Ch.1 Introduction To SE

The document provides an introduction to software engineering, describing what software is, the different classes and characteristics of software, and the key aspects of software engineering including methods, processes, tools and why software engineering is important.

Uploaded by

shreyjoshinms
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views72 pages

Ch.1 Introduction To SE

The document provides an introduction to software engineering, describing what software is, the different classes and characteristics of software, and the key aspects of software engineering including methods, processes, tools and why software engineering is important.

Uploaded by

shreyjoshinms
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 72

Introduction to

Software
Engineering
What is Software?

 Software is a set of instructions to acquire inputs and to


manipulate them to produce the desired output in terms of
functions and performance as determined by the user of
the software
 Also include a set of documents, such as the software
manual , meant for users to understand the software
system

2 Dr. Jyoti Deshmukh


Description of the Software

 A software is described by its capabilities. The capabilities relate to


the functions it executes, the features it provides and the facilities it
offers.
EXAMPLE
Software written for Sales-order processing would have
different functions to process different types of sales order from
different market segments .
 The features for example , would be to handle multi-currency
computing, updating product , sales and Tax status.
 The facilities could be printing of sales orders, email to customers
and reports to the store department to dispatch the goods.

3 Dr. Jyoti Deshmukh


Classes of Software

Software is classified into two classes:


 Generic Software:
is designed for broad customer market whose
requirements are very common, fairly stable and well understood by
the software engineer.
 Customized Software:
is developed for a customer where domain ,
environment and requirements are being unique to that customer and
cannot be satisfied by generic products.

4 Dr. Jyoti Deshmukh


What is Good Software?

 Software has number of attributes which decide whether it is a


good or bad .
 The definition of a good software changes with the person who
evaluates it.
 The software is required by the customer , used by the end users of an
organization and developed by software engineer .
 Each one will evaluate the different attributes differently in order to
decide whether the software is good.

5 Dr. Jyoti Deshmukh


What are the attributes of good
software?

The software should deliver the required functionality and performance to


the user and should be maintainable, dependable and usable.
• Maintainability
– Software must evolve to meet changing needs
 Dependability
– Software must be trustworthy
 Efficiency
– Software should not make wasteful use of system resources
 Usability
– Software must be usable by the users for which it was designed

6 Dr. Jyoti Deshmukh


Software - Characteristics

 Software has a dual role. It is a product, but also a vehicle for delivering a
product.

 Software is a logical rather than a physical system element.

 Software has characteristics that differ considerably from those of hardware.

 Software is developed or engineered, it is not manufactured in the


classical sense

 Software doesn’t “wear out”

 Most software is custom-built, rather than being assembled from


existing components.
7 Dr. Jyoti Deshmukh
Changing nature of
software(Types)
 System Software- A collection of programs written to service other
programs at system level.
For example, compiler, operating systems.

 Real-time Software- Programs that monitor/analyze/control real


world events as they occur.

 Business Software- Programs that access, analyze and process


business information.

 Engineering and Scientific Software - Software using “number


crunching” algorithms for different science and applications. System
simulation, computer-aided design.

8 Dr. Jyoti Deshmukh


Changing nature of
software(Types)
 Embedded Software-:
Embedded software resides in read-only memory and is used to
control products and systems for the consumer and industrial markets.
It has very limited and esoteric functions and control capability.

 Artificial Intelligence (AI) Software:


Programs make use of AI techniques and methods to solve complex
problems. Active areas are expert systems, pattern recognition, games

 Internet Software :
Programs that support internet accesses and applications. For example,
search engine, browser, e-commerce software, authoring tools.

9 Dr. Jyoti Deshmukh


Software Engineering

 “A systematic approach to the analysis, design, implementation and


maintenance of software.”
(The Free On-Line Dictionary of Computing)
 “ The systematic application of tools and techniques in the
development of computer-based applications.”
(Sue Conger in The New Software Engineering)
 “ Software Engineering is about designing and developing high-
quality software.”
(Shari Lawrence Pfleeger in Software Engineering -- The Production
of Quality Software)

10 Dr. Jyoti Deshmukh


What is Software Engineering?

