Bill of Quantities

The document outlines costs for construction of new powdered activated carbon dosing facilities and associated works at a water treatment plant. It includes line items for general preliminaries like performance bonds, insurances, site offices, equipment for the contractor and consultant, project signage, and other site requirements.

Uploaded by

Sarivin Kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views

Bill of Quantities

The document outlines costs for construction of new powdered activated carbon dosing facilities and associated works at a water treatment plant. It includes line items for general preliminaries like performance bonds, insurances, site offices, equipment for the contractor and consultant, project signage, and other site requirements.

Uploaded by

Sarivin Kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 68

CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER

ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) A: GENERAL AND PRELIMINARIES (blank)

(blank) A1: GENERAL (blank)

(blank) Notes: (blank)


a) The Contractor shall state N/A for
unrelated item/s. Item/s not priced are
considered included elsewhere.
b) The Contractor shall refer to Appendix
A1 for further details and explanations.

(blank) Performance Bond (blank)

A1.001 Allow costs for the Performance Bond. L.S.

(blank) Insurances (blank)

(blank) Insurance shall cover the total contract (blank)


sum and throughout the construction
period including the Defect Liability
Period.

A1.002 Allow cost for the Contractor's All Risk L.S.


and Third Party/Public Liability Insurance.

A1.003 Allow cost for the Workmen's L.S.


Compensation Insurance.

(blank) CIDB Levy (blank)

A1.004 Allow cost for the Construction Industry L.S.


Development Board (CIDB) Levy.

(blank) Mobilisation and Demobilisation (blank)

A1.005 Allow cost for mobilisation of the L.S.


Contractor's plant including transport to
Site and removal on completion of the
Works.

(blank) Contractor's Site Office (blank)

A1.006 Provide and maintain Contractor's L.S.


temporary site office, workmen
accommodation and stores as per
following requirements:

BQ SECTION A1
Page 1/7 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) a) The Contractor shall allow for (blank)
complying with all Safety, Health and
Welfare Regulations, appertaining to all
work people employed on the site.

(blank) b) The temporary building shall be (blank)


regularly cleaned, deodorised and
sanitized in accordance with the Health
Authority requirements. Contractor shall
make all the conservancy arrangements
and pay all the temporary water,
electricity charges and sanitation.

(blank) c) Contractor shall maintain the (blank)


temporary buildings through out the
construction period and make good all
areas were disturbed after the removal of
this temporary building.

(blank) C.A.'s Site Office and Facilities (blank)

A1.007 Provide and maintain the C.A.'s L.S.


temporary site office as per following
requirements:

(blank) a) Provide and maintain the C.A.'s (blank)


temporary site office (minimum 20 people
for the site meetings), as specified
complete with the furniture, air
conditioners, and all the necessary office
equipment as specified for the C.A's
representative and his staff.

(blank) b) The temporary building should be (blank)


cleaned regularly, deodorized, and
sanitized according to the Health
Authority requirements. Contractor shall
make all the conservancy arrangements
and pay for all the temporary water,
electricity charges and sanitation.

(blank) c) Contractor shall maintain the (blank)


temporary buildings throughout the
construction period. The temporary
building shall be removed three (3)
months after the issuance of the
Certificate of Practical Completion
(CPC) and make good all areas were
disturbed after the removal of this
temporary building and make good all
areas were disturbed after the removal of
this temporary building.

BQ SECTION A1
Page 2/7 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

(blank) Projector and Photocopier (blank)

A1.008 Provide and maintain a projector for L.S.


meeting presentations, photocopier
machine with colour printer and scanning
for the C.A's temporary site office
through out the construction period
including all the necessary disposables,
cartridges and printing paper. The
equipment shall be reverted to the
Contractor three (3) months after the
issuance of the Certificate of Practical
Completion (CPC). (Refer Appendix A1
for specifications).

(blank) Computer System (blank)

A1.009 Provide and maintain one (1) unit of the L.S.


computer system complete with the e-
mail line as specified for the C.A's
temporary site office through out the
construction period. The computer shall
be reverted to the Contractor three (3)
months after the issuance of the
Certificate of Practical Completion
(CPC). (Refer Appendix A1 for
specifications).

(blank) Internet Services for C.A.'s Site Office (blank)

A1.010 Provide and maintain the internet L.S.


services to the C.A's temporary site office
and provision for all the charges and
deposit required by the
telecommunication companies, taxes,
etc, through out the construction period
and shall be removed three (3) months
after the issuance of the Certificate of
Practical Completion (CPC).

(blank) Smartphone (blank)

BQ SECTION A1
Page 3/7 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


A1.011 Provide two (2) sets of the smart phone L.S.
(maximum of RM1,500/unit) for the use
of the C.A. or his authorized
representatives and pay for the bills (to
the maximum of RM250.00 per month
per user) and provision for all the
charges and deposit required by the
telecommunication companies, taxes,
etc. and maintain them in good working
condition throughout the Contract period
and to be reverted to the Contractor after
the issuance of the Certificate of Making
Good Defects (CMGD). (Refer Appendix
A1 for specifications).

(blank) Vehicle (blank)

A1.012 Provide one (1) no. of new project vehicle L.S.


of 1.5 cc for the use of the C.A and his
representative throughout the Contract
period, pay all toll cost, parking,
expenses on fuel and consumables,
maintenance and replacement of the
parts, insurances and taxes etc.
throughout the construction period and
to be reverted to the Contractor three (3)
months after the issuance of the
Certificate of Practical Completion
(CPC).

(blank) Setting Out and Survey (blank)

A1.013 Allow for all the setting out and survey of L.S.
the Works including the provision for all
the necessary equipment, materials,
licensed surveyor and labour as
specified.

(blank) Project Signboard (blank)

A1.014 Provide and maintain one (1) no. of the L.S.


project signboard as per AIR
SELANGOR's specification and
requirement and to be removed upon
completion of the project.

(blank) Site Requirements (blank)

BQ SECTION A1
Page 4/7 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


A1.015 Allow cost to maintain the works being L.S.
kept clear of water in all situation
including but not limited to the dewatering
of the trenches, excavated area and
during the testing and commissioning of
the pipe lines.

(blank) Temporary Works (blank)

A1.016 Allow cost for the temporary works and L.S.


shoring of the pipe trenches and
excavated area using whatever the
materials and not limited to timber and/or
steel sheet piles suitable to prevent the
pipe trenches from collapsing for the pipe
laying under the road pavement, water
logged and built up areas.

(blank) Temporary and Existing Access Road (blank)

A1.017 Provide and maintain the temporary and L.S.


existing access roads to the Site for the
duration of the Contract. Rate to include
the reinstatement to the original condition
on the completions of the Works.

(blank) Site Cleanliness (blank)

A1.018 Allow cost to maintain the cleanliness of L.S.


the working area including the ongoing
housekeeping, water spraying to reduce
the dust mainly on the main road, etc to
the requirement of the Authorities.
Clearing up the Site as directed during
the progress and upon completion of the
Works.

(blank) Hoarding (blank)

A1.019 Provide and maintain the hoarding at Site L.S.


for the duration of the Contract. The
hoarding shall be inclusive of metal deck
cladding gate and constructed using
approved metal deck with approved
colour and pattern. Rate to include the
reinstatement to the original condition on
the completions of the Works.

BQ SECTION A1
Page 5/7 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) Wash Trough (blank)

A1.020 Construct and maintain the wash trough L.S.


and high pressure water jet at Site for the
duration of the Contract. Rate to include
the reinstatement to the original condition
on the completions of the Works.

(blank) Progress Reports (blank)

A1.021 Provide a monthly progress report L.S.


consisting of three (3) colour copies and
two (2) copies of black and white printed
in the suitably bound album for the
duration of the Contract.

(blank) Site Agent (blank)

A1.022 Provide full time, qualified and L.S.


experienced engineer as the Site Agent
to the approval of the C.A.

(blank) Contract Documents (blank)

A1.023 Allow cost for the preparation of the one L.S.


(1) original, one (1) duplicate and five (5)
Certified True Copy of the contract
documentation, binding in hardcovers
and stamping.

(blank) Document Submissions (blank)

A1.024 Prepare and submission of the work L.S.


programme, shop drawing, calculation,
mill certificate, etc.

(blank) Operation and Maintenance (O&M) (blank)

A1.025 Preparation and submission of Operation L.S.


and Maintenance (O&M) Manuals.

(blank) As Built Drawings (blank)

BQ SECTION A1
Page 6/7 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


A1.026 The Contractor shall prepare, agree and L.S.
supply the C.A. with the "As Built"
drawings for all the works done as
constructed on site. All drawings must be
endorsed by the P.E.P.C. and shall be
submitted to the C.A. within three (3)
months from the date of the CPC.

(blank) Tests and Samples (blank)

A1.027 Submission of tests and samples for the L.S.


materials, equipment, mock-up,
catalogue, concrete trial mixed, cube
tests, steel bar tensile tests, etc. for the
C.A. approval when directed.

(blank) Factory Acceptance Test (FAT) (blank)

A1.028 Factory Acceptance Test (FAT) complete L.S.


with endorsement by the P.E.P.C. (Refer
Appendix A1 for specifications).

BQ SECTION A1
Page 7/7 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

A: GENERAL AND PRELIMINARIES

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) A: GENERAL AND PRELIMINARIES (blank)

(blank) A2: HEALTH AND SAFETY (blank)


PRECAUTIONS

(blank) Note: (blank)


a) The Contractor shall refer to Appendix
A2 for further details and explanations.

A2.001 Generals. L.S.

A2.002 NIOSH Safety Passport Courses. L.S.

A2.003 Confined Space Work. L.S.

A2.004 Working at Height. L.S.

A2.005 Chemical Handling. L.S.

A2.006 Hot Work. L.S.

A2.007 Excavation. L.S.

A2.008 Asbestos Containing Materials. L.S.

A2.009 Permit to Work and Operational Safety L.S.


Improvement (PTOS) and NIOSH
Competency Training and Certificate.

BQ SECTION A2
Page 1/1 Stamp/Sign
APPENDIX A1

ITEM DESCRIPTION

(blank) The following items are descriptions to the items to be priced in the BQ A1. Tenderer shall not
price the item in this Appendix.

A COMPUTER SYSTEM

(blank) 1. Minimum specification for each computer system are as following:

(blank) a) Processor: Intel Core i7

(blank) b) Memory: 16GB

(blank) c) Storage: 500GB SSD

(blank) d) Screen Size: Minimum 13"

(blank) e) Built In: Camera, Wi-Fi

(blank) f) Port: USB, USB-C and HDMI Port Adaptor

(blank) g) Accessories: HD Monitor 24" (HDMI cable shall be included), Wireless/Bluetooth Mouse.

(blank) 2. The following licenced software shall be provided. The licence shall be valid throughout the
construction period.

(blank) a) Window 11

(blank) b) Microsoft 365 with Outlook and Teams

(blank) c) Antivirus Software with Internet Security and Malware Protection

(blank) d) Microsoft Project

(blank) e) PDF Application

(blank) f) CAD Viewer Application

B PROJECTOR

(blank) Features of the projector shall include:

(blank) a) Input: HDMI (cable shall be included)

(blank) b) Projector Screen shall be included.

(blank) c) Minimum Resolution: 1920 x 1080

(blank) d) Minimum Brightness: 3000 Lumens

(blank) e) Keystone correction.

C PHOTOCOPIER

(blank) Features of the printer shall include:

(blank) a) A3 size, Double-Sided Print and Scan


APPENDIX A1
Page 1/2 Stamp/Sign
APPENDIX A1

ITEM DESCRIPTION

(blank) b) Supply of accessories, disposables, cartridges, printing paper and consumables.

D SMARTPHONE

(blank) Features of the smartphone shall include:

(blank) a) Minimum Storage: 256GB

(blank) b) Minimum Camera Resolution: 48MP

(blank) c) Minimum RAM: 8GB

E VEHICLE

(blank) Specification of vehicle is as following:

(blank) a) Engine: 1.5 cc

(blank) b) Toll Card (Touch & Go), Fuel Card and Monthly Parking Pass shall be included.

