OF4E TRCD Progress Test11 U21&22
OF4E TRCD Progress Test11 U21&22
1 All three cellists in the ............ had worked in Berlin at some point in their careers.
A gig B orchestra C choir
3 ............... being tired after their long flight, the band played brilliantly.
A Although B Despite C While
4 The ............ of a historic building can cost millions of pounds every year.
A uptake B upside C upkeep
6 Many people prefer to drive to work ............ their journey takes longer.
A even if B in spite of C even so
7 Several members of other bands came back on stage to ............ in with the final song.
A add B join C mix
8 The building is 18 ............ high and has fantastic views of the city.
A levels B flights C storeys
12 The TransMilenio is a rapid bus ............ in Bogotà, Colombia, that currently has eleven lines.
A project B method C system
13 Béla Bartók was a Hungarian ............ who based a lot of his pieces on folk music.
A composer B author C editor
OBJECTIVE FIRST FOURTH EDITION – THIS PAGE MAY BE PHOTOCOPIED © CAMBRIDGE UNIVERSITY PRESS and UCLES 2014
1 progress test
14 I wish you would ............ your decision – the festival needs your organisational skills.
A rewrite B reconsider C replace
15 A cover ............ is a recording of a song that has already been recorded by someone else.
A copy B model C version
16 The new ............ centre provides language classes and legal advice for residents.
A shopping B community C arts
19 The famous opera singer Cecilia Bartoli has ............ all over the world.
A played B presented C performed
23 After Anna sang her solo, the entire theatre ............ got to their feet and clapped.
A army B crowd C audience
24 If the weather conditions hadn’t improved, there would be food ........... now.
A absences B failures C shortages
25 Crime ............ have come down significantly since the city centre was regenerated.
A degrees B rates C sums
OBJECTIVE FIRST FOURTH EDITION – THIS PAGE MAY BE PHOTOCOPIED © CAMBRIDGE UNIVERSITY PRESS and UCLES 2014
2 progress test