 Engineering: The Application of Science to the Solution of Practical


Problems
 Software Engineering: The Application of CS to Building Practical Software
Systems
 Programming
– Individual Writes Complete Program
– One Person, One Computer
– Well-Defined Problem
– Programming-in-the-Small
 Software Engineering
– Individuals Write Program Components
– Team Assembles Complete Program
– Programming-in-the-Large
11 Dr. Jyoti Deshmukh
What is the difference between software engineering and
computer science?

Computer Science Software Engineering


is concerned with
 theory  the practicalities of developing
 fundamentals  delivering useful software

Computer science theories are currently insufficient to act as a complete


underpinning for software engineering, BUT it is a foundation for practica
aspects of software engineering

12 Dr. Jyoti Deshmukh


What is Software Engineering?

Although hundreds of authors have developed personal definitions of software


engineering, a definition proposed by Fritz Bauer[NAU69] provides a basis:

 “[Software engineering is] the establishment and use of sound


engineering principles in order to obtain economically software that is
reliable and works efficiently on real machines.”

The IEEE [IEE93] has developed a more comprehensive definition when it


states:

 “Software Engineering: (1) The application of a systematic, disciplined,


quantifiable approach to the development, operation, and maintenance of
software; that is, the application of engineering to software. (2) The study
of approaches as in (1).”

13 Dr. Jyoti Deshmukh


Software engineering is a layered
technology - Pressman’s view:

Software Engineering Layers

14 Dr. Jyoti Deshmukh


What is Software Engineering?

 Software methods:
 Software engineering methods provide the technical “how to’s” for
building software.

 Methods --> how to encompass a broad array of tasks:


- requirements analysis, design, coding, testing, and maintenance

 Software engineering methods rely on a set of basic principles.

15 Dr. Jyoti Deshmukh


What is Software Engineering?

 Software process:
Software engineering process is the glue that holds:
- technology together
- enables rational and timely development of computer
software.
Software engineering process is a framework of a set of key process
areas.
It forms a basis for:
- project management, budget and schedule control
- applications of technical methods
- product quality control

16 Dr. Jyoti Deshmukh


What is Software Engineering?

 Software tools:
- programs provide automated or semi-automated support for the
process and methods.
- programs support engineers to perform their tasks in a systematic
and/or automatic manner.

17 Dr. Jyoti Deshmukh


Why Software Engineering?

 Objectives:
- Identify new problems and solutions in software production.
- Study new systematic methods, principles, approaches for system
analysis,design, implementation, testing and maintenance.
- Provide new ways to control, manage, and monitor software process.
- Build new software tools and environment to support software
engineering.

18 Dr. Jyoti Deshmukh


Why Software Engineering?

Major Goals:
- To increase software productivity and quality.
- To effectively control software schedule and planning.
- To reduce the cost of software development.
- To meet the customers’ needs and requirements.
- To enhance the conduction of software engineering process.
- To improve the current software engineering practice.
- To support the engineers’ activities in a systematic and efficient
manner.

19 Dr. Jyoti Deshmukh


A Process Framework

20 Dr. Jyoti Deshmukh


Process Framework Activities

 Communication
 Planning
 Modeling
 Construction
 Deployment

21 Dr. Jyoti Deshmukh


Umbrella Activities

 Software project tracking & control


 Risk Management
 Formal Technical reviews
 Software configuration management
 Reusability management

22 Dr. Jyoti Deshmukh


 In recent years, there has been a significant
emphasis on “process maturity.” The Software
Engineering Institute (SEI) has developed a
comprehensive model predicated on a set of
software engineering capabilities that should be
present as organizations reach different levels of
process maturity.
 To determine an organization’s current state of
process maturity, the SEI uses an assessment that
results in a five point grading scheme.
23 Dr. Jyoti Deshmukh
 The grading scheme determines compliance with a
capability maturity model (CMM) [PAU93] that
defines key activities required at different levels of
process maturity.
 The SEI approach provides a measure of the global
effectiveness of a company's software engineering
practices and establishes five process maturity
levels that are defined in the following manner:

24 Dr. Jyoti Deshmukh


 Level 1: Initial. The software process is
characterized as ad hoc and occasionally
even chaotic. Few processes are defined,
and success depends on individual effort.
 Level 2: Repeatable. Basic project
management processes are established to
track cost, schedule, and functionality. The
necessary process discipline is in place to
repeat earlier successes on projects with
25 similar applications. Dr. Jyoti Deshmukh
 Level 3: Defined. The software process for
both management and engineering activities
is documented, standardized, and integrated
into an organization wide software process.
All projects use a documented and approved
version of the organization's process for
developing and supporting software. This
level includes all characteristics defined for
level 2.
26 Dr. Jyoti Deshmukh
 Level 4: Managed. Detailed measures of the
software process and product quality are
collected. Both the software process and
products are quantitatively understood and
controlled using detailed measures. This
level includes all characteristics defined for
level 3.

27 Dr. Jyoti Deshmukh


 Level 5: Optimizing. Continuous process
improvement is enabled by quantitative
feedback from the process and from testing
innovative ideas and technologies. This level
includes all characteristics defined for level 4

28 Dr. Jyoti Deshmukh


Process maturity level 2

Software configuration management


Software quality assurance
Software subcontract management
Software project tracking and oversight
Software project planning
Requirements management

29 Dr. Jyoti Deshmukh


Process maturity level 3

• Peer reviews
• Intergroup coordination
• Software product engineering
• Integrated software management
• Training program
• Organization process definition
• Organization process focus

30 Dr. Jyoti Deshmukh


Process maturity level 4

• Software quality management


• Quantitative process management

Process maturity level 5


• Process change management
• Technology change management
• Defect prevention

31 Dr. Jyoti Deshmukh


32 Dr. Jyoti Deshmukh
SDLC Process Model

SDLC – Software Development Life Cycle

Process model is a framework that describes


the activities,actions,tasks,milestones,and
work products performed at each stage of a
software development project that leads to a
high quality software

33 Dr. Jyoti Deshmukh


Life cycle models

 Waterfall model
 Incremental process models
– Incremental model
– RAD model
 Evolutionary Process Models
– Prototyping model
– Spiral model
 Object oriented process model
34 Dr. Jyoti Deshmukh
WATERFALL MODEL
a.k.as Linear life cycle model or
COMMUNICATION
Project initiation
classic life cycle model
Req. gathering

PLANNING
Estimating
Scheduling
tracking

MODELLING
Analysis
design

CONSTRUCTION
Code
Test

DEPLOYMENT
Delivery
Support
feedback
Dr. Jyoti Deshmukh 35
WATERFALL MODEL

 Project initiation & requirement gathering


– What is the Problem to Solve?
– What Does Customer Need/Want?
– Interactions Between SE and Customer
– Identify and Document System Requirements
– Generate User Manuals and Test Plans
• Planning
– Prioritize the requirements
– Plan the process

36 Dr. Jyoti Deshmukh


WATERFALL MODEL

 Analysis and design


– How is the Problem to be Solved?
– High-Level Design
– Determine Components/Modules
– Transition to Detailed Design
– Detail Functionality of Components/Modules
 Coding and Testing
– Writing Code to Meet Component/Module Design Specifications
– Individual Test Modules in Isolation
– Integration of Components/Modules into Subsystems
– Integration of Subsystems into Final Program
37 Dr. Jyoti Deshmukh
WATERFALL MODEL

 Deployment
– System Delivered to Customer/Market
– Bug Fixes and Version Releases Over Time
Strengths
 Easy to understand, easy to use
 Provides structure to inexperienced staff
 Milestones are well understood
 Sets requirements stability
 Good for management control (plan, staff, track)
 Works well when quality is more important than cost or schedule

38 Dr. Jyoti Deshmukh


Waterfall Drawbacks

 All projects cannot follow linear process


 All requirements must be known upfront
 Few business systems have stable
requirements.
 The customer must have patience. A working
version of the program will not be available until
late in the project time-span
 Leads to ‘blocking states’
39  Inappropriate to changes Dr. Jyoti Deshmukh
When to use the Waterfall
Model
 Requirements are very well known
 Product definition is stable
 Technology is understood
 New version of an existing product
 Porting an existing product to a new platform.