F FACTORY ACCEPTANCE TEST (FAT) AND SITE ACCEPTANCE TEST (SAT)

(blank) Local FAT

(blank) Factory Acceptance Test at the manufacturer's local facility before deliver to site and witness
by C.A. or his appointed representatives complete with test report. Rate to include setup of test
bench by the manufacturer, all necessary equipment and other expenses including all the
expenses incurred for the witness testing for the following:

(blank) a) Silo System (Knife Gate Valve, Screw Feeder, etc.)

(blank) b) Electrical Panel (MCC, SSB, LCP, O/S, etc.)

(blank) Site Acceptance Test (SAT)

(blank) a) Silo System

APPENDIX A1
Page 2/2 Stamp/Sign
APPENDIX A2

ITEM DESCRIPTION

(blank) DETAILS AND EXPLANATION FOR HEALTH AND SAFETY PRECAUTIONS

(blank) GENERAL

A The contractor shall provide and maintain all the necessary protective and safety helmets,
rubber boots, safety shoes and standard colour T-shirt for all the site staffs and workers to be
worn at all time throughout the construction period.

B Allow cost for complying with all the Health and Safety precaution for the works, including
provision for all the necessary equipment, material and labour in compliance with all the health,
safety and security requirements.

C To provide full time, qualified and experienced Site Safety Supervisor as required by the
Department of Safety and Health (DOSH) to the approval of the C.A.

D Allow cost for the provision of the Safety Vest (as per AIR SELANGOR's specification and
requirement) for each of the site staff and to be worn at all the time throughout the construction
period.

E Provide for the works to be kept clear of water.

F To provide the traffic management control system to the requirements of the relevant
authorities.

G Allow cost for liaison with the Authorities for the permit application, site registration and working
within the road / existing utilities reserve to meet the requirement of the Safety and Health and
Road / Utilities Authorities (DOSH, DBKL, MPAJ, TNB, TM, etc.) All related costs including the
application fees and mandatory charges shall be borne by the Contractor. Bank Guarantee or
any other form of deposit shall be borne by AIR SELANGOR.

H Allow cost for the provision and maintenance of all the traffic or warning signs, barricades
NYLEX road barriers, signal and blinking lamps and personnel to guide movements of traffic
day and night during the duration of the works. (All the road traffic signs are to be of the AIR
SELANGOR's standard drawings.) Minimum requirements for each works area:

(blank) a) Plastic cone.

(blank) b) NEYLEX barrier mesh.

(blank) c) AWAS signboard.

(blank) d) AWAS KERJA- KERJA AIR SELANGOR 50m DIHADAPAN signboard.

(blank) e) AWAS KERJA-KERJA AIR SELANGOR 100m DI HADAPAN signboard.

(blank) f) Amber wooden board showing a black arrow.

(blank) g) KERJA-KERJA PEMBANGUNAN OLEH AIR SELANGOR SEDANG DIJALANKAN,


SEBARANG GANGGUAN AMAT DIKESALI signboard.

(blank) h) Signal lights or blinkers.

(blank) i) STOP / GO control sign hand signal swing disc.

(blank) j) Other traffic signs required.

APPENDIX A2
Page 1/6 Stamp/Sign
APPENDIX A2

ITEM DESCRIPTION

(blank) NIOSH SAFETY PASSPORT COURSE

J To attend and complete the full day of training on Air Selangor NIOSH Safety Passport Course
for all the employees or workers of the contractor and sub-contractors who are required to
work at site(s).

K To obtain the Air Selangor Niosh Safety Passport Card after completion of the training. course.

L To ensure that all the employees and workers who are engaged in the work at the site (s) have
a valid Air Selangor Niosh Safety Passport Contractor's card issued by Air Selangor. The card
shall be displayed at all times when working at the site (s) and/or at any Air Selangor premise
(s).

M Report analysis, report writing and presentation To provide a copy of the Air Selangor NIOSH
Safety passport to the Pengurusan Air Selangor Sdn Bhd management team.

(blank) CONFINED SPACE WORK

N To provide and ensure all the workers involved in the confined space activities possess the
valid competencies as per required by the Industry Code of Practice For Safe Working In
Confined Space 2010 as per below:

(blank) a) Authorized Entrant (AE)

(blank) b) Standby Person (SP)

(blank) c) Authorized Gas Tester (AGT)

(blank) d) Entry Supervisor

P All competent persons shall possess the valid competency card issued by the National Institute
of Occupational Safety & Health (NIOSH) or any DOSH-recognized training provider.
Authorized Gas Tester and Entry Supervisor must possess the competency certificate issued
by the Department of Occupational Safety & Health (DOSH).

Q To provide the personal protective equipment (PPE), confined space equipment and
emergency equipment as per require but not limited by the Industry Code of Practice For Safe
Working In Confined Space 2010 and any related regulations as per below:

(blank) a) Basic PPE including safety helmet, safety shoes, and safety vest.

(blank) b) Special PPE including safety harness with double lanyard and etc.

(blank) c) Forced air ventilation equipment.

(blank) d) Atmosphere testing and monitoring equipment (5 gases of Cl2, O2, CO, H2S and CH4).

(blank) e) Self Contained Breathing Apparatus (SCBA) / escape set.

(blank) f) Equipment for safe ingress and egress such as ladder, winch and tripod.

(blank) g) Practicable communication devices.

(blank) h) Lighting equipment.

APPENDIX A2
Page 2/6 Stamp/Sign
APPENDIX A2

ITEM DESCRIPTION

(blank) i) Barriers and shields.

(blank) j) Emergency and Rescue equipment i.e. stretcher and first aid box.

(blank) k) Monitoring equipment such as Multi-Gas Detector shall be equipped with the calibration
certificate.

R To provide and post at site the adequate danger sign to indicate the work is being carried out in
the confined space, entering the confined space is prohibited unless authorized by the Entry
Supervisor.

S To prepare and submit the working in confined space documentation. The preparer shall at
least attend the confined space awareness training. All the documentation submitted shall be
endorsed by the contractor's Authorized Gas Tester:

(blank) a) Confined Space Entry Plan.

(blank) b) Ventilation Plan.

(blank) c) Emergency & Rescue procedure and plan.

(blank) d) Confined Space Risk Assessment.

(blank) e) Other related plan in case of using special installation or machinery i.e. scaffolding, mobile
crane and etc.

(blank) Based on the risk assessment, practicable hazard control shall be established and
implemented.

(blank) Sign Posting


T Confine space warning signages shall be posted at the conspicuous places when work is being
carried out.

(blank) Employee Training


U To prepare and ensure all the contractors that are involved in the confine space operation have
undergone training on the confine space safety courses approved by the JKKP and passed the
examination.

(blank) Equipment
V The contractor shall provide the appropriate equipment as follow:-

(blank) a) Atmosphere testing and monitoring equipment.

(blank) b) Personal Protective Equipment as far as practicable if engineering and work practice
controls do not adequately protect authorized entrants.

(blank) c) Forced air ventilation equipment require for achieving the acceptable entry conditions.

(blank) d) Lighting equipment needed to enable the authorised entrants to see clearly, work safely and
to be able to exit the confined space quickly in case of emergency.

(blank) e) Barriers and shields.

(blank) f) Equipment for safe ingress and egress for the authorised entrants, such as ladders, winch
and tripod.
APPENDIX A2
Page 3/6 Stamp/Sign
APPENDIX A2

ITEM DESCRIPTION

(blank) g) Emergency and rescue equipment; and

(blank) h) Any other equipment necessary for the safe entry into and rescue from the confined spaces.

(blank) Ventilation
W Ventilation shall be provided continuously throughout the period of the occupancy in the
confined space.

X The contractor shall ensure that his authorised entrant intending to work in confined space are
certified physically and mentally fit determined by an occupational health doctor (OHD shall
issue a health fitness certificate that shall be valid for a period of two (2) years.

(blank) WORKING AT HEIGHT

Y To provide an adequate fall protection device including safety harness to all the related worker
during working above 3 meter. Fall protection device shall be approved by the Department of
Occupational Safety & Health (DOSH).

Z To provide an adequate and proper A ladder (if any). The ladder shall be approved by the
approved authority bodies i.e. SIRIM and etc.

AA To provide a suitable working platform such as scaffolding complete with the erection &
inspection tagging.

AB To provide a competent erector / inspector recognized by DOSH for the scaffolding structure

AC Erection of the scaffolding more than 15 metre must be designed and drawing by the
Professional Engineer.

(blank) CHEMICAL HANDLING

AD To provide an adequate and proper chemical container complete with the labelling as per
require by the Classification, Labelling And Safety Data Sheet 2013 (CLASS 2013).

AE To provide storage area for chemical complete with warning signs that is suitable and
adequate as per stated in the Safety Data Sheet and CLASS 2013

AF To provide an adequate and proper PPE (approved with DOSH-SIRIM) as per stated in the
Safety Data Sheet.

AG To provide an adequate documentation for each chemical used including Safety Data Sheet
and Chemical Register.

AH To provide training related to chemical handling to workers as per requirement in Use and
Standards of Exposure of Chemical Hazardous to Health (USECHH 2000)

AJ To appoint assessor for conducting Chemical Health Risk Assessment (CHRA), Chemical
Exposure Monitoring (CEM) (if necessary) & Medical Surveillance (if necessary) as per
USECHH 2000

AK To carry out proper chemical waste disposal as per require by the related regulations including
the Environmental Quality (Scheduled Waste) Regulation 2005 and etc.

APPENDIX A2
Page 4/6 Stamp/Sign
APPENDIX A2

ITEM DESCRIPTION
(blank) HOT WORK

AL To provide and ensure all the worker involved in the hot work activities are trained person and
using the appropriated PPE during activities.

AM To provide an adequate ABC 9 kg Fire Extinguisher.

AN To provide the fire watcher during hot work activities.

AP To provide the oxy cutter cylinder cart including the flashback arrester.

AQ To provide the ventilation fan.

(blank) EXCAVATION

AR To provide shoring or suitable temporary structure for the excavation more than 1.5 metre
depth.

AS To provide suitable safe access into the excavation site such as ladder.

AT To provide the AESP and AGT if depth of the excavation works considered as confined space,
more than 1.5 metre.

AU To provide the mechanical ventilation for the excavation work more than 1.5 metre depth.

AV To provide an adequate control for the effective sediment traps such as the geotextiles fence,
polymer block, etc (if necessary).

(blank) ASBESTOS CONTAINING MATERIALS

AW To provide consultancy services for the supervision, inspection and exposure monitoring of the
asbestos containing material (ACM) including preparing of the final report on the analysis and
risk assessment at the project site:

AX To provide shoring or suitable temporary structure for the excavation more than 1.5 metre
depth.

AY To conduct the baseline survey and identification of the ACM material By the Competent
Asbestos Consultant: P406 Supervision and Management of the Safe Removal and Disposal
of Asbestos. Proficiency Certificate No. 180111/004 and Registered Chemist AMIC
1095/2640/96/99 and Accredited Laboratory SAMM 213.

AZ To liaise with the relevant authority (DOE & DOSH) for the Asbestos Removal (Surat Tanpa
Halangan).

BA To conduct the Chemical Health Risk Assessment and to provide CHRA report.

(blank) a) Malaysian DOSH requirement by the competent CHRA Assessor:

(blank) b) Comply with the Reg 9 of the USECHH Regulation 2000 (Use & Standards Of Exposure Of
Chemical Hazardous To Health Regulations 2000).

BB To conduct the Air Monitoring while maintenance work is in progress (test for the airborne
asbestos, Including Baseline) Boundary and personnel exposure monitoring.

APPENDIX A2
Page 5/6 Stamp/Sign
APPENDIX A2

ITEM DESCRIPTION
(blank) a) Chemical Exposure monitoring based on Malaysian DOSH requirement by the competent
Hygiene Tech I (Chemical Exposure ).

(blank) b) To Comply with the Reg 26 of the USECHH Regulation 2000 (Use & Standards Of Exposure
Of Chemical Hazardous To Health Regulations 2000), and Malaysia: Environmental Quality
(Clean Air) Regulations.

(blank) c) Min requirements: 1 area and 1 personnel sampling / daily (for entire duration of removal)

BC To conduct the air sampling and swap analysis after the asbestos Abatement project. (To test
for the abatement completion and cleanliness).

(blank) a) Chemical Exposure monitoring based on Malaysian DOSH requirement by the competent
Hygiene Tech I (Chemical Exposure).

BD To prepare the final report on the Analysis, Survey and Assessment.

