0% found this document useful (0 votes)
9 views

Bom A

Uploaded by

Jairo Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Bom A

Uploaded by

Jairo Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 28

Roofing Works

No. Area WL H slope area


1 9.6 11.1 1.05 11.15 93.79
2 10.3 2.6 0.5 2.65 26.1
3 1.8 2.5 0.5 2.55 4.59
Total 124.48

TILE WORKS

GROUND FLOOR DIM area qty.

FF01
60x60cm Living Area 6.59 5.3 34.93 97
Kitchen 4.79 5.5 26.35 73
Kitchen Counter 0.6 2.35 1.41 4
0.6 1.5 0.90 3
Bar Counter 0.5 2.35 1.18 3

- 0.5 1.05 0.53 1


Total 181
FF02
30x30cm Toilet & Bath 2.85 1.50 4.28 48
-wall 2.85 1.66 9.46 105
- 1.5 1.66 2.49 28
- 0.75 1.66 1.24 14
Total 194
FF03
30x30cm Bedroom 1 3.15 3.21 10.11 112
Total 112
FF04
60x60cm Carport 5.00 3.21 16.05 45
Porch 2.35 2.29 5.38 15
Lanai 4.50 1.80 8.10 23
Dirty Kitchen/
Laundry Area 4.00 2.15 8.60 24
Total 106

SECOND FLOOR DIM sqm. qty.

FF01
60x60cm Family Area 12.7 7.1 19.8 55
Total 55
FF02
30x30cm Toilet & Bath 2.15 1.7 3.85 43
30x30cm -wall 2.15 1.66 7.62 85
- 1.7 1.66 3.36 37
- 9.5 1.66 11.16 124
30x30cm MB-Toilet & Bath 2.65 1.43 4.08 45
30x30cm -wall 2.65 1.66 4.31 48
- 1.43 1.66 6.17 69
- 1.9 1.66 3.56 40
Total 490
FF03
30x30cm Bedroom 2 3.65 3.21 11.72 130
Bedroom 3 3.65 3.21 11.72 130
Masters Bedroom 4.26 3.05 12.99 144
Total 405
FF04
60x60cm Balcony 3.10 1.75 5.43 15
MB-Balcony 4.3 1.5 6.45 18
Total 33

5% Total
FF01 GROUND 181 11.8
60x60cm SECOND 55 248
FF02 GROUND 194 34.2
30x30cm SECOND 490 718
FF03 GROUND 112 25.9
30x30cm SECOND 405 543
FF04 GROUND 106 6.9
60x60cm SECOND 33 146

ABC Grout
unit TOTAL
Total sqm
Area Total of T&B 61.58 bags 8
Area Total of flooring 243.17 bags 30
Tile Adhesive
Total sqm
Area Total of T&B 61.58 bags 7
Area Total of flooring w/ counter except vinyl
196.63 bags 22
Cement
Total sqm
Area Total of T&B 61.58 bags 5
Area Total of flooring 225.05 bags 19
ABC Multibond Vinyl Type Adhesive
Total sqm
Area Total of flooring 46.54 kgs 8

CEILING WORKS
Gypsum Board Ceiling Board 3.0
DIM
GROUND FLOOR area qty
CF01
60x60cm Living Area 6.59 5.3 34.93 11.73
Kitchen 4.79 5.5 26.35 8.85
Total 21
CF02
30x30cm Toilet & Bath 2.85 1.50 4.28 1.44
Total 1
CF03
30x30cm Bedroom 1 3.15 3.21 10.11 3.40
Total 3
CF04 Carport 5.00 3.21 16.05 5.39
60x60cm Porch 2.35 2.29 5.38 1.81
Lanai 4.50 1.80 8.10 2.72
Dirty Kitchen/
Laundry Area 4.00 2.15 8.60 2.89
Total 13
TOTAL PCS 38
SECOND FLOOR DIM sqm. qty.
CF01
60x60cm Family Area 12.7 7.1 19.8 6.64
Total 7
CF02
30x30cm Toilet & Bath 2.15 1.7 3.85 1.29
30x30cm MB-Toilet & Bath 2.65 1.43 4.08 1.37
Total 3
CF03
30x30cm Bedroom 2 3.65 3.21
11.72 3.94
Bedroom 3 3.65 3.21
11.72 3.94
Masters Bedroom 4.26 3.05
12.99 4.36
Total 12
TOTAL PCS 12
TOTAL GYPSUM BOARD 51

