Structures Block Cost YB Section - 2 New Opt - 3
Structures Block Cost YB Section - 2 New Opt - 3
1 Culverts 6,656,000
3 Major Bridges -
4 ROB -
5 VUP -
6 LVUP -
7 SVUP -
8 Interchange -
9 Elevated -
10 Viaduct -
12 RE Wall -
13 Flyover -
14 Tunnel (4.380km)
Box Culvert
1 38+480 1x4x2 New Construction 16.00 64.00 26000 1664000
2 38+900 1x4x2 New Construction 16.00 64.00 1664000
3 39+400 1x4x2 New Construction 16.00 64.00 1664000
4 39+730 1x2x2 New Construction 16.00 32.00 832000
5 39+960 1x2x2 New Construction 16.00 32.00 832000
Total 6656000
Pipe Culvert
1 1.2 dia New Construction 30.50 24000
398+050
Total 6656000
Structure Cost (New/ Reconstruction/ Widen)
Design
S.No Side Width Skew Angle Length Area Rate (Sqm) Amount
Chainage (Km)
Minor Bridge
1 38+720 MNB 50 16.00 800.00 45000 36,000,000
2 39+220 MNB 40 16.00 640.00 45000 28,800,000
Total 64,800,000
Flyover
Viaduct
Total 0
Interchange
0+000 0.00 30000 0
1
0.00 4000 0
Total 0
Elevated
FLY Eleveted 0.00 5930 0.00 35000 0
RE Wall 0.00 0 0.00 3600 0
1
Crash Barrier with Friction
0 12000 0
slab
Total 0
VUP
1 VUP 33.50 20 670.00 38000 0
2 VUP 33.50 20 670.00 38000 0
3 VUP 33.50 20 670.00 38000 0
4 VUP 33.50 20 670.00 38000 0
5 VUP 33.50 20 680.34 38000 0
6 VUP 33.50 20 680.34 38000 0
7 VUP 33.50 20 670.00 38000 0
8 VUP 29.00 15 435.00 38000 0
Total -
LVUP
1 LVUP 33.50 20 670.00 35000 0
2 LVUP 33.50 20 670.00 35000 0
3 LVUP 33.50 20 670.00 35000 0
4 LVUP 33.50 20 670.00 35000 0
5 LVUP 33.50 20 670.00 35000 0
6 LVUP 33.50 20 670.00 35000 0
7 LVUP 33.50 20 670.00 35000 0
8 LVUP 33.50 20 670.00 35000 0
9 LVUP 29.00 12 348.00 35000 0
10 LVUP 29.00 12 348.00 35000 0
11 LVUP 29.00 12 348.00 35000 0
12 LVUP 29.00 12 348.00 35000 0
Total -
SVUP
1 SVUP 29.00 0 7 203.00 30000 0
2 SVUP 29.00 7 203.00 30000 0
3 SVUP 29.00 7 203.00 30000 0
4 SVUP 29.00 12 348.00 30000 0
Total -
MJBR
1 19+548 MJB 16.00 0 70 1120.00 50000 0
Total -
ROB/RUB
9+675 ROB 32.00 103.5 3312.00 80000 0.0
RE Wall 0.00 0 0.00 3600 0.0
1
Crash Barrier with Friction
0 12000 0.0
slab
RUB (Retain) 0.00 41 30.5 0.00 3500 0.0
RE Wall 0 4000 0.0
2
Crash Barrier with Friction
0 12000 0.0
slab
Total -
Total 64,800,000
Six Laning of Km. 192.00 to Km.198.000 between Vadodara – Surat section of NH-8 including construction of a new four lane Extra Dose Bridge across river
Narmada in the state of Gujarat on DBFOT (Toll) basis under NHDP Phase-V
Total 0m 0
1C & G Ha 0 15 0 65,412 -
2 EW Cutting (Shoulder) cum 0 0.0 -
3 EW filling cum 0 22.46 3.5000 0.0 272 -
4 Subgrade cum 0 14.46 0.5 0.0 323 -
5 Earthern Shoulder cum 0 2.44 0.29 0.0 323 -
6 Ganular Fill cum 0 2.15 0.15 0.0 2,047 -
7 Turfing sqm 0 4.472 0.0 47 -
8 CTSB cum 0 13.66 0.2 0.0 2,047 -
9 GSB-II cum 0 0.00 0 0.0 2,047 -
Total -
Rate/km #DIV/0!
Width (2-
Pavement Composition Thickness Unit
Lane)
BC 50 mm 9.50 11.5 15.5
DBM - Top Layer 120 mm 9.50
DBM - Middle Layer 120 mm 9.74
DBM - Bottom Layer mm
DLC mm
WMM - Top Layer 75 mm 10.08
WMM - Bottom Layer 75 mm 10.23
CTSB 200 mm 13.66
GSB Drainage mm
Subtotal 490 mm
Subgrade(Selected Earth) 500 mm 14.46
Total 1140 mm
Embankment mm 15.46
DBM Overlay mm
Ganular Fill 150 mm 2.15
Selected Fill 290 mm 2.44
Carriageway discription
Edge strip 0 m
Carriageway 7.5 m
Earthern Shoulder 2 m
Paved shoulder 2 m
Median width 0 m
Granular filling 0 m
Item
Description Unit Total Quantity Rate (Rs) Amount(Rs)
No.
6d,1 Construction of Reinforced Earth Wall
a) PCC For RE Wall Foundation Cum 434 4,228 1,836,770
Providing RCC Facia Panel for Reinforced earth retaining wall / Reinforced Earth
b) Structures (RES) for approaches and ramps as per Techincal specification 3100 and Sqm 26630 3,600 95,866,200
additional specifications
Filter media behind RE walls complete with all leads and lifts as per drawing and
c) Cum 15978 1,515 24,206,216
Technical Specification Clause 2200
d) Construction of embankment with Reinforced Earth Cum 291600 444 129,470,400
Providing and constructing RCC crash barrier with friction slab M 40 grade over RE
e) wall including cost of centering, shuttering and reinforcement as per approved Drawings Rmt 4800 11,033 52,957,848
and Technical Specifications
Total Amount 304,337,434
11 of 11