(blank) a) One (1) hard copy and soft copy for Air Selangor

(blank) b) One (1) copy submitted to DOSH

BE To Comply with the USECHH Regulation 2000 (Use & Standards Of Exposure Of Chemical
Hazardous To Health Regulations 2000)

(blank) PERMIT TO WORK AND OPERATIONAL SAFETY IMPROVEMENT (PTOS) AND NIOSH
COMPETENCY TRAINING AND CERTIFICATE

BF To attend and complete the training on Permit to Work (PTW) and Operational Safety
Improvement (OSI) for all the work leaders of the site staff, contractor and sub-contractors who
are required to work at site(s).

BG To provide participant from C.A.'s representatives to attend and obtain competency training
and certificate from NIOSH.

BH To obtain the Permit to Work and Operational Safety Improvement certificate after completion
of the training course.

BJ To ensure that only the certified Work Leaders are authorized to apply and sign Permit to Work
(PTW). The certificate shall be made available at all times when working at the site (s) and/or
at any Air Selangor premise (s).

BK To provide a copy of the Permit to Work and Operational Safety Improvement certificate to the
Pengurusan Air Selangor Sdn Bhd management team.

BL To ensure the validity of the certificate throughout the construction period.

APPENDIX A2
Page 6/6 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) B: CIVIL AND STRUCTURAL WORKS (blank)

(blank) Notes: (blank)


a) The Contractor shall provide for
temporary protection works to existing
structure, utilities and asset, temporary
shoring, stagging and strutting by using
temporary steel sheet pile or any
approved method statement during
construction works. The Contractor shall
includes mobilization and demobilization,
temporary platform, moving within the
site and reinstatement works upon
completion as directed by the C.A.

(blank) b) The Contractor must ensure to (blank)


includes all necessary temporary works
i.e. working access, working space,
pumping and dewatering works (including
genset or others power supply complete
with flexible hose pipe, etc.), spot light for
night work, confine space requirements
(air blower, etc.), working at height
requirements include temporary working
platform, staircases, gangway,
scaffolding, hoisting, etc. and to be
complied with the Health, Safety, Security
and Environment (HSSE) requirements.

(blank) PILING WORKS (blank)

(blank) The piling work deemed to include piling (blank)


records and disposal of excavated and
surplus materials.

(blank) 200MM X 200MM SQUARE PILE (blank)

(blank) Plant and Equipment (blank)

B.001 Provision of all necessary Injection L.S.


Method Piling plant and equipment,
transportation to the site, handling,
assembling, and removal of the site after
completion of operation.

B.002 Moving and handling of all piling plant L.S.


and equipment within the site and from
location to location as often as is, and
whenever necessary for the execution of
the whole piling operation.

BQ SECTION B
Page 1/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) 200mm x 200mm Precast Reinforced (blank)
Concrete Piles

B.003 Supply and deliver to site 9m length initial NO 49


piles.

B.004 Supply and deliver to site 9m length NO 49


extension pile

B.005 Supply and deliver to site 6m length NO 49


extension pile

B.006 Handle, pitch and drive vertical piles. M 1176

B.007 Lengthening of piles by jointing to detail. M 98

B.008 Cutting off piles head to required length NO 49


including stripping off to expose main
reinforcements to detail.

(blank) PILE TEST (blank)

(blank) The rate for pile test deemed to include (blank)


necessary equipments, staging, framing,
inserts and accessories and others
related works.

B.009 Provide all labour, plants, temporary NO 1


staging, kentledge, testing equipments
etc. and test load on working pile to the
maximum load test 600kN (twice working
load).

B.010 Carry out pile driving analyser (PDA) NO 8


monitoring on pile complete with all
necessary preparation for installing
transducers, setting up the necessary
equipment and monitoring by experience
personnel.

(blank) SITE CLEARANCE (blank)

B.011 General Site clearing of the right of way L.S.


undergrowth, trees bushes, shrubs and
grass. Rate shall deemed to include all
machinery, manpower and transportation
to dispose off site including all permits,
royalties, etc.

(blank) DEMOLITION WORKS (blank)

BQ SECTION B
Page 2/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) Demolish and remove existing structures (blank)
including hardstanding, pipes, thrust
blocks, etc. and dispose from Site to
Contractor's own dump as directed by the
C.A.

B.012 RC Chamber and other RC structures L.S.

B.013 Road Kerb M 50

B.014 Pillar Hydrant NO 1

B.015 Dismantling and removing of DN600mm M 80


existing pipe and fittings as directed by
C.A. Rate shall deemed to includes
excavation, dismantle, remove and
transportation cost and including cut,
weld and end cap existing pipe.

B.016 Dismantling and removing of existing M 80


underground electrical cables across the
site as directed by C.A. Rate shall
deemed to includes excavation,
dismantle, decommissioning and remove
and transportation cost and including cut,
weld and end cap existing pipe.

(blank) SUBSTRUCTURE (blank)

(blank) This elemental section comprises all (blank)


work below the structural level of the
ground floor slab and includes the
suspended ground floor slab together
with relevant excavations and
foundations.

(blank) Excavation (blank)

(blank) Excavate, commencing from existing (blank)


platform level, get out, part return, fill in
and well ram and remainder load and
remove from site for;-

B.017 Pilecap; not exceeding 1.50m deep M³ 28

B.018 Ground beam; not exceeding 1.50m M³ 10


deep

B.019 Trench; not exceeding 1.50m deep M³ 21.6

BQ SECTION B
Page 3/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) Excavate to reduce level commencing (blank)
from existing platform level, get out, load
and remove from site:-

B.020 200mm Deep for ground floor slab M² 136

B.021 200mm Deep for apron slab M² 56

B.022 200mm Deep for ramp slab M² 7

(blank) Approved crusher run, deposit, spread, (blank)


levelled and well compacted:-

B.023 150mm Thick base; under ground floor M² 136


slab

B.024 150mm Thick base; under trench M² 15

B.025 150mm Ditto; under apron slab M² 49

B.026 150mm Ditto; under ramp slab M² 8

(blank) Concrete (blank)

(blank) Lean concrete (Grade 15) in:- (blank)

B.027 50mm Thick blinding; beneath pilecap M² 27

B.028 50mm Ditto; beneath trench M² 29

B.029 50mm Ditto; beneath ground floor slab M² 136

B.030 50mm Ditto; beneath apron slab M² 49

B.031 50mm Ditto; beneath ramp slab M² 8

(blank) Vibrated reinforced concrete (Grade 30) (blank)


in:-

B.032 Pilecap M³ 10

B.033 Column stump M³ 2

B.034 Ground beam M³ 15

B.035 Trench M³ 5

(blank) Vibrated reinforced concrete (Grade 30) (blank)


in:-

B.036 150mm Thick ground floor slab M² 136

BQ SECTION B
Page 4/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.037 150mm Thick apron slab M² 49

B.038 150mm Thick (average) ramp slab M² 8

B.039 Extra over apron slab for base key M 49


thickening from 100mm to 250mm for an
average width of 275mm; including extra
excavation, hardcore, lean concrete and
formwork with angles, ends and
intersections

B.040 Extra over ramp slab, for base key M 5


200mm x 75mm thick; ditto

(blank) Reinforcement (blank)

(blank) Hot rolled steel reinforcement; mild steel (blank)


, minimum yield stress 250N/mm2, in

(blank) Column Stump (blank)

B.041 10mm Diameter as links KG 410

(blank) Trench (blank)

B.042 10mm Diameter KG 1100

(blank) Ground Beam (blank)

B.043 6mm Diameter as stirrups KG 748

(blank) Apron Slab (blank)

B.044 6mm Diameter KG 294

(blank) Ramp Slab (blank)

B.045 6mm Diameter KG 122

(blank) Hot rolled steel deformed reinforcement; (blank)


high yield 60, minimum yield stress
460N/mm2, in

(blank) Pilecap (blank)

B.046 16mm Diameter KG 2314

(blank) Column Stump (blank)

B.047 16mm Diameter KG 254

B.048 20mm Diameter KG 39

BQ SECTION B
Page 5/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

(blank) Ground Beam (blank)

B.049 25mm Diameter KG 325

B.050 20mm Ditto KG 691

B.051 16mm Diameter KG 752

(blank) Steel Fabric Reinforcement (blank)

(blank) Steel fabric reinforcement for concrete; (blank)


minimum yield stress 485N/mm2, well
lapped at joints including bending fabric
and notching around obstructions
(measured nett - allow for laps):-

B.052 Two layer of BRC No. A10 (weighing not M² 136


less than 6.16kg/m2) in ground slab

B.053 One layer of BRC No. A7 (weighing not M² 64


less than 3.02kg/m2) in ground slab

(blank) Formwork (blank)

(blank) Sawn formwork Class F1 to :- (blank)

B.054 Sides of pilecap M² 41

B.055 Sides of column stump M² 18

B.056 Sides of trench M² 60

B.057 Sides of ground beam M² 124

B.058 Edge of apron slab; not exceeding M 50


100mm high

B.059 Sides of ramp slab; varying in height from M 8


200mm to 300mm maximum

B.060 Extra-over for form edge of scupper drain M 50


size 100mm x 100mm

(blank) Sundries (blank)

BQ SECTION B
Page 6/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.061 Chemical soil treatment against M² 210
subterranean termite by an approved
established and experienced specialist in
termite control to ground floor slab, apron
and ramp, slab cable trench, base and
wall and including 1.00m beyond edge of
apron/perimeter drain (measured on plan
- nett horizontal area plus trench wall
area only)

B.062 Single layer of 0.25mm thick approved M² 210


polythene sheet well lapped at joint and
sealed with an approved pressure
sensitive tape; laid under concrete bed
(measured nett - allow for laps)

(blank) FRAME (blank)

(blank) Concrete (blank)

(blank) Vibrated reinforced concrete (Grade 30) (blank)


in:-

B.063 Column and Stiffener M³ 36

B.064 Plinth M³ 3

B.065 Upper Beam M³ 27

B.066 Roof Beam M³ 7

B.067 RC Flat Roof (Electrical Room) M³ 2

(blank) Reinforcement (blank)

(blank) Hot rolled steel reinforcement; mild steel (blank)


, minimum yield stress 250N/mm2, in

(blank) Column (blank)

B.068 10mm Diameter as links KG 2550

(blank) Plinth (blank)

B.069 12mm Diameter KG 420

(blank) Upper Beam (blank)

B.070 6mm Diameter as stirrups KG 4000

(blank) Roof Beam (blank)

BQ SECTION B
Page 7/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.071 6mm Diameter as stirrups KG 190

(blank) Hot rolled steel deformed reinforcement; (blank)


high yield 60, minimum yield stress
460N/mm2, in

(blank) Column (blank)

B.072 20mm Diameter KG 670

B.073 16mm Diameter KG 4470

(blank) Upper Beam (blank)

B.074 20mm Diameter KG 615

B.075 16mm Diameter KG 2100

(blank) Roof Beam (blank)

B.076 20mm Diameter KG 660

B.077 16mm Diameter KG 650

(blank) RC Flat Roof (blank)

B.078 12mm Diameter as starter bar KG 81

(blank) Steel Fabric Reinforcement (blank)

(blank) Steel fabric reinforcement for concrete; (blank)


minimum yield stress 485N/mm2, well
lapped at joints including bending fabric
and notching around obstructions
(measured nett - allow for laps):-

B.079 One layer of BRC No. A7 (weighing not M² 10


less than 3.02kg/m2) in ground slab

(blank) Formwork (blank)

(blank) Sawn formwork Class F2 to:- (blank)

B.080 Sides of column M² 273

B.081 Sides of plinth M² 15

B.082 Sides and soffit of upper beam M² 240

B.083 Sides and soffit of roof beam M² 60

B.084 Soffit of suspended flat roof M² 10

BQ SECTION B
Page 8/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

(blank) Staircase (blank)

(blank) Concrete (blank)

(blank) Vibrated reinforced concrete (Grade 30) (blank)


in

B.085 Staircase M³ 8

B.086 Landing beam M³ 1

B.087 100mm Thick landing slab M² 16

(blank) Reinforcement (blank)

(blank) Hot rolled steel deformed reinforcement; (blank)


high yield 60, minimum yield stress
460N/mm2, in

(blank) Staircase (blank)

B.088 16mm Diameter KG 996

B.089 12mm Diameter KG 333

(blank) Landing beam (blank)

B.090 16mm Diameter KG 80

B.091 12mm Diameter KG 88

(blank) Landing slab (blank)

B.092 16mm Diameter KG 535

B.093 12mm Diameter KG 416

(blank) Formwork (blank)

(blank) Sawn formwork Class F2 to:- (blank)

B.094 Sloping soffit of staircase M² 30

B.095 Soffit of landing slab M² 16

B.096 Sides and soffits of landing beam M² 7

B.097 Open string 275mm wide (extreme) wide M 35

B.098 Undercut riser 203mm high M 82

BQ SECTION B
Page 9/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) ROOF (blank)

(blank) Structural Steelwork (blank)

(blank) Notes: (blank)


a) The work covered in this section of the
Bills of Quantities generally consists of
providing all plants, labour, equipment,
supervision, appliances and materials,
and of performing all operations in
connection with the fabrication and
erection of structural and miscellaneous
iron and steelwork together with all
anchors, fastenings, hardware,
accessories and other supplementary
parts necessary to complete the work in
accordance with the specification and the
applicable drawings.