PAINTING WORKS
Concrete Neutralizer
sqm unit TOTAL
Total sqm
Exterior Wall 185.95 gal 23
Interior Wall 75.73 gal 9
Flat Latex Paint
Total sqm
Ceiling 61.58 gal 7
Interior Wall
196.63 gal 22
Acrylic Paint
Total sqm
Exterior wall 61.58 gal 5
Skimcoat
Total sqm
Area Total of wall 42.85 gal 7
Paint Thinner
Total sqm
Area Total of flooring gal 0
Waterproofing
Total sqm
Area Total 63.64 sqm 11
Toilet & Bath 4.28
Toilet & Bath 2F 3.85
MB-Toilet & Bath 4.08
Dirty Kitchen/
Laundry Area 8.60
Lanai 8.10
Kitchen 26.35
Wall height 8.4 Total 64
Paint Accessories
Total sqm
Area Total of wall 46.54 gal 8
Metal Furring (0.4mm thk)
CF04 - GF L S W Total
DK/LA 4.00 0.60 6.67 2.15 0.43 2.87
Carport 5.00 0.60 8.33 3.21 0.64 5.35
Porch 2.29 0.60 3.82 2.29 0.46 1.75
CF03 - GF
B1 3.21 0.60 5.35 3.15 0.63 3.37
CF01 - GF
LA 5.50 0.60 9.17 4.30 0.86 7.88
5.30 0.60 8.83 5.50 1.10 9.72
CF03 - 2F
B1 3.65 0.60 6.08 3.21 0.64 3.91
B2 3.65 0.60 6.08 3.21 0.64 3.91
MB 4.26 0.60 7.10 3.05 0.61 4.33
CF02 - 2F
T&B 2.15 0.60 3.58 1.70 0.34 1.22
MB-T&B 2.65 0.60 4.42 1.60 0.32 1.41
CF01 - 2F
FA 5.05 0.60 8.42 6.21 1.24 10.45
Total pcs 56

Metal Furring (0.8mm thk)


CF04 - GF L S W Total
DK/LA 4.00 1.20 3.33 2.15 0.43 1.43
Carport 5.00 1.20 4.17 3.21 0.64 2.68
Porch 2.29 1.20 1.91 2.29 0.46 0.87
CF03 - GF
B1 3.21 1.20 2.68 3.15 0.63 1.69

CF01 - GF
LA 5.50 1.20 4.58 4.30 0.86 3.94
5.30 1.20 4.42 5.50 1.10 4.86
CF03 - 2F
B1 3.65 1.20 3.04 3.21 0.64 1.95
B2 3.65 1.20 3.04 3.21 0.64 1.95
MB 4.26 1.20 3.55 3.05 0.61 2.17
CF01 - 2F

FA 5.05 1.20 4.21 6.21 1.24 5.23


Total pcs 27
CONCRETE

FOOTING B W H set qty. (cu.m)

F1 1.3 1.3 0.35 9 5.32


F2 1.6 1.6 0.35 2 1.79
F3 1.4 1.4 0.35 1 0.69
F4 0.8 0.8 0.3 3 0.58
F5 0.6 0.6 0.25 1 0.09
CF1 1.3 2.25 0.35 1 1.02
STF1 0.6 1.15 0.25 1 0.17
Total 10

GRADE BEAMS L W H set qty. (cu.m)

8 0.2 0.3 1 0.48


10.8 0.2 0.3 1 0.65
9.8 0.2 0.3 1 0.59
10.8 0.2 0.3 1 0.65
8 0.2 0.3 1 0.48
8.8 0.2 0.3 1 0.53
3.2 0.2 0.3 1 0.19
4.3 0.2 0.3 1 0.26
5.35 0.2 0.3 1 0.32
Total 4

COLUMN L W H set qty. (cu.m)

GROUND FLOOR TO SECOND FLOOR


C1 0.2 0.4 4.575 12 4.39
C2 0.2 0.3 4.575 5 1.37
Total 6
GROUND FLOOR TO SLAB
SOG1 3.9 4.95 0.1 1.93
1.8 7.6 0.1 1.37
36.96 10.395 0.1 2.66
4.4 2.8 0.1 1.23
SOG2 3.8 2.8 0.1 1.06
Total 8.3

COLUMN L W H set qty. (cu.m)

COLUMN FROM 2ND FLOOR TO ROOF


C1 0.2 0.4 2.8 10 2.24
PC1 0.2 0.3 2.8 4 0.672
Total 3
2ND FLOOR SLAB
S1
2.1 3.250 0.125 0.85
2.3 3.250 0.125 0.93
2.8 3.250 0.125 1.14
1.5 2.05 0.125 0.37
3.7 2.3 0.125 1.05
2.8 3.65 0.125 1.28
2.7 3.9 0.125 1.32
S2
1.3 3.9 0.125 0.63
0.8 2.8 0.125 0.28
1 2.8 0.125 0.35
Total 8.2