40 Dr. Jyoti Deshmukh


Incremental SDLC Model
 Combines the elements of waterfall model in an iterative
fashion
 Construct a partial implementation of a total system
 Then slowly add increased functionality
 User requirements are prioritised and the highest priority
requirements are included in early increments.
 Each subsequent release of the system adds function to the
previous release, until all designed functionality has been
implemented.

Dr. Jyoti Deshmukh 41


Dr. Jyoti Deshmukh 42
Incremental Model Weaknesses

 Requires good planning and design


 Requires early definition of a complete and
fully functional system to allow for the
definition of increments
 Well-defined module interfaces are required
(some will be developed long before others)
 Total cost of the complete system is not
lower

43 Dr. Jyoti Deshmukh


When to use the Incremental
Model

 When staffing is not available by deadline


 Most of the requirements are known up-front but are
expected to evolve over time
 When the software can be broken into increments and
each increment represent a solution
 A need to get basic functionality to the market early
 On projects which have lengthy development schedules
 On a project with new technology

44 Dr. Jyoti Deshmukh


RAD MODEL
Rapid Application Development
Model

 An incremental process model that emphasizes short


development cycle
 “High-speed” adaptation of the waterfall model.
 RAD approach also maps into the generic framework
activities

45 Dr. Jyoti Deshmukh


46 Dr. Jyoti Deshmukh
Drawbacks of RAD

 For large projects, RAD requires sufficient human


resources to create the right number of RAD teams.
 If developers & customers are not committed to rapid-fire
activities, RAD projects will fail.
 If the system cannot be properly modularized, building the
components will be problematic
 If high-performance is an issue, RAD may not work.
 RAD may be inappropriate when technical risks are high

47 Dr. Jyoti Deshmukh


When to use RAD

 Reasonably well-known requirements


 User involved throughout the life cycle
 Project can be time-boxed
 Functionality delivered in increments
 High performance not required
 Low technical risks
 System can be modularized

48 Dr. Jyoti Deshmukh


EVOLUTIONARY PROCESS
MODEL

 These models produce an increasingly more


complete version of the software with each
iteration
 When to use
– Tight market deadlines
– Well defined system requirements
– No details about system definition

49 Dr. Jyoti Deshmukh


PROTOTYPING MODEL

 A prototype is a partially developed product that enables


customers and developers to examine some aspects of the
proposed system and decide if it is suitable or appropriate
for the finished product
– Start with what is known about requirements.
– Do a quick design.
– Build the prototype by focusing on what will be seen
by the user.
– Use the prototype to show the user and help refining
requirements
50 Dr. Jyoti Deshmukh
PROTOTYPING MODEL

51 Dr. Jyoti Deshmukh


Drawbacks of Prototyping Model

 Customer sees what appears to be a working


version of the software and presumes that it
is the final thing.
 The developer often makes implementation
compromises in order to get a prototype
working quickly
Only one advantage is actual software is engineered
with an eye toward quality

52 Dr. Jyoti Deshmukh


SPIRAL MODEL

 It couples the iterative nature of prototyping with the


controlled and systematic aspects of the waterfall model
Process
 Adapted to complete life cycle
 Process is represented as a spiral rather than as a sequence
of activities with backtracking.
 Each loop in the spiral represents a phase in the process.
 No fixed phases such as specification or design - loops in
the spiral are chosen depending on what is required.

53 Dr. Jyoti Deshmukh


SPIRAL MODEL

54 Dr. Jyoti Deshmukh


Spiral Model Strengths

• Focuses attention on reuse options.


• Focuses attention on early error elimination.
• Puts quality objectives up front.
• Integrates development and maintenance.
• Provides a framework for hardware/software
Development.

55 Dr. Jyoti Deshmukh


Drawbacks of the Spiral Model

 It may be difficult to convince customers that


the evolutionary approach is controllable.
 It demands risk assessment expertise and
relies on this expertise for success.
 If a major risk is uncovered and managed,
problems will occur.