(blank) b) Limits of tolerance, tests of the (blank)


materials and workmanship and of the
finished works shall each comply to the
requirements of the specification or as
indicated in the drawings and the relevant
British Standards.

(blank) Steel Roof Trusses (blank)

(blank) Steelwork to BS 4360., Grade 43A; (blank)


bolted and welded including all shop and
site welding, filling smooth junctions,
hoisting and fixing in position complete all
necessary fixing accessories and drilling
through concrete or metal to the C.A's
approval

BQ SECTION B
Page 10/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) The following trusses; hoisting average (blank)
approximately 15.8m high above ground
level for complete roof overall size 16m
length x 8.5m width constructed of Type
ST1 Roof Trusses size 114.3 diameter x
5.0mm thick x 13.5kg/m CHS , Type ST2
size 60.3mm diameter x 5.0m thick x
6.82kg/m CHS strut, bracing and
diagonal bracing and Purlin P1 type YCP
1520 size 153mm x 71mm x 4.92kg/m
mild steel channel and 6mm fillet weld all
round and including m.s plate, bolt, nut
and washers and other necessary fixing
accessories and painting works detail as
shown in the drawing no. DPI/S/WTP-
LD/1450 and 1451. Rate shall deemed to
includes all temporary works scaffolding
works and support.

B.099 114.3mm diameter x 5.0mm thick x KG 1572


13.5kg/m Circular Hollow Section (CHS)
as Trusses (ST1)

B.100 60.3mm diameter x 5.0mm thick x KG 1200


13.5kg/m Circular Hollow Section (CHS)
as Bracing and Diagonal (ST2)

B.101 153mm x 71mm thick x 4.92kg/m YCP KG 790


1250 as C-Channel or Purlin (P1)

(blank) Erection of steelwork (blank)

B.102 All the Forgoing members KG 356.2

(blank) Connections (blank)

B.103 Allow for connection all necessary mild L.S.


steel connection plates, stiffener plates,
base plates, angle cleats, bolt with head,
nuts and washers, including all necessary
welding, drilling through concrete,
brickwall or metal, cast into concrete and
non-shrink epoxy grout as necessary.

(blank) Painting, Polishing and Similar Work (blank)

(blank) Prepare and apply one coat of primer (blank)


and two coat finishing coats of gloss
paint, all to the C.A approval, to

BQ SECTION B
Page 11/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.104 General surfaces of structural steelworks M² 100

(blank) Roof Covering (blank)

(blank) Metal Sheet Roofing (blank)

(blank) 0.48mm Thick base metal thickness (blank)


approved metal roofing fixed to the metal
roof framing (measured separately) and
including all necessary drilling, silicon
sealant and fixing accessories all in
accordance with the manufacturer's
instruction and the C.A approval.

B.105 Metal roofing deck laid curve on plan M² 224

B.106 50mm thick approved rockwool insulation M² 224


at 40kg/m3 density laid on and including
a layer of chicken wire mesh securely
fixed to steel purlin (measured
separately)

B.107 Layer of approved double sided M² 224


reflective aluminium foil with tear
resistance, fire rated laid on sloping or
curve roof well lapped.

(blank) Roof Drainage (blank)

(blank) Rainwater Downpipe (blank)

(blank) Approved heavy duty unplasticised (blank)


polyvinyl chloride (uPVC) rainwater
goods jointed and fixed in accordance
with the manufacturer's instructions
including all fixings and fittings

B.108 Gutter including fixing brackets M 40

B.109 100mm Diameter rainwater downpipe; M 130


fixed to wall

B.110 Ditto; under soffit of slabs, including M 130


additional brackets

B.111 Extra over for bend including extra joint NO 8

B.112 100mm Ditto; laid in trench including all M 12


necessary excavation, concrete surround
and formwork
BQ SECTION B
Page 12/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

B.113 Extra over for bend including extra joint NO 8

(blank) MISCELLANEOUS (blank)

B.114 Approved unplasticised PVC dome NO 8


rainwater outlet complete with removable
domed grid, brass screws and
polypropylene washers and casting outlet
into concrete gutter to discharge into and
including connection to 100mm diameter
unplasticised PVC rainwater downpipe

B.115 Prepare and apply one coat metallic M 130


primer and two coats gloss enamel paint
on downpipe

(blank) EXTERNAL WALLS (blank)

(blank) Brickwork (blank)

(blank) Common brickwork (clay brick) in cement (blank)


and sand (1:3) mortar with plasticiser:-

B.116 225mm thick brickwall M² 620

(blank) Damp-proof course (blank)

(blank) High Performance bituminous damp- (blank)


proof course; lapped 150mm at joints
and angles, laid on cement and sand
(1:3) mortar and neatly pointed on
exposed edges (measured nett and no
allowance made for laps)

B.117 225mm Wide M 196

B.118 To form Box-up 900mm x 900mm; NO 10


opening in one thick brickwall

(blank) WINDOWS (blank)

(blank) Glazed Metal Frame and Fixed Panels (blank)

(blank) Notes: (blank)


a) This section of the Bills of Quantities
have generally NOT been measured in
accordance to the Standard Method of
Measurement of Building Works.

BQ SECTION B
Page 13/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) b) The method used in this section shall (blank)
be adhered to for the purpose of
ascertaining the value of remeasured/
variation works.

(blank) c) The sizes stated in the descriptions (blank)


are the overall dimensions as given in the
related drawings.

(blank) d) All descriptions of metal work shall be (blank)


deemed to include for all frames,
mullions, transoms, metal louvres and all
requisite fixings, fixing brackets/
backings, fittings, glazing gasket, rubber
gasket, silicone sealant, setting blocks,
weather seal, accessories, approved
ironmongery as specified, etc. with the
exception of glass which is measured
separately.

(blank) e) All description of items given shall be (blank)


read in conjunction with Drawing.

(blank) Metalwork (blank)

(blank) Supply and fix in position; glazed natural (blank)


anodised aluminium window assembly;
protruded head and sill; with sub-frames;
EPDM gaskets and structural with sub-
frames; EPDM gaskets and structural
sealants; "Whitco" or equivalent
ironmongery; including all accessories
and hardware; building in or cutting and
pinning lugs, bolting, bedding frames in
cement mortar (1:3) and fixing to
masonry with holdfasts; for the complete
assembly:-

B.119 Fixed glass window; overall size 3600mm NO 4


x 600mm high comprising in 4 Nos. equal
panel each 900mm x 600mm high
(Type GW1)

B.120 Fixed glass window; overall size 1800mm NO 12


x 600mm high comprising in 2 Nos. equal
panel each 900mm x 600mm high
(Type GW2)

BQ SECTION B
Page 14/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.121 Fixed glass louvred window; overall size NO 4
3600mm x 600mm high comprising in 6
Nos. equal panel each 550mm x 600mm
high
(Type FW1)

B.122 Fixed glass louvred window; overall size NO 12


1800mm x 600mm high comprising in 3
Nos. equal panel each 550mm x 600mm
high
(Type FW2)

(blank) Glazing (blank)

(blank) Notes:- (blank)

(blank) a) The descriptions given are for the (blank)


supply and fixing of tampered glass to
metal panels; inclusive of all cutting to
correct sizes.

(blank) b) Glazing beads and gaskets are (blank)


deemed to be included with the
respective descriptions of metal window.

(blank) c) The quantities given below are based (blank)


on the overall sizes of the metal frame
windows and fixed panels.

B.123 6mm Thick approved glass; glazing to M² 26


metal casement windows panels.

B.124 6mm Thick approved glass; 150mm wide M 240


and glazing to metal frame windows and
louvred fixed panels

(blank) Sundries (blank)

B.125 Vibrated reinforced concrete (Grade 30) M³ 1


in lintol;

B.126 6mm Diameter mild steel bar KG 40


reinforcement in lintol

B.127 10mm Diameter high tensile bar KG 60


reinforcement in lintol

B.128 Sawn formwork Class F1, to sides and M² 25


soffit of lintol

(blank) EXTERNAL DOORS (blank)

BQ SECTION B
Page 15/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) Fire Door (blank)

(blank) Supply and install approved one hour fire (blank)


rated door complete with and including
one hour fire rated double rebated timber
door frame, sub-frames and intumescent
strip, all constructed and installed strictly
in accordance with the manufacturer's
instructions and to Bomba's approval
including providing certificate from the
Inspectorate of Fire Services Malaysia
(BOMBA Certificate).

B.129 Single leaf; overall size 900 mm wide x NO 3


2100 mm high.
(Type DR1)

(blank) Roller Shutters (blank)

(blank) Supply and fix complete in position (blank)


approved automatic motorised self
opening and closing aluminium roller
shutters; with comsash Alloy and
coloured powdered coated finish
conforming to BS 6496-1984 complete
with casings, channels, brackets,
guiderails, removable mullions, locking
device, self opening and closing
mechanisms, switches, including building
in or cutting pinning lugs, bolting, bedding
frames in cement mortar (1:3) and fixing
to brickwork or concrete; all to the C.A.'s
approval:-

B.130 Aluminium roller shutter to suit opening NO 1


size 3500 mm wide x 3500 mm high
overall.
(Type RS1)

(blank) Supply and fix complete in position the (blank)


following approved hot dipped
galvanised steel and epoxy primed door
frames of approved colour comprising of
head and jambs all cut, welded and
framed together and fixing with wire
anchors ;-

B.131 Door frame set; overall size 900 mm NO 3


wide x 2100mm high.

(blank) Supply and fix approved ironmongery (blank)


including all necessary requisite screws:-

BQ SECTION B
Page 16/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

B.132 125 mm x 89 mm x 2.5 mm Thick LOT 9


stainless steel hinges.

B.133 Cylindrical lockset in stainless steel NO 3


finish.

B.134 Automatic Hydraulic Door Closer NO 3

B.135 Stainless Steel Door Stopper NO 3

(blank) Painting and Decorating (blank)

(blank) Knot, prime, stop and paint one (blank)


undercoat and two finishing coats
approved gloss enamel paint on:-

B.136 General surfaces of timber door M² 32


(measured both sides)

B.137 Surfaces of metal door frame; exceeding M 17


200mm but not exceeding 300mm girth

(blank) INTERNAL WALLS (blank)

(blank) Brickwork (blank)

(blank) Common brickwork (clay brick) built in (blank)


cement and sand (1:3) mortar with
plasticiser:-

B.138 225mm thick brickwall M² 21

(blank) High Performance bituminous damp- (blank)


proof course; lapped 150mm at joints
and angles, laid on cement and sand
(1:3) mortar and neatly pointed on
exposed edges (measured nett and no
allowance made for laps)

B.139 225mm Wide M 7

(blank) FINISHES (blank)

(blank) The rates for plastering work shall be (blank)


deemed to include for all labour and
materials to form grooves, throating and
the like either shown in the Engineer's
drawings or otherwise deemed
necessary during the construction.