BEAMS L W H set qty. (cu.m)

2ND FLOOR
2B1 4.3 0.2 0.4 0.34
3.1 0.2 0.4 0.25
4.3 0.2 0.4 0.34
2.3 0.2 0.4 0.18
4.3 0.2 0.4 0.34
3.5 0.2 0.4 0.28
4.8 0.2 0.4 0.38
3.5 0.2 0.4 0.28
3.9 0.2 0.4 0.32
5.5 0.2 0.4 0.44
4.6 0.2 0.4 0.36
4.8 0.2 0.4 0.38
3.2 0.2 0.4 0.26
2B2 2.5 0.2 0.4 0.20
2B3 1.4 0.2 0.3 0.08
2B4 2.3 0.2 0.3 0.14
4.1 0.2 0.3 0.25
3.2 0.2 0.3 0.19
2.8 0.2 0.3 0.17
2B5 2.1 0.2 0.3 0.12
2CB1 3.0 0.2 0.4 0.24
5.0 0.2 0.4 0.40
2RB1 8.0 0.2 0.4 0.64
5.4 0.2 0.4 0.43
Total 7.0

FORM

FOOTING B W H set qty. (sq.m)


F1 1.3 1.3 0.35 9 16.38
F2 1.6 1.6 0.35 2 4.48
F3 1.4 1.4 0.35 1 1.96
F4 0.8 0.8 0.3 3 2.88
F5 0.6 0.6 0.25 1 0.6
CF1 1.3 2.25 0.35 1 2.485
STF1 0.6 1.15 0.25 1 0.875
Total 30

GRADE BEAMS L W H set qty. (sq.m)

8 0.2 0.3 1 8.0


10.8 0.2 0.3 1 10.8
9.8 0.2 0.3 1 9.8
10.8 0.2 0.3 1 10.8
8 0.2 0.3 1 8.0
8.8 0.2 0.3 1 8.8
3.2 0.2 0.3 1 3.2
4.3 0.2 0.3 1 4.3
5.35 0.2 0.3 1 5.4
Total 69

COLUMN L W H set qty. (sq.m)

GROUND FLOOR TO SECOND FLOOR


C1 4.575 0.4 0.2 12 65.9
C2 4.575 0.3 0.2 5 22.9
Total 89
GROUND FLOOR SLAB
SOG1 3.9 4.95 19.31
1.8 7.6 13.68
2.8 4.4 12.32
4.6 3.25 14.95
2.3 4.95 11.39
SOG2 3.8 2.8 10.64
Total 82.3

COLUMN L W H set qty. (sq.m)

COLUMN FROM 2ND FLOOR TO ROOF


C1 0.20 0.40 2.80 10 33.60
PC1 0.20 0.20 2.80 4 8.96
Total 43
2ND FLOOR SLAB
S1
2.1 3.250 0.125 6.83
2.3 3.250 0.125 7.48
2.8 3.250 0.125 9.10
1.45 2.05 0.125 2.97
3.65 2.3 0.125 8.40
2.8 3.65 0.125 10.22
2.7 3.9 0.125 10.53
S2
1.3 3.9 0.125 5.07
0.8 2.8 0.125 2.24
1 2.8 0.125 2.80
Total 65.6

Left Hook
m m Concrete Cover
(m)

F-1 1.3 1.3 0.075 0.2


F-2 1.6 1.6 0.075 0.2
F-3 1.4 1.4 0.075 0.2
F-4 0.8 0.8 0.075 0.2
F-5 0.6 0.6 0.075 0.2
CF-1 1.3 2.25 0.075 0.2
STF-1 0.6 1.15 0.075 0.2

Column from GF to 2nd Floor


L No. of bars pcs Rebar L(m) A Volume
C1 4.575 8 12 439.2 804.2477193 0.3532255983166
C2 4.575 6 5 137.25 804.2477193 0.1103829994739
Stirrups
L No. of bars pcs Rebar L(m) A Volume
C1 (LT1) 1.28 17 12 261.12 452.3893421 0.1181279050092
C1 (LT2) 0.76 17 12 155.04 452.3893421 0.0701384435992
C2 1.08 17 4 73.44 452.3893421 0.0332234732838

Concrete
Left Hook Clear Span Right Hook
L W Cover
(m) (m) (m)
(m)
F1 1.3 1.3 0.075 0.2 1.15 0.2
F2 1.6 1.6 0.075 0.2 1.45 0.2
F3 1.4 1.4 0.075 0.2 1.25 0.2
F4 0.8 0.8 0.075 0.2 0.65 0.2
F5 0.6 0.6 0.075 0.2 0.45 0.2
CF1 1.3 2.25 0.075 0.15 1.15 0.15
CF1 1.3 2.25 0.075 0.25 1.15 0.25
STF1 0.6 1.15 0.075 0.25 0.45 0.25
TOTAL
Rebars
Footing
Clear Span Right Hook
Total Short Side Long Side
(m) (m)