56 Dr. Jyoti Deshmukh


When to use Spiral Model

 When creation of a prototype is appropriate


 When costs and risk evaluation is important
 For medium to high-risk projects
 Long-term project commitment unwise because
of potential changes to economic priorities
 Users are unsure of their needs
 Requirements are complex
 New product line
 Significant changes are expected
57 Dr. Jyoti Deshmukh
The Rational Unified Process

1. A dynamic perspective, which shows the


phases of the model over time.
2. A static perspective, which shows the
process activities that are enacted.
3. A practice perspective, which suggests good
practices to be used during the process

58 Dr. Jyoti Deshmukh


Phases

59 Dr. Jyoti Deshmukh


1. Inception The goal of the inception phase is
to establish a business case for the system.
2. Elaboration The goals of the elaboration
phase are to develop an understanding of
the problem domain, establish an
architectural framework for the system,
develop the project plan, and identify key
project risks. On completion of this phase
you should have a requirements model for
60 the system Dr. Jyoti Deshmukh
3. Construction The construction phase
involves system design, programming, and
testing.
4. Transition The final phase of the RUP is
concerned with moving the system from the
development community to the user community
and making it work in a real environment.

61 Dr. Jyoti Deshmukh


Static Workflows in RUP

62 Dr. Jyoti Deshmukh


The practice perspective
Six fundamental best practices are
recommended:
1. Develop software iteratively- Plan
increments of the system based on
customer priorities and develop the highest-
priority system features early in the
development process.
2. Manage requirements- Explicitly document
the customer’s requirements and keep track
of changes to these requirements. Analyze
63 the impact of changes on the system before
Dr. Jyoti Deshmukh
3. Use component-based architectures
Structure the system architecture into
components
4. Visually model software- Use graphical UML
models to present static and dynamic views of
the software.
5. Verify software quality- Ensure that the
software meets the organizational quality
standards.
6. Control changes to software- Manage
changes to the software using a change
management system and configuration
64 Dr. Jyoti Deshmukh
management procedures and tools.
Agile Software Development

65 Dr. Jyoti Deshmukh


Plan Driven and Agile
development

66 Dr. Jyoti Deshmukh


Agile Methods

 extreme programming (Beck, 1999; Beck, 2000)


 Scrum (Cohn, 2009; Schwaber, 2004; Schwaber and Beedle,
2001)
 Crystal (Cockburn, 2001; Cockburn, 2004)
 Adaptive Software Development (Highsmith, 2000),
 DSDM (Stapleton, 1997; Stapleton, 2003), and
 Feature Driven Development (Palmer and Felsing, 2002).
 The success of these methods has led to some integration with
more traditional development methods based on system
modelling, resulting in the notion of agile modelling (Ambler and
Jeffries, 2002) and agile instantiations of the Rational Unified
Process (Larman, 2002).
67 Dr. Jyoti Deshmukh
Extreme Programming

68 Dr. Jyoti Deshmukh


Excercises

1. Giving reasons for your answer based on the type of system


being developed, suggest the most appropriate generic software
process model that might be used as a basis for managing the
development of the following systems:
 A system to control anti-lock braking in a car
 A virtual reality system to support software maintenance
 A university accounting system that replaces an existing system
 An interactive travel planning system that helps users plan
journeys with the lowest environmental impact

69 Dr. Jyoti Deshmukh


2. Historically, the introduction of technology has
caused profound changes in the labor market and,
temporarily at least, displaced people from jobs.
Discuss whether the introduction of extensive process
automation is likely to have the same consequences for
software engineers. If you don’t think it will, explain why
not. If you think that it will reduce job opportunities, is it
ethical for the engineers affected to passively or
actively resist the introduction of this technology?

70 Dr. Jyoti Deshmukh


3. Explain why incremental development is the
most effective approach for developing
business software systems. Why is this model
less appropriate for real-time systems
engineering?
4. Propose a specific software project that
would be amenable to the incremental model.
Present a scenario for applying the model to
the software.
71 Dr. Jyoti Deshmukh
5. As you move outward along the process flow
path of the spiral model, what can you say
about the software that is being developed or
maintained?
6. Provide five examples of software
development projects that would be amenable
to prototyping. Name two or three applications
that would be more difficult to prototype

72 Dr. Jyoti Deshmukh