BQ SECTION B
Page 17/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) WALL FINISHES (blank)

(blank) Externally (blank)

(blank) Cement and sand (1:6) plastering mixed (blank)


with an approved plasticiser in three
coats trowelled with a wood float:-

B.140 20mm Thick plainface to wall, column M² 700


and beam

(blank) Painting and Decorating (blank)

(blank) Prepare and apply one coat sealer and (blank)


two coats approved fungus resisting
weathersheild paint strictly in accordance
to the manufacturer's instructions and
recommendations:-

B.141 To plastered wall, column and beam M² 700

B.142 Extra over for painting to AIR Selangor L.S.


colour code and logo

(blank) Internally (blank)

(blank) Cement and sand (1:6) plastering mixed (blank)


with an approved plasticiser in three
coats trowelled smooth with a steel
trowel:-

B.143 20mm Thick plainface; to wall, column M² 735


and beam

(blank) Painting and Decorating (blank)

(blank) Prepare and apply one coat sealer and (blank)


two coats approved emulsion paint:-

B.144 To plastered wall, column and beam M² 735

(blank) FLOOR FINISHES (blank)

(blank) Externally (blank)

(blank) Cement and sand (1:3) paving trowelled (blank)


smooth with a steel trowel:-

B.145 25mm Thick (average) to apron slab; M² 49


finished to fall

BQ SECTION B
Page 18/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.146 20mm Thick to edge of apron slab; M 49
100mm high

B.147 32mm Thick to ramp; ditto M 3

(blank) Internally (blank)

(blank) Cement and sand (1:3) paving mixed (blank)


with approved non-metallic floor hardener
applied at the rate of 5 Tonne/sq.m
including finishing with an approved
curing and sealing compound; all in
accordance to the manufacturer's
instructions and recommendations. Rate
to includes approved epoxy paint to floor
as approved by the C.A..

B.148 25mm Thick to floor M² 136

B.149 25mm Thick to RC Plinth M² 15

(blank) CEILING FINISHES (blank)

(blank) Externally (blank)

(blank) Supply and fix approved aluminium strip (blank)


ceiling coloured steel c/w polyester paint
finish complete with suspension system
lining and clip-on type fixing joint and
including bar and channel complete with
all trimmings and accessories detail
strictly in accordance to the
manufacturer's instructions and
recommendations:-

B.150 0.5mm Thick aluminium strip ceiling M² 74


height 15.0m but not exceeding 20.0m

(blank) Internally (blank)

(blank) Supply and fix approved aluminium strip (blank)


ceiling coloured steel c/w polyester paint
finish complete with suspension system
lining and clip-on type fixing joint and
including bar and channel complete with
all trimmings and accessories detail
strictly in accordance to the
manufacturer's instructions and
recommendations:-

B.151 0.5mm Thick aluminium strip ceiling M² 136


height 15.0m but not exceeding 20.0m
BQ SECTION B
Page 19/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

(blank) Internally (blank)

(blank) Cement and sand (1:6) plastering mixed (blank)


with an approved plasticiser in three
coats trowelled smooth with a steel
trowel:-

B.152 20mm Thick plainface; to soffit of slab M² 10

(blank) Painting and Decorating (blank)

(blank) Prepare and apply one coat sealer and (blank)


two coats approved emulsion paint:-

B.153 to soffit of concrete slab and sides and M² 10


soffit of beams; height exceeding 3m but
not exceeding 5.0m

(blank) STAIRCASE FINISHES (blank)

(blank) 20mm Thick cement and sand (1:6) (blank)


mixed with an approved plasticiser as
described plainface to :-

B.154 Sides and sloping soffit of staircase, M² 40


landing beam and slab

B.155 Undercut riser 179mm high M 82

B.156 Open string 275mm wide (extreme width) M 35

(blank) Cement and sand (1:3) paving trowelled (blank)


smooth with a steel trowel:-

B.157 25mm Thick to staircase and landing M² 40


slab

B.158 Extra over for anti-slip tiles M 82

(blank) Prepare and apply approved Skim coat (blank)


(1mm - 2mm thickness at approximately
1.7kg per m2) filling and levelling plaster
all in accordance to manufacturer's
instruction and recommendations to:

B.159 Soffit of staircase and landing slab M² 40

BQ SECTION B
Page 20/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) Prepare and apply one coat sealer and (blank)
two coats of emulsion paint of approved
colour internally on surfaces of landing
slab

B.160 Soffit of staircase and landing slab M² 40

(blank) Stainless Steel Railing (blank)

B.161 Supply and fix 1200mm high stainless M 30


steel railing comprising of 48.3mm
diameter x 3.2mm thick CHS handrail
and baluster welded to mild steel plate
including all necessary bolts and nuts as
per detail shown in the drawing.

(blank) MISCELLANEOUS (blank)

(blank) MAINTENANCE PLATFORM (blank)

(blank) Temporary Works (blank)

B.162 Provision of supply, maintain and L.S.


removal upon completion of temporary
staging and scaffolding complete with
platform and gangway, staircase and
railing, etc. and including compliance to
the AIS HSE requirement as approved by
the C.A.

(blank) Structural Steelwork (blank)

(blank) Notes: (blank)


a) The work covered in this section of the
Bills of Quantities generally consists of
providing all plants, labour, equipment,
supervision, appliances and materials,
and of performing all operations in
connection with the fabrication and
erection of structural and miscellaneous
iron and steelwork together with all
anchors, fastenings, hardware,
accessories and other supplementary
parts necessary to complete the work in
accordance with the specification and the
applicable drawings.

BQ SECTION B
Page 21/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) b) Limits of tolerance, tests of the (blank)
materials and workmanship and of the
finished works shall each comply to the
requirements of the specification or as
indicated in the drawings and the relevant
British Standards.

(blank) Hot rolled section mild steel Grade 43A (blank)


to BS 4360, minimum yield stress 245
N/msq.m, bolted and welded fabricated
steelwork including all shop and site
welding; filling smooth junctions, hoisting
and fixing in position, complete all
necessary fixing accessories and drilling
through concrete or metal all to the C.A
approval.

(blank) The following cantilever steel platform; (blank)


hoisting average approximately 12.00m
high above ground floor level

B.163 152mm x 152mm x 30kg/m Galvanised KG 2223


Universal column

B.164 15mm thick galvanised steel ; 600mm x KG 485


176mm x 117.77kg/m2 base plate

B.165 8mm thick galvanised expanded metal as M² 43


platform

(blank) The following steel handrail ; hoisting (blank)


average approximately 12.00m high
above ground floor level

B.166 48.3mm diameter x 3.2mm thick x KG 600


3.61kg/m circular hollow section CHS
galvanised handrailing and steel post

B.167 5mm thick galvanised steel ; 150mm x KG 35


150mm x 39.26kg/m2 base plate

(blank) Erection of steelwork (blank)

B.168 All the forgoing galvanised members KG 340

(blank) Connections (blank)

BQ SECTION B
Page 22/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.169 Allow for connection all necessary mild L.S.
steel connection plates, stiffener plates,
base plates, angle cleats, bolt with head,
nuts and washers, including all necessary
welding, drilling through concrete,
brickwall or metal, cast into concrete and
non-shrink epoxy grout as necessary.

(blank) WORKING PLATFORM AT SILO (blank)

B.170 Supply, fabricate and installation of M 5


working access platform size 1000mm
wide at 1.50m high from ground level
constructed of 152mm x 152mm x
30kg/m UC frame, strut and bracing
member fillet weld all round and fixed to
concrete in position with 15mm thick mild
steel plate with G8.8 M20 heavy duty
anchor bolt, nut and fittings accessories
complete with 8mm thick expanded metal
plate platform and including 48.3 Ø x
3.2mm CHS 1100mm high m.s railing,
base and post fixed to expanded metal
platform including painting works
complete as detail shown in the drawing
as approved by the C.A. The rate shall
deemed to include all necessary
temporary works.

(blank) EXTERNAL WORKS (blank)

(blank) Perimeter Drain (blank)

B.171 Perimeter drain constructed of 300mm M 80


(average) deep to invert constructed of
150mm thick mass concrete (Grade 20)
base slab, laid 225mm diameter half-
round glazed ware drain channel bedded
on concrete base slab, half-brick (clay
brick) thick walls on one sides, finished
with 20mm thick cement and sand (1:3)
rendering on all exposed surfaces,
including all excavation, removal of
excavated materials from site, formwork,
forming bends, angles and junctions.

(blank) Sump (blank)

BQ SECTION B
Page 23/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.172 Sump overall size 450mm x 450mm x NO 2
250mm deep (internal dimension)
constructed of 225mm thick concrete
base , 225mm thick clay brickwall and
rendered internally with 20mm thick high
alumina cement, 225mm thick concrete
cover slab complete with mild steel rod,
400mm x 400mm removable precast
slab cover including all excavation,
formwork and forming opening through
brickwall for pipes and disposal of
surplus excavated materials from site.

(blank) New Premix (blank)

B.173 Supply and lay new premix constructed M² 300


of 100mm thick sand as subbase,
300mm thick crusher run as road base,
75mm thick asphaltic concrete binder
and bituminous RSK3 binder prime coat
and RS1 binder tack coat. Rate shall
deemed to include road marking works.

(blank) Road Kerb (blank)

B.174 Supply and lay precast concrete kerb M 60


including jointing, excavation, backfilling,
bedding and disposal of surplus materials
as shown in the drawing or as directed by
the C.A. as detail shown in the drawing

(blank) Reinstatement Works (blank)

B.175 Reinstatement works use method mill M² 350


and pave to the defective existing
pavement. The rate shall deemed to
include approved road marking as
directed by the C.A.

(blank) Turfing (blank)

B.176 Trim, level and grade flat surfaces or M² 700


filled or excavated formation and close
turfed with approved good grade cow
grass including 50mm thick black
vegetable earth and watering, fertilizing,
rolling, weeding, tending and
maintenance till full growth.

(blank) PIPE RELOCATION WORKS (blank)

BQ SECTION B
Page 24/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) EXISTING SCOUR PIPE AND (blank)
HYDRANT PIPE

B.177 Supply labour, tools and machineries to NO 8


carry out Trial Pit as directed by the C.A.
Rate to includes backfilling upon
completion.

B.178 Excavate trench for 150mm DN MSCL M 12


pipe to a depth exceeding 1.5m but not
exceeding 2.5m.

B.179 Excavate trench for 600mm DN MCSL M 90


pipe to a depth exceeding 2.5m but not
exceeding 3.0m.

B.180 Extra over item B.179 above for removal M³ 365


and disposal of excavated material,
transport and haul to an approved dump
site from site to Contractor's own dump

(blank) FILLING (blank)

B.181 Backfill materials to excavation in trench M³ 220


by approved imported sand. No
excavated materials shall be used as
backfilled materials. Imported backfill
materials shall be carried out in 150mm
thick layers using plate compactors and
Supply, fill and compact with approved
sand to pipe trenches or where as
directed by the C.A. Rate to include all
necessary stop ends.

B.182 Supply, fill and compact with approved M³ 145


imported materials or where as directed
by the C.A. Rate to include all necessary
stop ends.

(blank) SUPPLY, TRANSPORT, EXCAVATION, (blank)


LAY, INSTALL AND JOINT MILD
STEEL SPECIALS, FITTINGS

BQ SECTION B
Page 25/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) Supply, transport, excavation, lay, install (blank)
and joint complete Mild Steel specials,
joints and fittings to SPAN TS 21827:
Part 1 and Part 2: 2013 shall be all in
rates inclusive of all necessary jointing
materials such as steel collar, ring flange,
pipe cutting, welding of ring flanges to
pipes, repair internal lining and external
coating where required, trench
excavation, lay in position and make
welded collar joints or flanged joints for
all pipes, specials, joints and fittings. All
EPDM gaskets, bolts, nuts and washers
for making flanged joints shall be
supplied by Contractor.

(blank) Notes: (blank)


Unless otherwise stated
a) All below ground mild steel pipes and
specials shall be concrete lined internally
and bitumen coated with minimum
thickness of not less than 4.5mm
externally. All length pipes shall be flange
joint. The Contract Rates for supply of
unwrapped pipes and specials include
painting with polyamide cured epoxy zinc
phosphate primer as specified at the
place of manufacture in accordance with
the Specification.

(blank) b) All flanges shall be suitable to a (blank)


pressure rating of 16 bars or as
specified.

(blank) c) All diameters are referred to the (blank)


nominal diameter.

(blank) d) The thickness of steel shells and (blank)


cement mortar / concrete lining shall be
as stated in the specification.

(blank) e) All plain ended pipes and specials (blank)


shall be suitable for stepped coupling,
mechanical coupling, flange adaptor
joints and welded collar joint.

(blank) f) Making a welded collar joint shall (blank)


include two external circumferential
welds and one longitudinal butt weld.

