Feasibility Study Cum List of Equipment, Tooling and Testing Requirement
Feasibility Study Cum List of Equipment, Tooling and Testing Requirement
Feasibility Review:
S.NO. ITEM/CONCERN Yes
Material Plan:
Material
S. No. Model Number
grade
1
2
3
4
5
Equipment Plan:
Availability
S. No. Equipment Required
Y/N
1
2
3
4
5
Tool/Fixture Plan:
Availability
S. No. Tooling Required
Y/N
1
2
3
4
5
PDI Specifications:
Drawing
S. No. Characteristics Identified
Number
1
2
3
4
5
Conclusion
Feasible Product can be produced as specified wit
Sign-Off Sign-Off
No NA Comments / Action
Machine Tooling’s Remarks
RM Availability
Target Date
Supplier Y/N
Remarks