The document provides a checklist of 90 documents required for obtaining building permission and occupancy certificates from the Panvel Municipal Corporation. The checklist includes documents required at different stages like commencement certificate, plinth completion, and occupancy certificate. Key documents include application forms, ownership documents, drawings, structural designs, NOCs from various authorities, undertakings and indemnity bonds.

Uploaded by

plannersarvesh
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
353 views

PMC Checklist

The document provides a checklist of 90 documents required for obtaining building permission and occupancy certificates from the Panvel Municipal Corporation. The checklist includes documents required at different stages like commencement certificate, plinth completion, and occupancy certificate. Key documents include application forms, ownership documents, drawings, structural designs, NOCs from various authorities, undertakings and indemnity bonds.

Uploaded by

plannersarvesh
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PANVEL MUNICIPAL CORPORATION

BUILDING PERMISSION SECTION


CHECK LIST OF DOCUMENTS FOR BUILDING PERMISSION

ी./ ीम./मे. -------------------------------------,


--------------------------------------------------,
--------------------------------------------------,
---------------------------------------------------,
अनु. . कागद प ांचा तप शल मांक
A COMMENCEMENT CERTIFICATE DOCUMENTS
1 Application/forwarding letter from architect / licensee / owner C/
2 Application in prescribed form C/
3 Letter of appointment of Architect C/
4 Acceptance letter of Architect C/
5 Resignation letter of earlier Architect C/
6 Supervision memo from Architect in prescribed format C/
7 Copy of Architect’s registration with Council of Architecture C/
8 Letter of appointment of Structural Engineer C/
9 Acceptance letter of Structural Engineer C/
10 Resignation letter of earlier Structural Engineer C/
11 Supervision memo from Structural Engineer in prescribed format C/
12 Certificate of Earthquake stability C/
13 Confirmation of column position letter & column position drawing C/
14 RCC Drawing & RCC Design calculation from Structural Engineer C/
15 Copy of Registration / License of Structural Engineer C/
16 Letter of appointment of Licensed Plumber C/
17 Acceptance letter of Licensed Plumber C/
18 Supervision memo from Licensed Plumber in prescribed format C/
19 Copy of Registration / License of Licensed Plumber C/
20 Resignation letter of earlier Plumber C/
21 Owner Ship C/
22 Copy of agreement to Lease / 7/12 / P. R. Card C/
23 Copy of possession receipt C/
24 Copy of confirmed demarcation plan C/
25 Copy of registered tripartite agreement /Development agreement C/
26 Final transfer order from Estate section C/
27 Copy of power of attorney (POA) C/
29 One set of ground floor plan showing column position signed by structural engineer C/
30 One set of proposal drawing for scrutiny C/
31 Delay Condonation letter from Estate section C/
32 Time Extension from Estate Section C/
33 Initial I.D.C. letter from CIDCO for 12.50% scheme C/
34 No Dues Certificate from Estate Section CIDCO / P.M.C. C/
35 Affidavit for No Court Matter / Court Matter on Rs.200/- stamp paper. C/
36 Indemnity bond for COURT MATTER on Rs.200/- stamp paper C/
37 Aesthetic approval from Sr. Planner (C) C/
38 Approval of location & size of Elect. Sub Station from MSEDC C/
39 NOC from society C/
40 NOC from Assistant registrar C/
41 NOC from Airport Authority of India for Height clearance C/
42 Case status report of pending Court Matter. C/
43 Fire N.O.C. C/
44 Demolition & Reconstruction NOC from CIDCO C/
45 MAWEJA NOC from Land Section CIDCO. C/
46 Vacant Plot Letter & Photo C/
47 CIDCO NOC about land Acquisition of said land C/
B PLITH CHECKING DOCUMENTS
48 Application from Plinth Completion Certificate C/
49 Plinth Completion from Architect C/
50 Stability & earthquake certificate from structural Engineer C/
51 Plinth Photo C/
C OCCUPANCY CERTIFICATE DOCUMENTS
52 Application /Forwarding Letter from Architect/Licensee/Owner. C/
53 Completion Certificate from Architect and if required copy of Architect registration C/
with License validity.
54 Certificate of Structural Stability from Structural Engineer if required copy of C/
Structural Engineer registration copy with License validity.
55 Certificate of Earthquake Stability from Structural Engineer C/
56 Previous Architect resignation letter if Architect change. C/
57 Required New Architect C/
58 Letter of Appointment of Architect. C/
59 Acceptance letter of Architect. C/
60 Form of Supervision Memo. C/
61 Copy of Certificate of Architect registration with Council of Architecture with C/
registration Validity.
Completion Certificate from Architect.
62 Previous Structural Engineer resignation letter if Structural Engineer change. C/
63 Required New Structural Engineer C/
64 Letter of Appointment of Structural Engineer. C/
65 Acceptance letter of structural Engineer. C/
66 Form Of Supervision Memo. C/
67 Certificate of Structural Stability. C/
68 Certificate of Earthquake Stability. C/
69 Copy of Structural Engineer registration with License Validity. C/
70 Drainage Completion / Connection Certificate from Executive Engineer CIDCO. C/
71 NOC from EE (Water Supply) CIDCO. C/
72 Health NOC from Panvel Municipal Corporation / CIDCO C/
73 No Dues Certificate from Estate Section CIDCO. C/
74 Extension of Time limit letter from Estate Section CIDCO if required. C/
75 Tripartite Agreement if resale Plot Owner / Licensee (All). C/
76 Transfer Order of Estate Section CIDCO if resale Plot Owner / Licensee (All). C/
77 Copy of Power of Attorney (POA) if Licensee/Owner given POA. C/
78 Association / Society NOC. C/
79 Fly Ash/Bricks/Blocks/Tiles Undertaking Letter from Licensee/Owner. C/
80 Affidavit for No Court Matter / Court Matter on Rs. 200/- stamp paper. C/
81 Rain water harvesting affidavit. C/
82 Tree Plantation undertaking. C/
83 Indemnity bond for COURT MATTER on Rs.200/- stamp paper C/
84 Final Fire NOC from Fire Officer. C/
85 Lift inspection report from PWD. C/
86 Final I.D.C. letter from CIDCO for 12.50% scheme C/
87 Refusal Letter to Licensee/Owner. C/
88 Resubmission letters from Architect / Licensee / Owner. C/
89 As built drawing one set for scrutiny. C/
90 Other Documents (if any). C/