1.15 0.2 1.55 10 10


1.45 0.2 1.85 12 12
1.25 0.2 1.65 11 11
0.65 0.2 1.05 5 5
0.45 0.2 0.85 4 4
1.15 0.2 1.55 10 6
0.45 0.2 0.85 10 6

Co
Unit weight Total L No. of bars
7850 2772.82 C1 3.2 8
7850 866.51 PC1 3.2 4

Unit weight Total L No. of bars


7850 927.30 C1 (LT1) 1.28 16
7850 550.59 C1 (LT2) 0.76 16
7850 260.80 PC1 0.88 16
Total kg
GF to 2nd Floor 5378.02
2nd to Roof 3298.60

REBARS
Volume of
Total Unit Weight
Long Rebar Dia. Rebar
Total Short Side Total Rebar of Rebar
Side (m) Required
Length (kg/m3)
(m3)
1.55 10 10 20 31 0.012 0.003506017 7850
1.85 12 12 24 44.4 0.012 0.005021522 7850
1.65 11 11 22 36.3 0.012 0.004105433 7850
1.05 5 5 10 10.5 0.012 0.001187522 7850
0.85 4 4 8 6.8 0.012 0.000769062 7850
1.45 10 6 16 23.2 0.01 0.001822124 7850
1.65 10 6 16 26.4 0.016 0.005308035 7850
0.95 6 3 9 8.55 0.016 0.00171908 7850
Long Side Total Total Rebar Length Rebar Diameter Volume of Rebar
Required
10 20 31 0.012 0.003506017401406
12 24 44.4 0.012 0.005021521697498
11 22 36.3 0.012 0.004105433279711
5 10 10.5 0.012 0.001187522023057
4 8 6.8 0.012 0.000769061881599
6 16 24.8 0.012 0.002804813921125
6 16 13.6 0.012 0.001538123763198

Column from 2nd to Roof


pcs Rebar L A Volume Unit weight Total
10 256 804.2477193 0.20588741614 7850 1616.22
4 51.2 804.2477193 0.04117748323 7850 323.24
Stirrups
pcs Rebar L A Volume Unit weight Total
10 204.8 452.3893421 0.09264933726 7850 727.30
10 121.6 452.3893421 0.055010544 7850 431.83
4 56.32 452.3893421 0.02547856775 7850 200.01
Total kg
5378.02
3298.60

Total
Weight of
Weight of
Rebar Qty of
Rebar
Required Member
Required
(kg)
27.5222366 9 (kg)
247.7001294
39.41894533 2 78.83789065
32.22765125 1 32.22765125
9.322047881 3 27.96614364
6.037135771 1 6.037135771
14.30367135 1 14.30367135
41.66807434 1 41.66807434
13.49477408 1 13.49477408
462.2354705
Total 485
Unit Weight of Weight of Rebar Total
Rebar Required QTY

7850 27.52 9 247.70


7850 39.42 2 78.84
7850 32.23 1 32.23
7850 9.32 3 27.97
7850 6.04 1 6.04
7850 22.02 1 22.02
7850 12.07 1 12.07
TILE WORKS
VOLUME
EXCAVATION DIM VOLUME qty.
TOTAL
F1 1.30 1.30 1.50 2.54 9 22.82
F2 1.60 1.60 1.50 3.84 2 7.68
F3 1.40 1.40 1.50 2.94 1 2.94
F4 0.80 0.80 1.50 0.96 3 2.88
F5 0.60 0.60 1.50 0.54 1 0.54
CF1 1.30 2.25 1.50 4.39 1 4.39
STF1 0.60 1.15 1.50 1.04 1 1.04
WF 69.25 0.25 0.60 10.39 1 10.39
Total 53

VOLUME
BEDDING DIM VOLUME qty.
TOTAL
F1 1.30 1.30 0.75 1.27 9 11.41
F2 1.60 1.60 0.75 1.92 2 3.84
F3 1.40 1.40 0.75 1.47 1 1.47
F4 0.80 0.80 0.75 0.48 3 1.44
F5 0.60 0.60 0.75 0.27 1 0.27
CF1 1.30 2.25 0.75 2.19 1 2.19
STF1 0.60 1.15 0.75 0.52 1 0.52
WF 69.25 0.25 0.60 10.39 1 10.39
SOG1 5.35 4.30 0.10 2.30 1 2.30
5.35 2.30 0.10 1.23 1 1.23
3.45 4.88 0.10 1.68 1 1.68
2.00 8.00 0.10 1.60 1 1.60
4.80 3.20 0.10 1.54 1 1.54
SOG2 4.00 3.20 0.15 1.92 1 1.92
Total 42

VOLUME
BACKFILL DIM VOLUME qty.
TOTAL
F1 1.30 1.30 1.50 2.54 9 22.82
F2 1.60 1.60 1.50 3.84 2 7.68
F3 1.40 1.40 1.50 2.94 1 2.94
F4 0.80 0.80 1.50 0.96 3 2.88
F5 0.60 0.60 1.50 0.54 1 0.54
CF1 1.30 2.25 1.50 4.39 1 4.39
STF1 0.60 1.15 1.50 1.04 1 1.04
C1 0.40 0.20 4.58 0.37 12 4.39
C2 0.30 0.20 4.58 0.27 5 1.37
Total 37
GROUND FLOOR
EXTERIOR
GF L H sqm opening 1 opening 2 Total
W1 6.8 2.7 18.36 w3 1.8 w6 0.25 16.31
W2 4 2.7 10.8 10.8
W3 2.15 2.7 5.805 d2 1.89 3.915
W4 4 2.7 10.8 w5 1.2 9.6
W5 5.5 2.7 14.85 gd1 4.515 10.335
W6 2.5 2.7 6.75 6.75
W7 2.2 5.5 12.1 w1 5.4 6.7
W8 3.1 2.7 8.37 8.37
W9 4.3 2.7 11.61 w2 6 5.61
W10 2.35 2.7 6.345 6.345
W11 2.29 2.7 6.183 d1 3.36 2.823
W12 1.85 2.7 4.995 w4 1.2 3.795
W13 3.21 2.7 8.667 8.667
INTERIOR
GF L H sqm opening 1 opening 2 Total
IW1 4.65 2.7 12.555 d4 1.365 d3 1.68 9.51
IW2 3.21 2.7 8.667 8.667

SECOND FLOOR

EXTERIOR
2F L H sqm opening 1 opening 2 opening 3
EW1 7.6 2.4 18.24 w3 1.8 w3 1.8
EW2 8 2.4 19.2 w6 0.25
EW3 3.45 2.4 8.28 w3 1.8
EW4 1.8 2.4 4.32
EW5 2.2 5.5 12.1
EW7 4.6 2.4 11.04
EW8 4.3 2.4 10.32 gd2 6.3
EW9 1.2 2.4 2.88
EW10 5.5 2.4 13.2 w7 0.85 w7 0.85 w7 0.85
INTERIOR
2F L H sqm opening 1 Total
IW1 3.21 2.7 8.667 8.667
IW2 3.65 2.7 9.855 d3 1.68 8.175
IW3 1.6 2.7 4.32 d4 1.365 2.955
IW4 3.65 2.7 9.855 d3 1.68 8.175
IW5 1.795 2.7 4.8465 4.8465
IW6 2.25 2.7 6.075 6.075
IW7 1.05 2.7 2.835 2.835
IW8 4.34 2.7 11.718 d3 1.68 10.038
IW9 2.65 2.7 7.155 d4 1.365 5.79
TOTAL CHB
No. of
1st floor 2nd floor area qty. (pcs)
CHB
CHB 150 ext (6") 100.02 85.93 185.95 12.5 2324.4
CHB 100 int (4") 18.177 57.5565 75.7335 12.5 946.7
Total 3271

Mortar area t V Total Volume Cement Sand


177.25 0.012 2.127 9.10
12 1
67.03 0.012 0.804402 3.64
Cell Volume
CHB100 0.003 2.84
CHB150 0.003 6.97 Total

Plastering area t V Cement (40 kg) Sand (cu.m) Total Cement


185.95 0.24 44.63 12 1 535.54
74.68 0.24 17.92 12 1 215.08
Total 751

Doors/Windows DIM sqm qty.


d1 1.6 2.1 3.36 1
d2 0.9 2.1 1.89 1
d3 0.8 2.1 1.68 4
d4 0.65 2.1 1.37 3
gd1 2.15 2.1 4.52 2
gd2 3 2.1 6.30 1
w1 1.8 3 5.40 1
w2 3 2 6.00 1
w3 1.5 1.2 1.80 4
w4 1 1.2 1.20 1
w5 1.5 0.8 1.20 1
w6 0.5 0.5 0.25 2
w7 0.5 1.7 0.85 3
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB150
CHB100
CHB100
CHB150
CHB150
CHB100
Total CHB100
14.64 CHB150
18.95 CHB150
6.48 CHB150
4.32 CHB150
12.1 CHB150
11.04 CHB150
4.02 CHB150
2.88 CHB150
11.5 CHB150
CHB100
CHB100
CHB100
CHB100
CHB100
CHB100
CHB100
CHB100
CHB100
CHB100
CHB100
Total Cement Total Sand
109.20 9.10
43.73 3.64

153 12.74

Total Sand
44.63
17.92
62.55
Electrical Works Qty
Electrical Roughing - ins
a. Panel Board (12 Branches) 1
b. Circuit Breaker (20amp) 8
c. Circuit Breaker (30amp) 4
d. Circuit Breaker (100amp) 1
e. PVC Orange Pipe (15mm) 200
f. PVC Orange Pipe Elbow (15mm) 30
g. 3.5mm2 THHN wire Duraflex 250
h. 8.0mm2 THHN wire Duraflex 31
i. 22.0mm2 THHN wire Duraflex 31
j. Electrical Accessories 1
Lighting Fixtures
a. Pinlights 71
b. Center Light 11
c. Wall Lamp 2
d. Drop Light at Bar Counter 1
Devices
a. Convenience Outlet 33
b. Weather Proof Convenience Outlet 7
c. 1 gang Switch 5
d. 2 gang Switch 13
e. 3 gang Switch 3
f. 3-way Switch 4
g. ACU Outlet 4
h. CATV Outlet 6
Unit

pcs
pcs
pcs
pcs
pcs
pcs
m
m
m
lot

pcs
pcs
pcs
pcs

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
PVC Pipe 1/2"Ø x 3m
horizontal vertical
1.5 1
2 1
11.8 1
4 1
2.15 1
5 1
0.5 1
3 2.5
0.5 2.5
3.45 2.5
3.65 3.475
1.7
2.1
TOTAL 54

PVC Pipe 4"⌀ x 6m. PVC Pipe 2" x 6 m


horizontal vertical horizontal vertical
4.3 7.325 12 3.475
2.29 4.25 8.2 3.475
1.75 9.8 3.475
9.7 1.7 3.475
2.9 1 3.475
1.3 0.5 3.475
1.3 0.5 3.475
1.3 2
1.3 TOTAL 62
4
4
1.3
1.3
1.3
1.3
TOTAL 31
A.R. CONSTRUCTION COMPANY
Mobile No. (+63) 956 908 5636
email: [email protected]

Project : TWO STOREY RESIDENTIAL HOUSE


Location : N. Cristobal St., Batia, Bocaue, Bulacan
Owner : Engr. EMILSON C. GOLE CRUZ

BILL OF MATERIALS
ITEM DESCRIPTION AMOUNT
DIV. 01 GENERAL REQUIREMENT ₱207,634.00
DIV. 02 SITE WORKS ₱82,843.68
DIV. 03 CIVIL / STRUCTURAL WORKS ₱3,721,572.08
DIV. 04 WINDOWS/DOOR/DOOR JAMBS/CASEWORKS ₱204,371.00
DIV. 05 ROOFING / TINSMITHRY WORKS ₱72,571.84
DIV. 06 CEILING WORKS ₱30,356.84
DIV. 07 FINISHES / PAINTING WORKS ₱356,653.98
DIV. 08 ELECTRICAL ₱92,180.00
DIV. 09 SANITARY ₱141,707.67
DIV. 10 SPECIALTY WORKS ₱131,000.00
MATERIAL COST ₱5,040,891.08
LABOR COST (40%) ₱2,016,356.43
CONTINGENCIES (5%) ₱252,044.55
GRAND TOTAL ₱7,309,292.07

ITEM DESCRIPTION

DIV. 01 GENERAL REQUIREMENT Qty Unit Unit Price (Mtls) Amount


a. Mobilization / Demobilization 1 lot 365465 365465
b. Temfacil 1 lot 75000 75000
SUB-TOTAL 440464.6

DIV. 02 SITE WORKS Qty Unit Unit Price (Mtls) Amount


EARTHWORKS
a. Excavation 53 m3 546.8 28797.222
b. Bedding 42 m3 900 37615.613
c. Backfill 37 m3 450 16430.85
SUB-TOTAL 54046.463