BQ SECTION B
Page 26/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) g) All joints shall be externally wrapped (blank)
and internally protected unless otherwise
stated.

(blank) h) S-bend shall be erected as shown in (blank)


the Drawings and adjusted to suit site
conditions.

(blank) j) For the purpose of measurement and (blank)


payment, the supply, transport, deliver,
laying and/or installation of the length of
standard or cut straight pipes, specials
and fittings shall be the effective length
as laid measured along the crown of the
pipe.

(blank) Mild Steel Straight Pipes (blank)

B.183 600mm ND plain ended pipe M 90

B.184 150mm ND plain ended pipe M 12

(blank) Mild Steel Fittings and Joints (blank)

(blank) MS Bend (blank)

(blank) DN600mm Plain Ended Bend (blank)

B.185 More than 30 degree and up to 60 NO 4


degree.

B.186 More than 60 degree and up to 90 NO 3


degree.

(blank) DN150mm Plain Ended Bend (blank)

B.187 More than 30 degree and up to 60 NO 2


degree.

B.188 More than 60 degree and up to 90 NO 1


degree.

(blank) Collar (blank)

(blank) Rate to include supply, jointing material (blank)


and install complete.

B.189 DN 600mm NO 17

B.190 DN 150mm NO 4

(blank) OPEN CUT CONNECTION (blank)

BQ SECTION B
Page 27/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

B.191 Make all necessary preparation, liaison NO 1


with authorities, method statements,
piloting, to locate, excavate and provide
connection to existing 600mm DN mild
steel pipe. The rates shall be inclusive of
all excavation, labour, concreting works,
shoring, reinforcements, all necessary
materials, pipeworks, fittings, valves,
chamber etc. cutting and
decommissioning of existing pipes where
required, jointing works, making
formwork, dewatering to keep excavation
dry, provide temporary protection,
provide suitable backfill material,
compaction, reinstatement of excavation,
restoration of metalled road, night work,
accelerated charges, etc. to the
satisfaction of the C.A.

(blank) LINE STOPPING (blank)

B.192 Line stopping works for the extension of NO 1


150mm DN mild steel pipe. The rate shall
include 2 sets of hot tapping works
including site preparation, materials,
labour, tools and machineries, cutting off
existing pipe and install temporary
bypass pipe and fittings, temporary
valves including all excavation, temporary
shoring, dewatering and backfilling. To
obtain approval from the C.A for the
design, method statement and materials
supply including handling and positioning
of hot tapping, pipe sleeve, gasket,
valves, coring head, pumps, power
packs, jointing and other necessary
works as directed by the C.A.

(blank) Pillar Hydrant (blank)

BQ SECTION B
Page 28/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


B.193 Supply, transport, fix install and joint NO 1
complete 100mm dia. inlet pillar hydrant
with 65mm dia. double outlets to the
requirements of BOMBA complete with
flanged ended Mild Steel pipe length to
suit site condition, flanged Ductile Iron
duck foot bend, flange and plain ended
Mild Steel straight pipe cut to suit, flange
adaptors, sluice valve, flange ended Mild
Steel pipe cut to suit complete as per
drawing details. Rate shall include all
excavation, concreting works for thrust
blocks, aprons, supports, sand
backfilling, Grade 30 PC Chamber
complete with PC slab cover and
reinstatement of excavation.

(blank) Mass Concrete Grade 20 (blank)

B.194 In haunches, support blocks, thrust and M³ 2


anchor blocks and surround for pipes,
valves support, blank flange support and
etc. Rate to include all necessary
formworks.

(blank) Testing and Flushing (blank)

B.195 Allow a sum to maintain water pressure L.S.


in the new water 150mm DN pipeline at a
minimum of 6 bars for the purpose of
making under pressure tapping for
ferrules and checking for leakage of
installed ferrules point to the existing
pipeworks up to connection 2 hours upon
the successful completion of pressure
test required.

B.196 Allow a sum for sterilising and flushing of L.S.


150mm DN pipelines as specified. Rate
to include supply of treated water,
making temporary cross connection to
existing pipes and chemical used and
proper disposal to waterways after
neutralization where required by the C.A.

(blank) UNDERGROUND CABLES DIVERSION (blank)


WORKS

BQ SECTION B
Page 29/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

B: CIVIL AND STRUCTURAL WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) To supply, deliver, lay and joint the (blank)
existing 600V Copper cables
underground complete with termination
and joint kits, excavation work, sand
bedding, protective bricks / PVC, G.I pipe
sleeve and concrete surround bedding
for road crossing cable, making good
cable tagging, markers testing and
commissioning and etc. as per
specifications :

B.197 2 nos of 4C x 150mm2 X/S/P cable M 60

B.198 2 nos of 4C x 185mm2 X/S/P cable M 60

B.199 To supply, deliver, lay and joint the M 60


existing 8 core fibre optic cables laid in
HDPE corrugated pipe underground
complete with termination and joint kits,
excavation work, sand bedding,
protective bricks / PVC, G.I pipe sleeve
and concrete surround bedding for road
crossing cable, making good cable
tagging, markers, testing and
commissioning and etc. as per
specifications.

BQ SECTION B
Page 30/30 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) C: MECHANICAL, ELECTRICAL AND (blank)
INSTRUMENTATION, TELEMETRY
AND SCADA WORKS

(blank) C1: MECHANICAL, ELECTRICAL AND (blank)


INSTRUMENTATION WORKS

(blank) Notes: (blank)


a) The Contractor must ensure that the
design for Silo system complied with the
engineering guide line and practise,
specifications and safety requirement.
The Contractor shall prepare shop
drawing, method statement and
calculation endorsed by the Professional
Engineer with Practicing Certificate
(P.E.P.C) and shall obtain C.A. approval.
The works shall be carried out as per
compliance with the relevant authorities
requirement (Majlis Daerah, NIOSH,
DOE, DOSH and etc).

(blank) b) The delivery and installation works of (blank)


new Silo for Powdered Activated Carbon
(AC) shall includes all preparation works,
temporary works, protection works and
site measurement for transportation,
machineries, etc. subjected to the
approved method statement and C.A
approval. The Contractor shall prepare all
materials, labour (experienced site
supervisor and skilled workers during
installation works), tools, equipments,
machineries (low loader transport, mobile
crane, etc.) including standby
machineries during installation works to
suit with the site conditions and to comply
with all authorities requirements.

(blank) c) All equipments must inclusive of Asset (blank)


Registration and Tagging in compliance
with the requirements by using any
suitable material or method to the C.A's
approval and as directed by C.A.

(blank) MECHANICAL WORKS (blank)

(blank) MECHANICAL VENTILATION SYSTEM (blank)

BQ SECTION C1
Page 1/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.001 Supply, deliver and install mechanical LOT 10
Ventilation / Exhaust Fan, 2500 cfm wall
mounted supply air fan and extraction fan
complete with shutter, thermostat sensor,
air grill, incoming cable, control panel,
switch, contactor, cabling work laid in G.I
conduit from control panel to each fan
panel and other necessary accessories.

C1.002 Supply, deliver and install mechanical LOT 1


Ventilation / Exhaust Fan, 400 cfm wall
mounted supply air fan and extraction fan
complete with shutter, thermostat sensor,
air grill, incoming cable, control panel,
switch, contactor, cabling work laid in G.I
conduit from control panel to each fan
panel and other necessary accessories.

C1.003 Provide design and calculation for L.S.


mechanical Ventilation / Exhaust Fan
approved and endorsed by PE,
inspection and testing conducted by
competent person (Hygiene Tech)
include report and documentations in
compliance with the relevant authority
(DOSH).

(blank) AIR COMPRESSOR SYSTEM (blank)

C1.004 Supply and install Air Compressor, LOT 2


reciprocate type, capacity min. 12 m3/hr
@ 6 bar (1 duty and 1 standby), max.
working pressure 10 bar, 3
phase/415V/50Hz, auto drain facility, built-
in air receiver, max 72dB(A) pressure
relief valve and pressure gauge to dust
collector at top of silo, knife valve and all
necessary accessories required for a
complete system. Rate to include
application and approval to the
requirements in compliance with the
relevant authority (DOSH).

C1.005 Supply and install refrigerant Air Dryer LOT 2


complete with air filter and all necessary
accessories required for a complete
system.

BQ SECTION C1
Page 2/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.006 Supply and install Air Receiver Tank of LOT 1
welded steel construction including
supports, gauges and all necessary
accessories required for a complete
system. Provisional capacity minimum
1000L and minimum 2 days storage.

C1.007 Supply and install GI delivery pipework L.S.


from Air Compressor to Silo equipment
including bends, couplings, tee, check
valves, valves, regulator, trays, bracket,
tap tee off at compressor and all
necessary accessories required for a
complete system.

C1.008 Supply and install clear air Pre Filter, LOT 1


filtration degree 1.0 micron and working
pressure 16 bar and all necessary
accessories required for a complete
system.

C1.009 Supply and install clear air Post Filter, LOT 1


filtration degree 0.01 micron and working
pressure 16 bar and all necessary
accessories required for a complete
system.

C1.010 Supply and install Air Compressor LOT 1


Control Panel, mild steel enclosure, IP64,
indicator light, exhaust fan with filter,
thermostat, ammeter, voltmeter, digital
power meter, frequency inverter, MCB,
auto manual selector, emergency stop
button, terminal blocks, SPD,
programming, SCADA and all necessary
accessories required for a complete
system. Rate to include all power,
control, signals cabling works and cable
tray to each equipment as specified and
shown in the Drawing No.:
DPI/290/AC/M/T/4004.

C1.011 Provide and conduct Noise Mapping for L.S.


Air Compressor area complete with all
documentations, signages, warning
labels and necessary items in
compliance with the relevant authority
(DOE).

(blank) MOTIVE WATER SYSTEM (blank)

BQ SECTION C1
Page 3/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.012 Supply, deliver and install Motive Water LOT 1
Pump, multistage type, capacity 12 m3/hr
@ 6 bar head (1 duty and 1 standby) 4
pole class IE3 with variable speed drive
(VSD) complete with isolating valves,
check valves, pressure gauge, control
panel, grade 25 concrete plinth of
100mm thick, power and signal cables,
cable tray and all necessary accessories
required for a complete system.

C1.013 Supply and install motive water GI LOT 1


pipework from tapping point to motive
water pump including hot tapping works,
valves, fittings and all necessary
accessories required for a complete
system.

C1.014 Supply and install motive water GI and LOT 2


PVC Schedule 80 for preparation and
dosing pipework, consist of various sizes
complete with Y strainer, double union
ball valve, rotameter, pressure gauge,
fittings and all necessary accessories
required for a complete system for Silo
(No. 1 and No. 2).

(blank) POWDERED ACTIVATED CARBON (blank)


(AC) SILO SYSTEM

C1.015 Supply, fabricate, deliver and install Silo LOT 2


for Powdered Activated Carbon (AC),
capacity 15 tonnes, epoxy coated mild
steel material with sight glass, metal
structure as support to the Silo complete
with extended walkway, handrail, include
bolt, nut and anchor bolt to the RC
ground structure, earthing system and all
cabling works using armoured cable to
MCC AC. Rate to include all necessary
accessories required for a complete
system and shall consist of all necessary
instrument device for fully function and
operational as below.

(blank) Dust Collector with Dehumidifier (blank)

(blank) Pressure Switch (blank)

(blank) Pressure Relief Valve (blank)

BQ SECTION C1
Page 4/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) Paddle Level Switch (blank)

(blank) Vibrator (blank)

(blank) Shock Absorber (blank)

(blank) Air Cannon (blank)

C1.016 Supply and install motor driven Screw LOT 2


Feeder with variable speed drive (VSD),
multiscrew type, double feeding line,
capacity 2.5 mg/l to 5mg/l, self cleaning
feeder screw, PTC thermistor, heater,
labyrinth seals, friction clutch, incoming
cable using 1 x 4C 10 mmsq
PVC/SWA/PVC multicore cu., cable tray/
trunking, termination works to the
respective equipment, complete with
spare parts and all necessary
accessories required for a complete
system.

C1.017 Supply and install SS304 Wetting Cone, LOT 2


water jet parabolic cone type complete
with PVC Schedule 80 pipeworks, 50mm
dia. incoming pipework with solenoid
valve, flow indicator, double union ball
valve, fittings and all necessary
accessories required for a complete
system.

