name: Signature: Date:

Disposition Complete:

Name: Signature: Date:


Contractor:

CSC:

PIU: