Method Statement Plastering
Method Statement Plastering
FOR PLASTERING
1. Scope:
This procedure relates the plastering activities and these required properties including
mortar and reinforcement accessories.
2. REFERENCE DOCUMENTS
Documents establish by the contractor
A. Execution documents (SBG/SENLABO BTP)
Dar specifications 09220
Material test report
Design mix of mortar
6 MANPOWER
Site engineer
Surveyor
Foreman
Masons
Helpers/ labors
7 MASONRY EQUIPMENT
scaffoldings with complete accessories and approved by the engineer
Tooling of masonry (trowel, plumb line, and hammer, Ruler, niveau….)
Mortar contains, Brush, sponge
Mortar mixer
Material
Approved and tested sand
Cement
Admixture
Reinforcement and accessories