C1.018 Supply and install Ejector and PVC LOT 2


Schedule 80 pipework from Wetting
Cone to Mixing Tank include double
union ball valves, fittings, gauge, flow
indicator and all necessary accessories
required for a complete system.

BQ SECTION C1
Page 5/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.019 Supply, fabricate, deliver and install LOT 2
SS316 Mixing Tank include stainless
steel structure as support to the tank,
cylindrical type, capacity 1.0 m3, top
entry, Mechanical Motor Mixer (final
output speed below 100rpm) complete
with SS316 shaft and SS316 impeller,
level gauge, electrode level sensor
include signal cable using 1 x 2C
2.5mmsq PVC/SWA/PVC Cu., outlet
strainer, dust arrestor, incoming power
supply using 1 x 4C 10mm
PVC/SWA/PVC Cu. cable, weirs,
motorised valve, double union ball valve,
electrode, connectors, drain valves,
overflow pipe weir, incoming pipe, weir
connection, extraction fan, vortex mixer
and breeding system. Rate to include all
necessary accessories required for a
complete system. The mixing tank shall
include service manhole for maintenance
and scour pipe at the bottom of the tank.

C1.020 To supply and install Load Cell for LOT 2


Weighing system (4 nos per Silo), SS304
IP68 weight module, weighing controller
(1 nos per lot) with LCD graphical
display, 320x240 pixels: 5.7''(145mm),
TFT colour, PROFIBUS-DP, PROFINET
or Ethernet/IP (either one type), cable kit,
power and signal cable with tray from
SS304 panel (IP65) to each sensor or
instrument, starterpac installation, force
calibration complete with runflat features,
ethernet IP connectivity, PLC and HMI
connected to existing SCADA and all
necessary accessories required for a
complete system. Rate to include
calibration works at site following ISO
170125 with appropriate test weight
including material for calibration and
report.

C1.021 Supply and install Anti Blockage system LOT 2


placed in feeders and conveyors with
induction proximity switch, incoming
power and all necessary accessories
required for a complete system for Silo
(No. 1 and No. 2).

BQ SECTION C1
Page 6/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.022 Supply and install Knife Gate Valve LOT 2
complete with pneumatic actuator,
double flanges, mild steel with SS304
slide plates, dual slide plates, adjustable
gland seals, solenoid valve, ball valve
and see through glass at end of hopper
for Silo (No. 1 and No. 2). Rate to include
fittings and all necessary accessories
required for a complete system.

C1.023 Supply and install SS304 Dust Collector LOT 2


with air pulse jet control by electronic
sensor, SS304 body material at top of the
silo connected to air compressor,
incoming power complete with solenoid
valve, fittings and all necessary
accessories required for a complete
system. Rate to include application and
approval to the requirements in
compliance with the relevant authority
(DOE).

C1.024 Supply and install SS304 Feeder Pipe LOT 2


100mm dia. from breaching inlet to top of
the silo complete with camlock,
motorised butterfly valve, basket strainer,
signal cable to load cell panel and
command centre, fittings, bracket,
incoming power, cable tray/ trunking,
termination works to the respective
equipment and all necessary accessories
required for a complete system.

C1.025 Supply and install SS304 Ejector , LOT 2


capacity 6 bar at dosing pipeline
complete with fittings, bracket, valves,
gauge, flow indicator and all necessary
accessories required for a complete
system.

BQ SECTION C1
Page 7/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.026 Supply and install PVC Schedule 80 LOT 2
pipework, minimum 50mm dia. for supply
from Motive Water Pump to Wetting
Cone, Mixing Tank, Ejector complete
with solenoid valve, power and control
cable using 1 x 2C 2.5mmsq
PVC/SWA/PVC and multicore 2.5 mmsq
cu cable, pressure reducing valve,
bracket, fittings and all necessary
accessories required for a complete
system for Silo (No. 1 and No. 2).

C1.027 Supply and install Water Tap (industrial LOT 1


grade) and PVC Schedule 80 pipework,
minimum 50mm dia. for cleaning
purpose with PRV and 30m heavy duty
flexible hose, bracket, fitting, valve and
all necessary accessories required for a
complete system.

C1.028 Supply and install PVC Schedule 80 LOT 2


pipework, minimum 40mm dia. from weir
of Mixing Tank to Ejector with motorised
valve, pressure gauge, fittings and all
necessary accessories required for a
complete system.

(blank) Supply, deliver and install PVC Hose, (blank)


transparent flexible steel spiral type,
minimum 65mm dia. complete with HDG
tray, support, bracket, fittings and to be
laid inside existing trench from Ejector to
dosing point. Rate to include all
necessary accessories required for a
complete system.

C1.029 Silo No. 1 M 150

C1.030 Silo No. 2 M 150

C1.031 Supply, deliver and install Lifting Davit, LOT 2


minimum capacity 150 kg, manual chain
block, support, fittings and all necessary
accessories located at top of the Silo
(No. 1 and No. 2).

C1.032 Supply, deliver and install Scissor Lift, LOT 1


heavy duty portable type, minimum
capacity 200 kg, 2 meter height and all
necessary accessories.

BQ SECTION C1
Page 8/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.033 Supply, deliver and install 9kg ABC Dry LOT 2
Powder portable fire extinguisher
complete with fire certificate, bracket and
all necessary accessories

C1.034 Supply, deliver and install 4.5kg CO2 LOT 3


portable fire extinguisher complete with
fire certificate, bracket and all necessary
accessories.

C1.035 Supply and install stainless steel LOT 1


Emergency Eye Wash and Shower
complete with GI pipework from tapping
point to Emergency Eye Wash and
Shower include all necessary fittings,
valves and accessories.

(blank) SPARE PART (blank)

C1.036 Ejector NO 2

C1.037 Mechanical Motor Mixer complete with NO 2


shaft and impeller

C1.038 Screw Feeder NO 2

C1.039 Transparent Flexible Steel Spiral PVC M 150


Hose

(blank) ELECTRICAL AND (blank)


INSTRUMENTATION WORKS

(blank) Note: (blank)


a) The Contractor shall ensure to include
supply and deliver to site including F.A.T,
taxes and duties, insurance, freight,
loading and unloading and storing at site,
complete erection and installation,
painting, tagging, all necessary fixing
accessories, site testing, setting to work
and attendance during the running and
maintenance period of all plant and
equipment supplied as specified and as
shown on the drawings.

(blank) MOTOR CONTROL CENTRE (MCC AC) (blank)

BQ SECTION C1
Page 9/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.040 Supply, deliver and install 400V, 80A LOT 1
IP54 type of Motor Control Centre (MCC
AC) located in AC electrical room, floor
standing metal clad cubicle type with type-
tested certification KEMA or ASTA as
specified. The MCC shall comprise main
incoming MCCB c/w all fuses, current
transformer (CT), overcurrent and earth
fault protection (OCEF), indicating and
recording instruments, metering and
measuring equipment, motor overload,
protective and control relays, surge
protection, timer, 24V DC power supply,
weight controller, direct online starter,
VSD, indicating lights, push buttons, hour
run meter, complete internal wiring in the
panel, panel heater, alarm & bell light for
MCC AC (shall be install at above main
entrance door of AC electrical room) and
etc. as per shown in the drawing and
requirements. Rate shall also to include
provisional cubicle for a complete
interconnection with SCADA and Local
Control Panel (LCP) and obtaining
calibration certification for protection
relays and to be endorsed by the
qualified service engineer. Panel
thickness at least 2.3mm and paint
thickness at least 75 micron average.

(blank) LOCAL CONTROL PANEL (LCP) (blank)

BQ SECTION C1
Page 10/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.041 Supply, deliver and install Local Control LOT 1
Panel (IP54) located in AC electrical
room floor standing metal clad cubicle
type with tested certification KEMA or
ASTA as specified for both each lime
dosing system for all equipment including
screw feeder, mixing tank and etc.,
programmable logic controller (PLC) c/w
DI/DO and AI/AO, 7 inches HMI display,
SPD, indication light, exhaust fan with
filter, thermostat ammeter, voltmeter,
digital power meter, frequency inverter,
MCB, auto/manual selector switch,
emergency stop button, terminal blocks,
panel internal wiring compartment,
programming service and link to
Outstation Panel (O/S AC). Rate to
include control cabling work to each
equipment's, cable tray and termination
work fittings and all necessary
accessories required for a complete
system. Panel thickness at least 2.3mm
and paint thickness at least 75 micron
average.

(blank) SUB-SWITCH BOARD (SSB AC) (blank)

C1.042 To supply, deliver and install 400V 100A LOT 1


50kA @3sec Sub-Switch Board (SSB)
floor standing metal clad cubicle type,
tested certification KEMA or ASTA as
specified as per drawing and
specifications c/w incoming and outgoing
circuit breakers (4P MCCB), contactors,
main busbars, CTs, DPMs, surge
suppressor, overcurrent and earth fault
protection (OCEF) , relays, fuse, pump
starter control panel, indicators light,
recording instrument metering and
measuring, motor overload protective,
hour run meter, surge protection device
(SPD), cable termination, SCADA I/O
point terminals and all necessary
accessories required for a complete
system. Panel shall be made from electro-
galvanised form 3B with IP54. Panel
thickness at least 2.3mm and paint
thickness at least 75 micron average.

BQ SECTION C1
Page 11/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.043 To supply, deliver and install 4P MCCB LOT 1
100A 50kA at Spare compartment MSB
Polymer Plant (located at Chemical
Building) complete with internal cable
between MCCB and Busbar. The price
shall include dismantling work for the
existing MCCB in the MSB Polymer and
complete with termination kit, cable lug
and other necessary accessories.

(blank) Submain Cable to Sub-Switch Board (blank)


(SSB AC)

C1.044 Supply, lay and install submain cable M 200


from existing MSB Polymer Plant to Sub-
Switch Board (SSB AC) using 1x 4C
50mmsq XLPE/SWA/PVC Cu.
cable, laid on cable tray and
underground. Rate to include excavation,
cable slab, cable marker, sand back fill,
wall bracket pit/junction box,
cable glands, cable ties, fixing
accessories, cable termination works at
existing panel and new panel, making
good works as specified and drawing.

(blank) Submain Cable from Sub-Switch (blank)


Board (SSB AC)

C1.045 To Motor Control Centre (MCC AC) using M 10


1x4C 35mmsq PVC/SWA/PVC Cu.
cable, laid in trunking/conduit. Rate to
include cable ties, brackets,
cable glands, trunking/conduit jointing,
copper bridge, fixing accessories, etc
and termination works to the panel as
specified and drawings.

C1.046 To Distribution Board (DB L&P) using M 10


1x4C 16mmsq PVC/SWA/PVC Cu.
cable, laid in trunking/conduit. Rate to
include cable ties, brackets,
cable glands, trunking/conduit jointing,
copper bridge, fixing accessories, etc
and termination works to the panel as
specified and drawings.

BQ SECTION C1
Page 12/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.047 To Outstation Panel (O/S AC) using M 10
1x4C 4mmsq PVC/SWA/PVC Cu. cable,
laid in trunking/conduit. Rate to include
cable ties, brackets, cable glands,
trunking/conduit jointing, copper bridge,
fixing accessories, etc and termination
works to the panel as specified and
drawings.

C1.048 To Exhaust Fan Control Panel using LOT 1


1x4C 10mmsq PVC/SWA/PVC Cu.
cable, laid in trunking/conduit. Rate to
include cable ties, brackets,
cable glands, trunking/conduit jointing,
copper bridge, fixing accessories, etc
and termination works to the panel as
specified and drawings.

C1.049 To 30A TPN Isolator using 1x4C LOT 1


10mmsq PVC/SWA/PVC Cu. cable, laid
in trunking/conduit. Rate to include cable
ties, brackets, cable glands,
trunking/conduit jointing, copper bridge,
fixing accessories, etc and termination
works to the panel as specified and
drawings.

C1.050 To Motive Water Pump using 1x4C LOT 2


6mmsq PVC/SWA/PVC Cu. cable, laid in
trunking/conduit. Rate to include cable
ties, brackets, cable glands,
trunking/conduit jointing, copper bridge,
fixing accessories, etc and termination
works to the panel as specified and
drawings.