DIV. 03 CIVIL / STRUCTURAL WORKS Qty Unit Unit Price (Mtls) Amount
CONCRETING WORK
a. Footing
a.1 Concrete 9.7 m3 4200 40587.75
a.2 Form Rebars 29.7 m2 1240 36778.4
a.3 Rebars 485.0 kgs. 192 93120
b. Grade Beams
b.1 Concrete 4.1 m3 4200 17400.6
b.2 Form Rebars 69.1 m2 1240 85622
b.3 Rebars kgs. 341 0
c. Column from GF To 2nd Flr.
c.1 Concrete 5.8 m3 4200 24210.9
c.2 Form Rebars 88.8 m2 2584 229342.92
c.3 Rebars 5378.0 kgs. 341 1833906
d. Ground flr. Slab 0
d.1 Concrete 8.3 m3 4200 34654.2
d.2 Form Rebars 82.3 m2 1240 102027.2
d.3 Rebars 3298.6 kgs. 133 438713.31
e. Column from 2nd To Roof
e.1 Concrete 2.9 m3 4200 12230.4
e.2 Form Rebars 42.6 m2 2584 109975.04
e.3 Rebars kgs. 341 0
f. Second flr. Slab
f.1 Concrete 8.2 m3 4200 34454.438
f.2 Form Rebars 65.6 m2 914 59983.535
f.3 Rebars kgs. 133 0
g. Beams @ 2nd flr.
g.1 Concrete 7.0 m3 4200 29479.8
g.2 Form Rebars 110.0 m2 1240 136400
g.3 Rebars kgs. 341 0
h. Roof Beams
h.1 Concrete 2.03 m3 4200 8534.4
h.2 Form Rebars 5.05 m2 1240 6259.52
h.3 Rebars kgs. 341 0
i. Stair/ Landing
i.1 Concrete 1.28 m3 4200 5376
i.2 Form Rebars 6.2 m2 1240 7688
i.3 Rebars 182.51 kgs. 192 35041.92
MASONRY
a. 6" Concrete Hollow Blocks 2324.375 pcs. 16 37190
b. 4" Concrete Hollow Blocks 947 pcs. 15 14200.031
c. Reinforcing Steel Bar 540 kls. 36 19440
d. Sand 12.74 m3 700 8921.1733
e. Cement 152.93 bags 218 33339.699
f. G.I # 16 6 rolls 85 510
g. Plastering
g.1 Concrete 750.61 bags 218 163633.94
g.2 Sand 62.55 m3 1000 62551.2
SUB-TOTAL 226185.14

DIV. 04 WINDOWS/DOOR/DOOR JAMBS/CASEWORKS Qty Unit Unit Price (Mtls) Amount

a. D-1 1.60m X 2.10m Double Leaf Swing Door Panel Door with 1 set 24300 24300
Door Jamb at Entrance
b. D-2 0.90m X 2.10m Single Leaf Swing Door Panel Door with 1 set 7585 7585
Door Jamb at Kitchen
4 set 10500 42000
c. D-3 0.80m x 2.10m Flush Door Type at Bedrooms
3 set 3262 9786
d. D-4 0.65m x 2.10m PVC Door Type at T&B

e. GD-1 2.15m x 2.10m Sliding Glass Door in Aluminum Frame at 2 set 12000 24000
Dining Room/Family Area
f. GD-2 3.00m x 2.10m Sliding Glass Door in Aluminum Frame at 1 set 16000 16000
Master BR Balcony
WINDOWS
a. W-1 1.80m x 3.0m Awning + Fixed Type Window 1 set 18000 18000
b. W-2 3.0m x 2.0m Awning + Fixed Type Window 1 set 14000 14000
c. W-3 1.50m x 1.20m Sliding Type Window 4 set 5000 20000
d. W-4 1.00m x 1.20m Sliding Type Window at Foyer 1 set 4500 4500
e. W-5 1.50m x 0.80m Sliding Type Window at Kitchen 1 set 4200 4200
f. W-6 0.50m x 0.50m Awning Type Window at T&B - GF&2F 2 set 2500 5000

g. W-7 0.50m x 1.700mAwning Type Window at MB T&B 2 set 7500 15000

SUB-TOTAL 204371

DIV. 05 ROOFING WORKS Qty Unit Unit Price (Mtls) Amount


a. Pre-Painted Roofing Ribtype 0.5mm with framings 124.48 sqm 583 72571.84
SUB-TOTAL 72571.84

DIV. 06 CEILING WORKS Qty Unit Unit Price (Mtls) Amount


a. Gypsum Board ceiling (8' x 4' board) 51 pcs 247.5 12523.327
b. Metal Furring (0.4mm thk) 56 pcs 135 7581.9195
c. Metal Furring (0.8mm thk) 27 pcs 185 4951.5898
d. Hanging Rod (3/8" diameter) 60 pcs 80 4800
e. Blind Rivets 2 boxes 250 500
SUB-TOTAL 30356.836