C1.051 To UPS using 2x1C 4mmsq PVC/PVC LOT 1


with CPC Cu. Cable be laid in
trunking/conduit. Rate to include cable
ties, brackets, cable glands,
trunking/conduit jointing, copper bridge,
fixing accessories, etc and termination
works to the panel as specified and
drawings.

(blank) DISTRIBUTION BOARD (DB L&P) (blank)

BQ SECTION C1
Page 13/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.052 To supply, deliver and install 400V 40A LOT 1
Distribution board as per drawing and
specifications c/w circuit breakers (4P
MCCB), contactors, main busbars, CTs,
RCCB, ELR, relays, fuse, indicators
light, cable termination and all necessary
accessories required for a complete
system. Panel shall be made from
Electro-galvanised IP54. Panel thickness
at least 1.5mm and paint thickness at
least 75 micron average.

(blank) Final Circuit Cable From Distribution (blank)


Board (DB L&P)

(blank) Supply and install wiring point for lighting (blank)


using 2x1C 1.5mmsq PVC cable with
CPC in 20mm dia., laid in concealed G.I
conduit c/w 6A metal clad switches and
all necessary accessories as per
specification and drawings.

C1.053 Lighting Point (include Emergency light & NO 41


Keluar sign)

(blank) Supply and install wiring point for lighting (blank)


using 2x1C 4.0mmsq PVC cable with
CPC in 20mm dia., laid in concealed G.I
conduit c/w metal clad switches and all
necessary accessories as per
specification and drawings.

C1.054 Lighting Point (Flood Light) NO 4

(blank) Supply and install wiring power point (blank)


using 2x1C 4mmsq PVC cable with CPC
in 25mm dia., lain in concealed G.I
conduit and all necessary accessories as
per specification and drawings to
following panel.

C1.055 13A Switch Socket Outlet (Metal Clad NO 19


type)

(blank) Light Fittings (blank)

(blank) Supply and install LED fitting include (blank)


reflector, necessary fittings, housing,
mounting bracket, tube, heavy duty and
anti-corrosive, etc and as per
specification and drawings.

BQ SECTION C1
Page 14/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.056 1 x 20 Watt (Wall Mount) NO 13

C1.057 1 x 20 Watt (Ceiling Mount) NO 3

C1.058 1 x 20 Watt (Wall Mount, Weatherproof) NO 3

C1.059 2 x 20 Watt (Wall Mount) NO 9

C1.060 2 x 20 Watt (Ceiling Mount) NO 2

(blank) Supply and install LED Lighting IP65 Die- (blank)


Cast Aluminium complete with bracket.

C1.061 200 Watt LED Floodlight (with minimum NO 4


135lm per Watt)

(blank) Supply and install complete with bracket (blank)

C1.062 1x8W self contained 'Emergency' light NO 8


with fitting (twin type) include 3 hours
standby NICAD battery and charger.

C1.063 1x8W self contained 'KELUAR' sign with NO 3


fitting include 3 hours standby NICAD
battery and charger.

(blank) LIGHTNING PROTECTION SYSTEM (blank)

(blank) Supply, delivery, testing and commission (blank)


of surge and lighting protection system
as per specifications and drawings
include air final, 50mmsq stay wire from
terminal to test clamp, 25mm x 3mm
copper tape from test clamp to earthing
chamber and interlink chamber for AC
plant. Each grounding point shall consist
of copper bonded rods, coupling and
exothermic joint. Bi-Metal connector shall
be use for stay wire and copper tape
jointing. Grounding resistance shall be
equal or less than ≤10 Ohm.

(blank) Air Termination Network (blank)

C1.064 Air Terminal c/w gunmetal terminal base NO 2


and fastener

C1.065 50mmsq stay wire c/w slate holdfast and L.S.


accessories at roof area

(blank) Lightning Down Conductor (blank)

BQ SECTION C1
Page 15/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.066 50mmsq stay wire from roof to test point LOT 4
at column complete with wire saddles in
conduit (Bi-Metal Connector)

C1.067 25mm x 3mm copper tape up from Earth LOT 4


Chamber complete with saddles in pvc
trunking to test point.

(blank) EARTHING SYSTEM (blank)

(blank) Earthing Systems shall be equal or less (blank)


than ≤10 Ohm.

C1.068 300mm x 300mm x 180mm heavy duty NO 4


concrete Earth Chamber, removable
cover complete with 16mm diameter x
3000mm cooper jacketed steel, gun
metal rod coupling, Thermoweld
Exothermic Welding (Bi-Metal).

C1.069 25mm x 3mm copper tape bonding all L.S.


the earth chamber.

C1.070 25mm x 3mm copper tape bonding L.S.


conductor from nearest test point to Main
Earthing Bar Terminal.

C1.071 Complete earthing system for the L.S.


installation of Sub-Switch Board (SSB
AC), Distribution Board (DB L&P) and all
electrical panel. Rate to include copper
tape, fixing accessories, earth bar,
earthing chamber, earth rod and etc as
per drawing and specification. Earth
resistance for electrical panel shall be
equal or less than ≤3 Ohm.

C1.072 Complete earthing system for the L.S.


installation of Motor Control Centre (MCC
AC), Local Control Panel (LCP),
Outstation Panel (O/S AC), SCADA and
electronic panel. Rate to include copper
tape, fixing accessories, earth bar,
earthing chamber, earth rod and etc as
per drawing and specification. Earth
resistance for electronic panel shall be
equal or less than ≤1 Ohm.

BQ SECTION C1
Page 16/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C1.073 Supply and install 25mm x 3mm copper L.S.
tape from the new plant earthing
chamber to bonding conductor with the
nearest existing plant earthing
chamber/earthing bar terminal.

(blank) MISCELLANEOUS (blank)

C1.074 Main Single Line Diagram endorsed by L.S.


Professional Engineer and framed with
glass panel. The size of frame shall be
minimum 1050mm x 750mm.

C1.075 Cable pit 450mm (W) x 450mm (L) for L.S.


incoming cable to Powdered Activated
Carbon (AC) electrical room.

BQ SECTION C1
Page 17/17 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) C: MECHANICAL, ELECTRICAL AND (blank)
INSTRUMENTATION, TELEMETRY
AND SCADA WORKS

(blank) C2: TELEMETRY AND SCADA WORKS (blank)

(blank) Notes: (blank)


a) The Contractor shall ensure to include
supply and deliver to site including F.A.T,
taxes and duties, insurance, freight,
loading and unloading and storing at site,
complete erection and installation,
painting, tagging, all necessary fixing
accessories, site testing, setting to work
and attendance during the running and
maintenance period of all plant and
equipment supplied as specified and as
shown on the drawings.

(blank) b) The Contractor shall appoint the third (blank)


party from approved vendor list for
configuration, integration, interfacing and
programming works with the existing
SCADA system for new Powdered
Activated Carbon system to ensure the
design interfacing, technical part and all
specification meet the contract
requirements and as directed by C.A.

(blank) OUTSTATION PANEL (O/S AC) (blank)

C2.001 Supply, deliver and install Outstation LOT 1


Panel (O/S AC) for SCADA system, floor
mounted type complete with PLC, I/O
module, modbus TCP/RTU protocol
ready, processor module, controller,
software programming, fibre optic switch,
surge protection device (SPD), relays,
breakers, contactors and etc. to monitor
and control the auto dosing and
preparation for Powdered Activated
Carbon include all the necessary data to
be displayed according to drawing and
specifications. Panel shall be made from
epoxy coated mild steel IP54. Panel
thickness at least 2.3mm and paint
thickness at least 75 micron average.

BQ SECTION C2
Page 1/3 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C2.002 Configuration, calibration, integration, LOT 1
interfacing and programming works for
existing SCADA system at Main Control
SCADA Room (Command Centre) for
new Powdered Activated Carbon system
include new graphic monitoring and
control layout, alarm/events, trending,
reports and all necessary data as per
requirements from plant operation and as
directed by C.A.

(blank) FIBER OPTIC AND COMMUNICATION (blank)


CABLE

C2.003 Supply, lay and install communication LOT 1


cable from Outstation Panel (O/S AC) to
MCC AC include termination, integration
works and all necessary accessories
required for a complete system.

C2.004 Supply, lay and install 8 core fibre cable M 100


from Outstation Panel (O/S AC) to
existing Alum Plant Outstation Panel
(O/S AP) at Chemical Plant and laid in
100mm dia HDPE duct include
termination, testing, modification and all
necessary accessories required for a
complete system. (Link to existing
SCADA redundant ring)

C2.005 Supply, lay and install 8 core fibre cable M 200


from Outstation Panel (OS AC) to
existing Admin Building Outstation Panel
(O/S AB) respectively laid in 100mm dia
HDPE duct include termination, testing,
modification and all necessary
accessories required for a complete
system. (Link to existing SCADA
redundant ring)

C2.006 Dismantling work for existing unused L.S.


fibre optic from Alum Plant Outstation
Panel (O/S AP) to Admin Building
Outstation Panel (O/S AB).

BQ SECTION C2
Page 2/3 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

C: MECHANICAL, ELECTRICAL AND INSTRUMENTATION, TELEMETRY AND SCADA WORKS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


C2.007 Supply and install 100mm dia. G.I pipe M 10
sleeve for cable road crossing complete
with 450mm (W) x 450mm (L) cable pit
(both side). The rate shall include road
cutting, back filing, compaction work,
sand bedding, protective bricks / PVC,
G.I pipe sleeve and concrete surround
bedding for road crossing cable, making
good cable tagging, markers and
reinstatement works.

(blank) BACK-UP POWER SUPPLY (blank)

C2.008 Supply, deliver and install one (1) set of LOT 1


110-300VAC online double conversion
Uninterruptible Power Supply (UPS) for
Outstation Panel (O/S AC). The capacity
of UPS shall be 1000VA/W, zero transfer
time, unity power factor and complete
with voltage regulation, battery voltage
36VDC with backup time 30mins @
1000W, LCD display, alarm and fault
code, normal and bypass mode including
cabling works and all the necessary
accessories required for a complete
system.

BQ SECTION C2
Page 3/3 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

D: MISCELLANEOUS

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) D: MISCELLANEOUS (blank)

(blank) Testing and Commissioning (blank)

D.001 Provision of operation labour, electricity, L.S.


other equipments and facilities for
Testing and Commissioning of the
complete system and all associated
equipment. Rate to include supply of
chemical (powdered activated carbon),
provide materials, tools and skilful
personnel to conduct testing and
commissioning as specified in the
specification.

(blank) Training (blank)

D.002 Provision of Training on the complete L.S.


system components, the operation of
each component and all associated
equipment prior to testing and
commissioning and during maintenance
period. Rate to include to provide
materials, tools and skilful personnel to
conduct training as specified in the
specification.

(blank) Service and Maintenance (blank)

D.003 Provision of Service and Maintenance L.S.


inclusive Preventive Maintenance of all
equipment and system include technical
representative and support, troubleshoot,
on-site assistance and skilful personnel
during the Defect and Liability Period
(DLP). Services and maintenance shall
comply to manufacturer's requirement
and as directed by C.A.

BQ SECTION D
Page 1/1 Stamp/Sign
CONSTRUCTION OF A NEW POWDERED ACTIVATED CARBON DOSING FACILITIES AND OTHER
ASSOCIATED WORKS AT LABOHAN DAGANG WATER TREATMENT PLANT

E: PROVISIONAL SUM

NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)


(blank) E: PROVISIONAL SUM (blank)

E.001 Provide a Provisional Sum of Ringgit L.S. 30,000.00


Malaysia Thirty Thousand Only (RM
30,000.00) for Compliance with
Authorities Requirement to be used as
directed by the Contract Administrator
and to be deducted in whole or in part if
not required.

E.002 Provide a Provisional Sum of Ringgit L.S. 70,000.00


Malaysia Seventy Thousand Only (RM
70,000.00) for Contingency Works,
Reinstatement Works, Pipe Relocation
Works, Cable Diversion Works and
Other Repair Works to be used as
directed by the Contract Administrator
and to be deducted in whole or in part if
not required.

E.003 Provide a Provisional Sum of Ringgit L.S. 70,000.00


Malaysia Seventy Thousand Only (RM
70,000.00) for Modification Works to
Existing Electrical Panel, Cabling,
System, Pipe Connection and Building to
be used as directed by the Contract
Administrator and to be deducted in
whole or in part if not required.

BQ SECTION E