DIV. 07 FINISHES Qty Unit Unit Price (Mtls) Amount


TILE WORKS
a. Toilet and Bath
a.1 Matt Finish Ceramic Tiles (300mm x 300mm) 718 pcs 136.5 98061.373
a.2 ABC Grout 8 bags 150 1154.5688
a.3 Tile Adhesive 7 bags 550 3725.4085
a.4 Cement 5 bags 220 1165.0368
b. Flooring
b.1 Ceramic Tiles (600mm x 600mm) 248 pcs 210 52091.9
b.2 Matt Finish Ceramic Tiles (600mm x 600mm) 146 pcs 675 98450.297
b.3 Vinyl Tiles (300mm x 300mm) 543 pcs 26.5 14387.844
b.4 ABC Grout 30 bags 150 4559.4187
b.5 Cement 22 bags 220 4758.4823
b.6 Tile Adhesive 19 bags 550 10645.054
b.7 ABC Multibond Vinyl Tile Adhesive 8 kgs 824 6391.15
PAINTING WORKS
a. Concrete Neutralizer 33 gal 23191.7
b. Flat Latex Paint 28 gal 709 20762.545
c. Acrylic Paint 5 gal 731 2118.2488
d. Skimcoat 7 bags 400 357.1
e. Paint Thinner 2 gal 50 1560
f. Waterproofing 11 m2 780 8273.85
g. Paint Accessories 1 lot 5000 5000
SUB-TOTAL 356654

DIV. 08 ELECTRICAL WORKS Qty Unit Unit Price (Mtls) Amount


ELECTRICAL ROUGHING-INS
a. Panel Board (12 Branches) 1 pcs 1300 1300
b. Circuit Breaker (20amp) 8 pcs 299 2392
c. Circuit Breaker (30amp) 4 pcs 299 1196
d. Circuit Breaker (100amp) 1 pcs 850 850
e. PVC Orange Pipe (15mm) 200 pcs 52 10400

f. PVC Orange Pipe Elbow (15mm) 30 pcs 15 450

g. 3.5mm2 THHN wire Duraflex 250 m 13.2 3300

h. 8.0mm2 THHN wire Duraflex 31 m 32 992

i. 22.0mm2 THHN wire Duraflex 31 m 79 2449


j. Electrical Accessories 1 lot 5000 5000
LIGHTING FIXTURES
a. Pinlights 71 pcs 349 24779
b. Center Light 11 pcs 1899 20889
c. Wall Lamp 2 pcs 900 1800
d. Drop Light at Bar Counter 1 pcs 2500 2500
DEVICES
a. Convenience Outlet 33 pcs 130 4290

b. Weather Proof Convenience Outlet 7 pcs 645 4515


c. 1 gang Switch 5 pcs 80 400
d. 2 gang Switch 13 pcs 110 1430
e. 3 gang Switch 3 pcs 150 450
f. 3-way Switch 4 pcs 218 872
g. ACU Outlet 4 pcs 135 540
h. CATV Outlet 6 pcs 231 1386
SUB-TOTAL 92180

DIV. 09 PLUMBING WORKS Qty Unit Unit Price (Mtls) Amount


FIXTURES AND ACCESORIES
a. Water Closet and Lavatory Set with complete accessories 3 sets 12600 37800
b. Angle Valve 3 pcs 315 945
c. Floor Drain 8 pcs 260 2080
d. PVC P-trap 5 pcs 290 1450
e. Kitchen Faucet 2 pcs 1900 3800
f. Kitchen Sink with complete accessories 2 pcs 2840 5680
g. Shower Set with complete accessories 3 pcs 2400 7200
h. Hose Bibb 3 pcs 320 960
i. Teflon Tape 5 pcs 32 160

WATER LINE AND ROUGHING-INS


a. PVC Pipe 1/2"⌀ x 3m. 18 pcs 127 2286
b. PVC Tee 1/2"⌀ x 1/2"⌀ WOT 40 pcs 31 1240
c. Plumbing Fittings and Accessories 1 lot 5000 5000
SEWER LINE AND ROUGING-INS
a. Septic Tank 1 lot 40000 40000
b. PVC Pipe 4"⌀ x 6m. 5 pcs 3200 16533.333
c. PVC Pipe 2"⌀ x 6m. 10 pcs 1120 11573.333
d. Plumbing Fittings and Accessories 1 lot 5000 5000

SUB-TOTAL 141707.67

DIV. 10 SPECIALTY WORKS Qty Unit Unit Price (Mtls) Amount


EARTHWORKS
a. Steel Railings at Staircase 1 lot 47000 47000
b. Steel Railings at Balcony (FA) 1 lot 40000 40000
c. Steel Railings at Balcony (MB) 1 lot 44000 44000
SUB-TOTAL 131000